CN206189397U - Simple and easy hollow pile of civil engineering - Google Patents
Simple and easy hollow pile of civil engineering Download PDFInfo
- Publication number
- CN206189397U CN206189397U CN201621226041.3U CN201621226041U CN206189397U CN 206189397 U CN206189397 U CN 206189397U CN 201621226041 U CN201621226041 U CN 201621226041U CN 206189397 U CN206189397 U CN 206189397U
- Authority
- CN
- China
- Prior art keywords
- pile body
- pile
- limit disk
- civil engineering
- circle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a simple and easy hollow pile of civil engineering, the pile body is cylindrically barrel -shaped structure, install the strengthening rib on the annular side of pile body, the strengthening rib is provided with between many and a plurality of strengthening ribs equidistance and arranges, spacing dish is installed to the upper end of pile body, the edge of last spacing dish is offered flutedly, the recess is the ring shape slotted hole structure of square for the cross section, the fixed orifices comes realization fixing the pile body with lower fixed orifices through adding upward, this design be convenient for carry on according to high needs selection of different height dimensions pile bodies, the strengthening rib that is located in addition on the terminal surface of the pile body outside has played the function of strengthening the whole bearing capacity of pile body, this design is effectual has solved traditional pile body because the too big pile body that causes of transverse load takes place the problem of deforming, and infiltration kong ze discharges the inside moisture of pile body, fixing two pile bodies is realized with the lug assembly together to the recess in addition, this design has ensured two pile bodies stability before, and improved the efficiency of pile body installation.
Description
Technical field
The utility model is a kind of simple hollow pile of civil engineering, belongs to civil engineering plant field.
Background technology
In the prior art, the small pile for being used in civil engineering, is all to use deal pile according to traditional form, first by
Deal pile needs to cut down substantial amounts of pine forest, natural, ecological is formed and is destroyed, and the deal pile for besides generating naturally is in diameter, height
With it is right and wrong degree etc. aspect again be difficult satisfaction design specific requirement, during use pile body in the presence of external force often
Depression, and then the scope of pile body carrying is influenceed, pile body traditional in addition is present installs inconvenient and internal easy water accumulation etc.
Problem, so needing a kind of simple hollow pile of civil engineering to solve the above problems.
Utility model content
In view of the shortcomings of the prior art, the utility model purpose is to provide a kind of simple hollow pile of civil engineering, with
Solve the problems, such as to be proposed in above-mentioned background technology, the utility model is easy to use, is easy to operation, and good stability, reliability is high.
To achieve these goals, the utility model is to realize by the following technical solutions:A kind of civil engineering letter
Easy hollow pile, including upper limit disk, upper fixing hole, pile body, reinforcement, lower limit disk, groove, projection, water seepage hole and lower solid
Determine hole, the pile body is cylindrical barrel structure, reinforcement is installed in the annular side of the pile body, the reinforcement is set
Have between many and multiple reinforcements and equidistantly arranged, the upper end of the pile body is provided with upper limit disk, the upper limit disk
Edge it is fluted, the groove is the square annular groove pore structure in cross section, and fixed hole position is in upper
On position-arresting disk and be particularly located at position of the upper limit disk near the center of circle, the lower end of the pile body is provided with lower limit disk, it is described under
Position-arresting disk opens up lower fixed hole near the position in the center of circle, and the lower end of the lower limit disk is equipped with projection, and the projection is transversal
The square cirque structure in face, the lower end of the pile body side offers water seepage hole, the fixed hole center of circle to the upper limit
The distance in the position disk center of circle is identical with the distance in the lower fixed hole center of circle to the lower limit disk center of circle.
Further, the reinforcement is cirque structure of the cross section in equilateral triangle.
Further, the internal diameter of the upper limit disk is identical with the external diameter of pile body.
Further, fixed hole is equidistantly arranged between being provided with multiple and multiple upper fixing holes.
Further, the external diameter of the upper limit disk is identical with the external diameter of lower limit disk.
Further, the lower fixed hole is equidistantly arranged between being provided with multiple and multiple lower fixed holes.
Further, the inside of the water seepage hole is provided with screen pack.
The beneficial effects of the utility model:The simple hollow pile of a kind of civil engineering of the present utility model, by solid in addition
Determine hole and lower fixed hole to realize the fixation to pile body, the design is easy to according to the highly desirable different height size pile body that carries out
Selection, the reinforcement being additionally disposed in pile body end face outside serves the function of strengthening pile body total bearing capacity, and the design is effective
Solve the problems, such as that traditional pile body causes pile body to deform upon because transverse load is excessive, and water seepage hole is then by inside pile body
Moisture is discharged, and then serves the effect for keeping pile body internally dry, and groove is assembled together realization to two with projection in addition
The fixation of pile body, the design has ensured the stability before two pile bodies, and improves the efficiency that pile body is installed, and this practicality is new
Type is easy to use, is easy to operation, and good stability, reliability is high.
Brief description of the drawings
The detailed description made to non-limiting example with reference to the following drawings by reading, other spies of the present utility model
Levy, objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural representation of the utility model simple hollow pile of civil engineering;
Fig. 2 is the structural representation of projection in a kind of the utility model simple hollow pile of civil engineering;
In figure:1- upper limits disk, the upper fixing holes of 2-, 3- pile bodies, 4- reinforcements, 5- lower limits disk, 6- grooves, 7- projections,
8- water seepage holes, 9- lower fixed holes.
Specific embodiment
For technological means, creation characteristic, reached purpose and effect for realizing the utility model are easy to understand, below
With reference to specific embodiment, the utility model is expanded on further.
Fig. 1 and Fig. 2 is referred to, the utility model provides a kind of technical scheme:A kind of simple hollow pile of civil engineering, including
Upper limit disk 1, upper fixing hole 2, pile body 3, reinforcement 4, lower limit disk 5, groove 6, projection 7, water seepage hole 8 and lower fixed hole 9,
Pile body 3 is cylindrical barrel structure, and reinforcement 4 is provided with the annular side of pile body 3, and reinforcement 4 is provided with many and multiple
Equidistantly arranged between reinforcement 4, the upper end of pile body 3 is provided with upper limit disk 1, and the edge of upper limit disk 1 is fluted
6, groove 6 is the square annular groove pore structure in cross section, and upper fixing hole 2 is located on upper limit disk 1 and is particularly located at
Position-arresting disk 1 is provided with lower limit disk 5 near the position in the center of circle, the lower end of pile body 3, and lower limit disk 5 is opened up near the position in the center of circle
Lower fixed hole 9, the fixation to pile body 3 is realized by the upper fixing hole 2 of addition with lower fixed hole 9, and the design is easy to according to height
Need to carry out the selection of different height size pile body 3, the reinforcement 4 being additionally disposed in the end face outside of pile body 3 serves reinforcement stake
The function of the total bearing capacity of body 3, the design effectively solves traditional pile body 3 and causes pile body 3 to occur because transverse load is excessive
The problem of deformation, the lower end of lower limit disk 5 is equipped with projection 7, and projection 7 is the square cirque structure in cross section, pile body 3
The lower end of side offers water seepage hole 8, and distance and the center of circle of lower fixed hole 9 in the center of circle of upper fixing hole 2 to the center of circle of upper limit disk 1 are arrived down
The distance in the center of circle of position-arresting disk 5 is identical.
Reinforcement 4 is cirque structure of the cross section in equilateral triangle, the internal diameter of upper limit disk 1 and the external diameter phase of pile body 3
Together, upper fixing hole 2 is equidistantly arranged between being provided with multiple and multiple upper fixing holes 2, the external diameter and lower limit of upper limit disk 1
The external diameter of disk 5 is identical, and lower fixed hole 9 is equidistantly arranged between being provided with multiple and multiple lower fixed holes 9, water seepage hole 8 it is interior
Portion is provided with screen pack, and water seepage hole 8 serves the work for keeping pile body 3 internally dry then by the moisture discharge inside pile body 3
With groove 6 is assembled together realization to two fixations of pile body 3 with projection 7 in addition, before the design has ensured two pile bodies 3
Stability, and improve pile body 3 installation efficiency.
Specific embodiment:When being used, staff is checked the utility model first, is checked whether and is deposited
In defect, if there is cannot just carry out using if defect, now need to notify that maintenance personal is repaired, if do not deposited
Can be carried out using if problem, when in use, two pile bodies 3 are fixed together first, by stake in fixed process
The side of the distribution projection 7 of body 3 is installed together with the side of redistribution grooves 6, and the angle between two pile bodies 3 is adjusted after installation
Degree, then will be fixed between upper fixing hole 2 and lower fixed hole 9 by stud, and support fixation is served after the completion of fixing
Effect, finally carries out use, and during use, the moisture inside pile body 3 is discharged by water seepage hole 8, if desired
Carry out if concreting, the moisture in concrete is discharged by water seepage hole 8, and the screen pack being located in water seepage hole 8 is played
The effect of filtering.
General principle of the present utility model and principal character and advantage of the present utility model has been shown and described above, for
For those skilled in the art, it is clear that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and without departing substantially from this
In the case of the spirit or essential attributes of utility model, the utility model can be in other specific forms realized.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, scope of the present utility model is by institute
Attached claim is limited rather than described above, it is intended that will fall in the implication and scope of the equivalency of claim
All changes are included in the utility model.Any reference in claim should not be considered as the right involved by limitation
It is required that.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each implementation method is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should
Specification an as entirety, the technical scheme in each embodiment can also be formed into those skilled in the art through appropriately combined
May be appreciated other embodiment.
Claims (7)
1. a kind of simple hollow pile of civil engineering, including upper limit disk, upper fixing hole, pile body, reinforcement, lower limit disk, groove,
Projection, water seepage hole and lower fixed hole, it is characterised in that:The pile body is cylindrical barrel structure, the annular side of the pile body
Reinforcement is installed, the reinforcement is provided between many and multiple reinforcements and is equidistantly arranged, the pile body on face
Upper end is provided with upper limit disk, and the edge of the upper limit disk is fluted, and the groove is the square circle in cross section
Annular slotted hole structure, fixed hole position is described on upper limit disk and position of the upper limit disk near the center of circle is particularly located at
The lower end of pile body is provided with lower limit disk, and the lower limit disk opens up lower fixed hole, the lower limit disk near the position in the center of circle
Lower end be equipped with projection, the projection is the square cirque structure in cross section, and the lower end of the pile body side opens up
Have a water seepage hole, the distance in the fixed hole center of circle to the upper limit disk center of circle and the lower fixed hole center of circle to the lower limit disk center of circle away from
From identical.
2. the simple hollow pile of a kind of civil engineering according to claim 1, it is characterised in that:The reinforcement is cross section
In the cirque structure of equilateral triangle.
3. the simple hollow pile of a kind of civil engineering according to claim 1, it is characterised in that:The internal diameter of the upper limit disk
External diameter with pile body is identical.
4. the simple hollow pile of a kind of civil engineering according to claim 1, it is characterised in that:Fixed hole is provided with
Equidistantly arranged between the upper fixing hole of multiple and multiple.
5. the simple hollow pile of a kind of civil engineering according to claim 1, it is characterised in that:The external diameter of the upper limit disk
External diameter with lower limit disk is identical.
6. the simple hollow pile of a kind of civil engineering according to claim 1, it is characterised in that:The lower fixed hole is provided with
Equidistantly arranged between multiple and multiple lower fixed holes.
7. the simple hollow pile of a kind of civil engineering according to claim 1, it is characterised in that:The inside peace of the water seepage hole
Equipped with screen pack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621226041.3U CN206189397U (en) | 2016-11-15 | 2016-11-15 | Simple and easy hollow pile of civil engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621226041.3U CN206189397U (en) | 2016-11-15 | 2016-11-15 | Simple and easy hollow pile of civil engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206189397U true CN206189397U (en) | 2017-05-24 |
Family
ID=58725707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621226041.3U Expired - Fee Related CN206189397U (en) | 2016-11-15 | 2016-11-15 | Simple and easy hollow pile of civil engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206189397U (en) |
-
2016
- 2016-11-15 CN CN201621226041.3U patent/CN206189397U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207660312U (en) | A kind of building combined type adjustable support frame | |
CN102086697A (en) | Floor through-hole formwork device | |
CN201857613U (en) | Bamboo joint type anchor rod | |
CN206189397U (en) | Simple and easy hollow pile of civil engineering | |
CN202090336U (en) | Spirally-proceeding type steel tube concrete pile | |
CN202253697U (en) | Suspending structure of internal cylinder chimney | |
CN209873542U (en) | Protector is used in building engineering construction | |
CN206844612U (en) | A kind of coal mine underground construction scaffold | |
CN208961968U (en) | A kind of wall column reinforcing bar stacking platform | |
CN203430543U (en) | Expansion anchor rod | |
CN206279632U (en) | A kind of attachment structure of new steel column and beams of concrete | |
CN201314042Y (en) | Expansion-type pile foundation | |
CN203795414U (en) | Telescopic building pile | |
CN204139190U (en) | A kind of Liftable preformed bricks fetal membrane | |
CN206110350U (en) | Steel pipe truss of falling triangle last quarter support welding structure | |
CN205676877U (en) | A kind of guider for the treatment of of soft foundation equipment | |
CN208152010U (en) | A kind of combined type steel pipe diaphragm wall | |
CN104963335A (en) | Assembly type roasting and baking integral pile and use method thereof | |
CN204152513U (en) | The nozzle of buildup in filling in mine mining vertical sand warehouse can be prevented | |
CN204510780U (en) | Temporary fixed support pedestal | |
TWM599056U (en) | Wing plate type base structure | |
CN209653371U (en) | A kind of runner carrying template | |
CN203891439U (en) | Building construction beam frame | |
CN207633844U (en) | sleeve-type chimney | |
CN203034896U (en) | Chimney provided with a plurality of holes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170524 Termination date: 20171115 |
|
CF01 | Termination of patent right due to non-payment of annual fee |