CN206188546U - Carbide acetylene chemical wastewater zero release processing system - Google Patents
Carbide acetylene chemical wastewater zero release processing system Download PDFInfo
- Publication number
- CN206188546U CN206188546U CN201621209888.0U CN201621209888U CN206188546U CN 206188546 U CN206188546 U CN 206188546U CN 201621209888 U CN201621209888 U CN 201621209888U CN 206188546 U CN206188546 U CN 206188546U
- Authority
- CN
- China
- Prior art keywords
- water tank
- water
- decarbonizing tower
- pump
- weak acid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W10/00—Technologies for wastewater treatment
- Y02W10/30—Wastewater or sewage treatment systems using renewable energies
- Y02W10/37—Wastewater or sewage treatment systems using renewable energies using solar energy
Landscapes
- Water Treatment By Electricity Or Magnetism (AREA)
- Separation Using Semi-Permeable Membranes (AREA)
Abstract
The utility model discloses a carbide acetylene chemical wastewater zero release processing system, including the high -density clarification tank who connects gradually, highly dense pond product water tank, multi -media filter, weak acid sun bed, weak acid sun bed product water tank, decarbonizing tower, decarbonizing tower product water tank, electrodialysis device subassembly, electrodialysis device subassembly includes the electrodialysis device, and the electrodialysis device is connected with fresh -water tank, electrode liquid case, thick water tank, electric osmose division water tank, and the decarbonizing tower water tank passes through the elevator pump to be connected with the fresh -water tank, and electric osmose division water tank passes through the high -pressure pump and is connected with reverse osmosis unit. This system treatment process is in advance selected rationally, and salt concentration efficiency is high, and product water quality of water is good, can save rear end strong brine evaporative concentration's investment and running cost greatly, is the preferred processing system of carbide acetylene chemical wastewater zero release.
Description
Technical field
The utility model is related to a kind of sewage disposal system, more particularly to a kind of carbide acetylene chemical engineering sewage zero discharge treatment
System.
Background technology
The Coal Chemical Industry new technology of calcium carbide method acetylene production, has overturned the coal gasifying process of Coal Chemical Industry upstream, with wide
Application prospect.Country proposes strict requirements to newly-built Coal Chemical Engineering Project with water and Sewage Water Emissions, it is desirable in enterprise
Portion's waste water realizes zero-emission.Therefore, sewage zero-discharge treatment is can't steer clear of in the popularization and application of acetylene from calcium carbide Coal Chemical Industry new technology
Technical problem.
Generally, carbide acetylene chemical engineering sewage (including production waste water, sanitary sewage and peace and quiet lower water etc.) is by one
Its main contamination index COD can be reduced to 50mg/L or so, ammonia nitrogen drop after level pretreatment, secondary biochemical treatment and advanced treating
As little as 5mg/L or so, phenol are reduced to below 0.5mg/L, but salt content is still higher, it is necessary to be carried out at desalination after advanced treating
Reason, the desalination Water circulation after desalination, strong brine is generally required and is evaporated condensing crystallizing, finally realizes zero-emission.
To realize the zero-emission of waste water, New Coal Chemical enterprise is by salt content water higher and through organic after advanced treating
Waste water is further processed, and is carried out frequently with two sections of " less salt water process+strong brine curing process ".Each section of conventional treatment technology and master
Want function as described below:
Less salt water treatment stage, the conventional treatment technology of the section is mechanical filter+decalcification magnesium technology+film concentration, wherein mechanical mistake
The purpose of filter is further to remove suspension and colloid in waste water;Decalcification, magnesium technology, main purpose are to realize the removal of calcium, magnesium,
Subsequent treatment section scale problems are prevented, film concentration is the reclamation rate that brine concentration is further improved water.Strong brine curing process
Section, the conventional treatment technology of the section is mechanical vapor or evaporation pond, and wherein mechanical vapor is that the crystallization of salt is realized using steam, evaporation
The pool is to utilize solar energy, under field conditions (factors) gradually evaporates strong brine high, realizes the crystallization of salt.At present, strong brine solidification is more
Using evaporative crystallization, mainly include multiple-effect evaporation technology and mechanical vapor recompression technology, this two classes technical matters is ripe, can root
According to actual conditions, suitable evaporation technique is selected.The sewage zero-discharge processing system that the utility model is related to focuses on low-solids water
Processing stage.The main purpose in this stage is as far as possible to improve the salinity of waste water, reduces the scale of subsequent evaporation device, is reduced
Investment and operating cost.
At present, the desalination method of low-solids water has ion-exchange, membrane separation process (to refer mainly to double films of filtration-reverse osmosis
Method), electroosmose process etc..Meanwhile, to realize effective stable operation of above desalter, in addition it is also necessary to water is carried out certain pre-
Treatment, for example with techniques such as coagulating sedimentation, multi-medium filtering, charcoal absorptions, it is therefore an objective to remove suspension, the glue in water
Body material, when using embrane method as desalinating process, in addition it is also necessary to sofening treatment, calcium, magnesium, silicon in removal sewage are carried out to water
Deng material, suppress pollution of such material to film.
The shortcoming of above-mentioned prior art:
Ion-exchange has that occupation area of equipment is big, system operation maintenance is frequently complicated.Also, ion is handed over
Once changing resin adsorption saturation, it is necessary to regenerate, substantial amounts of regeneration liquid waste is produced, therefore effluent quality is also in cyclic fluctuation,
Need to add flocculant during regeneration and expend substantial amounts of soda acid, be unfavorable for environmental protection;Meanwhile, ion-exchanger be generally diameter compared with
Big tank body, volume is big, weight is big, not readily transportable and installation and debugging, long construction period.
Requirement of the membrane separation process to the quality and water of film is very high, it is necessary first to content of organics is dropped to it is very low, otherwise
Organic matter can form dirty stifled in film concentration, decline membrane lifetime shortening, aquifer yield, and the hardness of waste water can rise in film concentration
Height, easily crystallization, and the fouling on film, makes film lose concentrating capacity.
Utility model content
The purpose of this utility model is to provide that a kind of flow is reasonable, treatment effect is stable, with low cost, easy to operate, easy
In the carbide acetylene chemical engineering sewage zero-discharge treatment system of management.
The purpose of this utility model is achieved through the following technical solutions:
Carbide acetylene chemical engineering sewage zero-discharge treatment system of the present utility model, including the high density clarification being sequentially connected
Pond, highly dense pond are produced water tank, more medium filter, weak acid cation bed, weak acid cation bed and produce water tank, decarbonizing tower, decarbonizing tower product water tank, electric osmose
Analysis apparatus component, the electrodialysis plant component includes electrodialysis plant, and the electrodialysis plant is connected with fresh-water tank, electrode solution
Case, concentrated water case, electric osmose division water tank, the decarbonizing tower water tank are connected by elevator pump with the fresh-water tank, the electric osmose division
Water tank is connected by high-pressure pump with the reverse osmosis unit.
The technical scheme provided by above-mentioned the utility model is as can be seen that the carbide acetylene of the utility model embodiment offer
Chemical engineering sewage zero-discharge treatment system, flow is reasonable, treatment effect is stable, it is with low cost, easy to operate, be easily managed.
Brief description of the drawings
The structural representation of the carbide acetylene chemical engineering sewage zero-discharge treatment system that Fig. 1 is provided for the utility model embodiment
Figure.
In figure:
1- high dense settling ponds, 2- stirrings, 3- produces water tank, 4- more medium filters, 5- weak acid cation beds, 6- weak acid in highly dense pond
Cation bed produces water tank, 7- decarbonizing towers, 8- decarbonizing tower water tanks, 9- elevator pumps, 10- electrodialysis plants, 11- fresh-water tanks, 12- electrode solutions
Case, 13- concentrated water casees, 14- electric osmose division water tanks, 15- high-pressure pumps, 16- reverse osmosis units.
Specific embodiment
With reference to the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out clearly
Chu, it is fully described by, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole realities
Apply example.Based on embodiment of the present utility model, those of ordinary skill in the art are obtained under the premise of creative work is not made
The every other embodiment for obtaining, belongs to protection domain of the present utility model.
Carbide acetylene chemical engineering sewage zero-discharge treatment system of the present utility model, its preferably specific embodiment is:
Including be sequentially connected high dense settling pond, highly dense pond produce water tank, more medium filter, weak acid cation bed, weak acid sun
Bed product water tank, decarbonizing tower, decarbonizing tower produce water tank, electrodialysis plant component, and the electrodialysis plant component includes electrodialysis plant,
The electrodialysis plant is connected with fresh-water tank, electrode liquid case, concentrated water case, electric osmose division water tank, and the decarbonizing tower water tank is by carrying
Rise pump to be connected with the fresh-water tank, the electric osmose division water tank is connected by high-pressure pump with the reverse osmosis unit.
The mixed zone of the high dense settling pond front end and reaction zone are respectively provided with agitating device, and depositing separation area sets oblique
Pipe settler, the sludge out pipe of sludge hopper is connected with the reaction zone, and highly dense pond water outlet passes through delivery port after being collected by effluent weir
Water tank is produced with the highly dense pond to be connected;
Produce and be connected with elevator pump between water tank and the more medium filter in the highly dense pond;
The more medium filter inside loads and includes the multimedium filtrate of cobblestone, quartz sand, manganese sand;
The weak acid cation bed inside filling weak-acid cation-exchange resin;
The weak acid cation bed to be produced and be connected with elevator pump between water tank and the decarbonizing tower;
The decarbonizing tower inside filling filler, bottom is provided with blower fan, and top is provided with tail gas outlet.
The delivery port of the fresh-water tank is connected by pump with each freshwater room of the electrodialysis plant, and the freshwater room goes out
The mouth of a river is connected respectively with the fresh-water tank and electric osmose division water tank, and the delivery port of the concentrated water case is filled by pump with the electrodialysis
Each concentrated water room connection put, the delivery port of the concentrated water room is connected respectively with the concentrated water case and condensed water discharge outlet, the electricity
The sodium sulphate electrode solution outlet of pole liquid case is connected by pump with the cathode chamber of the electrodialysis plant and anode chamber, the cathode chamber
It is connected with the electrode liquid case with the electrode solution refluxing opening of anode chamber.
The reverse osmosis unit sets concentrate recirculation mouthful and reuse water out.
Carbide acetylene chemical engineering sewage zero-discharge treatment system of the present utility model, the characteristics of for New Coal Chemical sewage,
And the requirement of carbide acetylene chemical engineering sewage zero-emission salt concentration, using " softening clarification-multi-medium filtering-weak acid cation bed-decarburization
The pretreatment system of tower ", can use to greatest extent by Impurity removals such as the organic matter in sewage, suspension, scale forming matters
Salinity in water inlet can be concentrated to higher concentration by the main body desalination system of " electrodialysis-counter-infiltration ", and ensure to produce water water
Matter is good.Sewage zero-discharge processing system pretreating process selection is reasonable, and salt thickening efficiency is high, and producing water water quality is good, can be with
Investment and operating cost that rear end strong brine is concentrated by evaporation are greatlyd save, is the preferred process of carbide acetylene chemical engineering sewage zero-emission
System.Flow is reasonable, treatment effect is stable, it is with low cost, easy to operate, be easily managed.
The utility model is to realize carrying out salt concentration to carbide acetylene chemical engineering sewage by following processing system:
The system includes high dense settling pond, more medium filter, weak acid cation bed, decarbonizing tower, electrodialysis and counter-infiltration dress
Put.Carbide acetylene chemical engineering sewage by one-level pretreatment and secondary biochemical treatment after water outlet into the utility model be related to it is highly dense
In degree depositing reservoir, high dense settling pond is made up of mixed zone, reaction zone and precipitation/enrichment region, is set in mixed zone and reaction zone
Mechanical agitation, the medicaments such as flocculant, flocculation aid, sodium carbonate are added in mixed zone, and the synchronization for completing the materials such as suspension, calcium and magnesium is gone
Remove, sewage is mixed into reaction zone with medicament, coagulating is completed under the stirring action of certain frequency, suspension and colloid are wadded a quilt with cotton
Solidifying, calcium ions and magnesium ions form Precipitation, form alumen ustum;Alumen ustum enters settling zone, and settling zone uses reverse-flow association control coprecipitation mode,
Mud-water separation is completed herein, and a sludge part is back to the sludge concentration in maintenance reaction area in reaction zone, the outer row of a part.
The water outlet of high dense settling pond is connected with highly dense water case, and sewage is pumped into more medium filter, mistake by elevator pump
Filling filtrate in filter, the suspension and turbidity remained in sewage is further reduced;More medium filter water outlet and weak acid cation bed
It is connected, weak-acid cation-exchange resin is loaded in weak acid cation bed, further the cation such as remaining calcium and magnesium in removal sewage.It is many
Medium filter sets air-water backwashing system;Weak acid cation bed sets ion exchange resin regeneration system.
The water outlet of weak acid cation bed enters weak acid cation bed and produces water pot, and sewage is pumped into decarbonizing tower by elevator pump, is used in decarbonizing tower
After hydrochloric acid is by sewage pH reductions, by the concentration reduction of the carbon dioxide in sewage, carbonate by the way of air stripping, slow down
Follow up device fouling.Decarbonizing tower water outlet enters decarbonizing tower and produces water pot.
Decarbonizing tower product water is pumped into the fresh-water tank of electrodialysis plant by elevator pump, and fresh-water tank water outlet pumps into electric osmose by high-pressure pump
The freshwater room of analysis, a freshwater room water outlet part is back in fresh-water tank, and a part enters electric osmose division water as electric osmose division water
Tank.The condensed water of concentrated water case pumps into electrodialytic concentrated water room by high-pressure pump, and a water outlet part in concentrated water room is back to concentrated water case, one
It is allocated as entering evaporative crystallization operation for strong brine.The electrode solution of electrode liquid case squeezes into anode chamber and cathode chamber by pump, then from anode
In room and cathode chamber circulating reflux to electrode liquid case.Electrodialysis is separated by by anions and canons between each room through film.Anode chamber and the moon
Pole room is respectively provided with electrode material.Add DC electric field on electrode, the zwitterion of freshwater room is realized directional migration, complete salt
The high power concentration and separation of water.
Electric osmose division water pumps into reverse osmosis unit after entering product water pot by high-pressure pump pressurization.In the satisfaction that high-pressure pump is provided
Under the pressure effect of counter-infiltration operation, sub and micro other the ion permeable reverse osmosis membranes of most of moisture turn into after collection and produce
Product water, is entered by water production pipeline and produces water tank;Most of salinity and colloid, organic matter in water etc. can not pass through reverse osmosis membrane,
Remain in a small amount of concentrated water, be vented back in the biochemical system of front end by concentrated water pipe.When reverse osmosis unit is stopped transport, by programme-control
Auto-flushing 3~5 minutes, in order to avoid concentrated water side pollutant, salinity etc. are deposited on film surface, enables reverse osmosis membrane to be obtained when shutting down
To effective maintenance.Reverse osmosis membrane is by that after longtime running, can accumulate some dirts for being difficult to rinse, such as organic matter, inorganic salts
Fouling etc., causes reverse osmosis membrane performance to decline.This kind of dirt must carry out cleaning using chemicals could be removed, to recover anti-
The performance of permeable membrane.
Compared with prior art, the system has following beneficial technique effect:
Based on the pretreatment system of " high dense settling pond-more medium filter-weak acid cation bed-decarbonizing tower ", can be with
Effective removal includes all kinds of impurity such as organic matter, suspension, colloid, calcium, magnesium, silicon, can effectively slow down rear end electrodialysis
The dirt of film and reverse osmosis membrane is blocked up.
Based on the salt concentration of " electrodialysis-counter-infiltration " and piece-rate system, can be dense by raw water salinity to greatest extent
It is reduced to a high degree, different from conventional electrodialysis process, in normal operation production process, raw water enters fresh water to the system
Groove, electrodialysis membrane stack is input into through pump, then returns to fresh-water tank, and desalination aquatic products are formed in return side;The electricity in electrodialysis membrane stack
Under field action, salt ion and hydrone migrate into concentrated water room, and as circulation condensed water returns to concentrated water groove, overflow forms concentration
Aquatic products, and concentrated water groove is then supplemented without raw water.Electrodialytic concentrated water total suspended solid can reach more than 20000mg/L,
Reverse osmosis produced water total suspended solid can reach below 300mg/L.
Specific embodiment:
Below with reference to accompanying drawing, the utility model preferred embodiment is described in detail.
See Fig. 1, carbide acetylene chemical engineering sewage zero-emission desalination system main equipment of the present utility model, including high density is clear
Clear pond 1, highly dense pond are produced water tank 3, more medium filter 4, weak acid cation bed 5, weak acid cation bed and produce water tank 6, decarbonizing tower 7, decarbonizing tower product
Water tank 8, electrodialysis plant 10~14, reverse osmosis unit 16.The mixed zone of the front end of high dense settling pond 1 and reaction zone are respectively provided with
Agitating device 2, depositing separation area sets association control precipitation, and the sludge out pipe of sludge hopper is connected with reaction zone, can be dirty by sludge hopper by pump
Mud is back in reaction zone, and highly dense pond water outlet is flowed out after being collected by effluent weir from delivery port, and delivery port produces the phase of water tank 3 with highly dense pond
Even.Water outlet of water tank connection elevator pump 9 is produced in highly dense pond, and lifting pump discharge is connected with the water inlet of more medium filter 4, multimedium
The inside of filter 4 loads cobblestone, quartz sand, manganese sand as multimedium filtrate, delivery port after filtering and weak acid cation bed 5
Water inlet is connected, the inside of weak acid cation bed 5 filling weak-acid cation-exchange resin, delivery port and the weak acid cation bed of weak acid cation bed 5
Water tank 6 is produced to be connected.Weak acid cation bed produces the delivery port of water tank 6 connection elevator pump 9, the delivery port of elevator pump 9 and the top water inlet of decarbonizing tower 7
It is connected, filler is filled inside decarbonizing tower 7, from blower fan to the bottom blast of decarbonizing tower 7, the tail gas after stripping is from the top of decarbonizing tower 7
Discharge, the bottom outlet pipe of decarbonizing tower 7 produces water pot 8 and is connected with decarbonizing tower.Decarbonizing tower produces the delivery port of water tank 8 and is connected with elevator pump 9, carries
The delivery port for rising pump 9 is connected with the fresh-water tank 11 of electrodialysis plant, and the water outlet of fresh-water tank 11 squeezes into each of electrodialysis plant 10 by pump
In freshwater room, fresh-water tank 11 is back to from a freshwater room outlet pipe part, a part enters electric osmose division as electric osmose division water
Water tank 14, the water outlet of electrodialysis concentrated water case 13 is driven into each concentrated water room of electrodialysis plant 10 by pump, from concentrated water room outlet pipe one
Partial reflux is a part of to be drained into evaporative crystallization operation as condensed water to concentrated water case 13;Sulphur is configured in electrode liquid case 12
Sour sodium electrode solution, electrode solution is driven into cathode chamber and anode chamber by pump, from the electrode solution backflow out of cathode chamber and anode chamber
To in electrode liquid case 12.The delivery port of electric osmose division water tank 14 is connected with high-pressure pump 15, and the water outlet of high-pressure pump 15 enters counter-infiltration
In device 16, reverse osmosis water outlet is back in the biochemical treatment system of front end as Water circulation, the concentrated water of counter-infiltration is produced by pipeline.
The sewage in the example is processed by device provided by the utility model, is always hanged by the electrodialysis concentrated water for concentrating
Floating solid concentration can reach more than 20000mg/L, and the total suspended solid of reverse osmosis produced water can reach below 300mg/L.
The characteristics of the utility model and advantage are:
The utility model uses the pretreatment system of " high dense settling pond-multi-medium filtering-weak acid cation bed-decarbonizing tower ",
Good condition can be created for the main body desalination system of electrodialysis-counter-infiltration below, slow down electrodialytic zwitterion film
With the pollution and blocking of the reverse osmosis membrane of counter-infiltration, so as to improve the stability of system.In addition, film of the electrodialysis as the system
Upgrading unit, with continuous operation, investment cost can be kept to save, operation energy consumption is low, is not required to consume steam, low-temp low-pressure condition
Under realize that high power is concentrated, Operation and Maintenance is simple, the features such as floor space is small.Counter-infiltration as the final processing unit of the system,
Its producing water water quality is good, can be with direct reuse in production.
Tests prove that, the system is used for the zero-emission desalting processing of carbide acetylene chemical engineering sewage, by the electric osmose for concentrating
Analysis concentrated water total suspended solid concentration can reach more than 20000mg/L, greatly reduce investment and fortune that back segment is concentrated by evaporation operation
Row expense, the total suspended solid of reverse osmosis produced water can reach below 300mg/L, reach the water quality requirement of reuse.It is carbide acetylene
The preferred technique scheme of chemical engineering sewage zero-emission salt concentration process.
The utility model based on the pretreatment of " high dense settling pond-multi-medium filtering-weak acid cation bed-decarbonizing tower "+
Salt concentration and membrane separation device based on " electrodialysis-counter-infiltration " process carbide acetylene chemical engineering sewage, realize such sewage
Zero-emission.It is characterized in that using high dense settling pond can Collecting flocculation, precipitation, remove oil removal, colloid and calcium ions and magnesium ions in one
Body, in the ion exchange by filtering and weak acid cation bed and decarburization, can have dirty stifled material to remove major part to film.Separately
Outward, electrodialysis plant is characterised by that raw water enters fresh-water tank, and electrodialysis membrane stack is input into through pump, then returns to fresh-water tank,
Return side forms desalination aquatic products;Under electric field action in electrodialysis membrane stack, salt ion and hydrone migrate into concentrated water room,
As circulation condensed water returns to concentrated water groove, overflow forms concentration aquatic products, and concentrated water groove is then supplemented without raw water.Electrodialysis+
On the one hand the combination of counter-infiltration improves the salinity of condensed water, on the other hand ensures producing water water quality.
The above, only the utility model preferably specific embodiment, but protection domain of the present utility model is not
This is confined to, any one skilled in the art can readily occur in the technical scope that the utility model is disclosed
Change or replacement, should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should
It is defined by the protection domain of claims.
Claims (4)
1. a kind of carbide acetylene chemical engineering sewage zero-discharge treatment system, it is characterised in that including the high density clarification being sequentially connected
Pond, highly dense pond are produced water tank, more medium filter, weak acid cation bed, weak acid cation bed and produce water tank, decarbonizing tower, decarbonizing tower product water tank, electric osmose
Analysis apparatus component, the electrodialysis plant component includes electrodialysis plant, and the electrodialysis plant is connected with fresh-water tank, electrode solution
Case, concentrated water case, electric osmose division water tank, the decarbonizing tower water tank are connected by elevator pump with the fresh-water tank, the electric osmose division
Water tank is connected by high-pressure pump with the reverse osmosis unit.
2. carbide acetylene chemical engineering sewage zero-discharge treatment system according to claim 1, it is characterised in that the high density
The mixed zone of depositing reservoir front end and reaction zone are respectively provided with agitating device, and depositing separation area sets inclined-pipe settler, sludge hopper
Sludge out pipe be connected with the reaction zone, highly dense pond water outlet produces water tank after being collected by effluent weir by delivery port and the highly dense pond
It is connected;
Produce and be connected with elevator pump between water tank and the more medium filter in the highly dense pond;
The more medium filter inside loads and includes the multimedium filtrate of cobblestone, quartz sand, manganese sand;
The weak acid cation bed inside filling weak-acid cation-exchange resin;
The weak acid cation bed to be produced and be connected with elevator pump between water tank and the decarbonizing tower;
The decarbonizing tower inside filling filler, bottom is provided with blower fan, and top is provided with tail gas outlet.
3. carbide acetylene chemical engineering sewage zero-discharge treatment system according to claim 2, it is characterised in that the fresh-water tank
Delivery port be connected with each freshwater room of the electrodialysis plant by pump, the delivery port of the freshwater room and the fresh-water tank and
Electric osmose division water tank is connected respectively, and the delivery port of the concentrated water case is connected by pump with each concentrated water room of the electrodialysis plant,
The delivery port of the concentrated water room is connected respectively with the concentrated water case and condensed water discharge outlet, the sodium sulphate electrode of the electrode liquid case
Liquid outlet is connected by pump with the cathode chamber of the electrodialysis plant and anode chamber, and the electrode solution of the cathode chamber and anode chamber is returned
Head piece is connected with the electrode liquid case.
4. carbide acetylene chemical engineering sewage zero-discharge treatment system according to claim 3, it is characterised in that the counter-infiltration
Device sets concentrate recirculation mouthful and reuse water out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621209888.0U CN206188546U (en) | 2016-11-01 | 2016-11-01 | Carbide acetylene chemical wastewater zero release processing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621209888.0U CN206188546U (en) | 2016-11-01 | 2016-11-01 | Carbide acetylene chemical wastewater zero release processing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206188546U true CN206188546U (en) | 2017-05-24 |
Family
ID=58734961
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621209888.0U Expired - Fee Related CN206188546U (en) | 2016-11-01 | 2016-11-01 | Carbide acetylene chemical wastewater zero release processing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206188546U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108218072A (en) * | 2018-03-22 | 2018-06-29 | 山东泰禾环保科技股份有限公司 | Haline water alkali-making process and its device |
CN108423907A (en) * | 2018-03-22 | 2018-08-21 | 山东泰禾环保科技股份有限公司 | Haline water Zero discharge treatment method and its device |
-
2016
- 2016-11-01 CN CN201621209888.0U patent/CN206188546U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108218072A (en) * | 2018-03-22 | 2018-06-29 | 山东泰禾环保科技股份有限公司 | Haline water alkali-making process and its device |
CN108423907A (en) * | 2018-03-22 | 2018-08-21 | 山东泰禾环保科技股份有限公司 | Haline water Zero discharge treatment method and its device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105540967B (en) | A kind of organic wastewater minimizing, recycling processing method and processing system | |
CN105000737B (en) | A kind of Industrial sewage treatment system and sewage water treatment method | |
CN206266392U (en) | A kind of papermaking wastewater zero-discharge treatment system | |
CN205687741U (en) | A kind of desalination reclamation set of water treatment facilities | |
CN103979729A (en) | Desulfurization waste water recycling and zero discharge system and method | |
CN104016529A (en) | Multi-stage countercurrent electrodialyzer reversal-based method for treating saline wastewater in coal chemical industry | |
CN207596652U (en) | A kind of highly mineralized mine water near-zero release comprehensive resource PDCES processing systems | |
CN105110538B (en) | A kind of desulfurization wastewater technique of zero discharge | |
CN102838227A (en) | System and method for treating industrial park recycled water to form power plant boiler supplemental water | |
CN203878018U (en) | Desulfurization wastewater recycling and zero-discharge system | |
CN102452760A (en) | Treatment method for recycle of oil field produced water | |
CN103172216A (en) | Method for advanced treatment and reuse of wastewater | |
CN111056676A (en) | Electrodialysis desalination treatment system and method for circulating water and sewage of thermal power plant | |
CN104108830A (en) | Novel recycled water advanced treatment and recycling system | |
CN103145264B (en) | Purifying treatment and recycling process for high-salt-content reclaimed water | |
CN102718351A (en) | Device and method for sewage desalting | |
CN211226806U (en) | Zero release processing system of cosmetics waste water | |
CN204281479U (en) | A kind for the treatment of system of coating wastewater | |
CN206188546U (en) | Carbide acetylene chemical wastewater zero release processing system | |
CN205442869U (en) | It produces brackish water desalination system of water recovery rate to improve bitter | |
CN110759570A (en) | Treatment method and treatment system for dye intermediate wastewater | |
CN202729926U (en) | System for treating recycled water of industrial park into make-up water for boiler of power plant | |
CN205575835U (en) | Electroplating wastewater treatment system | |
CN109422383A (en) | A kind of Treated sewage reusing treatment process | |
CN106746130A (en) | A kind of high-salt concentrated water zero-discharge treatment system and process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170524 Termination date: 20181101 |