CN206204899U - Power station - Google Patents
Power station Download PDFInfo
- Publication number
- CN206204899U CN206204899U CN201621304209.8U CN201621304209U CN206204899U CN 206204899 U CN206204899 U CN 206204899U CN 201621304209 U CN201621304209 U CN 201621304209U CN 206204899 U CN206204899 U CN 206204899U
- Authority
- CN
- China
- Prior art keywords
- generator
- channel
- passage
- impeller
- water inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 79
- 230000007423 decrease Effects 0.000 claims description 3
- 108091006146 Channels Proteins 0.000 claims 13
- 102000010637 Aquaporins Human genes 0.000 claims 1
- 108010063290 Aquaporins Proteins 0.000 claims 1
- 238000005381 potential energy Methods 0.000 abstract description 5
- 230000005611 electricity Effects 0.000 description 3
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
The utility model provides a kind of power station, including water inlet, first passage, second channel, third channel, the first generator, the second generator and the 3rd generator;First generator is arranged on first passage and water inlet junction, first passage has the first arc area with second channel junction, second generator includes the axle of impeller and connection impeller, wherein while corresponding with first passage, half is located in the first arc area impeller with axle as boundary in addition;3rd generator is set with respect to third channel.Impeller on the generator of the utility model water slug first drives the first electrical power generators, water impact in the first arc area having by first passage and second channel junction is arranged on the second generator impeller of intersection and then drives the second electrical power generators, so water continues to impact the impeller of the 3rd generator so as to drive the 3rd electrical power generators, the multiple generators of setting so step by step contribute to potential energy sufficiently using water, practical.
Description
Technical field
The utility model is related to a kind of power station, particularly it is a kind of can step by step using water energy power station.
Background technology
Water-power plant is the power station that the kinetic energy that the powerful current produced using water-head are had is generated electricity, referred to as
" power station ", the industrial enterprise for promoting the hydraulic turbine to drive generating set using the water energy in river and generating electricity, advantage:Without fuel,
Low cost, free from environmental pollution, electromechanical equipment be simple to manufacture, operate flexibly etc., at the same generating hydraulic structure can with flood control, fill
Irrigate, feed water, shipping, the cause such as cultivation are combined, carrying out water resource comprehensive utilization, but power station when using water energy also
Being can a large amount of water energy loss.
Utility model content
Problem to be solved in the utility model is directed to the above-mentioned deficiency in the presence of prior art and provides a kind of water power
Station contributes to potential energy sufficiently using water.
To achieve the above object, the utility model employs following technical scheme:Power station, including water inlet, first
Passage, second channel, third channel, the first generator, the second generator and the 3rd generator;The water inlet, first passage,
Second channel and third channel are sequentially communicated, the vertical first passage of the water inlet, the first passage vertical described the
Two passages, the vertical third channel of the second channel;First generator be arranged on the first passage with it is described enter
Mouth of a river junction, the first passage has the first arc area, the second generator bag with the second channel junction
Include impeller and connect the axle of the impeller, the impeller with the axle as boundary is wherein while relative with the first passage
Should, half is located in first arc area in addition;The relatively described third channel of 3rd generator is set.
Further, the water inlet is circular water inlet, and the water inlet wraps up the water inlet of the first passage, described
Between water inlet top is provided with the first generator operation, the main shaft of first generator stretches out between first generator operation
And towards the first passage, impeller is installed on the main shaft.
Further, plate and pipelined channel are provided with first arc area, the impeller of second generator is located at institute
State plate top, the pipelined channel be located at the lower section of the plate and connect first arc area by wall and described second
Passage.
Further, fourth lane and Five-channel are also provided with after the third channel and generator is respectively provided with, institute
State fourth lane and Five-channel is similar with the second channel and third channel respectively.
Further, first generator, the second generator and the 3rd generator power successively decrease successively.
Compared to prior art, the utility model has the advantages that:The utility model water enters from the water inlet
The first passage, second channel and third channel, the leaf that water impacts on first generator at first are sequentially entered after entering
Wheel drives first electrical power generators, by the water after the impeller on first generator continue along the first passage to
The second channel vertical with the first passage is flowed down and enters into, water is logical with described second by the first passage
Impact is arranged on the impeller of second generator of intersection and then drives institute during the first arc area that road junction has
The second electrical power generators are stated, second generator includes the impeller of the second generator and connects the leaf of second generator
The axle of wheel, wherein while corresponding with the first passage, half is located at described the impeller with the axle as boundary in addition
In first arc area, when water is past to flow down, current just impact the impeller of wherein one half of second generator so as to drive
The impeller rotation of second generator, but first arc area is set to arc with convenient installation in intersection
Second generator, still further aspect can also be easy to guiding water to be flowed into the second channel to be helped to reduce flow of water energy loss
Lose, when water is flowed into the third channel from the second channel, due to the relatively described third channel of the 3rd generator
Set, so water continues to impact the impeller of the 3rd generator so as to drive the 3rd electrical power generators, so step by step
The multiple generators of the setting potential energy that contributes to sufficiently using water, it is practical.
Brief description of the drawings
A kind of power station structural representation that Fig. 1 is provided for the utility model.
Fig. 2 is the utility model the first arc area structural representation.
Fig. 3 is a kind of power station sectional view of the utility model.
Specific embodiment
In order that technological means, creation characteristic, reached purpose that the utility model is realized more understand and are easy to effect
Understand, the utility model is further elaborated with reference to the accompanying drawings and detailed description:
The utility model proposes a kind of power station, including water inlet 1, first passage 2, second channel 3, third channel 4,
First generator 5, the second generator 6 and the 3rd generator 7;The water inlet 1, first passage 2, second channel 3 and threeway
Road 4 is sequentially communicated, the vertical first passage 2 of the water inlet 1, and the vertical second channel 3 of the first passage 2 is described
The vertical third channel 4 of second channel 3;First generator 5 is arranged on the first passage 2 and is handed over the water inlet 1
Place is met, the first passage 2 has the first arc area 8 with the junction of the second channel 3, and second generator 6 includes
The axle of impeller and the connection impeller, the impeller with the axle as boundary is wherein while relative with the first passage 2
Should, half is located in first arc area 8 in addition;The relatively described third channel 4 of 3rd generator 7 is set.
The water inlet of the present utility model as power station water inlet, river, lake water or seawater are from the water inlet
Mouth enters, and water is sequentially entered to the first passage, second channel and third channel, due to described from after water inlet entrance
First generator is arranged on the first passage and the water inlet junction, so when water enters fashionable from the water inlet, water
The impeller impacted at first on first generator drives first electrical power generators, by the leaf on first generator
Water after wheel continues along the first passage to flowing down and entering the second channel vertical with the first passage, and water exists
Impact is arranged on the institute of intersection during the first arc area having with the second channel junction by the first passage
State the impeller of the second generator and then drive second electrical power generators, second generator includes the leaf of the second generator
The axle of the impeller of second generator is taken turns and connects, the impeller with the axle as boundary is wherein while with described first
Passage is corresponding, and half is located in first arc area in addition, and when water is past to flow down, current just impact wherein one half of institute
The impeller of the second generator is stated so as to the impeller for driving second generator rotates, but first arc area is having a common boundary
Place is set to arc and installs second generator with convenient, and still further aspect can also be easy to guiding water to be flowed into described the
Two passages help to reduce the flow of water loss of energy, when water is flowed into the third channel from the second channel, due to described the
The relatively described third channel of three generators is set, so the impeller that water continues to impact the 3rd generator is described so as to drive
3rd electrical power generators, the multiple generators of setting so step by step help sufficiently to utilize the potential energy of water, practical.
As shown in figure 1, used as specific embodiment, the water inlet 1 is circular water inlet, the water inlet 1 wraps up described
The water inlet of first passage 2, just from the entrance from all directions of the first passage 2, the top of the water inlet 1 is provided with the to such water
The 9 convenient equipment for placing first generators 5 are laid between one generator operation, and the main shaft of first generator 5 is from described
9 are stretched out and towards the first passage 2 between the first generator operation, and impeller is provided with the main shaft, and water impacts institute after entering
The impeller for stating the first generator 5 drives first generator 5 to rotate so as to generate electricity.
As shown in Fig. 2 as specific embodiment, because second generator 6 includes impeller and connects the impeller
Axle, wherein while corresponding with the first passage 2, half is located at described the to the impeller with the axle as boundary in addition
In one arc area 8, so when the impeller of second generator 6 starts to rotate, first arc can be carried water into
In region 8, blocked by the impeller of second generator 6 after water is entered into first arc area 8, part water is not square
Just flow out, so being provided with plate 10 and pipelined channel 11 in first arc area 8, the impeller of second generator 6 is located at
The top of the plate 10, the pipelined channel 11 be located at the lower section of the plate 10 and connect first arc area 8 by wall at
With the second channel 3, water is from institute so after water brings the first arc area 8 into by the impeller of second generator 6
Pipelined channel 11 is stated to flow out into the second channel 3.
As shown in figure 3, as specific embodiment, when dam is highly sufficiently high, can may be used also after the third channel 4
To be provided with fourth lane 12 and Five-channel 13 and be respectively provided with generator, the fourth lane 12 and Five-channel 13 respectively with
The second channel 3 is similar with third channel 4, and passage is set successively according to dam height more, makes full use of water potential energy.
As shown in figure 1, as specific embodiment, it is contemplated that water is from the water inlet 1, first passage 2, the and of second channel 3
After third channel 4 is sequentially entered, energy is constantly losing, so first generator 5, the second generator 6 and the 3rd hair
The power of motor 7 successively decreases contribute to cost-effective successively.
Finally illustrate, above example is only used to illustrate the technical solution of the utility model and unrestricted, although ginseng
The utility model has been described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this
The technical scheme of utility model is modified or equivalent, without deviating from the objective and model of technical solutions of the utility model
Enclose, it all should cover in the middle of right of the present utility model.
Claims (5)
1. power station, it is characterised in that:Including water inlet (1), first passage (2), second channel (3), third channel (4),
One generator (5), the second generator (6) and the 3rd generator (7);The water inlet (1), first passage (2), second channel
(3) it is sequentially communicated with third channel (4), the vertical first passage (2) of the water inlet (1), the first passage (2) is vertical
The second channel (3), the vertical third channel (4) of the second channel (3);First generator (5) is arranged on institute
First passage (2) and the water inlet (1) junction are stated, the first passage (2) has with the second channel (3) junction
First arc area (8), axle of second generator (6) including impeller and the connection impeller, with the axle as boundary
The impeller wherein while corresponding with the first passage (2), half is located in first arc area (8) in addition;
The relatively described third channel (4) of 3rd generator (7) is set.
2. power station according to claim 1, it is characterised in that:The water inlet (1) is circular water inlet, the water inlet
(1) water inlet of the first passage (2) is wrapped up, it is described between being provided with the first generator operation above the water inlet (1) (9)
The main shaft of the first generator (5) stretches out and towards the first passage (2), the master from (9) between first generator operation
Impeller is installed on axle.
3. power station according to claim 1, it is characterised in that:Plate (10) and stream are provided with first arc area (8)
Aquaporin (11), the impeller of second generator (6) is located at the plate (10) top, and the pipelined channel (11) is positioned at described
The lower section of plate (10) and connect first arc area (8) by wall and the second channel (3).
4. power station according to claim 1, it is characterised in that:Fourth lane (12) is additionally provided with after the third channel (4)
With Five-channel (13) and be respectively provided with generator, the fourth lane (12) and Five-channel (13) are logical with described second respectively
Road (3) is similar with third channel (4).
5. power station according to claim 1, it is characterised in that:First generator (5), the second generator (6) and
Three generators (7) power successively decreases successively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621304209.8U CN206204899U (en) | 2016-11-30 | 2016-11-30 | Power station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621304209.8U CN206204899U (en) | 2016-11-30 | 2016-11-30 | Power station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206204899U true CN206204899U (en) | 2017-05-31 |
Family
ID=58754158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621304209.8U Expired - Fee Related CN206204899U (en) | 2016-11-30 | 2016-11-30 | Power station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206204899U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114262107A (en) * | 2022-01-17 | 2022-04-01 | 西安建筑科技大学 | A bury formula sewage multi-stage treatment device for urban garden |
-
2016
- 2016-11-30 CN CN201621304209.8U patent/CN206204899U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114262107A (en) * | 2022-01-17 | 2022-04-01 | 西安建筑科技大学 | A bury formula sewage multi-stage treatment device for urban garden |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100960032B1 (en) | Wind-Hydro Power Generating method | |
CN206110073U (en) | Multi -functional full through -flow lock chamber pump station | |
CN206204899U (en) | Power station | |
CN203394678U (en) | Direct hydro-generator | |
CN108223243A (en) | A kind of intelligent hydroelectric system based on classification generation mode | |
CN207959118U (en) | A kind of multi-functional flood control case of hydraulic engineering | |
CN202732206U (en) | Hydraulic gravity power generation device | |
CN205567081U (en) | Pumping system is removed in complementary integration of wind light storage | |
CN205559171U (en) | Multipotency source system of irrigating by lifting water to a higher level with a water pump, etc based on irrigate by lifting water to a higher level with a water pump, etc. efficiency | |
CN208416771U (en) | A kind of low head water wheel generating set | |
CN204299780U (en) | Solar energy draws water elevated storage electricity generating device | |
CN203515923U (en) | River stream hydraulic blade runner electricity generation drive motor | |
CN203604103U (en) | Pipe-laying type hydroelectric power facility | |
CN114458518A (en) | High-efficient water kinetic energy carousel formula generating set | |
CN204511754U (en) | The unit of chain transmission water wheel dynamic power | |
WO2014000349A1 (en) | Water turbine and power station with same | |
JPS59136579A (en) | Irrigation canal installing type hydraulic power plant | |
CN103397977A (en) | Pipeline-laying type hydroelectric generation method and electric generation facility thereof | |
CN204610127U (en) | The unit of belt transmission water wheel dynamic power | |
JP2004068655A (en) | Constant-water open type water wheel generation device | |
CN219753161U (en) | Integrated water turbine gate | |
CN107750567A (en) | A kind of integrated mobile pumping system that can realize scene storage complementary function | |
CN204511753U (en) | The unit of gear transmission water wheel dynamic power | |
CN203594553U (en) | Small-fall water wheel generator with double water outlets | |
CN204239130U (en) | To the unit of wheel transmission water wheel dynamic power |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170814 Address after: B1-25-27 76 Building No. 401121 north of the city of Chongqing new hi tech Park Avenue Patentee after: YUNENG (GROUP) CO.,LTD. Address before: 401120 Chongqing city Yubei District Longxi Street Zihyuan Road No. 116 Ding Tai 1 apartment 2-5-1 Patentee before: CHONGQING DINGTAI ENERGY (Group) Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170531 |
|
CF01 | Termination of patent right due to non-payment of annual fee |