CN206208030U - A kind of Isa furnace lead smelting high lead slag slag chute - Google Patents
A kind of Isa furnace lead smelting high lead slag slag chute Download PDFInfo
- Publication number
- CN206208030U CN206208030U CN201621236091.XU CN201621236091U CN206208030U CN 206208030 U CN206208030 U CN 206208030U CN 201621236091 U CN201621236091 U CN 201621236091U CN 206208030 U CN206208030 U CN 206208030U
- Authority
- CN
- China
- Prior art keywords
- slag
- slag chute
- chute
- lead
- isa furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
The utility model is related to a kind of Isa furnace lead smelting high lead slag slag chute, belong to lead and smelt metallurgical equipment invention application technology, described Isa furnace lead smelting high lead slag slag chute includes slag chute A, slag chute B, slag chute C, described slag chute A is connected with slag chute B using flange, slag chute C has 4, between 4 is sequentially connected using flange;The utility model can meet the high lead slag conveying of Isa furnace lead smelting generation;Adapt to the technological requirement that Isa furnace lead smelting high lead slag is delivered to reduction furnace;High lead slag slag chute is combined water-cooled buried tube type cast copper slag chute, can meet slag conveying space requirement between Isa furnace and reduction furnace, quick for installation, lightly;Water-cooled is simple to operate, and heat exchange is fast;Buried tube type Copper Water Jacket, compact conformation, reliability is high;Simple structure, the characteristics of stable.
Description
Technical field
The utility model belongs to lead and smelts metallurgical equipment invention application technology, specifically, is related to a kind of Isa furnace lead to melt
Refining high lead slag slag chute.
Background technology
In Isa furnace lead smelting process, the high temperature of Isa furnace lead smelting grey slag high need to be delivered to reduction furnace through slag chute
Carry out further reducing and smelting technique.Because the high temperature of Isa furnace melting grey slag temperature high is high, lead ratio is great, and slag chute is washed away
Greatly;To the frequent scaling loss of existing use cast iron slag chute, influence Isa furnace, reduction furnace effective operation time cause and cause to run slag accident,
And there is larger safe major hidden danger.
The content of the invention
In order to overcome problem present in background technology, the utility model can meet Isa furnace lead smelting work there is provided one kind
The novel slag chute of skill high temperature high lead slag conveying.
To achieve the above object, the utility model is achieved by the following technical solution:
Described Isa furnace lead smelting high lead slag slag chute includes slag chute A1, slag chute B2, slag chute C3, slag chute
It is built-in type compulsory circulative cooling water copper pipe 4 that A1, slag chute B2, slag chute C are internal, and outside is cast copper opening trench structure
The buried tube type forced circulation water cooling copper water nested structure of slag chute 5, slag chute A1 is provided with two in 90 ° of slag notches I of angle
6th, slag notch II 7, described slag chute C3 has four, slag chute A1 and slag chute B2, slag chute B2 and slag chute C3, slag chute
It is sequentially connected using flange between C3 and slag chute C3.
Further, described Isa furnace lead smelting high lead slag slag chute is installed on Isa furnace slag tap and reduction furnace entrance
Between, its setting angle is 10 °.
Further, the built-in type compulsory circulative cooling water copper buried in described slag chute A1, slag chute B2, slag chute C3
Pipe 4 is the T2 copper pipes of non junction Φ 46 × 8 of melting copper water casting, the cooling water copper pipe structure exported using triple feed inlet three.
Further, 5mm thickness wear-resistant alloy layers are welded with the slag notch I 6 of described slag chute A1, slag notch II 7.
Further, in the bottom interior wall of described slag chute A1 the fissure of displacement be inlaid with one layer of length × width × height for 240mm ×
The refractory brick of 110mm × 75mm, is inlaid with one layer of length × width × height for 240mm × 110mm × 75mm on the side wall of slag chute A1
Refractory brick.
Further, described slag chute B2, the trough rim of slag chute C3 are that to use length × width × height be 240mm × 110mm
The parallel protective layer built by laying bricks or stones of refractory brick full sized brick of × 75mm, the groove arc of described slag chute B2 is one section of 800mm long and weldering
5mm thickness wear-resistant alloy layer arc ditches are connect, plasticity material protective layer is painted with the bottom land inwall of slag chute B2.
Further, the junction of described slag chute B2 and slag chute A1 is designed as -10 ° of flange connection surface.
The beneficial effects of the utility model:
1. high lead slag slag chute can meet the high lead slag conveying of Isa furnace lead smelting generation;Adapt to Isa furnace lead smelting high
Lead skim is delivered to the technological requirement of reduction furnace.
2. high lead slag slag chute is combined water-cooled buried tube type cast copper slag chute;Combined type is easy for installation, can meet Chinese mugwort Sa
The requirement of slag conveying space, quick for installation between stove and reduction furnace, lightly;Water-cooled is simple to operate, and heat exchange is fast;Buried tube type copper water
Set, compact conformation, reliability is high, and processing and fabricating is convenient.
3. the utility model also has simple structure, the characteristics of stable.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is the structural representation of the utility model slag chute A;
Fig. 4 is the front view of the utility model slag chute B;
Fig. 5 is the top view of the utility model slag chute B;
Fig. 6 is the sectional drawing of the utility model slag chute B;
Fig. 7 is the front view of the utility model slag chute C;
Fig. 8 is the utility model slag chute C top views;
Fig. 9 is the sectional drawing of the utility model slag chute C.
In figure, 1- slag chute A, 2- slag chute B, 3- slag chute C, 4- built-in type compulsory circulative cooling water copper pipes, 5- cast coppers
Be open trench structure slag chute, 6- slag notches I, 7- slag notches II.
Specific embodiment
In order that the purpose of this utility model, technical scheme and beneficial effect are clearer, below in conjunction with accompanying drawing, to this
The preferred embodiment of utility model is described in detail, to facilitate the technical staff to understand.
As shown in figs 1-9, described Isa furnace lead smelting high lead slag slag chute includes that slag chute A1, slag chute B2, slag are slipped
Groove C3, slag chute A1, slag chute B2, slag chute C is inside is built-in type compulsory circulative cooling water copper pipe 4, and outside is cast copper
The buried tube type forced circulation water cooling copper water nested structure of opening trench structure slag chute 5, slag chute A1 is provided with two in 90 ° of folders
The slag notch I 6 at angle, slag notch II 7, slag notch I 6 are the urgent slagging passage of Isa furnace slag, and slag machine is cast in slagging to straight line;Slag notch
II 7 is the normal slagging passage of Isa furnace slag, is the main part of this slag chute.Described slag chute C3 has four, slag chute
It is sequentially connected using flange between A1 and slag chute B2, slag chute B2 and slag chute C3, slag chute C3 and slag chute C3.
Described Isa furnace lead smelting high lead slag slag chute is installed between Isa furnace slag tap and reduction furnace entrance, its peace
Dress angle is 10 °, is easy to the flowing of Isa furnace high lead slag, Isa furnace high lead slag is successfully flowed into reduction furnace entrance.
The built-in type compulsory circulative cooling water copper pipe 4 buried in described slag chute A1, slag chute B2, slag chute C3 is melting
The T2 copper pipes of non junction Φ 46 × 8 of copper water casting, the cooling water copper pipe structure exported using triple feed inlet three, it is ensured that slag chute A1,
The cooling effect of high lead slag, meets technical cooling requirement in slag chute B2, slag chute C3, often saves slag chute design triple feed inlet three and goes out
Mouth cooling water copper pipe, meets technical cooling requirement.
5mm thickness wear-resistant alloy layers are welded with the slag notch I 6 of described slag chute A1, slag notch II 7, due to slag chute
The slag notch I 6 of A1, the exit of slag notch II 7 are that frequent section is washed away in slag flowing, so setting 5mm thickness wear-resistant alloy layers, can be prolonged
The service life of long slag chute A1, it is ensured that production efficiency.
In the bottom interior wall of described slag chute A1 the fissure of displacement be inlaid with one layer of length × width × height for 240mm × 110mm ×
The refractory brick of 75mm, is inlaid with the fire resisting that one layer of length × width × height is 240mm × 110mm × 75mm on the side wall of slag chute A1
Brick, it is considered to during Isa furnace slagging, high temperature high lead slag(1100 DEG C of temperature, lead tolerance 56%)Slag chute A1 is flowed into, there is high temperature sludge liquid
Slag chute A1 is washed away, makes its wear extent big, therefore the design inlays one layer of length × width × height for 240mm in the walls of slag chute A1 tetra-
The refractory brick of × 110mm × 75mm, the bottom fissure of displacement inlays the refractory brick that one layer of length × width × height is 240mm × 110mm × 75mm,
Reduce the abrasion of slag stream and wash away, more preferable covering slag chute A1.
Described slag chute B2, the trough rim of slag chute C3 are use length × width × height for 240mm × 110mm × 75mm resistance to
The parallel protective layer built by laying bricks or stones of firebrick full sized brick, the groove arc of described slag chute B2 is one section of 800mm long and welding 5mm thickness is wear-resisting
Alloy-layer arc ditch, is painted with plasticity material protective layer on the bottom land inwall of slag chute B2;The plasticity bed of material washes away mill during use
After damage can conveniently, in time, quickly apply mend, reduce slag stream abrasion and wash away, more preferable covering slag chute B2, slag chute
C3.Found through during use, the groove face erosive wear of slag chute B2 is the most serious, therefore slag chute B2 groove faces cambered design is one
The welding 5mm thickness wear-resistant alloy layers of segment length 800mm, covering slag chute B2 extends its service life.Because of slag chute B2 and slag chute
C3 is installed on 10 ° of technological datum face, is connected with the installation of slag chute A1 for ease of slag chute B2, therefore slag chute B2 is slipped with slag
Groove A1 junctions are designed as -10 ° of flange connection surface.
The course of work of the present utility model:
The slag notch I 6 of Isa furnace lead smelting high lead slag slag chute is connected with Isa furnace slag tap, the outlet of slag chute C3
End be connected with reduction furnace entrance, and ensure Isa furnace lead smelting high lead slag slag chute setting angle be 10 °, Isa furnace high lead slag
Slag chute A1 is entered by slag notch I 6 from Isa furnace slag tap, slag chute B2 is then passed to, then flow to slag chute C3, by slag chute
C3 is flowed into reduction furnace.
Finally illustrate, preferred embodiment above is only used to illustrate the technical solution of the utility model and unrestricted, to the greatest extent
Pipe is described in detail by above preferred embodiment to the utility model, but those skilled in the art should manage
Solution, can make various changes, without departing from the utility model claims institute to it in the form and details
The scope of restriction.
Claims (7)
1. a kind of Isa furnace lead smelting high lead slag slag chute, it is characterised in that:Described Isa furnace lead smelting high lead slag slag chute
Including slag chute A(1), slag chute B(2), slag chute C(3), slag chute A(1), slag chute B(2), slag chute C(3)It is inside
It is built-in type compulsory circulative cooling water copper pipe(4), outside is cast copper opening trench structure slag chute(5)Buried tube type forced circulation
Water cooling copper water nested structure, slag chute A(1)Two are provided with 90 ° of slag notches I of angle(6), slag notch II(7), it is described
Slag chute C(3)There are four, slag chute A(1)With slag chute B(2), slag chute B(2)With slag chute C(3), slag chute C(3)With slag
Chute C(3)Between be sequentially connected using flange.
2. a kind of Isa furnace lead smelting high lead slag slag chute according to claim 1, it is characterised in that:Described Isa furnace
Lead smelting high lead slag slag chute is installed between Isa furnace slag tap and reduction furnace entrance, and its setting angle is 10 °.
3. a kind of Isa furnace lead smelting high lead slag slag chute according to claim 1, it is characterised in that:Described slag chute
A(1), slag chute B(2), slag chute C(3)The built-in type compulsory circulative cooling water copper pipe for inside burying(4)It is the nothing of melting copper water casting
The T2 copper pipes of joint Φ 46 × 8, the cooling water copper pipe structure exported using triple feed inlet three.
4. a kind of Isa furnace lead smelting high lead slag slag chute according to claim 1, it is characterised in that:Described slag chute
A(1)Slag notch I(6), slag notch II(7)Place is welded with 5mm thickness wear-resistant alloy layers.
5. a kind of Isa furnace lead smelting high lead slag slag chute according to claim 1,3 or 4, it is characterised in that:Described
Slag chute A(1)Bottom interior wall on the fissure of displacement be inlaid with one layer of length × width × height be 240mm × 110mm × 75mm refractory brick, slag
Chute A(1)Side wall on be inlaid with one layer of length × width × height be 240mm × 110mm × 75mm refractory brick.
6. a kind of Isa furnace lead smelting high lead slag slag chute according to claim 1 or 3, it is characterised in that:Described slag
Chute B(2), slag chute C(3)Trough rim be to use length × width × height parallel for the refractory brick full sized brick of 240mm × 110mm × 75mm
The protective layer built by laying bricks or stones, described slag chute B(2)Groove arc be one section of 800mm long and welding 5mm thickness wear-resistant alloy layer arcs
Ditch, slag chute B(2)Bottom land inwall on be painted with plasticity material protective layer.
7. a kind of Isa furnace lead smelting high lead slag slag chute according to claim 2, it is characterised in that:Described slag chute
B(2)With slag chute A(1)Junction be designed as -10 ° of flange connection surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621236091.XU CN206208030U (en) | 2016-11-18 | 2016-11-18 | A kind of Isa furnace lead smelting high lead slag slag chute |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621236091.XU CN206208030U (en) | 2016-11-18 | 2016-11-18 | A kind of Isa furnace lead smelting high lead slag slag chute |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206208030U true CN206208030U (en) | 2017-05-31 |
Family
ID=58749437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621236091.XU Active CN206208030U (en) | 2016-11-18 | 2016-11-18 | A kind of Isa furnace lead smelting high lead slag slag chute |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206208030U (en) |
-
2016
- 2016-11-18 CN CN201621236091.XU patent/CN206208030U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9829250B2 (en) | Fluid cooled lances for top submerged injection | |
CN105737614B (en) | For the spray gun of side-blown submerged combustion molten bath metallurgy stove and with its metallurgical furnace | |
CN204770627U (en) | Packing is put in middle of single current passageway formula induction heating bend pipe type passageway | |
CN207365710U (en) | A kind of metallurgical equipment, metallurgical slag exhaust system and its chute | |
KR100823014B1 (en) | Tap hole cooling structure | |
CN206208030U (en) | A kind of Isa furnace lead smelting high lead slag slag chute | |
CN103245192A (en) | Medium-frequency induction furnace and blast furnace and medium-frequency induction furnace combined smelting system | |
CN103966381B (en) | A kind of device promoting Gas Flow reasonable layout in shaft furnace | |
CN205300256U (en) | Metallurgical stove brickwork structure | |
CN205635677U (en) | Converter armor formula oxygen rifle | |
CN203999676U (en) | A kind of converter divides slag water conservancy diversion skirtboard device | |
CN107151719A (en) | A kind of blast furnace crucibe | |
CN208588245U (en) | A kind of Copper steel cladding water jacket | |
CN205170949U (en) | Electromagnetic propulsion formula aluminium bits recovery unit | |
CN206645999U (en) | A kind of clarification structure for 3D glass furnace ears pond | |
CN105486093A (en) | Casting copper water jacket | |
CN205362644U (en) | Be favorable to casting novel slag chute of sediment | |
CN215050600U (en) | Molten pool smelting furnace slag notch protection device | |
CN202599121U (en) | Cast copper molten metal jacket with large-area surfaced wear-resistant and heat-resistant alloy | |
CN207247886U (en) | A kind of integral type smelting equipment | |
CN205642011U (en) | Unobstructed smelting furnace slagging chute flows | |
CN206215901U (en) | The multi-functional chute device of ferroalloy with fixed ladle | |
CN204514047U (en) | Bottom convertor charge door protective device | |
CN114774603B (en) | Recycling system of high-temperature radiant heat of blast furnace tapping channel | |
CN201731763U (en) | Electric furnace with self-protection furnace wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |