CN206183829U - Safety ring on buckle formula pole - Google Patents

Safety ring on buckle formula pole Download PDF

Info

Publication number
CN206183829U
CN206183829U CN201621264235.2U CN201621264235U CN206183829U CN 206183829 U CN206183829 U CN 206183829U CN 201621264235 U CN201621264235 U CN 201621264235U CN 206183829 U CN206183829 U CN 206183829U
Authority
CN
China
Prior art keywords
clip
clamp
safety
buckle
regulation handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621264235.2U
Other languages
Chinese (zh)
Inventor
刘兴江
余海涛
周嗣海
钟磊
刘颖
徐盛鑫
雒乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201621264235.2U priority Critical patent/CN206183829U/en
Application granted granted Critical
Publication of CN206183829U publication Critical patent/CN206183829U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a safety ring on buckle formula pole, including first clamp, the second clamp, third clamp and connecting device, the second clamp respectively with first clamp, the third clamp passes through connecting device and links to each other, first clamp, the second clamp, all be equipped with antiskid rubber mat on the third clamp inner wall, still all be equipped with the boss on the first clamp and on the third clamp, be equipped with the recess on the boss, connect through the threaded rod between the recess, threaded rod one end is equipped with the regulation handle, the other end is equipped with the movable rod, be equipped with safe link between first clamp and the second clamp, also be equipped with safe link on the third clamp. The utility model discloses simple structure, convenient and practical can can also be used for articulating the safety belt or install down the landing device that transmits the article enough for operator person provides the position of standing.

Description

Safety collar on buckle-type bar
Technical field
The utility model is related to a kind of power distribution rod aid, and in particular to safety collar on buckle-type bar.
Background technology
Shaft tower is that shaft tower is more by steel or armored concrete system for supporting the supporter of power transmission line in overhead transmission line Into, be the main support structure of overhead transmission line, in work operations on power distribution rod, operating personnel generally use riding boogie board or Climbers carry out the operation on shaft tower, but, can not easily near job position when operating personnel is using riding boogie board or climbers It is mobile, additionally, for some can not on cross-arm direct operation, and need the work that some ad-hoc locations are carried out on shaft tower, Also still also the work that can be adjusted at any time can be provided for operating personnel without a kind of succinct convenience, safe and reliable security tool Platform.
Utility model content
Technical problem to be solved in the utility model is on power distribution rod in work operations, operating personnel using riding boogie board or Can not easily be moved about in job position during person's climbers, and traditional be worked for operating personnel on shaft tower Platform, install complex, and cannot adjust after being generally all mounted on shaft tower, when needing to move to next position Reinstalled, it is necessary to dismantle during work, waste substantial amounts of human and material resources and time, it is therefore intended that provided on buckle-type bar Safety collar, solves problems described above.
The utility model is achieved through the following technical solutions:
Safety collar on buckle-type bar, including the first clip, the second clip, the 3rd clip and attachment means, described second Clip is connected with the first clip, the 3rd clip by attachment means respectively, the first clip and the 3rd clip can be filled around connection Activity is put, the first clip, the second clip, the 3rd clip three composition toroidal preferably can be fitted on shaft tower, the first card Boss is equipped with hoop and the 3rd clip, the side wall of boss is provided with groove, and threaded rod is provided with groove, and threaded rod top is provided with Regulation handle, threaded rod bottom is provided with motion bar, and motion bar is connected with the boss on the 3rd clip, and motion bar can be in boss Upper activity.
Further, antiskid glue cushion is equipped with first clip, the second clip, the 3rd clip inwall, can after load To ensure to block shaft tower without down sliding.
Further, safety hanging ring is provided between first clip and the second clip, safety also is provided with the 3rd clip Link, safety hanging ring can provide the position stood for operating personnel, may be simultaneously used for hanging safety belt or install lower transmission The pulley gear of object, safety hanging ring is respectively positioned on the first clip, the second clip, the lateral wall of the 3rd clip, is easy to operation people Member uses safety hanging ring.
Further, the safety hanging ring is welded with the first clip, the second clip, the 3rd clip respectively, is strengthened safety and is hung Bonding strength between ring and the first clip, the second clip, the 3rd clip.
Further, the regulation handle bottom is provided with blind hole, and screw thread is provided with blind hole, and threaded rod passes through with regulation handle Threaded connection, rotates regulation handle, and the spacing between two boss can be adjusted by threaded rod, meets the bar to motionless diameter The clamping of tower.
Further, the motion bar is rivet, and motion bar can be movable on boss, so as to drive threaded rod to live together It is dynamic.
Further, the regulation handle can drive threaded rod activity in groove.
Further, the attachment means be rotating shaft screw, rotating shaft screw cause the second clip can with the first clip and The activity of 3rd clip.
The utility model compared with prior art, has the following advantages and advantages:
1st, safety collar on the utility model buckle-type bar, by rotating position of the regulation handle on threaded rod, can adjust The diameter of clip is saved, can be used for the different height of the conical shaft tower of different-diameter or same circular cone shaft tower;
2nd, safety collar on the utility model buckle-type bar, antiskid glue cushion on clip inwall is fitted shaft tower table completely in clip Behind face, because conical shaft tower is closer to shaft tower bottom, the diameter of shaft tower is bigger, and the antiskid glue cushion of clip inwall is subject to shaft tower pair Its frictional resistance is bigger, it is ensured that clip will not slide downward, for operating personnel provides reliable workbench;
3rd, safety collar on the utility model buckle-type bar, the safety hanging ring on clip lateral wall both can be as operating personnel The position of standing, can be used for the pulley gear that hanging safety belt is buckled or installs lower transmission object again.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the utility model embodiment, constitutes the one of the application Part, does not constitute the restriction to the utility model embodiment.In the accompanying drawings:
Fig. 1 is the utility model structural representation;
Fig. 2 is the side view after the utility model A portions amplify.
Mark and corresponding parts title in accompanying drawing:
1- safety hanging rings, 2- attachment means, 3 first clips, 4- antiskid glue cushions, 5- regulation handles, 6- threaded rods, 7- is convex Platform, the clips of 8- second, the clips of 9- the 3rd, 10- grooves, 11- motion bars.
Specific embodiment
To make the purpose of this utility model, technical scheme and advantage become more apparent, with reference to embodiment and accompanying drawing, The utility model is described in further detail, and exemplary embodiment of the present utility model and its explanation are only used for explaining this Utility model, is not intended as to restriction of the present utility model.
Embodiment
As shown in figure 1, safety collar on the utility model buckle-type bar, including the first clip 3, the second clip 8, the 3rd clip 9 and attachment means 2, first clip 3, the second clip 8 and the 3rd clip 9 are identical arcuate structure, the first card Antiskid glue cushion 4 is equipped with the 3, second clip 8 of hoop and the madial wall of the 3rd clip 9, antiskid glue cushion 4 is also arcuate structure, when anti- Sliding rubber cushion 4 fit completely shaft tower surface when, antiskid glue cushion 4 is understood can produce frictional resistance to shaft tower surface, anti-skidding so as to play Effect, the attachment means 2 are preferably rotating shaft screw, and the second clip 8 is respectively with the first clip 3 and the 3rd clip 9 by being connected Device 2 is connected, and the first clip 3, the second clip 8 and the three of the 3rd clip 9 constitute a clip for toroidal, attachment means 2 can make freely activity between the first clip 3 and the second clip 8, and equally, attachment means 2 can also make the 3rd clip 9 and the second card Between hoop 8 can freely activity, be provided with safety hanging ring 1 between the clip 8 of first clip 3 and second, safety hanging ring 1 is positioned at the On the lateral wall of one clip 3 and the second clip 8, the clip 3 of safety hanging ring 1 and first and the second clip 8 are by way of welding Link together, by welding manner, the connection that can strengthen between the clip 3 of safety hanging ring 1 and first and the second clip 8 is strong Degree, has ensured operating personnel's life security during construction, and safety hanging ring 1, safety hanging ring are again provided with the 3rd clip 9 1 also is located on the lateral wall of the 3rd clip 9, and is connected by welding manner, equally increased the clip of safety hanging ring 1 and the 3rd Bonding strength between 9, safety hanging ring 1 can provide the strong point in actual work for operating personnel, be easy to operating personnel Stand on safety hanging ring 1, convenient to be moved about in job position, safety hanging ring 1 can be also used for operating personnel Safety belt lock catch is articulated on safety hanging ring 1, prevents operating personnel's falling from high altitude when operation, and also can be in safety Pulley gear is installed on link 1, it is convenient, fast by the object transport on ground to job position;Second clip 3 and Boss 7 is equipped with the lateral wall of three clip 9, the side wall of boss 7 is provided with groove 10, groove 10 and is provided with threaded rod 6, threaded rod The boss 7 that 6 bottom is provided with motion bar 11, and the clip 9 of motion bar 11 and the 3rd is connected in groove 10, and motion bar 11 is Rivet, motion bar 11 can be movable in the boss 7 of the 3rd clip 9, and the top of threaded rod 6 is provided with regulation handle 5, regulation handle 5 bottom is provided with blind hole, and screw thread is provided with blind hole, and regulation handle 5 is threadedly attached in blind hole with threaded rod 6, is rotated Regulation handle 5, it is possible to achieve position of the regulation handle 5 on threaded rod 6, due to the one end of threaded rod 6 be with the 3rd clip 9 Boss 7 is fixedly connected, and rotates regulation handle 5, and regulation handle 5 is moved towards the direction of the convex platform 7 of the first clip 3, final regulation Handle 5 is contacted with the boss 7 on the first clip 3, continues to rotate regulation handle 5, the boss 7 on 5 pairs of the first clips 3 of regulation handle Extruding force is produced, forces the boss 7 on the first clip 3 to be moved towards the boss 7 on the 3rd clip 9, so as to adjust the straight of clip Footpath, meets the clamping of different-diameter shaft tower, because threaded rod 6 is connected to motion bar 11, therefore regulation handle 5 and the energy of threaded rod 6 With the activity in the groove 10 on boss 7 of motion bar 11, it is easy to be quick installed at clip on shaft tower, it is simple, convenient.
Operation principle of the present utility model is:Rotation regulation handle 5, until boss 7 and regulation handle on the first clip 3 5 separate, activity adjustment handle 5, and regulation handle 5 drives threaded rod 6 to be rotated around motion bar 11, by the activity of threaded rod 6 to the Outside groove 10 on one clip 3, because the second clip 8 is connected with the first clip 3 and the 3rd clip 9 by attachment means 2 respectively Connect, therefore the clip 9 of movable first clip 3 and the 3rd, clip is arranged on to be needed on the shaft tower of operation, will by regulation handle 5 The activity of threaded rod 6 rotates regulation handle 5 to adjust the diameter of clip to original position, and clip is fixed on shaft tower, by It is cone shape in shaft tower, conical shaft tower is bigger closer to pole-footing diameter, so can be inwards when clip is by downward pressure Side produces pressure, forces antiskid glue cushion 4 and shaft tower to contact, and the frictional resistance for hindering clip to move down is produced, so as to ensure that Clip will not slide downward, be firmly stuck on shaft tower, clip is fixed on when on shaft tower, and operating personnel can stand on safety hanging ring It is convenient to be moved about in job position on 1, and safety hanging ring 1 can be as the fixing point of safety belt lock catch, during operation, can It is articulated on safety hanging ring 1 with by safety belt lock catch, safety hanging ring 1 provides safety guarantee for operating personnel, can also be in safety Pulley gear is installed, pulley gear can be used for transmitting object up and down on link 1, the convenient operating personnel on shaft tower takes work Required object during industry;When operation is complete, regulation handle 5 is rotated, regulation handle 5 is separated with the boss 7 on the first clip 3 Open, pull regulation handle 5, by activity in its upper groove 10 of the first clip 3 out, the clip 9 of movable first clip 3 and the 3rd will Clip is removed from shaft tower.
Above-described specific embodiment, is entered to the purpose of this utility model, technical scheme and beneficial effect One step is described in detail, be should be understood that and be the foregoing is only specific embodiment of the present utility model, is not used to limit Fixed protection domain of the present utility model, all any modifications within spirit of the present utility model and principle, made, equally replaces Change, improve, should be included within protection domain of the present utility model.

Claims (8)

1. safety collar on buckle-type bar, it is characterised in that:Including the first clip (3), the second clip (8), the 3rd clip (9) and Attachment means (2), second clip (8) is connected with the first clip (3) and the 3rd clip (9) by attachment means (2) respectively, First clip (3) and the 3rd clip (9) can be around attachment means (2) activities, the first clip (3), the second clip (8), the 3rd Clip (9) three constitutes toroidal, is equipped with boss (7) on the first clip (3) and the 3rd clip (9), two boss (7) It is all provided with the wall of side fluted (10), threaded rod (6) is provided with groove (10), threaded rod (6) top is provided with regulation handle (5), spiral shell Rasp bar (6) bottom is provided with motion bar (11), and motion bar (11) is connected with the boss (7) on the 3rd clip (9).
2. safety collar on buckle-type bar according to claim 1, it is characterised in that:First clip (3), the second clip (8), it is equipped with antiskid glue cushion (4) on the 3rd clip (9) inwall.
3. safety collar on buckle-type bar according to claim 1, it is characterised in that:First clip (3) and the second card Safety hanging ring (1) is provided between hoop (8), safety hanging ring (1) also is provided with the 3rd clip (9).
4. safety collar on buckle-type bar according to claim 3, it is characterised in that:The safety hanging ring (1) is respectively positioned on On one clip (3), the second clip (8), the lateral wall of the 3rd clip (9), and safety hanging ring (1) respectively with the first clip (3), Second clip (8), the welding of the 3rd clip (9).
5. safety collar on buckle-type bar according to claim 1, it is characterised in that:Regulation handle (5) bottom is provided with Blind hole, is provided with screw thread in blind hole, threaded rod (6) is connected through a screw thread with regulation handle (5).
6. safety collar on buckle-type bar according to claim 1, it is characterised in that:The motion bar (11) is rivet.
7. safety collar on buckle-type bar according to claim 1, it is characterised in that:The regulation handle (5) can drive spiral shell Rasp bar (6) activity in groove (10).
8. safety collar on buckle-type bar according to claim 1, it is characterised in that:The attachment means (2) are rotating shaft spiral shell Silk.
CN201621264235.2U 2016-11-21 2016-11-21 Safety ring on buckle formula pole Active CN206183829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621264235.2U CN206183829U (en) 2016-11-21 2016-11-21 Safety ring on buckle formula pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621264235.2U CN206183829U (en) 2016-11-21 2016-11-21 Safety ring on buckle formula pole

Publications (1)

Publication Number Publication Date
CN206183829U true CN206183829U (en) 2017-05-24

Family

ID=58723749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621264235.2U Active CN206183829U (en) 2016-11-21 2016-11-21 Safety ring on buckle formula pole

Country Status (1)

Country Link
CN (1) CN206183829U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107159745A (en) * 2017-05-26 2017-09-15 四川省星光钢结构有限公司 Heated type restoring means at steel local dent
CN107317258A (en) * 2017-08-17 2017-11-03 国网河南省电力公司西峡县供电公司 One kind is ascended a height operation simple platform
CN107551420A (en) * 2017-08-26 2018-01-09 国网山东省电力公司烟台供电公司 A kind of safety belt backup protection rope fixing device for cement pole operation
CN108371766A (en) * 2018-04-16 2018-08-07 嘉兴市恒光电力建设有限责任公司华创分公司 Job safety auxiliary device on bar
CN110860052A (en) * 2019-11-01 2020-03-06 国网天津市电力公司 Safety belt suspension device for GIS maintenance
CN115463355A (en) * 2022-09-29 2022-12-13 中国五冶集团有限公司 Safety rope fixing device used during erection and dismantling of high-altitude frame body

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107159745A (en) * 2017-05-26 2017-09-15 四川省星光钢结构有限公司 Heated type restoring means at steel local dent
CN107159745B (en) * 2017-05-26 2018-11-23 四川省星光钢结构有限公司 Heated type restoring means at steel local dent
CN107317258A (en) * 2017-08-17 2017-11-03 国网河南省电力公司西峡县供电公司 One kind is ascended a height operation simple platform
CN107551420A (en) * 2017-08-26 2018-01-09 国网山东省电力公司烟台供电公司 A kind of safety belt backup protection rope fixing device for cement pole operation
CN108371766A (en) * 2018-04-16 2018-08-07 嘉兴市恒光电力建设有限责任公司华创分公司 Job safety auxiliary device on bar
CN110860052A (en) * 2019-11-01 2020-03-06 国网天津市电力公司 Safety belt suspension device for GIS maintenance
CN115463355A (en) * 2022-09-29 2022-12-13 中国五冶集团有限公司 Safety rope fixing device used during erection and dismantling of high-altitude frame body

Similar Documents

Publication Publication Date Title
CN206183829U (en) Safety ring on buckle formula pole
CN104110119B (en) A kind of construction ceiling suspension rod locating mounting method and easy device
CN207277803U (en) A kind of novel high-altitude scaffold
CN106213757B (en) A kind of electrician can backpack lifting tool bag
CN204001643U (en) A kind of indoor suspended ceiling hangs muscle erecting device
CN205626785U (en) Novel many functional safety take hanger
CN110755822A (en) Sitting type pole climbing device capable of performing rotary operation and rotary operation method
CN207256045U (en) A kind of height-adjustable three-jaw clamping device
CN104100076B (en) A kind of indoor suspended ceiling hangs muscle erecting device
CN205170243U (en) Emergency rescue tripod
CN209767000U (en) Power supply transmission line maintenance device
CN103441444B (en) A kind of safety belt type wire outgoing tool
CN207043082U (en) Removable steel pipe straightening bending apparatus
CN207506870U (en) A kind of lower tensioning apparatus of steel wire rope drop preventer
CN207406013U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device
CN206129193U (en) Drilling tool aligns ware
CN206298271U (en) Rotatable combination lifting system
CN206437781U (en) Rotatable combined sling
CN206154240U (en) Over -and -under type ceiling puncher
CN211536409U (en) Sitting type pole climbing device capable of rotating for operation
CN208694179U (en) Elevating device and equipment of ascending a height
CN203867147U (en) Construction ceiling lifting rod positioning installing method and simple device
CN206458907U (en) A kind of conduit for being easy to regulation installs suspension and support
CN206873888U (en) A kind of construction site climbing device
CN206362321U (en) A kind of servicing unit of tunnel monitoring measurement steel ruler convergence gauge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant