CN206186090U - Prepare no end plate stretch -draw utensil of stress tube stake in advance - Google Patents

Prepare no end plate stretch -draw utensil of stress tube stake in advance Download PDF

Info

Publication number
CN206186090U
CN206186090U CN201621189378.1U CN201621189378U CN206186090U CN 206186090 U CN206186090 U CN 206186090U CN 201621189378 U CN201621189378 U CN 201621189378U CN 206186090 U CN206186090 U CN 206186090U
Authority
CN
China
Prior art keywords
plate
tensioning
stretching
fixed
end plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621189378.1U
Other languages
Chinese (zh)
Inventor
梁槟星
李龙
何友林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Sanhe Pile Co Ltd
Original Assignee
Guangdong Sanhe Pile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Sanhe Pile Co Ltd filed Critical Guangdong Sanhe Pile Co Ltd
Priority to CN201621189378.1U priority Critical patent/CN206186090U/en
Application granted granted Critical
Publication of CN206186090U publication Critical patent/CN206186090U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a prepare no end plate stretch -draw utensil of stress tube stake in advance, including fixed plate, shrouding, stiff end subassembly, stretch -draw end subassembly, pipe die and tensioning screw rod subassembly, the both ends opening of pipe die is stiff end opening and stretch -draw end opening respectively, the stiff end subassembly includes stiff end end plate and stiff end baffle, the stiff end end plate is connected with detachable mode and fixed plate, the stiff end baffle is connected with detachable mode and stiff end end plate, stretch -draw end subassembly includes stretch -draw board, stretch -draw end end plate and stretch -draw end baffle, stretch -draw end end plate is connected with detachable mode and stretch -draw board, stretch -draw end baffle is connected with detachable mode and stretch -draw end end plate, the fixed prestressing steel cage of stiff end subassembly and stretch -draw end subassembly cooperation, in advance after the stress tube stake shaping, but stiff end subassembly and stretch -draw end subassembly complete disassembly get off, the stake of stress tube in advance of preparation does not have the end plate.

Description

A kind of tensioning tool for preparing end-plate-free pile for prestressed pipe
Technical field
The utility model is related to pre-tensioning system to produce the device of concrete precast pile, and in particular to one kind prepares end-plate-free and in advance should The tensioning tool of solenoid stake.
Background technology
Prestressed concrete prefabricated pile typically using pre-tensioning system produce, its be mainly used in industry with civil buildings, structures, The low pile caps such as municipal administration, highway, railway, bridge, harbour, water conservancy basis, traditional pretensioning prestressed concrete prefabricated pile system When work, the two ends of pipe die are respectively arranged at using two end plates, deformed bar heading is arranged in pipe die after compiling cage. Deformed bar heading is fixed in the counterbore on end plate, and is capable of achieving deformed bar cage by the connection with tensioning mechanism Tensioning applies prestressing force to concrete material;Concrete perfusion material, by centrifugal forming, forms a hollow circle and cuts afterwards Face product, the two end plates in manufacturing process are integrally connected with tubular pile concrete and steel reinforcement cage;End plate is after pile tube finished product dispatches from the factory Basic role be to be welded to connect by end plate between stake and stake, and hammering construction hour hammer impact pile end plate pile tube is beaten In underground layer.But in the case of for static pressure construction and drilling pile construction not pile extension, pile end board is to play preparation substantially During booster action, but occupy larger specific gravity in end plate cost, cause pile tube relatively costly.
Utility model content
In order to overcome the deficiencies in the prior art, the purpose of this utility model is to provide one kind to prepare end-plate-free prestressed pipe The tensioning tool of stake, fixing end component and stretching end component coordinate fixed deformed bar cage, after prestressed pipe forming pile, fixing end Component and stretching end component is completely detachable gets off, the pile for prestressed pipe of preparation without end plate, the utility model simple structure, And be easily assembled.
The purpose of this utility model is realized using following technical scheme:A kind of tensioning for preparing end-plate-free pile for prestressed pipe Tool, including fixed plate, shrouding, fixing end component, stretching end component, pipe die and tensioning screw rod component;
The both ends open of the pipe die is respectively fixed end opening and tensioning end opening;The fixed plate is fixedly connected on On the opening of fixed end, and cover fixed end opening;The shrouding lid is located on tensioning end opening;The fixing end component and stretching end Component is arranged on the inside of pipe die;The stretching end component can be moved back and forth along the major axis of pipe die;
The fixing end component includes fixing end end plate and fixed endplate;The fixing end end plate is removably It is connected with fixed plate;The fixed endplate removably with fixing end end plate connection;Set on the fixed endplate There is dividing plate to draw hole;The fixing end end plate is provided with end plate and draws hole;The dividing plate draws hole, and to draw hole with end plate corresponding;
The stretching end component includes stretch board, stretching end end plate and tensioning endplate;The stretching end end plate is with removable The mode unloaded is connected with stretch board;The tensioning endplate removably with stretching end end plate connection;The stretching end Dividing plate is provided with dividing plate and draws hole;The stretching end end plate is provided with end plate and draws hole;The dividing plate draws hole, and to draw hole with end plate corresponding;
The tensioning screw rod component is fixedly connected with stretching end component, and tensioning screw rod component draws from the interior of pipe die Stretch.
Preferably, the fixing end component is annular fixing end component, and it is provided with inner ring opening;The inner ring opening peace Equipped with the cylinder of falling remaining slurry;It is connected with inside pipe die inside the cylinder of falling remaining slurry.
Preferably, the end plate draws hole includes reinforcing bar jack and reinforcing bar counterbore;The reinforcing bar jack and reinforcing bar counterbore phase Connection.
Preferably, being inserted with bolt in the fixing end end plate and fixed plate;The screw bolt passes fixed plate and Fixing end end plate, fixing end end plate and fixed plate are connected;The fixed endplate is provided with bayonet lock;On the fixing end end plate It is provided with the pin-and-hole corresponding with bayonet lock.
More preferably, the fixed endplate is provided with least three bayonet locks.
Preferably, being inserted with bolt on the stretching end end plate and stretch board;The screw bolt passes stretch board and Stretching end end plate, stretching end end plate and stretch board are connected;The tensioning endplate is provided with bayonet lock;On the stretching end end plate It is provided with the pin-and-hole corresponding with bayonet lock.
More preferably, the tensioning endplate is provided with least three bayonet locks.
Preferably, the tensioning screw rod component includes tensioning screw rod and nut;Tensioning screw rod is fixedly connected on stretch board On, and it is perpendicular with the plane of stretch board;Tensioning screw rod is stretched from the interior of pipe die, and through shrouding;Locking nut Shrouding is set to be fixed at tensioning end opening.
Compared to existing technology, the beneficial effects of the utility model are:
1st, the utility model simple structure, fixing end end plate and fixed endplate, stretching end end plate and tensioning endplate it Between removably connect, assembly and disassembly are simple, after prestressed pipe forming pile, by fixing end end plate, fixed endplate, stretching end End plate and tensioning endplate are dismantled completely, and the pile for prestressed pipe of preparation is without end plate;
2nd, the fixed form of each part of the utility model is simple, and after the pile for prestressed pipe demoulding, each part is reusable, Preparation efficiency is high, prepares end-plate-free pile for prestressed pipe, has saved the manufacturing cost of pile for prestressed pipe, reduces pile foundation engineering Cost.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model fixing end end plate;
Fig. 3 is the structural representation that the utility model fixes endplate;
Fig. 4 is the structural representation of the utility model stretching end end plate;
Fig. 5 is the structural representation of the utility model tensioning endplate;
Wherein, 1, fixed plate;2nd, shrouding;3rd, fixing end component;31st, inner ring opening;32nd, fixing end end plate;321st, end plate Draw hole;3211st, reinforcing bar jack;3212nd, reinforcing bar counterbore;322nd, pin-and-hole;33rd, fixed endplate;331st, dividing plate draws hole;332nd, block Pin;4th, stretching end component;41st, stretch board;42nd, stretching end end plate;421st, end plate draws hole;4211st, reinforcing bar jack;4212nd, reinforcing bar Counterbore;422nd, pin-and-hole;43rd, tensioning endplate;431st, dividing plate draws hole;432nd, bayonet lock;5th, pipe die;51st, fixed end opening;52nd, open Pull end opening;6th, tensioning screw rod component;61st, tensioning screw rod;62nd, nut;7th, the cylinder of falling remaining slurry.
Specific embodiment
Below, with reference to accompanying drawing and specific embodiment, the utility model is described further:
Reference picture 1, a kind of tensioning tool for preparing end-plate-free pile for prestressed pipe, including fixed plate 1, shrouding 2, fixing end component 3rd, stretching end component 4, pipe die 5 and tensioning screw rod component 6;
The both ends open of the pipe die 5 is respectively fixed end opening 51 and tensioning end opening 52;The fixed plate 1 is fixed and connected It is connected on fixed end opening 51, and covers fixed end opening 51;The lid of the shrouding 2 is located on tensioning end opening 52;The fixation End component 3 and stretching end component 4 are arranged on the inside of pipe die 5;The stretching end component 4 can back and forth be moved along the major axis of pipe die 5 It is dynamic.
Reference picture 2 simultaneously combines Fig. 3, and the fixing end component 3 is annular fixing end component 3, and is provided with inner ring opening 31;Institute State inner ring opening 31 and the cylinder of falling remaining slurry 7 is installed;The inside of the cylinder of falling remaining slurry 7 is connected with inside pipe die 5.The fixing end component 3 include fixing end end plate 32 and fixed endplate 33;The fixing end end plate 32 is removably connected with fixed plate 1; The fixed endplate 33 is removably connected with fixing end end plate 32;The fixed endplate 33 is provided with dividing plate and draws Hole 331;The fixing end end plate 32 is provided with end plate and draws hole 321;The dividing plate draws hole 331, and to draw hole 321 with end plate corresponding;Institute State end plate and draw hole 321 including reinforcing bar jack 3211 and reinforcing bar counterbore 3212;The reinforcing bar jack 3211 and the phase of reinforcing bar counterbore 3212 Connection.
Bolt is inserted with the fixing end end plate 32 and fixed plate 1;The screw bolt passes fixed plate 1 and fixing end End plate 32, fixing end end plate 32 and fixed plate 1 are connected;The fixed endplate 33 is provided with least three bayonet locks 332;It is described Fixing end end plate 32 is provided with the pin-and-hole 322 corresponding with bayonet lock 332.
Reference picture 4 simultaneously combines Fig. 5, and the stretching end component 4 includes stretch board 41, stretching end end plate 42 and tensioning endplate 43;The stretching end end plate 42 is removably connected with stretch board 41;The tensioning endplate 43 is with dismountable side Formula is connected with stretching end end plate 42;The tensioning endplate 43 is provided with dividing plate and draws hole 431;The stretching end end plate 42 is provided with End plate draws hole 421;The dividing plate draws hole 431, and to draw hole 421 with end plate corresponding;The end plate draws hole 421 and includes reinforcing bar jack 4211 and reinforcing bar counterbore 4212;The reinforcing bar jack 4211 is connected with reinforcing bar counterbore 4212.
Bolt is inserted with the stretching end end plate 42 and stretch board 41;The screw bolt passes stretch board 41 and tensioning End end plate 42, stretching end end plate 42 and stretch board 41 are connected;The tensioning endplate 43 is provided with least three bayonet locks 432; The stretching end end plate 42 is provided with the pin-and-hole 422 corresponding with bayonet lock 432.
The tensioning screw rod component 6 includes tensioning screw rod 61 and nut 62;Tensioning screw rod 61 is fixedly connected on stretch board 41 On, and it is perpendicular with the plane of stretch board 41;Tensioning screw rod 61 is stretched from the interior of pipe die 5, and through shrouding 2;Lock Tight nut 62 makes shrouding 2 be fixed at tensioning end opening 52.
The specifically used step of the present embodiment is as follows:Bayonet lock 332 is inserted into pin-and-hole 322 first, endplate 33 is fixed in rotation, Bayonet lock 332 is set to fall into pin-and-hole 322;After the fixed endplate 33 of rotation, the dividing plate of fixed endplate 33 draws hole 331 and fixing end end The end plate of plate 32 draws one line of the coincidence of hole 321;Steel reinforcement cage cage bar through dividing plate is drawn hole 331 and end plate draws hole 321, and Swiveling Rebar Cage, makes the heading of cage bar fall into during end plate draws the reinforcing bar counterbore 3212 in hole 321;Then with bolt fixed plate 1 and fixing end end Plate 32 is connected to one, completes the steel reinforcement cage assembling of fixing end;Equally, bayonet lock 432 is inserted into pin-and-hole 422, rotation stretching end every After plate 43, the dividing plate of tensioning endplate 43 draws hole 431 and the end plate of stretching end end plate 42 draws one line of the coincidence of hole 421;Steel reinforcement cage Cage bar draws hole 431 through dividing plate and end plate draws hole 421, and Swiveling Rebar cage, the heading of cage bar is fallen into the steel that end plate draws hole 421 In muscle counterbore 4212;Then stretch board 41 and stretching end end plate 42 are connected to one with bolt, complete the steel reinforcement cage of stretching end Assembling;Finally, completion steel reinforcement cage and tensioning by set upper sealing plate 2 on the tensioning screw rod 61 on stretch board 41 and nut 62 of screwing on That saws is die-filling, and delivering to subsequent processing carries out feeding.
The cylinder of falling remaining slurry 7 is flowed into through the remaining slurry in matched moulds, tensioning, centrifugal forming, pipe die 5 after feeding, atmospheric steam curing makes Concrete carries out form removal after reaching collapsible die intensity.Step of removal order is as follows:Lay down fixing end end plate 32 and fixed plate 1, open The bolt of pull end end plate 42 and stretch board 41, this separates fixing end end plate 32 and fixed plate 1, stretching end end plate 42 and stretch board 41 separate;Fixed endplate 33 and tensioning endplate 43 are rapped, makes to fix endplate 33 with the disengaging pile tube of fixing end end plate 32, it is whole Body rotation stretching end end plate 42 and tensioning endplate 43, extract stretching end end plate 42 out and tensioning endplate 43 departs from steel reinforcement cage cage bar Heading;This just makes end-plate-free pile for prestressed pipe complete the demoulding, and pile tube enters next high-pressure curing process section, finally completes nothing The preparation of end plate pile for prestressed pipe, but shorter cage bar is also protruded at pile tube two ends, can be cut off according to actual needs;For making The tensioning tool of standby end-plate-free pile for prestressed pipe is then flowed into next preparation circulation.
It will be apparent to those skilled in the art that technical scheme that can be as described above and design, make other various It is corresponding to change and deformation, and all these change and deformation should all belong to the protection of the utility model claim Within the scope of.

Claims (8)

1. it is a kind of prepare end-plate-free pile for prestressed pipe tensioning tool, including fixed plate, shrouding, fixing end component, stretching end component, Pipe die and tensioning screw rod component;It is characterized in that:
The both ends open of the pipe die is respectively fixed end opening and tensioning end opening;The fixed plate is fixedly connected on fixing end On opening, and cover fixed end opening;The shrouding lid is located on tensioning end opening;The fixing end component and stretching end component It is arranged on the inside of pipe die;The stretching end component can be moved back and forth along the major axis of pipe die;
The fixing end component includes fixing end end plate and fixed endplate;The fixing end end plate removably with it is solid Fixed board is connected;The fixed endplate removably with fixing end end plate connection;The fixed endplate be provided with every Plate draws hole;The fixing end end plate is provided with end plate and draws hole;The dividing plate draws hole, and to draw hole with end plate corresponding;
The stretching end component includes stretch board, stretching end end plate and tensioning endplate;The stretching end end plate is with dismountable Mode is connected with stretch board;The tensioning endplate removably with stretching end end plate connection;The tensioning endplate It is provided with dividing plate and draws hole;The stretching end end plate is provided with end plate and draws hole;The dividing plate draws hole, and to draw hole with end plate corresponding;
The tensioning screw rod component is fixedly connected with stretching end component, and tensioning screw rod component is stretched from the interior of pipe die.
2. the tensioning for preparing end-plate-free pile for prestressed pipe according to claim 1 has, it is characterised in that:The fixing end group Part is annular fixing end component, and is provided with inner ring opening;The inner ring opening is provided with the cylinder of falling remaining slurry;The cylinder of falling remaining slurry is internal It is connected with inside pipe die.
3. the tensioning for preparing end-plate-free pile for prestressed pipe according to claim 1 has, it is characterised in that:The end plate draws hole Including reinforcing bar jack and reinforcing bar counterbore;The reinforcing bar jack is connected with reinforcing bar counterbore.
4. the tensioning for preparing end-plate-free pile for prestressed pipe according to claim 1 has, it is characterised in that:The fixing end end Bolt is inserted with plate and fixed plate;The screw bolt passes fixed plate and fixing end end plate, by fixing end end plate and fixation Plate is connected;The fixed endplate is provided with bayonet lock;The fixing end end plate is provided with the pin-and-hole corresponding with bayonet lock.
5. the tensioning for preparing end-plate-free pile for prestressed pipe according to claim 4 has, it is characterised in that:The fixing end every Plate is provided with least three bayonet locks.
6. the tensioning for preparing end-plate-free pile for prestressed pipe according to claim 1 has, it is characterised in that:The stretching end end Bolt is inserted with plate and stretch board;The screw bolt passes stretch board and stretching end end plate, by stretching end end plate and tensioning Plate is connected;The tensioning endplate is provided with bayonet lock;The stretching end end plate is provided with the pin-and-hole corresponding with bayonet lock.
7. the tensioning for preparing end-plate-free pile for prestressed pipe according to claim 6 has, it is characterised in that:The stretching end every Plate is provided with least three bayonet locks.
8. the tensioning for preparing end-plate-free pile for prestressed pipe according to claim 1 has, it is characterised in that:The tensioning screw rod Component includes tensioning screw rod and nut;Tensioning screw rod is fixedly connected on stretch board, and perpendicular with the plane of stretch board;Tensioning Screw rod is stretched from the interior of pipe die, and through shrouding;Locking nut makes shrouding be fixed at tensioning end opening.
CN201621189378.1U 2016-10-31 2016-10-31 Prepare no end plate stretch -draw utensil of stress tube stake in advance Active CN206186090U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621189378.1U CN206186090U (en) 2016-10-31 2016-10-31 Prepare no end plate stretch -draw utensil of stress tube stake in advance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621189378.1U CN206186090U (en) 2016-10-31 2016-10-31 Prepare no end plate stretch -draw utensil of stress tube stake in advance

Publications (1)

Publication Number Publication Date
CN206186090U true CN206186090U (en) 2017-05-24

Family

ID=58734131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621189378.1U Active CN206186090U (en) 2016-10-31 2016-10-31 Prepare no end plate stretch -draw utensil of stress tube stake in advance

Country Status (1)

Country Link
CN (1) CN206186090U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109795025A (en) * 2019-02-22 2019-05-24 东南大学 A kind of device preparing the permeable tubular pole of model

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109795025A (en) * 2019-02-22 2019-05-24 东南大学 A kind of device preparing the permeable tubular pole of model

Similar Documents

Publication Publication Date Title
CN101642932B (en) Production process of short tubular piles
CN106988483A (en) A kind of assembled steel reinforced Concrete U Vierendeel girder and its construction method
CN104416675A (en) Manufacturing process of pre-tensioned prestressed centrifugal concrete square pile
CN105569331A (en) Simple supporting method for cylindrical concrete formwork
CN106223544A (en) A kind of ultra-high performance concrete post permanent template and preparation method thereof
CN103866761A (en) Mechanical connection pile head using repetitively used precast concrete pile as end plate and manufacturing method of mechanical connection pile head
CN103496926A (en) Production method of prestressed concrete corrugated sheet pile
CN107366353A (en) A kind of assembled steel reinforced concrete frame column with variable cross-sections and its construction method
CN104972550B (en) The polygonal mould and preparation method of a kind of in-situ precast concrete-pile
CN102373702B (en) Concrete circular pile and processing method thereof
CN206186090U (en) Prepare no end plate stretch -draw utensil of stress tube stake in advance
CN208347790U (en) Assembled two serves as a contrast u-shaped tube chip architecture and its reinforcing bar mould
CN206513015U (en) The aluminum alloy mould plate mechanism that building floor is constructed is used for based on BIM technology
CN103737718A (en) Prefabricated reinforced concrete hollow column template and making method thereof
CN105365040A (en) Production technology of short tubular pile
CN101349110B (en) Reducing prestress structure system before prestressed reinforcement withdrawing tension
CN112873527A (en) Manufacturing mold and method for supporting pile
CN107217790A (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its construction method
CN110629787A (en) Core mold for pipe gallery pouring and construction method
CN110953125A (en) Prefabricated polygonal prestressed concrete tower cylinder and manufacturing mold of cylinder sections thereof
CN203876035U (en) Precast reinforced concrete hollow column template
CN212427567U (en) Reinforced concrete prefabricated column type steel connecting joint
CN202850017U (en) Modified type prestress high-strength concrete hollow square pile
CN214644692U (en) Post-tensioning precast concrete supporting member and inner supporting system
CN214460442U (en) Pre-tensioning precast concrete supporting member and inner supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant