CN206189221U - Temperature reduction and phase change bituminous pavement structure suitable for heavily traffic - Google Patents

Temperature reduction and phase change bituminous pavement structure suitable for heavily traffic Download PDF

Info

Publication number
CN206189221U
CN206189221U CN201620748460.7U CN201620748460U CN206189221U CN 206189221 U CN206189221 U CN 206189221U CN 201620748460 U CN201620748460 U CN 201620748460U CN 206189221 U CN206189221 U CN 206189221U
Authority
CN
China
Prior art keywords
pavement structure
phase transformation
heavy traffic
lowered
asphalt pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620748460.7U
Other languages
Chinese (zh)
Inventor
王慧
沈佳
王迎春
段丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201620748460.7U priority Critical patent/CN206189221U/en
Application granted granted Critical
Publication of CN206189221U publication Critical patent/CN206189221U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model belongs to the technical field of road engineering, a temperature reduction and phase change bituminous pavement structure suitable for heavily traffic is related to, surface course, the surface course under the concrete that permeates water, cement stable permeate water upper base layer, graded broken stone base layer and graded macadam bedding layer during the cling compound is joined in marriage to surface course, division level on top -down lays the phase transition permeable asphalt concrete on the soil matrix in proper order. The utility model provides a road surface structure can adapt to the heavy traffic load characteristics, satisfies accumulative total standard shaft ne=1.2's 107~2.5 107 (inferior / lane) road, under the prerequisite of guaranteeing bearing capacity, can effectively reduce pavement temperature.

Description

A kind of phase transformation cooling asphalt pavement structure suitable for heavy traffic
Technical field
The utility model belongs to road engineering technical field, is related to a kind of pavement structure, more particularly to a kind of suitable for weight The phase transformation cooling asphalt pavement structure of traffic.
Background technology
Bituminous concrete is black material, and heat absorption capacity is strong, easily causes pavement temperature to raise.Road surface high temperature can give road Durability, traffic safety and ecological environment bring and have a strong impact on, and such as accelerate ageing of asphalt, aggravation road surface high temperature rut, induce and hand over Interpreter's event, aggravation urban heat land effect etc..With global air temperature warming, the extensive use of bituminous paving, road surface high temperature problem is more Plus it is prominent.
In conventional research, people are generally individually using in phase-change temperature control bituminous concrete or pervious asphalt concrete One kind reduces pavement temperature.But some problems are also occurred in that during use:(1) phase-change material adds very few cooling-down effect Not substantially, the performance of excessive influence bituminous concrete is added, in order to ensure the pavement performance of bituminous concrete, phase-change temperature control The cooling function of bituminous concrete is limited by very large;(2) pervious asphalt concrete has than larger porosity, but The bearing capacity of this material is limited, is not suitable for heavy traffic, very heavy traffic road occupation.
Therefore it provides a kind of cooling asphalt pavement structure suitable for heavy traffic road is problem demanding prompt solution.
Utility model content
The purpose of this utility model is to provide a kind of phase transformation cooling asphalt pavement structure suitable for heavy traffic, road surface knot Structure can adapt to heavy traffic load feature, meet accumulated standard axle time Ne=1.2 × 107~2.5 × 107The road in (secondary/track) Road, on the premise of bearing capacity is ensured, can effectively reduce pavement temperature.
To achieve the above object, the utility model is adopted the following technical scheme that:
A kind of phase transformation cooling asphalt pavement structure suitable for heavy traffic, it is characterised in that:It is described suitable for heavy traffic Phase transformation cooling asphalt pavement structure includes the phase transformation pervious asphalt concrete upper layer being laid on successively on soil matrix from top to bottom, opens Level is with surface layer, pervious concrete cutting optimal, the permeable upper basic unit of cement stabilizing, gravel-sorted subbase and graded broken stone in antiskid Bed course.
Preferably, the level of phase transformation pervious asphalt concrete upper layer that is used of the utility model is with being OGFC-16;Institute The thickness for stating phase transformation pervious asphalt concrete upper layer is 40mm.
Preferably, surface layer is that big space open gradation drainage type pitch grinds in the open gradation antiskid that is used of the utility model Consumption layer, with being OGFC-16, the thickness of surface layer is 50mm to the level of surface layer in the open gradation antiskid in the open gradation antiskid.
Preferably, the pervious concrete cutting optimal that the utility model is used is Sand-free permeable concrete layer, it is described The thickness of water coagulation soil cutting optimal is 200mm, and the voidage of the pervious concrete cutting optimal is 15~25%.
Preferably, the thickness of the permeable upper basic unit of cement stabilizing that the utility model is used is 400mm, the cement is steady The voidage of fixed permeable upper basic unit is 15~25%.
Preferably, the crush values of building stones are not more than 25%, institute in the gravel-sorted subbase that is used of the utility model The compactness of gravel-sorted subbase is stated not less than 100%, the CBR values of the gravel-sorted subbase are described not less than 100% The thickness of gravel-sorted subbase is 200mm.
Preferably, the crush values of building stones are not more than 26% in the granular cushion that is used of the utility model, it is described The compactness of granular cushion is not less than 98%, and the CBR values of the granular cushion are not less than 100%, and the level is with broken The thickness of stone bed course is 200mm.
Preferably, the compression rebound modulu of soil matrix that the utility model is used is not less than 45MPa.
The utility model compared with the prior art, with advantages below and beneficial effect:
The utility model provides a kind of phase transformation suitable for heavy traffic and lowers the temperature asphalt pavement structure, including from bottom to top according to Below the permeable upper basic unit of the secondary granular cushion being laid on soil matrix, gravel-sorted subbase, cement stabilizing, pervious concrete Surface layer, phase transformation pervious asphalt concrete upper layer in layer, open gradation antiskid.The pavement structure that the utility model is used utilizes phase Become storage of the phase transformation fuel factor of bituminous concrete to solar energy reduces bituminous paving temperature with release, while using pervious asphalt Pavement structure adjusts the temperature and humidity of air, so as to reduce pavement temperature.By pervious concrete cutting optimal and cement stabilizing The application of porous base course improves bearing capacity of pavement structure, overcomes phase-change temperature control bituminous concrete and pervious asphalt concrete should With the problem of the Lack of support for bringing.In a word, the utility model provides a kind of phase transformation cooling pitch suitable for heavy traffic On the one hand pavement structure has more preferable road surface cooling-down effect, on the one hand disclosure satisfy that the use requirement of heavy traffic road.
Brief description of the drawings
Fig. 1 is the structural representation of pavement structure provided by the utility model;
Wherein:
1- soil matrixs;2- granular cushions;3- gravel-sorted subbases;The permeable upper basic unit of 4- cement stabilizings;5- is permeable mixed Solidifying soil cutting optimal;Surface layer in 6- open gradation antiskids;7- phase transformation pervious asphalt concrete upper layers.
Specific embodiment
The utility model is further described in conjunction with drawings and Examples, but the utility model is not limited only to down The implementation method stated.
Referring to Fig. 1, the utility model provides a kind of phase transformation cooling asphalt pavement structure suitable for heavy traffic, including certainly It is lower and on be laid on granular cushion 2 on soil matrix 1, the permeable upper basic unit 4 of gravel-sorted subbase 3, cement stabilizing, thoroughly successively Surface layer 6 and phase transformation pervious asphalt concrete upper layer 7 in water coagulation soil cutting optimal 5, open gradation antiskid.
Wherein:
Phase transformation pervious asphalt concrete upper layer 7, with being OGFC-16, cementitious matter is high-viscosity asphalt and phase transformation to the level for using The mixture of material, phase-change material is polyethylene glycol.The thickness of phase transformation pervious asphalt concrete upper layer 7 is 4cm.
Surface layer 6 uses big space open gradation drainage type asphalt wearing layer in open gradation antiskid, and it is OGFC-16 that level is matched somebody with somebody, Pitch is high-viscosity asphalt, and thickness is 50mm.
Pervious concrete cutting optimal 5 uses Sand-free permeable concrete, and aggregate uses gap grading, and thickness is 200mm, Voidage is 15~25%.
The permeable upper basic unit 4 of cement stabilizing, aggregate uses gap grading, and thickness is 400mm, and voidage is 15~25%.
Gravel-sorted subbase 3, it is desirable to which the crush values of building stones are not more than 25%, is designed using heavy compacting criteria, compacting Degree is not less than 100% not less than 100%, CBR values, and thickness is 200mm.
Granular cushion 2, it is desirable to which the crush values of building stones are not more than 26%, is designed, compactness using heavy compacting criteria It is not less than 100% not less than 98%, CBR values, thickness is 200mm.
The compression rebound modulu of soil matrix 1 is not less than 45MPa.

Claims (8)

1. a kind of phase transformation suitable for heavy traffic is lowered the temperature asphalt pavement structure, it is characterised in that:The phase suitable for heavy traffic Becoming cooling asphalt pavement structure includes being laid on soil matrix successively from top to bottom(1)On phase transformation pervious asphalt concrete upper layer (7), surface layer in open gradation antiskid(6), pervious concrete cutting optimal(5), the permeable upper basic unit of cement stabilizing(4), graded broken stone bottom Basic unit(3)And granular cushion(2).
2. the phase transformation suitable for heavy traffic according to claim 1 is lowered the temperature asphalt pavement structure, it is characterised in that:The phase Become pervious asphalt concrete upper layer(7)Level be OGFC-16;The phase transformation pervious asphalt concrete upper layer(7)Thickness It is 40mm to spend.
3. the phase transformation suitable for heavy traffic according to claim 2 is lowered the temperature asphalt pavement structure, it is characterised in that:It is described to open Level is with surface layer in antiskid(6)It is big space open gradation drainage type asphalt wearing layer, surface layer in the open gradation antiskid(6)Level match somebody with somebody It is OGFC-16, surface layer in the open gradation antiskid(6)Thickness be 50mm.
4. the phase transformation suitable for heavy traffic according to claim 3 is lowered the temperature asphalt pavement structure, it is characterised in that:It is described Water coagulation soil cutting optimal(5)It is Sand-free permeable concrete layer, the pervious concrete cutting optimal(5)Thickness be 200mm, it is described Pervious concrete cutting optimal(5)Voidage be 15~25%.
5. the phase transformation suitable for heavy traffic according to claim 4 is lowered the temperature asphalt pavement structure, it is characterised in that:The water Mud stablizes permeable upper basic unit(4)Thickness be 400mm, the permeable upper basic unit of cement stabilizing(4)Voidage be 15~25%.
6. the phase transformation suitable for heavy traffic according to claim 5 is lowered the temperature asphalt pavement structure, it is characterised in that:The level With granular sub-base(3)The crush values of middle building stones are not more than 25%, the gravel-sorted subbase(3)Compactness be not less than 100%, the gravel-sorted subbase(3)CBR values be not less than 100%, the gravel-sorted subbase(3)Thickness be 200mm。
7. the phase transformation suitable for heavy traffic according to claim 6 is lowered the temperature asphalt pavement structure, it is characterised in that:The level With blotter(2)The crush values of middle building stones are not more than 26%, the granular cushion(2)Compactness be not less than 98%, institute State granular cushion(2)CBR values be not less than 100%, the granular cushion(2)Thickness be 200mm.
8. the phase transformation suitable for heavy traffic according to claim 7 is lowered the temperature asphalt pavement structure, it is characterised in that:The soil Base(1)Compression rebound modulu be not less than 45MPa.
CN201620748460.7U 2016-07-15 2016-07-15 Temperature reduction and phase change bituminous pavement structure suitable for heavily traffic Expired - Fee Related CN206189221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620748460.7U CN206189221U (en) 2016-07-15 2016-07-15 Temperature reduction and phase change bituminous pavement structure suitable for heavily traffic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620748460.7U CN206189221U (en) 2016-07-15 2016-07-15 Temperature reduction and phase change bituminous pavement structure suitable for heavily traffic

Publications (1)

Publication Number Publication Date
CN206189221U true CN206189221U (en) 2017-05-24

Family

ID=58736485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620748460.7U Expired - Fee Related CN206189221U (en) 2016-07-15 2016-07-15 Temperature reduction and phase change bituminous pavement structure suitable for heavily traffic

Country Status (1)

Country Link
CN (1) CN206189221U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183551A (en) * 2018-07-31 2019-01-11 同济大学 A kind of porous colour gap bituminous pavement and its construction method
CN114525707A (en) * 2021-12-31 2022-05-24 同路达(上海)生态科技有限公司 Composite pavement structure based on high-performance ecological macroporous concrete material

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183551A (en) * 2018-07-31 2019-01-11 同济大学 A kind of porous colour gap bituminous pavement and its construction method
CN114525707A (en) * 2021-12-31 2022-05-24 同路达(上海)生态科技有限公司 Composite pavement structure based on high-performance ecological macroporous concrete material
CN114525707B (en) * 2021-12-31 2024-02-02 同路达(上海)生态科技有限公司 Composite pavement structure based on high-performance ecological macroporous concrete material

Similar Documents

Publication Publication Date Title
CN202031001U (en) Compound water-permeable road structure
CN102515650B (en) Phase change thermoregulation cement pitch composition concrete and preparation method thereof
CN205874873U (en) Phase transition road surface structure that adjusts temperature
CN204875416U (en) Porous pavement structure
CN109594445A (en) A kind of ecology environmental protection color asphalt paving and its construction method
CN101973726A (en) Porous pavement partially taking steel slag as coarse aggregate
CN111074715A (en) Anti-crack roadbed and pavement structure and construction method thereof
CN206189222U (en) Temperature reduction and phase change flexible base asphalt pavement structure suitable for very heavy traffic
CN206189221U (en) Temperature reduction and phase change bituminous pavement structure suitable for heavily traffic
CN112501976A (en) Construction method of high-strength permeable concrete for non-motor vehicle lane
CN204940041U (en) Concrete dynamic modulus cooling asphalt pavement structure
CN209024907U (en) A kind of double-deck water-permeating pitch mixed material paving structure for bridge floor
CN211256535U (en) A concrete road surface structure that permeates water for heavy-duty traffic
CN104499397A (en) Asphalt pavement structure based on coordination of deformation of subgrade and pavement
CN202519561U (en) Urban road permeable cement concrete pavement structure
CN206189223U (en) Temperature reduction and phase change flexible base asphalt pavement structure suitable for heavily traffic
CN207987662U (en) A kind of permeable pavement structure suitable for high frequency heavy duty road conditions
CN101691730B (en) Composite road surface course structure and construction method thereof
CN206189224U (en) Temperature reduction and phase change bituminous pavement structure suitable for very heavy traffic
CN207176431U (en) A kind of permeable pavement structure based on sponge the idea of the city
CN207143635U (en) A kind of asphalt pavement structure of energy-saving and emission-reduction
CN206143559U (en) High -performance cold regeneration road surface structure
CN205134120U (en) Super thick cement stabilized macadam base
CN205856961U (en) A kind of high-mechanic block-stone pavement structure being applicable to very heavy traffic
CN205839503U (en) A kind of block-stone pavement structure being applicable to heavy traffic

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524

Termination date: 20190715