CN206191136U - Water distributing device - Google Patents
Water distributing device Download PDFInfo
- Publication number
- CN206191136U CN206191136U CN201621268703.3U CN201621268703U CN206191136U CN 206191136 U CN206191136 U CN 206191136U CN 201621268703 U CN201621268703 U CN 201621268703U CN 206191136 U CN206191136 U CN 206191136U
- Authority
- CN
- China
- Prior art keywords
- supervisor
- knockout drum
- branch pipe
- water knockout
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model belongs to the technical field of the conduit coupling, specifically provide a water distributing device. Water distributing device is including being responsible for the branch pipe that is linked together with the person in charge respectively with a plurality of, and the person in charge's one end is provided with the head for the end of intaking, the other end, and the end of intaking reduces 30~40% through throat processing, the internal diameter of holding of intaking. The utility model provides a water distributing device can effectively reduce the inside water hammer of water distributing device, makes rivers in the inside even stable reposition of redundant personnel of water distributing device. The utility model discloses a numerical control offset arc machine and the punching equipment accurate anastomotic arc hole of acquisition and arc are concave, realize arc hole and the concave seamless butt joint of arc, promote the leakproofness and the aesthetic property of the product that obtains.
Description
Technical field
The utility model is related to conduit coupling technical field, and in particular to a kind of water knockout drum.
Background technology
During water knockout drum is water system, for connecting each road heating tube confession, the distribution of backwater, captation.The first generation point water
Device is connect using silk and for each supervisor and branch pipe to be attached assembling, poorly sealed close, and leak infiltration phenomenon takes place frequently.Second generation water knockout drum
Pad it is more, and need addition fixed pipe cap and concentric reducer manually in practical process medial end portions, use inconvenience.
The supervisor of existing water knockout drum is generally the homogeneous straight pipe of diameter, the water inlet end and supervisor's main part of this straight pipe
Internal diameter is consistent, and then water velocity will not be reduced when causing current to be run in through water inlet end entrance supervisor's main body.The water of high speed
In stream turn sharp to branch pipe, larger water hammer effect can be produced, and then influence and jeopardize equipment safety.Meanwhile, diameter is homogeneous
Straight tubular supervisor be also unfavorable for current from supervisor to branch pipe smooth shunting.
Additionally, existing water knockout drum blocks and opens up steam vent again when specifically installing and using, it is necessary to supplement setting
Row exhaust pressure relief, this is to very inconvenient using bringing.
Additionally, the production technology of existing water knockout drum is present, automaticity is low, and low production efficiency, supervisor fits not with branch pipe
Tightly, pad multi-product aesthetic property is poor, the deficiency such as antiseptic and rustproof erosion poor performance of product.
Utility model content
In order to solve the above mentioned problem of prior art presence, the utility model provides a kind of dividing for water inlet end necking of supervisor
Hydrophone, reaches reduction water hammer effect, and current are smoothly diverted to from supervisor the effect in branch pipe.
The utility model is further realized by following scheme.
Water knockout drum of the present utility model includes supervisor and several branch pipes being connected with the supervisor respectively, the supervisor
One end be water inlet end, the other end is provided with end socket, and the water inlet end is processed through necking, the internal diameter of the water inlet end reduces 30~
40%.
The water inlet end being responsible in the water knockout drum that the utility model is provided is processed through necking, and the internal diameter of water inlet end is removed less than supervisor
The internal diameter of other main parts outside water inlet end, under same flow, the water of the larger inside of supervisor's mid-section body part internal diameter
Stream flow velocity reduces the water hammer effect that current enter in branch pipe from supervisor less than the flow rate of water flow inside water inlet end, carries
Rise stabilization of equipment performance.Meanwhile, in supervisor's main body after flow velocity reduction, further such that main in-pipe flow can smoothly by evenly
Distribution to each branch pipe.Utility model people of the present utility model further study show that, the internal diameter of water inlet end is too small, equally can
Cause too high into water end position flow rate of water flow, water inlet is slow without smooth.But, if the internal diameter of water inlet end is excessive, then rise completely
Less than foregoing reduction water hammer effect and the effect of lifting shunting uniformity and fluency.Utility model people of the present utility model exists
Established on further Research foundation, when the internal diameter of water inlet end is that (supervisor's main part is to refer to remove to supervisor's main part
Other parts outside water inlet end) internal diameter 60~70% when (namely water inlet end internal diameter reduce 30~40%), can obtain
Unexpected effect, each side Expected Results is reached most preferably.
Further, the wall upper surface of the supervisor offers several arc holes, and one end thread of the branch pipe is described
The other end of branch pipe is provided with that arc corresponding with the arc hole is recessed, and the arc of the branch pipe is recessed to weld the arc hole for being arranged at the supervisor
Position.
Further, the side wall lower surface of the supervisor offers exhaust outlet near the position of the end socket.
Further, the supervisor and the branch pipe are carbon steel seamless steel pipe.
Further, the inside and outside wall of the supervisor and the branch pipe is provided with coating layer, and the inwall of the coating layer sets
Epoxy resin layer is equipped with, the inwall of the epoxy resin layer is provided with polyethylene layer.
Further, the inside and outside wall of the supervisor and the branch pipe is provided with nickel dam or zinc layers.
The production technology of foregoing water knockout drum, comprises the following steps:
S1, carbon steel seamless steel pipe is cut using numerical control pipe cutter as supervisor's blank, the left end of blank will be responsible for as entering
Water end (W.E.) simultaneously carries out necking treatment, and the internal diameter of water inlet end is contracted to the 60~70% of original diameter in necking treatment;
S2, the wall upper surface using punching apparatus in supervisor's blank go out several arc holes and obtain final product supervisor successively;
S3, carbon steel seamless steel pipe is cut using numerical control pipe cutter as branch pipe blank, using arc-punching machine by branch pipe blank
It is recessed that the arc corresponding with the arc hole on supervisor S2 is gone out in one end, obtains branch pipe;
S4, the arc hole site that the recessed one end of the arc of some branch pipes is respectively welded at the supervisor, obtain final product water knockout drum blank;
S5, the water knockout drum blank is carried out into post processing obtain final product the water knockout drum;The post processing is:In the water knockout drum
Blank inside and outside wall carries out plastic-coated treatment, in the treatment of water knockout drum blank inwall coating polyethylene layer, by the water knockout drum blank
The treatment of electrostatic spraying epoxy powder is carried out, the water knockout drum blank is carried out galvanizing treatment or the water knockout drum blank is carried out
Nickel Plating Treatment.
The production technology of foregoing water knockout drum, carries out auxiliary production, automatically using numerical control pipe cutter, punching apparatus and arc-punching machine
Change degree is high, improves production efficiency.Meanwhile, using carbon steel seamless steel pipe as supervisor and the raw material of branch pipe, carbon steel is seamless
Steel tube seamless gap, it is integrally formed, the pad quantity of water knockout drum can be substantially reduced, and then lift product aesthetics and sealing
Energy.Arc hole is made using punching apparatus and arc-punching machine respectively and arc is recessed, accurate can control arc hole and the recessed shape specification of arc, made
Arc hole and arc is recessed being capable of slitless connection, further lift-off seal performance.
Further, the concrete mode of welding is in S4:First along three welderings of welding around arc hole by the way of spot welding
Contact, it is then arc hole and arc is recessed by the way of the boxing again between welded, the process of electric welding and boxing is in indifferent gas
Carried out under body protection.
Further, the water inlet end thread of blank will be responsible for using numerically controlled lathe after necking treatment in S1;Used in S3
Numerically controlled lathe is by the other end thread of the branch pipe blank.
Further, the right-hand member for being responsible for blank is carried out into welding closure using end socket in S1.
In sum, the beneficial effects of the utility model are:The water knockout drum that the utility model is provided can be reduced effectively point
Water hammer effect inside hydrophone, and lift uniform and stable shunting of the current inside water knockout drum.The end socket and steam vent energy set up
Enough further facilitate the follow-up of water knockout drum of the present utility model to use, end socket etc. is installed without follow-up overpunch and thread
Complicated procedures of forming, also has compared to threaded connection by way of end socket carries out welding closure in advance and seals the effect forbidden.
Further, water knockout drum of the present utility model, can by the way that rationally organically layout sets up multi-level inner liner and outer lining
Obtain preferable antirust, anti-corrosive effect.The production technology of offer has the advantages that high degree of automation, production efficiency are high, and also
Accurate identical arc hole can be obtained to arc-punching machine and punching apparatus by Numeric Control Technology and arc is recessed, realize arc hole and recessed seamless of arc
Docking, further lifting obtains the sealing and aesthetic property of product.In the welding step of production technology, three points of point are first passed through
Be fixed for relative position between supervisor and branch pipe by weldering, then will be responsible for using boxing again and is welded close completely with branch pipe
Envelope, first spot welding can be positioned conveniently, and branch pipe is glanced off during preventing boxing.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only
It is some embodiments of the present utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of water knockout drum of the present utility model;
Fig. 2 is the decomposition texture schematic diagram of water knockout drum of the present utility model;
Fig. 3 is the cross-sectional structure figure of the supervisor in water knockout drum of the present utility model.
1- supervisors in figure;11- water inlet ends;12- exhaust outlets;13- arcs hole;2- end sockets;3- branch pipes;31- arcs are recessed;In 111-
Lining;112- outer linings.
Specific embodiment
To make the purpose of this utility model, technical scheme and advantage clearer, below will be to technology of the present utility model
Scheme is described in detail.Obviously, described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not before creative work is made
Resulting all other implementation method is put, the scope that the utility model is protected is belonged to.
Embodiment 1:
The present embodiment provides a kind of water knockout drum, as depicted in figs. 1 and 2, including supervisor and several respectively with the supervisor
The branch pipe being connected, one end of the supervisor is water inlet end, and the other end is provided with end socket, and the water inlet end is processed through necking, institute
The internal diameter for stating water inlet end reduces 30~40%, namely the internal diameter of the water inlet end of supervisor's left end is supervisor's mid-section body part internal diameter
60~70%.
The water inlet end being responsible in the water knockout drum that the present embodiment is provided is processed through necking, the internal diameter of water inlet end less than supervisor remove into
The internal diameter of other main parts outside water end (W.E.), under same flow, the current of the larger inside of supervisor's mid-section body part internal diameter
Flow velocity reduces the water hammer effect that current enter in branch pipe from supervisor less than the flow rate of water flow inside water inlet end, lifting
Stabilization of equipment performance.Meanwhile, in supervisor's main body after flow velocity reduction, further such that main in-pipe flow can smoothly by evenly
Distribute to each branch pipe.The embodiment people of the present embodiment further study show that, the internal diameter of water inlet end is too small, can equally cause into
Water end (W.E.) position flow rate of water flow is too high, and water inlet is slow without smooth.But, if the internal diameter of water inlet end is excessive, then before not having completely
State the effect for reducing water hammer effect and lifting shunting uniformity and fluency.The embodiment people of the present embodiment is further grinding
Established on the basis of studying carefully, when the internal diameter of water inlet end is that (supervisor's main part is outside referring to removing water inlet end to supervisor's main part
Other parts) internal diameter 60~70% when (namely water inlet end internal diameter reduce 30~40%), can obtain unexpected
Effect, each side Expected Results is reached most preferably.
In order to lift the sealing property and aesthetic of the water knockout drum of the present embodiment, in further improvement, the supervisor
Wall upper surface offer several arc holes, one end thread of the branch pipe, the other end of the branch pipe be provided with it is described
The corresponding arc in arc hole is recessed, and the arc of the branch pipe is recessed to weld the arc hole site for being arranged at the supervisor.Embodiment after this optimization
Water knockout drum has abandoned the screwed connection in traditional water knockout drum, and water knockout drum is obtained by all-welded mode, finally ensure that product
The sealing property of product, and also the aesthetic of water knockout drum product can be lifted.
In order to further facilitate the construction usage of the present embodiment water knockout drum, the further optimization to the present embodiment, the master
The side wall lower surface of pipe offers exhaust outlet near the position of the end socket.Can trapped gas, the row for setting up in water knockout drum pipeline
Gas port can connect setting air bleeding valve, and trapped gas can be easily discharged rapidly by air bleeding valve, mitigate overpressure, carry
Rise equipment safety in operation.Further, can also be connected by exhaust outlet and set up valve and surge tank, surge tank can be interim
The a large amount of gases of enrichment storage, further facilitate and use.
For the further lifting requirement that tightness and aesthetic property are sealed to the present embodiment water knockout drum, it is further improved
In, the supervisor and the branch pipe are carbon steel seamless steel pipe.
In order to lift the antirust, anti-corrosive performance of the present embodiment product, as shown in figure 3, the further optimization to the present embodiment,
The inwall of the supervisor and the branch pipe is additionally provided with liner, and the liner includes coating layer, epoxy resin layer and polyethylene layer, tool
Body:The inwall of the supervisor and the branch pipe is provided with coating layer, and the inwall of the coating layer is provided with epoxy resin layer,
The inwall of the epoxy resin layer is provided with polyethylene layer.Coating layer, epoxy resin layer and the polyethylene layer set up can rise
To antiseptic and rustproof erosion effect, three is overlapped mutually can further lift antiseptic effect, further, polyethylene layer abrasive resistance
By force, the inner surface contacted with water in pipe is arranged at, permanent current scour is resistant to, and then lift the use longevity of anticorrosive coat
Life, the epoxy resin layer also effect with basic unit, can be easy to the smooth attachment of polyethylene layer, with reference to more stable so that poly-
Pvdf layer is difficult for drop-off, and then further lifting anti-corrosion service life.
Another optional antiseptic and rustproof etching method, can carry out electroplating processes, in Fen Shui to the water knockout drum of the present embodiment
The surfaces externally and internally of device forms anti-oxidant erosion-resisting coating, and then increases the service life, and specific embodiment is:It is described supervisor and
The inside and outside wall of the branch pipe is provided with nickel dam or zinc layers.
Embodiment 2:
The present embodiment provides a kind of production technology of water knockout drum (water knockout drum particularly shown in embodiment 1), including following
Step:
S1, carbon steel seamless steel pipe is cut using numerical control pipe cutter as supervisor's blank, the left end of blank will be responsible for as entering
Water end (W.E.) simultaneously carries out necking treatment, and the internal diameter of water inlet end is contracted to the 60~70% of original diameter in necking treatment;
S2, the wall upper surface using punching apparatus in supervisor's blank go out several arc holes and obtain final product supervisor successively;
S3, carbon steel seamless steel pipe is cut using numerical control pipe cutter as branch pipe blank, using arc-punching machine by branch pipe blank
It is recessed that the arc corresponding with the arc hole on supervisor S2 is gone out in one end, obtains branch pipe;
S4, the arc hole site that the recessed one end of the arc of some branch pipes is respectively welded at the supervisor, obtain final product water knockout drum blank;
S5, the water knockout drum blank is carried out into post processing obtain final product the water knockout drum;The post processing is:In the water knockout drum
Blank inside and outside wall carries out plastic-coated treatment, in the treatment of water knockout drum blank inwall coating polyethylene layer, by the water knockout drum blank
The treatment of electrostatic spraying epoxy powder is carried out, the water knockout drum blank is carried out galvanizing treatment or the water knockout drum blank is carried out
Nickel Plating Treatment.
The production technology of the water knockout drum that the present embodiment is provided, is carried out auxiliary using numerical control pipe cutter, punching apparatus and arc-punching machine
Production is helped, high degree of automation improves production efficiency.Meanwhile, using carbon steel seamless steel pipe as supervisor and the former material of branch pipe
Material, carbon steel seamless steel pipe is seamless, be integrally formed, and can substantially reduce the pad quantity of water knockout drum, and then it is beautiful to lift product
Sight degree and sealing property.Arc hole is made using punching apparatus and arc-punching machine respectively and arc is recessed, arc hole and arc accurate can be controlled recessed
Shape specification, make arc hole and arc is recessed being capable of slitless connection, further lift-off seal performance.
In order that slitless connection is realized between supervisor and branch pipe, the further optimization to the present embodiment, the tool welded in S4
Body mode is:First along three pads are welded around arc hole by the way of spot welding, then again by the way of boxing by arc
Welded between hole and arc are recessed, the process of electric welding and boxing is carried out under inert gas shielding.First pass through three points of point
Be fixed for relative position between supervisor and branch pipe by weldering, then will be responsible for using boxing again and is welded close completely with branch pipe
Envelope, first spot welding can be positioned conveniently, and branch pipe is glanced off during preventing boxing, and then be realized between supervisor and branch pipe
Slitless connection.Because seamless steel pipe is easily subject to dioxygen oxidation at high temperature, therefore welded under inert gas shielding, prevented
The only oxidation of seamless steel pipe, and then further lifting water knockout drum life of product.
In order to further facilitate the connection between produced water knockout drum and other pipelines, to the further excellent of the present embodiment
Change, the water inlet end thread of blank will be responsible for using numerically controlled lathe after necking treatment in S1;Will be described using numerically controlled lathe in S3
The other end thread of branch pipe blank.
Further, the right-hand member for being responsible for blank is carried out into welding closure using end socket in S1, the end socket set up can enter one
The use of convenient the produced water knockout drum of step, while all-welded connected mode avoids the possibility of the gas leakage infiltration at end socket.
The above, specific embodiment only of the present utility model, but protection domain of the present utility model do not limit to
In this, any one skilled in the art can readily occur in change in the technical scope that the utility model is disclosed
Or replace, should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be with the power
The protection domain that profit is required is defined.
Claims (10)
1. water knockout drum, it is characterised in that:Including supervisor and several branch pipes being connected with the supervisor respectively, the supervisor's
One end is water inlet end, and the other end is provided with end socket, and the water inlet end is processed through necking, the internal diameter of the water inlet end reduces 30~
40%.
2. water knockout drum according to claim 1, it is characterised in that:The wall upper surface of the supervisor offers several arcs
Hole, one end thread of the branch pipe, it is recessed that the other end of the branch pipe is provided with arc corresponding with the arc hole, the arc of the branch pipe
It is recessed to weld the arc hole site for being arranged at the supervisor.
3. water knockout drum according to claim 2, it is characterised in that:The side wall lower surface of the supervisor is provided with exhaust outlet.
4. water knockout drum according to claim 3, it is characterised in that:The side wall lower surface that the end socket is located at the supervisor is leaned on
The position of the nearly end socket.
5. water knockout drum according to claim 1, it is characterised in that:The supervisor is carbon steel seamless steel pipe.
6. water knockout drum according to claim 5, it is characterised in that:The branch pipe is carbon steel seamless steel pipe.
7. according to any described water knockout drum of claim 1~6, it is characterised in that:The supervisor and the inside and outside wall of the branch pipe
It is provided with coating layer.
8. water knockout drum according to claim 7, it is characterised in that:The coating layer of the inwall of the supervisor and the branch pipe
Inwall is provided with epoxy resin layer, and the inwall of the epoxy resin layer is provided with polyethylene layer.
9. according to any described water knockout drum of claim 1~6, it is characterised in that:The supervisor and the inside and outside wall of the branch pipe
It is provided with nickel dam.
10. according to any described water knockout drum of claim 1~6, it is characterised in that:The supervisor and the inside and outside wall of the branch pipe
It is provided with zinc layers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621268703.3U CN206191136U (en) | 2016-11-23 | 2016-11-23 | Water distributing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621268703.3U CN206191136U (en) | 2016-11-23 | 2016-11-23 | Water distributing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206191136U true CN206191136U (en) | 2017-05-24 |
Family
ID=58723810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621268703.3U Active CN206191136U (en) | 2016-11-23 | 2016-11-23 | Water distributing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206191136U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106402554A (en) * | 2016-11-23 | 2017-02-15 | 河南卡斯特流体科技有限公司 | Water distributor and production process thereof |
CN112344116A (en) * | 2020-10-10 | 2021-02-09 | 金汝 | Cleanable pipeline |
-
2016
- 2016-11-23 CN CN201621268703.3U patent/CN206191136U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106402554A (en) * | 2016-11-23 | 2017-02-15 | 河南卡斯特流体科技有限公司 | Water distributor and production process thereof |
CN112344116A (en) * | 2020-10-10 | 2021-02-09 | 金汝 | Cleanable pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106402554A (en) | Water distributor and production process thereof | |
CN206191136U (en) | Water distributing device | |
CN104405973A (en) | Flange steel-plastic composite pipe adjustment short pipe | |
CN206001178U (en) | A kind of tube bends | |
CN204647619U (en) | Anticorrosion composite pipe connects special welding flanged joint | |
CN206592702U (en) | A kind of sealing device of the nitrogen charging mouth of pipe | |
CN206561186U (en) | Double air flow structure local dry cavity underwater robots weld Mini drain cap | |
CN206943638U (en) | A kind of nitrogen injection device for oil-gas pipeline fire operation | |
CN203011228U (en) | Water distribution device | |
CN207094059U (en) | A kind of threeway closure plate weld leakage is met an urgent need tape-pressure leakage clogging device | |
CN204739350U (en) | Hydraulic turbine shaft seal water supply ring canal | |
CN218818827U (en) | Three-way joint for pipeline | |
CN207213390U (en) | A kind of compound composite pipe tightness connector of hole pattern steel strip-plastic | |
CN201964089U (en) | Anticorrosion pipeline | |
CN202132922U (en) | Steam generator of pressurized water reactor nuclear power station | |
CN206846154U (en) | A kind of integral lining corrosion resisting alloy composite elbow being connected firmly | |
CN206839450U (en) | A kind of electric welding machine Special circulation water pipe arranging device | |
CN205226757U (en) | A positive left -hand thread ferrule connection structure for interior outer anti -corrosion pipeline | |
CN204477546U (en) | Flange steel-plastic composite pipe regulates short tube | |
CN217411289U (en) | Gas pipeline welding seam processing apparatus | |
CN204254145U (en) | Gas steel pipeline band gas plugging device | |
CN208237304U (en) | Waste discharge feed channel and waste air equipment | |
CN202849475U (en) | Installing structure for water inlet pipe of furnace cap and furnace mouth | |
CN207500546U (en) | A kind of copper valve with check function | |
CN217421087U (en) | Safety sucker rod blowout preventer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |