CN206203631U - The modular construction of cage built-in system decoration - Google Patents

The modular construction of cage built-in system decoration Download PDF

Info

Publication number
CN206203631U
CN206203631U CN201621116098.8U CN201621116098U CN206203631U CN 206203631 U CN206203631 U CN 206203631U CN 201621116098 U CN201621116098 U CN 201621116098U CN 206203631 U CN206203631 U CN 206203631U
Authority
CN
China
Prior art keywords
plaque
group
cage
piece
modular construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621116098.8U
Other languages
Chinese (zh)
Inventor
王群文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621116098.8U priority Critical patent/CN206203631U/en
Application granted granted Critical
Publication of CN206203631U publication Critical patent/CN206203631U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a kind of modular construction of cage built-in system decoration, wherein be assembled in the modular construction in each face wall face in cage mainly include more than at least a piece of can Quick connecting plaque, and coordinate L-shaped panel, skirting board, plaque support base bar, the component such as side seal panel and top panel, the upper and lower ends edge of each plaque is respectively formed with one group and connects groove and group connects convex portion respectively, so that the group of ora terminalis connects convex portion and can connect groove with the group of each plaque upper edge and is mutually assembled and forms a metope under each plaque, the various types of materials of required size can be first got out in factory according to the size of each cage, can be to site operation, and simple and convenient assembly, quickly, the engineering time can be greatly decreased and wage cost is reduced.

Description

The modular construction of cage built-in system decoration
Technical field
The utility model is related to a kind of modular construction of cage built-in system decoration, and espespecially one kind can be quick with multi-disc The plaque that group connects, and coordinate the components such as L-shaped panel, skirting board, plaque support base bar, side seal panel and top panel, can be according to The size of each cage can first get out the various types of materials of required size in factory, you can to site operation, and simple and convenient assembly, Quickly, the engineering time can be greatly decreased and wage cost is reduced, and shortens the cage built-in system for taking the elevator engineering time The Modular Structure Design of decoration.
Background technology
Press, at present because of the shortage of manpower, along with pay rise, various carpenters, mud do, the cost of electrician and carrying also therewith Go up, and be mostly that after the completion of G- Design is designed, then the dealer that please decorate is by all kinds of materials at present in the decoration of cage inner wall surface Material and instrument are loaded onto scene, and in after the actual size of scene amount elevator inner wall surface processed, then scene cuts material and constructed, because often The space size of one job site is different, and resident family visitor comes in and goes out and uses elevator quite frequent, in addition to construction inconvenience is caused, also draws The time of construction long, construction cost increase is in turn resulted in, and the normal operation of construction period influence elevator also results in resident family and visit The inconvenience of visitor, and construction finishes and also needs to be cleared up in the rubbish produced by the surplus material at scene, instrument and construction, actually industry Person and the difficulty of client.
Utility model content
The purpose of this utility model is to provide a kind of modular construction of cage built-in system decoration, solves existing skill Above-mentioned technical problem present in art.
To achieve the above object, the technical solution adopted in the utility model is:
A kind of modular construction of cage built-in system decoration, it is mainly each face wall face assembling one in cage Modularization assembling metope, it is characterised in that:
The modularization assembling metope mainly includes at least a piece of plaque, skirting board, plaque support base bar and top panel, Wherein skirting board then sets a plaque support base bar located at the bottommost of each metope of cage in the upper set of skirting board, should Plaque support base bar is L-shaped, and is extended with a L-shaped horizontal supporting portion, the water of the L-shaped near hypomere in plaque support base bar The outer end of flat supporting part is formed with block edge, and then formation one is available for plaque at the top of the horizontal supporting portion of plaque support base bar Embedding group of group-embedded groove, the first embedding group of group-embedded groove in the plaque support base bar of a piece of plaque, then sequentially group is connected to less a piece of plaque Covered with by the metope in cage, the upper and lower ends edge of each plaque is respectively formed with one group and connects groove and group connects convex portion, with Enable the group of ora terminalis under each plaque to connect convex portion and the group of each plaque upper edge and connect groove to be mutually assembled and form a metope, Between ceiling in the last a piece of plaque in top and cage also group set one as ending top panel, the top panel Assemble and completely fill up ending with by the last a piece of plaque in last a piece of plaque top.
The modular construction of the cage built-in system decoration, wherein:Groove is connect by cage in the group of each plaque The madial wall of metope connects the lateral wall of groove higher than group, and is provided with lockhole on the madial wall, is assembling the structure of each plaque In, it is fixed on cage inner wall surface with by each plaque lock group through lockhole by screw, and can be by after each plaque group connects The screw is covered to be hidden, and the hypomere of top panel is formed with strip depression ornamental portion, strip depression ornamental portion group The gap position that the medial and lateral wall of groove is formed is connect assigned in last a piece of plaque top group, the last a piece of plaque is complete It is whole to fill up ending.
The modular construction of the cage built-in system decoration, wherein:It is oblique one to be also formed with below the panel of top Raised line, the inclined-plane of the oblique raised line can the group that enters at the top of last a piece of plaque of insert group connect groove.
The modular construction of the cage built-in system decoration, wherein:Also include ㄇ type side seal panels, constitute module Change the plaque support base bar of assembling metope, the both sides of the structure that at least a piece of plaque and top panel are completed respectively to be assembled with The one ㄇ type side seal panels.
The modular construction of the cage built-in system decoration, wherein:Also include L-shaped panel, it is every in cage One corner bending place group is provided with the L-shaped panel.
The modular construction of the cage built-in system decoration, wherein:It is wherein a piece of in each modularization assembling metope Handrail is provided with plaque.
The modular construction of the cage built-in system decoration, wherein:The height of each plaque is various different heights Size.
The modular construction of the cage built-in system decoration, wherein:L-shaped panel, skirting board, plaque support base Bar, side seal panel and top panel are made of with metal, timber, plastic cement or composite.
The modular construction of the cage built-in system decoration, wherein:Skirting board is integrated with plaque support base bar Shaping.
Major advantage of the present utility model is, with multi-disc can Quick connecting plaque, and coordinate L-shaped panel, skirting board, The components such as plaque support base bar, side seal panel and top panel constitute modularization assembling metope, can be according to the size of each cage It is directly into site operation and simple and convenient assembly, quick after factory can first get out the various types of materials of required size, can be significantly Reduce the engineering time and reduce wage cost, and shorten the occupancy elevator engineering time.
Brief description of the drawings
Fig. 1 be the utility model attempt one of which in cage inner wall surface carry out modularization assembling metope embodiment office Cut open and show three-dimensional exploded view in portion.
Fig. 2 is the sectional drawing after the utility model modularization assembling metope is completed.
Fig. 3 is the three-dimensional exploded view of the utility model modularization assembling metope.
Fig. 4 is the cross-sectional side view after the utility model modularization assembling metope is completed.
Fig. 5 is that embodiment of the utility model after be completed for modularization assembling metope by cage inner wall surface is three-dimensional Figure.
Description of reference numerals:1- cages;11- ceilings;2- modularization assembling metopes;21- skirting boards;22- plaque branch Support base strip;221- horizontal supporting portions;222- block edges;223- group-embedded grooves;23- plaques;231- groups connect groove;232- groups connect convex Portion;233- madial walls;234- lateral walls;235- lockholes;2351- screws;24- tops panel;241- depression ornamental portions;242- is oblique Raised line;25- side seal panels;26-L shape panels;3- handrails.
Specific embodiment
Refer to shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, the utility model is decorate about a kind of cage built-in system Modular construction, wherein the modularization assembling metope 2 for being assembled in each face wall face in cage 1 mainly includes at least a piece of plaque 23rd, side seal panel 25, skirting board 21, plaque support base bar 22 and top panel 24, wherein skirting board 21 are every located at cage 1 The bottommost of one metope, then in the top of skirting board 21, group sets a plaque support base bar 22, the plaque support base bar 22 is in L-shaped, and it is extended with a L-shaped horizontal supporting portion 221, the horizontal supporting portion 221 of the L-shaped near hypomere in plaque support base bar 22 Outer end be formed with block edge 222, and then form one in the top of horizontal supporting portion 221 of plaque support base bar 22 and be available for plaque 23 embedding groups of group-embedded groove 223, by a piece of plaque 23 first embedding group in after the group-embedded groove 223 of the plaque support base bar 22, then can be again Sequentially group is connected to less a piece of plaque 23 and is covered with by the metope in cage 1, and the upper and lower ends edge of each plaque 23 distinguishes each shape Cheng Youyi groups connect groove 231 and group connects convex portion 232 so that the group of 23 times ora terminalis of each plaque connect convex portion 232 can be with each plaque The group of 23 upper edges connects groove 231 and is mutually assembled and forms a metope, and the group of each plaque 23 connects groove 231 by cage 1 The madial wall 233 of metope connects another lateral wall 234 of groove 231 higher than group, and is provided with lockhole 235 on the madial wall 233, And can be fixed on electricity with by the lock group of each plaque 23 through lockhole 235 by screw 2351 when each plaque 23 is assembled The inner wall surface of elevator car 1, and those screws 2351 are covered after being connect by 23 groups of each plaque and hide, with up to beautiful onlooker (such as Fig. 4 It is shown), between ceiling 11 in the last a piece of plaque 23 in top and cage 1, organize separately set one as ending top decorations Bar 24, the hypomere of the top panel 24 is formed with strip depression ornamental portion 241, to assemble in the last top of a piece of plaque 23 Group connects the breach that the medial and lateral wall 233234 of the different length of groove 231 is formed, and it is completely filled up into ending, and at top Strip depression ornamental portion 241 lower section of panel 24, is separately formed with an oblique raised line 242, by oblique raised line 242 inclined-plane can insert group enter The group for entering the top of last a piece of plaque 23 connects groove 231, and can be beneficial to top panel 24 assembling and with last a piece of plaque 23 The purpose (as shown in Figure 4) that top pushes against.
Plaque support base bar 22 in foregoing composition modularization assembling metope 2, it is a piece of more than plaque 23 and top adorn After bar 24 is completed, a ㄇ type side seals panel 25 is respectively separately assembled with its both sides, to complete each modularization assembling metope (as shown in Figure 3), and wherein skirting board 21 can be integrally formed with plaque support base bar 22.
Additionally, the utility model separately includes L-shaped panel 26, in before the construction of modularization assembling metope 2, prior in cage 1 Each corner bending place group be provided with a L-shaped panel 26, with the ornamenter as the gap between each modularization assembling metope 2 (as shown in Figure 2), and can be according to required in handrail 3 is set on the wherein a piece of plaque 23 of each modularization assembling metope 2, by this reality With it is new with multi-disc can Quick connecting plaque 23, and coordinate L-shaped panel 26, skirting board 21, plaque support base bar 22, side seal The modularization assembling metope 2 that panel 25 and the grade component of top panel 24 are constituted, can be according to the size of each cage 1 in factory First get out the various types of materials of required size, you can to site operation.
And the height of each plaque 23 can be according to being actually needed or visual demand can be for various different height sizes, and L-shaped is adornd The components such as bar 26, skirting board 21, plaque support base bar 22, side seal panel 25 and top panel 24 can be with metal, timber, plastic cement Or composite is made.
In sum, the utility model tool simple and convenient assembly, quick, can be greatly decreased the engineering time and reduce wage cost, And shorten the occupancy elevator engineering time.

Claims (9)

1. the modular construction that a kind of cage built-in system is decorate, it is mainly each face wall face in cage and assembles a mould Blockization assembles metope, it is characterised in that:
The modularization assembling metope mainly includes at least a piece of plaque, skirting board, plaque support base bar and top panel, wherein Skirting board then sets a plaque support base bar, the plaque located at the bottommost of each metope of cage in the upper set of skirting board Support base bar is L-shaped, and is extended with a L-shaped horizontal supporting portion, the level branch of the L-shaped near hypomere in plaque support base bar The outer end of support part is formed with block edge, and then formation one is available for embedding group of plaque at the top of the horizontal supporting portion of plaque support base bar Group-embedded groove, the first embedding group of group-embedded groove in the plaque support base bar of a piece of plaque, then sequentially group be connected to less a piece of plaque with will Metope covering in cage, the upper and lower ends edge of each plaque is respectively formed with one group and connects groove and group connects convex portion, so that often The group of ora terminalis connects convex portion and can connect groove with the group of each plaque upper edge and is mutually assembled and forms a metope under one plaque, on top In the last a piece of plaque in portion and cage between ceiling also group set one as ending top panel, the top panel assembles In last a piece of plaque top ending is completely filled up with by the last a piece of plaque.
2. the modular construction that cage built-in system as claimed in claim 1 is decorate, it is characterised in that:In the group of each plaque The madial wall that groove is connect by cage metope connects the lateral wall of groove higher than group, and is provided with lockhole on the madial wall, in assembling In the structure of each plaque, cage inner wall surface, and each decorations are fixed on by each plaque lock group through lockhole by screw Plate group can be covered the screw after connecing to be hidden, and the hypomere of top panel is formed with strip depression ornamental portion, this Shape depression ornamental portion is assembled and connects the gap position that the medial and lateral wall of groove is formed in last a piece of plaque top group, should Last a piece of plaque completely fills up ending.
3. the modular construction that cage built-in system as claimed in claim 1 is decorate, it is characterised in that:Under the panel of top Side is also formed with an oblique raised line, the inclined-plane of the oblique raised line can the group that enters at the top of last a piece of plaque of insert group connect groove.
4. the modular construction that cage built-in system as claimed in claim 1 is decorate, it is characterised in that:Also include ㄇ type side seals Panel, in the knot for constituting the plaque support base bar of modularization assembling metope, at least a piece of plaque and top panel are completed The both sides of structure are respectively assembled with the ㄇ type side seal panels.
5. the modular construction that cage built-in system as claimed in claim 4 is decorate, it is characterised in that:Also include L-shaped panel, Each corner bending place group in cage is provided with the L-shaped panel.
6. the modular construction that cage built-in system as claimed in claim 1 is decorate, it is characterised in that:In each modularization group Handrail is provided with the dress wherein a piece of plaque of metope.
7. the modular construction that cage built-in system as claimed in claim 1 is decorate, it is characterised in that:The height of each plaque It is various different height sizes.
8. the modular construction that cage built-in system as claimed in claim 5 is decorate, it is characterised in that:L-shaped panel, skirt Plate, plaque support base bar, side seal panel and top panel are made of with metal, timber, plastic cement or composite.
9. the modular construction that cage built-in system as claimed in claim 1 is decorate, it is characterised in that:Skirting board and plaque branch Support base strip is one of the forming.
CN201621116098.8U 2016-10-12 2016-10-12 The modular construction of cage built-in system decoration Expired - Fee Related CN206203631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621116098.8U CN206203631U (en) 2016-10-12 2016-10-12 The modular construction of cage built-in system decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621116098.8U CN206203631U (en) 2016-10-12 2016-10-12 The modular construction of cage built-in system decoration

Publications (1)

Publication Number Publication Date
CN206203631U true CN206203631U (en) 2017-05-31

Family

ID=58760933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621116098.8U Expired - Fee Related CN206203631U (en) 2016-10-12 2016-10-12 The modular construction of cage built-in system decoration

Country Status (1)

Country Link
CN (1) CN206203631U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111629986A (en) * 2018-01-31 2020-09-04 三菱电机大楼技术服务株式会社 Elevator cage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111629986A (en) * 2018-01-31 2020-09-04 三菱电机大楼技术服务株式会社 Elevator cage

Similar Documents

Publication Publication Date Title
CN206625507U (en) The assembled skirting of LED light bar can be filled
CN206346432U (en) A kind of fabricated wallboard interface arrangment
CN204163259U (en) The ceiling structure of integrated interior decoration
CN206203631U (en) The modular construction of cage built-in system decoration
CN106609583A (en) A functional wall surface plastic panel
CN103015601B (en) Secondary ceiling structural piece
CN103088988A (en) Installation structure of seamless installation clamping key and outdoor floor
CN103485505A (en) Multi-functional wall moulding panel
CN103741929A (en) Integrated-house floor structure
CN211257519U (en) Special recess section bar of ceiling gypsum board furred ceiling
CN211341374U (en) Lamp slot
CN208472940U (en) One kind building profile and its component, builds frame and its component
CN110670787A (en) Groove profile special for ceiling gypsum board suspended ceiling and mounting method thereof
CN205046814U (en) Compound top hangs wiring strip
TWM534745U (en) Modular structure of inside elevator cabin system decoration
CN211735997U (en) Decorative strip and lamp groove
CN207032621U (en) A kind of concave surface ceiling structure
CN213015066U (en) End scene wall
CN203654599U (en) Wall plate structure of integrated house
CN204703443U (en) A kind of floor
CN103088993B (en) Edge collecting decorative piece of suspended ceiling corner protruding part
CN203669292U (en) Floor structure of integrated house
CN204081334U (en) Wall panel
CN203097227U (en) Trimming decorative piece of protruding portion of suspended ceiling corner
CN203097228U (en) Trimming decorative piece of protruding portion of suspended ceiling corner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170531

CF01 Termination of patent right due to non-payment of annual fee