CN206194178U - Leaking stoppage trainer - Google Patents
Leaking stoppage trainer Download PDFInfo
- Publication number
- CN206194178U CN206194178U CN201620988149.XU CN201620988149U CN206194178U CN 206194178 U CN206194178 U CN 206194178U CN 201620988149 U CN201620988149 U CN 201620988149U CN 206194178 U CN206194178 U CN 206194178U
- Authority
- CN
- China
- Prior art keywords
- pressure
- leak
- valve
- leakage
- plugging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
本实用新型公开了一种堵漏训练装置,所述堵漏训练装置包括高压储气瓶组,所述高压储气瓶组通过管道连接有减压输入阀和减压器,所述减压输入阀和减压器的下游连接有若干个输出管道,每个输出管道上均依次连接有电磁阀、手动阀和泄露道具,所述泄露道具上设置有泄漏点;其中,所述电磁阀均与PLC连接,由所述PLC控制电磁阀的工作。本实用新型的堵漏训练装置设置有多种形式的漏点泄漏,可供消防官兵日常使用内封堵漏袋、捆扎堵漏带、粘贴堵漏工具组、磁压堵漏器、高温高压注胶堵漏枪等堵漏器材进行堵漏基本技能训练,也可用于对训练人员的训练效果进行考核。
The utility model discloses a leak-stopping training device. The leak-stopping training device comprises a high-pressure gas storage cylinder group, and the high-pressure gas storage cylinder group is connected with a decompression input valve and a pressure reducer through pipelines. There are several output pipelines connected downstream of the valve and the pressure reducer, and each output pipeline is connected with a solenoid valve, a manual valve and a leaking tool in sequence, and a leakage point is arranged on the leaking tool; wherein, the solenoid valves are connected with The PLC is connected, and the work of the solenoid valve is controlled by the PLC. The leak plugging training device of the utility model is provided with various forms of leak point leakage, which can be used by fire officers and soldiers for daily use of internal leak plugging bags, binding leak plugging tapes, sticking leak plugging tool sets, magnetic pressure leak plugging devices, high temperature and high pressure injectors, etc. Plugging equipment such as glue plugging guns can be used for basic plugging skills training, and can also be used to evaluate the training effect of trainers.
Description
技术领域technical field
本实用新型属于消防训练用具领域,具体涉及一种堵漏训练装置,该装置主要用于气体泄漏的堵漏训练。The utility model belongs to the field of fire-fighting training equipment, in particular to a plugging training device, which is mainly used for the plugging training of gas leakage.
背景技术Background technique
在消防部队中,为了提高消防工作人员应对出险现场的能力,平时需要进行各种模拟训练,堵漏训练是其中一个极为重要的训练项目。这里所说的堵漏是指在灭火与应急救援中针对储罐、管线等泄漏事故而采取的封堵措施。目前这种封堵训练基本上是通过理论学习和对泄漏实物进行测试,还没有用于堵漏模拟训练的专业设施。In the fire brigade, in order to improve the ability of firefighters to deal with emergency situations, various simulation trainings are usually required, among which leak plugging training is an extremely important training item. The plugging mentioned here refers to the plugging measures taken for leakage accidents such as storage tanks and pipelines in fire fighting and emergency rescue. At present, this kind of plugging training is basically through theoretical study and real leakage testing, and there is no professional facility for plugging simulation training.
实用新型内容Utility model content
针对现有技术中存在的问题,本实用新型的目的在于提供一种堵漏训练装置,该堵漏训练装置设置有多种形式的漏点泄漏,可供消防官兵日常使用内封堵漏袋、捆扎堵漏带、粘贴堵漏工具组、磁压堵漏器、高温高压注胶堵漏枪等堵漏器材进行堵漏基本技能训练,也可用于对训练人员的训练效果进行考核。Aiming at the problems existing in the prior art, the purpose of this utility model is to provide a plugging training device, which is equipped with various forms of leak point leakage, which can be used by firefighters and soldiers for daily use of internal sealing leak bags, Bundling plugging tape, sticking plugging tool set, magnetic pressure plugging device, high temperature and high pressure glue injection plugging gun and other plugging equipment are used for basic skills training of plugging, and can also be used to evaluate the training effect of trainers.
为实现上述目的,本实用新型采用以下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种堵漏训练装置,所述堵漏训练装置包括高压储气瓶组,所述高压储气瓶组通过管道连接有减压输入阀和减压器,所述减压输入阀和减压器的下游连接有若干个输出管道,每个输出管道上均依次连接有电磁阀、手动阀和泄露道具,所述泄露道具上设置有泄漏点;其中,所述电磁阀均与PLC连接,由所述PLC控制电磁阀的工作。A plugging training device, the plugging training device includes a high-pressure gas cylinder group, the high-pressure gas cylinder group is connected with a decompression input valve and a pressure reducer through a pipeline, and the decompression input valve and the pressure reducer There are several output pipelines connected to the downstream of each output pipeline, and each output pipeline is sequentially connected with a solenoid valve, a manual valve and a leaking prop, and the leaking prop is provided with a leak point; wherein, the solenoid valves are connected with the PLC, and the The PLC controls the work of the solenoid valve.
进一步,所述高压储气瓶组至所述输出管道中间的输送管道上设置有压力表。Further, a pressure gauge is provided on the delivery pipeline between the high-pressure gas cylinder group and the output pipeline.
进一步,所述输出管道的气体入口设置有压力变送器,所述压力变送器与所述PLC连接。Further, the gas inlet of the output pipeline is provided with a pressure transmitter, and the pressure transmitter is connected with the PLC.
进一步,所述输出管道与所述泄露道具通过快速插拔接头连接,且所述泄露道具包括但不仅限于带有圆孔泄漏孔的罐体、带有裂缝泄漏孔的罐体、带有砂眼泄漏孔的罐体、带有泄漏孔的法兰根和带有泄漏孔的弯头。Further, the output pipeline is connected to the leakage tool through a quick-plug joint, and the leakage tool includes but is not limited to a tank body with a round hole leakage hole, a tank body with a crack leakage hole, a tank body with a sand hole leakage Tanks with leak holes, flanges with leak holes and elbows with leak holes.
进一步,所述泄露道具内设置有承压腔,所述承压腔与泄露道具的内壁焊接密封,在泄露道具的内壁上承压腔范围内设置泄漏点,承压腔设置有与给气管路连接的接口。Further, a pressure chamber is provided inside the leakage prop, and the pressure chamber is welded and sealed with the inner wall of the leakage prop. Leakage points are set within the range of the pressure chamber on the inner wall of the leakage prop, and the pressure chamber is provided with an air supply pipeline. The interface to connect to.
进一步,所述高压储气瓶组的气源出口设置补气阀、排气阀和压力表;所述补气阀用于向储气瓶组内灌充高压气体,所述排气阀用于排放系统内余气,所述压力表用于监视储气瓶内压力。Further, the outlet of the gas source of the high-pressure gas storage cylinder set is provided with an air supply valve, an exhaust valve and a pressure gauge; the air supply valve is used to fill high-pressure gas into the gas storage cylinder set, and the exhaust valve is used to Discharge the residual gas in the system, and the pressure gauge is used to monitor the pressure in the gas cylinder.
进一步,所述减压输入阀和减压器的下游连接有三个输出管道,可供三组人员同时模拟训练。Further, there are three output pipelines connected downstream of the decompression input valve and the pressure reducer, which can be used for simultaneous simulation training by three groups of personnel.
本实用新型具有以下有益技术效果:The utility model has the following beneficial technical effects:
1、整套系统可以实现各种气体在不同压力下以各种形式泄漏,可以集成在一起,也可以部分选择,可满足各种使用单位实际训练的需要。1. The whole system can realize the leakage of various gases under different pressures in various forms, can be integrated together, and can also be partially selected, which can meet the actual training needs of various users.
2、PLC自动控制,用户训练前可自行选择任意一处或多处泄漏,堵漏作业时间和作业完成情况将由程序自动记录并判断,可用于日常训练,也可以用于考核。2. PLC automatic control, users can choose any one or more leaks before training, the plugging operation time and job completion will be automatically recorded and judged by the program, which can be used for daily training and assessment.
3、通过罐体内部承压腔的设计使液体或气体不必充满储罐即可实现模拟泄漏,极大的节约了水源或气源。该设计也可使同一罐体实现同时完成气、液等不同形式的泄漏及可使不同漏点单独控制。3. Through the design of the pressure chamber inside the tank, the liquid or gas can realize the simulated leakage without filling the tank, which greatly saves the water or gas source. This design also enables the same tank body to simultaneously complete different forms of leakage such as gas and liquid, and enables separate control of different leakage points.
4、气体泄漏的压力可由可调式减压器任意调整,以完成在任意压力下的堵漏训练。4. The pressure of gas leakage can be adjusted arbitrarily by the adjustable pressure reducer to complete the plugging training under any pressure.
5、可更换式快速插拔接头的设计可在减少整体体积的条件下实现训练内容的多样化,通过更换模拟泄漏道具完成各种尺寸、各种类型的堵漏训练。5. The design of the replaceable quick plug-in joint can realize the diversification of training content under the condition of reducing the overall volume, and complete various sizes and types of plugging training by replacing the simulated leakage props.
6、适用性强,整套系统有选择的搭载于各种场景平台上可实现多种场景模拟泄漏。6. Strong applicability, the whole system can be selectively mounted on various scene platforms to realize leakage simulation in various scenes.
附图说明Description of drawings
图1为本申请的堵漏训练装置的结构示意图。Fig. 1 is a structural schematic diagram of the leakage plugging training device of the present application.
具体实施方式detailed description
下面,参考附图,对本实用新型进行更全面的说明,附图中示出了本实用新型的示例性实施例。然而,本实用新型可以体现为多种不同形式,并不应理解为局限于这里叙述的示例性实施例。而是,提供这些实施例,从而使本实用新型全面和完整,并将本实用新型的范围完全地传达给本领域的普通技术人员。Below, with reference to the accompanying drawings, the utility model is described more fully, and exemplary embodiments of the utility model are shown in the accompanying drawings. However, the invention may be embodied in many different forms and should not be construed as limited to the exemplary embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art.
为了易于说明,在这里可以使用诸如“上”、“下”“左”“右”等空间相对术语,用于说明图中示出的一个元件或特征相对于另一个元件或特征的关系。应该理解的是,除了图中示出的方位之外,空间术语意在于包括装置在使用或操作中的不同方位。例如,如果图中的装置被倒置,被叙述为位于其他元件或特征“下”的元件将定位在其他元件或特征“上”。因此,示例性术语“下”可以包含上和下方位两者。装置可以以其他方式定位(旋转90度或位于其他方位),这里所用的空间相对说明可相应地解释。For ease of description, spatially relative terms such as "upper," "lower," "left," and "right" may be used herein to describe the relationship of one element or feature relative to another element or feature shown in the figures. It will be understood that the spatial terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if the device in the figures is turned over, elements described as "below" other elements or features would then be oriented "above" the other elements or features. Thus, the exemplary term "lower" can encompass both an orientation of above and below. The device may be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative specifications used herein interpreted accordingly.
如图1所示,本申请提供了一种堵漏训练装置,该堵漏训练装置包括高压储气瓶组1,高压储气瓶组1通过管道连接有减压输入阀2和减压器3,减压输入阀2和减压器3的下游连接有若干个输出管道,每个输出管道上均依次连接有电磁阀4、手动阀5和泄露道具6,泄露道具6上设置有泄漏点7;其中,电磁阀4均与PLC连接,由PLC控制电磁阀4的工作。As shown in Figure 1, the present application provides a leak-stopping training device, which includes a high-pressure gas storage cylinder set 1, and the high-pressure gas storage cylinder set 1 is connected with a decompression input valve 2 and a pressure reducer 3 through pipelines , the downstream of the decompression input valve 2 and the pressure reducer 3 are connected with several output pipelines, and each output pipeline is connected with a solenoid valve 4, a manual valve 5 and a leakage prop 6 in sequence, and the leakage prop 6 is provided with a leakage point 7 ; Among them, the solenoid valve 4 is connected with the PLC, and the work of the solenoid valve 4 is controlled by the PLC.
高压储气瓶组1至输出管道中间的输送管道上设置有压力表8。A pressure gauge 8 is arranged on the conveying pipeline between the high-pressure gas cylinder group 1 and the output pipeline.
输出管道的气体入口设置有压力变送器9,压力变送器9与PLC连接。The gas inlet of the output pipeline is provided with a pressure transmitter 9, and the pressure transmitter 9 is connected with the PLC.
输出管道与泄露道具6通过快速插拔接头10连接,且泄露道具6包括但不仅限于带有圆孔泄漏孔的罐体、带有裂缝泄漏孔的罐体、带有砂眼泄漏孔的罐体、带有泄漏孔的法兰根和带有泄漏孔的弯头。The output pipeline is connected to the leakage tool 6 through a quick plug-in joint 10, and the leakage tool 6 includes but not limited to a tank body with a round hole leakage hole, a tank body with a crack leakage hole, a tank body with a trachoma leakage hole, Flanges with leak holes and elbows with leak holes.
泄露道具6内设置有承压腔11,承压腔11与泄露道具6的内壁焊接密封,在泄露道具6的内壁上承压腔范围内设置泄漏点7,承压腔11设置有与给气管路连接的接口。The leakage prop 6 is provided with a pressure chamber 11, the pressure chamber 11 is welded and sealed with the inner wall of the leakage prop 6, and the leakage point 7 is set on the inner wall of the leakage prop 6 within the range of the pressure chamber, and the pressure chamber 11 is provided with an air supply pipe interface for the road connection.
高压储气瓶组1的气源出口设置补气阀12、排气阀13和压力表14;补气阀12用于向储气瓶组内灌充高压气体,排气阀12用于排放系统内余气,压力表14用于监视储气瓶内压力。The gas source outlet of the high-pressure gas storage cylinder group 1 is provided with an air supply valve 12, an exhaust valve 13 and a pressure gauge 14; the air supply valve 12 is used for filling high-pressure gas into the gas storage cylinder group, and the exhaust valve 12 is used for the exhaust system Residual gas in the interior, pressure gauge 14 is used for monitoring the pressure in the gas cylinder.
减压输入阀2和减压器3的下游连接有三个输出管道,可供三组人员同时模拟训练。The downstream of the decompression input valve 2 and the pressure reducer 3 are connected with three output pipelines, which can be used for simultaneous simulation training of three groups of personnel.
高压储气瓶组1由6只20MPa储气瓶组成。High-pressure gas storage cylinder group 1 is composed of 6 20MPa gas storage cylinders.
本申请的堵漏训练装置工作过程为:The working process of the plugging training device of the present application is:
由高压储气瓶组1作为气体泄漏的气源,气源出口设置补气阀12、排气阀13和压力表14,补气阀12用于向储气瓶组内灌充高压气体,排气阀13用于排放系统内余气,压力表14用于监视储气瓶内压力。高压气体经减压输入阀2后进入减压器3,减压器3可根据情况设置气体减压后的输出压力,减压器3出口设置安全阀15和压力表8,安全阀15用于防止输出气体压力超出低压管路的最高承受压力造成危险,压力表8用于监视减压后气体的输出压力。减压后的气体经减压输出阀输送至各路常闭电磁阀4处,各电磁阀4前端设置压力变送器9,压力变送器9监测泄漏开始后的系统压力并传递给PLC,PLC程序通过不同漏点泄漏压力和未泄漏压力数值的对比判断堵漏作业的完成情况。当通过PLC程序选定需要泄漏的漏点后,相应电磁阀4打开,带压气体进入漏点道具,人员进行堵漏作业。The high-pressure gas storage cylinder group 1 is used as the gas source for gas leakage, and the gas supply outlet is provided with a gas supply valve 12, an exhaust valve 13 and a pressure gauge 14. The gas valve 13 is used to discharge the residual gas in the system, and the pressure gauge 14 is used to monitor the pressure in the gas cylinder. The high-pressure gas enters the pressure reducer 3 after the pressure reduction input valve 2, and the pressure reducer 3 can set the output pressure after the gas is decompressed according to the situation. The outlet of the pressure reducer 3 is provided with a safety valve 15 and a pressure gauge 8, and the safety valve 15 is used for To prevent the output gas pressure from exceeding the maximum withstand pressure of the low-pressure pipeline and cause danger, the pressure gauge 8 is used to monitor the output pressure of the decompressed gas. The decompressed gas is sent to 4 normally closed solenoid valves through the decompression output valve. A pressure transmitter 9 is installed at the front end of each solenoid valve 4. The pressure transmitter 9 monitors the system pressure after the leakage starts and transmits it to the PLC. The PLC program judges the completion of the plugging operation by comparing the leakage pressure and the non-leakage pressure value of different leakage points. When the leak point to be leaked is selected through the PLC program, the corresponding solenoid valve 4 is opened, the gas under pressure enters the leak point props, and the personnel carry out the plugging operation.
模拟罐体或其他大型设施泄漏的道具内设有承压腔11,承压腔11与罐壁焊接密封,在罐壁上承压腔范围内设置泄漏点7,承压腔11预留接口与供气管路连接,这种设计可以使带压气体充满承压腔后即可实现模拟泄漏,不必使气体充满整个罐体,还可以实现同一罐体或道具实现气体、液体的多点同时泄漏。通过快速插拔接头10可以在有限的空间内通过更换泄漏道具的方式实现多种不同尺寸、类型泄漏的训练。堵漏训练结束后,训练人员可以通过手势、报告或按下按钮的方式告知操作人员堵漏作业完成,操作人员对PLC程序下达完成指令,程序对作业时间和作业完成情况进行自动判断并给出训练分数并选择存档或输出。系统还可以设置几组相同的漏点,供训员进行分组考核比武。A pressure chamber 11 is provided in the props for simulating the leakage of tanks or other large facilities, and the pressure chamber 11 is welded and sealed with the tank wall. Leakage points 7 are set within the scope of the pressure chamber on the tank wall. The gas supply pipeline is connected. This design can realize the simulated leakage after the pressurized gas fills the pressure chamber. It is not necessary to fill the entire tank with gas, and it can also realize the simultaneous leakage of gas and liquid at multiple points in the same tank or prop. The quick plug-in joint 10 can realize the training of various leaks of different sizes and types in a limited space by replacing leaking props. After the plugging training is over, the trainer can inform the operator that the plugging operation is completed through gestures, reports or pressing a button. The operator will issue a completion command to the PLC program, and the program will automatically judge the operation time and job completion status and give Training scores and choose to archive or export. The system can also set several groups of the same leak points for trainers to conduct group assessment and competition.
上面所述只是为了说明本实用新型,应该理解为本实用新型并不局限于以上实施例,符合本实用新型思想的各种变通形式均在本实用新型的保护范围之内。The above is just to illustrate the utility model, it should be understood that the utility model is not limited to the above embodiments, and various modifications conforming to the idea of the utility model are within the scope of protection of the utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620988149.XU CN206194178U (en) | 2016-08-30 | 2016-08-30 | Leaking stoppage trainer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620988149.XU CN206194178U (en) | 2016-08-30 | 2016-08-30 | Leaking stoppage trainer |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206194178U true CN206194178U (en) | 2017-05-24 |
Family
ID=58727723
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620988149.XU Expired - Fee Related CN206194178U (en) | 2016-08-30 | 2016-08-30 | Leaking stoppage trainer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206194178U (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107293176A (en) * | 2017-08-13 | 2017-10-24 | 北京管通科技开发有限责任公司 | A kind of pressure sealing analog simulation training points-scoring system and method |
| CN108470490A (en) * | 2018-05-19 | 2018-08-31 | 张繁荣 | A kind of pipeline wrapping training system |
| CN108506738A (en) * | 2018-04-11 | 2018-09-07 | 天津安固密封技术有限公司 | A kind of harmful influence non-stop plugging drilling system and drilling method |
| CN109459184A (en) * | 2018-12-13 | 2019-03-12 | 广西电网有限责任公司电力科学研究院 | The device and its application method of electrical equipment SF6 gas leakage standard source are provided |
| CN109584665A (en) * | 2018-11-23 | 2019-04-05 | 国网天津市电力公司电力科学研究院 | Sulfur hexafluoride leaks simulator and leak detection Training Methodology |
| CN111462569A (en) * | 2020-05-15 | 2020-07-28 | 天津市江达扬升工程技术有限公司 | Emergency leakage stoppage teaching aid |
| CN112071145A (en) * | 2020-09-07 | 2020-12-11 | 广东电网有限责任公司 | Gas leakage simulation device |
| CN115798292A (en) * | 2022-11-30 | 2023-03-14 | 新兴铸管股份有限公司 | Pressure transmitter uses training examination device |
| CN119927940A (en) * | 2024-12-25 | 2025-05-06 | 山东大学 | A petrochemical scene robot handling operation simulation test platform and test method |
-
2016
- 2016-08-30 CN CN201620988149.XU patent/CN206194178U/en not_active Expired - Fee Related
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107293176A (en) * | 2017-08-13 | 2017-10-24 | 北京管通科技开发有限责任公司 | A kind of pressure sealing analog simulation training points-scoring system and method |
| CN108506738A (en) * | 2018-04-11 | 2018-09-07 | 天津安固密封技术有限公司 | A kind of harmful influence non-stop plugging drilling system and drilling method |
| CN108470490A (en) * | 2018-05-19 | 2018-08-31 | 张繁荣 | A kind of pipeline wrapping training system |
| CN109584665A (en) * | 2018-11-23 | 2019-04-05 | 国网天津市电力公司电力科学研究院 | Sulfur hexafluoride leaks simulator and leak detection Training Methodology |
| CN109459184A (en) * | 2018-12-13 | 2019-03-12 | 广西电网有限责任公司电力科学研究院 | The device and its application method of electrical equipment SF6 gas leakage standard source are provided |
| CN109459184B (en) * | 2018-12-13 | 2024-03-08 | 广西电网有限责任公司电力科学研究院 | Device for providing SF6 gas leakage standard source of electrical equipment and using method thereof |
| CN111462569A (en) * | 2020-05-15 | 2020-07-28 | 天津市江达扬升工程技术有限公司 | Emergency leakage stoppage teaching aid |
| CN112071145A (en) * | 2020-09-07 | 2020-12-11 | 广东电网有限责任公司 | Gas leakage simulation device |
| CN115798292A (en) * | 2022-11-30 | 2023-03-14 | 新兴铸管股份有限公司 | Pressure transmitter uses training examination device |
| CN119927940A (en) * | 2024-12-25 | 2025-05-06 | 山东大学 | A petrochemical scene robot handling operation simulation test platform and test method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206194178U (en) | Leaking stoppage trainer | |
| CN206194177U (en) | Leaking stoppage trainer | |
| CN206162920U (en) | Dangerization article tank wagon trainer | |
| CN103745625B (en) | A kind of emergency leakage blocking simulated fire fighting training device with pressure | |
| CN107179169B (en) | A nuclear power plant check valve test device and test method | |
| CN106247169A (en) | A kind of mining liquid carbon dioxide pipeline transporter and carrying method | |
| CN201765743U (en) | Chemical pipeline blocking leakage under pressure test training integrated equipment | |
| CN103940559A (en) | Leak detection device for valve | |
| CN208457435U (en) | A kind of follow-on pressure sealing equipment | |
| CN204143749U (en) | Harmful influence production area simulated leakage trainer | |
| CN207690341U (en) | Low temperature groove tank car leakage accident with pressure disposes simulation training device | |
| CN203433733U (en) | Simulation apparatus for chemical disaster accident | |
| CN104500977A (en) | Test system for pipeline maintenance and repair technology | |
| CN105890845A (en) | Pipeline high strength and tightness test fixture and method | |
| CN204463661U (en) | Portable leakage blockage simulation training facilities | |
| CN203811339U (en) | Valve leak detection device | |
| CN205157127U (en) | Pipeline high strength and tightness test frock | |
| CN203706478U (en) | Emergent leaking stoppage fire fighting simulation training apparatus with pressure | |
| CN205719499U (en) | Portable safety valve calibration equipment | |
| CN105444973B (en) | Low-temperature pressure Automatic-boosting balancing device | |
| CN207637326U (en) | A kind of pressure sealing analog simulation training device | |
| RU2279140C1 (en) | Device for training specialists in removal of gas leaks from gas pipelines | |
| CN203847991U (en) | Full-closed swaging device | |
| CN206207013U (en) | A kind of mining liquid carbon dioxide pipeline transporter | |
| CN107731039B (en) | Low temperature groove tank car leakage accident with pressure disposes simulation training device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170524 |