CN206189402U - Early warning device that stock was used - Google Patents

Early warning device that stock was used Download PDF

Info

Publication number
CN206189402U
CN206189402U CN201621216084.3U CN201621216084U CN206189402U CN 206189402 U CN206189402 U CN 206189402U CN 201621216084 U CN201621216084 U CN 201621216084U CN 206189402 U CN206189402 U CN 206189402U
Authority
CN
China
Prior art keywords
section
warning device
early warning
prior
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621216084.3U
Other languages
Chinese (zh)
Inventor
郑枫壤
李红梅
石峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201621216084.3U priority Critical patent/CN206189402U/en
Application granted granted Critical
Publication of CN206189402U publication Critical patent/CN206189402U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses an early warning device that stock was used, the stock includes the anchor section and supports the section anchor section and the early warning device who supports to be equipped with connection anchor section between the section and support the section, early warning device is including following the gliding baffle of early warning device inner wall, baffle one side is with the anchor section or support the section to be connected, is close to one side of supporting the section and is connected with the early warning line, the early warning line is along supporting the section to extend, after bolt installation(3) finishes, the early warning line stretches out outside the rock mass. After the stock gets into the operation state, along with supporting the not hard up of the outside country rock of section, can drive the end movement of baffle towards early warning device to make to support section and anchor section part each other, at the detached in -process, the early warning line surpasss the length of rock mass can be shorter and shorter, consequently, and the stress of the length situation judgement stock that measurement personnel can be through early warning indicating line, taking precautions againt calamity. This early warning device's simple structure, simple to operate.

Description

A kind of prior-warning device of anchor pole
Technical field
The utility model belongs to the technical field of foundation stabilization, and in particular to a kind of prior-warning device of anchor pole.
Background technology
Anchor rod anchored is a kind of reinforcing mode for being in the earth formation tightly chained together works and stratum by anchor pole, The pulling force of anchor pole and the shearing strength transferring structure thing of surrounding formation is relied in work, stratum itself is reinforced, guarantor is reached Hold the purpose of works and Rock Slide Stability.Anchor pole can be divided into tension type anchor pole and pressure according to the stress state difference residing for anchoring piece Power type anchor pole.Tension type anchor pole is easily pulled off when working, and the stability and antiseptic property of pulling force firmware are all poor.And pressure-type The bearing capacity and deformation performance of anchor pole make moderate progress compared with tension type anchor pole, have for permanent anchoring engineering very big excellent More property.
After anchor bolt construction is finished, due to burying the reason being trapped in rock mass, the working condition and compression situation of anchor pole are extraneous It is difficult to detect, this is very big threat to the safety during operation.Therefore, need badly and a kind of facilitate testing staff to judge anchor pole Working condition prior-warning device.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of prior-warning device for anchor pole, the prior-warning device Simple structure, and facilitate testing staff to observe and take appropriate measures.
The technical scheme that the utility model solution above-mentioned technical problem is used is for a kind of prior-warning device of anchor pole, institute Anchor pole is stated including anchoring section and section is supported, connection anchoring section is provided with the anchoring section and between supporting section and is supported the early warning of section Device;The prior-warning device includes the dividing plate that can be slided along prior-warning device inwall;The dividing plate side and anchoring section or support section Connection, early warning line is connected near the side of section is supported;The early warning line is extended to along support section and stretched out outside rock mass.
After anchor pole enters operation state, with the loosening for supporting section outside country rock, can be filled towards early warning with dynamic dividing plate One end movement put, so that support that section and anchoring section are separated from each other, in a separate process, length of the early warning line beyond rock mass Can it is shorter and shorter, therefore, testing staff can judge the stress of anchor pole by the length situation of early warning instruction line, prevent in Possible trouble.The simple structure of the prior-warning device, it is easy for installation.
Further, the side being connected with anchoring section on the dividing plate or the side being connected with support section are provided with and early warning The elastomeric element of crust of the device connection.The elastomeric element can be anchoring section and support section as the main bearing member of anchor pole Offer holdback force is separated from each other, so as to strengthen the bearing capacity and deformability of anchor pole.
Further, the elastomeric element is stage clip.It is not easy to crack when stage clip is in pressured state, for permanent anchoring work Journey tool has an enormous advantage.
Further, when the side of the dividing plate is connected with anchoring section, the anchoring section sets with the junction of prior-warning device There is chute;When the side of the dividing plate is with supporting that section is connected, the support section is provided with chute with the junction of prior-warning device.It is logical Cross setting chute, it is possible to decrease support section or the frictional force between anchoring section and prior-warning device, prevent the Housing failure of prior-warning device, Extend the service life of prior-warning device.
Further, the top for supporting section is socketed with anchor disk and nut successively.
Further, the support section is provided with axial through hole, and the early warning line is laid along the through hole and stretches out support Outside section.It is placed within support section by by early warning line, is not only advantageous for maintenance, detection and the installation of early warning line, and this Bolt deformation degree shown by early warning line under state is more accurate.
Further, the early warning line is welded or is bonded as one with dividing plate.Which kind of combined process is specifically used, can be according to pre- Depending on the material of alert line and dividing plate, for example, when early warning line and dividing plate are stainless steel, using the early warning line of solder bond Adhesion with dividing plate is stronger, and testing result is more effectively.Further, the early warning line is stainless steel wire.
Brief description of the drawings
Fig. 1 is the prior-warning device of embodiment 1 and the scheme of installation of anchor pole.
Fig. 2 is the prior-warning device of embodiment 2 and the scheme of installation of anchor pole.
Specific embodiment
Embodiment 1
As shown in figure 1, anchor pole includes anchoring section 1 and supports section 2, connection is provided between the anchoring section 1 and support section 2 The prior-warning device 3 of anchoring section 1 and support section 2;The prior-warning device 3 is provided with the dividing plate 31 that can be slided along the inwall of prior-warning device 3;Institute State the side of dividing plate 31 to be connected with section 2 is supported, opposite side is connected with early warning line 32;It is connected with anchoring section 1 on the dividing plate 31 Side is provided with the stage clip 33 with the cage connection of prior-warning device 3.The anchoring section 1 is provided with chute 34 with the junction of prior-warning device 3. The support section 2 is provided with axial through hole 21, and the early warning line 32 is laid and stretched out outside support section 2 along the through hole 21. The early warning line 32 is stainless steel wire and is welded as a whole with dividing plate 31.The top for supporting section 2 is socketed with the He of anchor disk 4 successively Nut 5.
Embodiment 2
As shown in Fig. 2 anchor pole includes anchoring section 1 and supports section 2, connection is provided between the anchoring section 1 and support section 2 The prior-warning device 3 of anchoring section 1 and support section 2;The prior-warning device 3 is provided with the dividing plate 31 that can be slided along the inwall of prior-warning device 3;Institute State dividing plate 31 and be also associated with early warning line 32 with the side for supporting section 2 to be connected;With the side for supporting section 2 to be connected on the dividing plate 31 It is provided with the stage clip 33 with the cage connection of prior-warning device 3.It is described to support that section 2 is provided with chute 34 with the junction of prior-warning device 3.It is described Support that section 2 is provided with axial through hole 21, the early warning line 32 is laid and stretched out outside support section 2 along the through hole 21.It is described Early warning line 32 is stainless steel wire and is welded as a whole with dividing plate 31.The top for supporting section 2 is socketed with anchor disk 4 and nut successively 5。

Claims (8)

1. a kind of prior-warning device of anchor pole, the anchor pole includes anchoring section (1) and support section (2), it is characterised in that:Described Connection anchoring section (1) is provided between anchoring section (1) and support section (2) and the prior-warning device (3) of section (2) is supported;The early warning dress Put (3) including can along prior-warning device (3) inwall slide dividing plate (31);Dividing plate (31) side and anchoring section (1) or support Section (2) connection, early warning line (32) is connected near the side of section (2) is supported;The early warning line (32) extends along support section (2) To stretching out outside rock mass.
2. a kind of prior-warning device of anchor pole as claimed in claim 1, it is characterised in that:On the dividing plate (31) and anchoring section (1) side being connected or the side being connected with support section (2) are provided with the elastomeric element with prior-warning device (3) cage connection (33)。
3. a kind of prior-warning device of anchor pole as claimed in claim 2, it is characterised in that:The elastomeric element (33) is pressure Spring.
4. a kind of prior-warning device of anchor pole as claimed in claim 1, it is characterised in that:When the dividing plate (31) side with When anchoring section (1) is connected, the anchoring section (1) is provided with chute (34) with the junction of prior-warning device (3);When the dividing plate (31) Side with supporting that section (2) is connected when, the junction of support section (2) and prior-warning device (3) is provided with chute (34).
5. a kind of prior-warning device of anchor pole as claimed in claim 1, it is characterised in that:Support section (2) is provided with axial direction Through hole (21), the early warning line (32) lays and stretches out outside support section (2) along the through hole (21).
6. a kind of prior-warning device of anchor pole as claimed in claim 5, it is characterised in that:It is described support section (2) top according to It is secondary to be socketed with anchor disk (4) and nut (5).
7. a kind of prior-warning device of anchor pole as claimed in claim 1, it is characterised in that:The early warning line (32) and dividing plate (31) weld or be bonded as one.
8. a kind of prior-warning device of anchor pole as claimed in claim 1, it is characterised in that:The early warning line (32) is stainless steel Silk.
CN201621216084.3U 2016-11-09 2016-11-09 Early warning device that stock was used Expired - Fee Related CN206189402U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621216084.3U CN206189402U (en) 2016-11-09 2016-11-09 Early warning device that stock was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621216084.3U CN206189402U (en) 2016-11-09 2016-11-09 Early warning device that stock was used

Publications (1)

Publication Number Publication Date
CN206189402U true CN206189402U (en) 2017-05-24

Family

ID=58734109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621216084.3U Expired - Fee Related CN206189402U (en) 2016-11-09 2016-11-09 Early warning device that stock was used

Country Status (1)

Country Link
CN (1) CN206189402U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108397220A (en) * 2018-03-23 2018-08-14 李海斌 A kind of anchor cable is anti-to be penetrated and monitoring device
CN110242349A (en) * 2019-06-06 2019-09-17 法施达科技有限公司 Pressure sensing built-in sliding chute
CN113266007A (en) * 2021-05-26 2021-08-17 中国矿业大学 Prestressed anchor cable with fracture early warning function

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108397220A (en) * 2018-03-23 2018-08-14 李海斌 A kind of anchor cable is anti-to be penetrated and monitoring device
CN110242349A (en) * 2019-06-06 2019-09-17 法施达科技有限公司 Pressure sensing built-in sliding chute
CN113266007A (en) * 2021-05-26 2021-08-17 中国矿业大学 Prestressed anchor cable with fracture early warning function

Similar Documents

Publication Publication Date Title
CN205449674U (en) Experimental die pull - displacement monitoring devices is drawn to laboratory stock
CN206189402U (en) Early warning device that stock was used
CN102020161B (en) Connecting device of hauling rope of elevator for mines and detection method thereof
CN112945124B (en) Comprehensive detection testing machine for detecting performance of detector in pipeline
CN107084893B (en) Joint rock mass anchor rod dynamic load test device
CN113418647B (en) Floating force testing device and method for shield segment in surrounding rock
CN107036737A (en) A kind of recyclable mining induced stress monitoring probe
CN204514514U (en) A kind of device detecting anchor axial force and bending moment force
CN204435439U (en) A kind of foundation pile static load detects uses Novel self-balanced load box
CN203811306U (en) Concrete strain gauge assembly device
CN109763851A (en) Have anchor force grading forewarning system and the reciprocal plastic deformation of tool allows the anchorage and method of pressure characteristic
CN106499421B (en) A kind of mechanical constant-resistance individual prop withdrawing technique and recovery method
CN215003458U (en) Comprehensive detection testing machine for detecting performance of detector in pipeline
CN205691478U (en) A kind of disk brake for car liner corrosion cohesive force test fixture
CN102134990B (en) Cement head magnetic induction rubber plug indicator
CN104278677B (en) A kind of device and method for A/C in antiseepage wall chase section casting process
CN206410929U (en) A kind of anchor rod drawing instrument connector
CN109024714A (en) A kind of pulling resistance testing device of anchor pole
CN105424485B (en) Concrete filled steel tube bow member perfusion pilot system and test method
CN105509683B (en) Displacement measuring device for self-balancing pile testing method
CN105937402A (en) Anchor bolt supporting system with self-drilling type recognizable loose surrounding rock drill bit
CN106979900B (en) Soil and structure interface fluid-solid coupling effect tester
CN205981524U (en) Be used for civil engineering prestressing force shearing force detection device
CN104290772A (en) Shear force sensor
CN210395425U (en) Main transformer foundation of outdoor substation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524

Termination date: 20201109