CN206178969U - Engineering cost progress monitoring device - Google Patents

Engineering cost progress monitoring device Download PDF

Info

Publication number
CN206178969U
CN206178969U CN201621212755.9U CN201621212755U CN206178969U CN 206178969 U CN206178969 U CN 206178969U CN 201621212755 U CN201621212755 U CN 201621212755U CN 206178969 U CN206178969 U CN 206178969U
Authority
CN
China
Prior art keywords
unit
casing
elastic component
observation window
schedule monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621212755.9U
Other languages
Chinese (zh)
Inventor
陈淑珍
孙敬涛
方翠兰
季敏
赵媛静
盘钦卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Vocational Institute of Engineering
Original Assignee
Chongqing Vocational Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Vocational Institute of Engineering filed Critical Chongqing Vocational Institute of Engineering
Priority to CN201621212755.9U priority Critical patent/CN206178969U/en
Application granted granted Critical
Publication of CN206178969U publication Critical patent/CN206178969U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This patent application belongs to the auxiliary construction equipment field, specifically discloses an engineering cost progress monitoring device, including box, construction progress display unit, touching unit, the control unit and progress control unit, be equipped with first observation window and a plurality of second observation window on the box, construction progress display unit corresponds the setting with first observation window, progress control unit corresponds the setting with the second observation window, the touching unit is fixed on construction progress display unit, when construction progress display unit rotates, touching unit trigger switch, but progress control unit is in on -state. Compare with traditional progress monitoring device, this scheme can realize two -way feedback, and staff and cost personnel carry out fine understanding each other, the carrying out of the work of not being convenient for.

Description

A kind of construction costs Schedule monitoring device
Technical field
The utility model belongs to building auxiliary equipment field.
Background technology
At present, the engineering that enterprise can be to being accepted before bid for being responsible for calling for bid makes construction costs, existing cost The information that flow is provided for staff according to owner, and the information for oneself being obtained to site inspection is carried out to the engineering accepted The work that cost is calculated.Due to the cumbersome of cost work, it is necessary to the work to cost staff exercises supervision, and at present can only The cost of cost staff is worked by related personnel is exercised supervision, do not meet the requirement now to office automatic, together When need extra work personnel, cause the waste of human resources.
Number of patent application is the patent of CN201520794193.2, discloses a kind of construction costs progress control system, is wrapped Included servomotor, left shaft holder, screw mandrel, nut, right axle bearing, pole, controller, control panel, connecting rod, progress plate and Indicator lamp;The left surface of progress plate is provided with control panel and controller, and controller is controlled located at the top of control panel Panel is connected with controller.It is unintelligible to construction costs progress that the program overcomes cost staff, it is difficult to construction costs Progress and working time distribution carry out Reasonable adjustment, the shortcoming for increasing work management difficulty.
However, although cost personnel can know that the progress of work, but whether staff is not aware that cost personnel Solution situation, the program can only unidirectionally be fed back, it is impossible to so that staff and cost personnel are understood well each other, be not easy to The development of work.
Utility model content
The purpose of this utility model is to provide a kind of construction costs Schedule monitoring device of energy Two-way Feedback.
In order to achieve the above object, base case of the present utility model provides a kind of construction costs Schedule monitoring device, bag Casing, construction speed display unit, touching unit, control unit and Schedule monitoring unit are included, the casing is provided with the first sight Window and multiple second observation windows are examined, the construction speed display unit is correspondingly arranged with the first observation window, the Schedule monitoring list Unit is correspondingly arranged with the second observation window, and the touching unit is fixed on construction speed display unit, the construction speed displaying During unit rotational, touching unit triggers switch, Schedule monitoring unit is in can conducting state.
The principle of this base case is:Workmen complete after construction, often operation then rotate once construct into Degree display unit, with the job schedule for telling monitoring personnel current.Meanwhile, monitoring personnel is knowing the job schedule of workmen Afterwards, then monitoring unit is controlled, monitoring information is shown, allow workmen to understand the situation of monitoring.
The beneficial effect of this base case is:After construction speed display unit being rotated due to necessary workmen, progress Monitoring unit can just be in the state that can be turned on, and monitoring personnel can just carry out the operation of Schedule monitoring unit, effectively avoid The maloperation of monitoring personnel.Compared with traditional Schedule monitoring device, this programme can realize Two-way Feedback, staff and cost Personnel are understood well each other, are not easy to the development of work.
Scheme two:Scheme is preferred based on this, and the construction speed display unit includes polygon prism, and the polygon prism turns Dynamic to be arranged in casing, each side of the polygon prism is provided with construction speed bar.Each side of polygon prism then represents one Individual construction speed, simple structure, it is that may be viewed by rotate corresponding side and be directed at the first observation window, is checked conveniently.
Scheme three:This is preferred for scheme two, the Schedule monitoring unit include electromagnet, installing plate, the first elastic component, Lantern and iron block are folded, the installing plate is fixed in casing, and first elastic component is connected between installing plate and iron block, institute The one end for stating folding lantern is fixed on a mounting board, and the other end is fixed on iron block, and first elastic component is located at and folds lantern Interior, when the electromagnet is powered off, iron block is located at the top of the second observation window, and when the electromagnet is powered, iron block is inhaled with electromagnet Draw together, the folding lantern is provided with Schedule monitoring bar.
When workmen rotate polygon prism after, then the circuit of electromagnet be in can conducting state, now, monitoring personnel is only needed Control the switch of electromagnet, electromagnet to produce magnetic force, you can to draw down iron plate, and then stretch folding lantern so that fold Schedule monitoring bar on lantern is located at the position of the second observation window, you can the progress of convenient construction personnel's checking monitoring.
Scheme four:This is preferred for scheme three, and the touching unit includes being arranged on top and and the polygon prism of polygon prism The corresponding projection in each side, each projection gradually increases along clockwise direction, described control unit include push rod, frizzen and Controlling organization, the controlling organization includes depression bar, the second elastic component, the 3rd elastic component, mounting seat and controlling switch, the push rod It is corresponding with projection, and slide laterally and be arranged in casing, the elastic component is connected between casing and push rod, and the frizzen is consolidated It is scheduled on push rod, the mounting seat is fixed in casing, the controlling switch is arranged in mounting seat, the 3rd elastic component connects It is connected between depression bar and mounting seat, the other end that the depression bar is connected with the 3rd elastic component is hinged in casing, the control machine The quantity of structure is corresponding with the quantity of observation window, and each controlling switch controls a circuit for electromagnet.
Cause that frizzen is located at different positions according to raised thickness difference, so as to promote depression bar to trigger control open Close so that electromagnet is in the state that can be turned on.
Scheme five:This is preferred for scheme four, and the 3rd elastic component is rubber parts.Rubber parts have good Insulating effect, high safety.
Scheme six:This is preferred for scheme five, and the surface of the iron block is provided with one layer of antirust coat.Antirust coat can be played Good anti-rust action, can improve the service life of iron block.
Brief description of the drawings
Fig. 1 is a kind of structural representation of construction costs Schedule monitoring device of the utility model embodiment.
Fig. 2 is the sectional view of Fig. 1.
Fig. 3 is the structural representation of polygon prism in the present embodiment.
Fig. 4 is the structural scheme of mechanism of touching unit in the present embodiment.
Specific embodiment
The utility model is described in further detail below by specific embodiment:
Reference in Figure of description includes:Casing 10, the first observation window 101, the second observation window 102, electromagnet 20th, iron block 30, folding lantern 40, installing plate 50, polygon prism 60, raised 71, push rod 72, frizzen 73, pressing plate 74, controlling switch 75th, mounting seat 76, the 3rd elastic component 77, the second elastic component 78.
As shown in figure 1, a kind of construction costs Schedule monitoring device, including casing 10, construction speed display unit, touching list Unit, control unit and Schedule monitoring unit, casing 10 are provided with the first observation window 101 and six the second observation windows 102, construct into Degree display unit is correspondingly arranged with the first observation window 101, and Schedule monitoring unit is correspondingly arranged with the second observation window 102, and touching is single Unit is fixed on construction speed display unit, when the construction speed display unit is rotated, touching unit triggers switch, progress prison Control unit is in can conducting state.
As shown in Fig. 2 Schedule monitoring unit includes electromagnet 20, installing plate 50, the first elastic component, folding lantern 40 and iron Block 30.Installing plate 50 is fixed in casing 10, and the first elastic component is connected between installing plate 50 and iron block 30, folds lantern 40 Upper end is fixed on installing plate 50, and lower end is fixed on iron block 30.The surface of iron block 30 is provided with one layer of antirust coat.Antirust coat Good anti-rust action can be played, the service life of iron block 30 can be improved.First elastic component is located at and folds in lantern 40, electromagnet During 20 power-off, iron block 30 is located at the top of the second observation window 102, and when electromagnet 20 is powered, iron block 30 attracts with electromagnet 20 Together, fold lantern 40 and be provided with Schedule monitoring bar.Wherein, the first elastic component uses stainless steel stage clip, and using effect is more preferable.Enter Degree monitoring bar is marked with pre-set monitoring information, and it is mutually matched with the progress of the side of polygon prism 60.Electromagnet 20 is total Two switches are had, by monitoring personnel control, another switch is triggered a switch when then being rotated by polygon prism 60.
As shown in figure 3, construction speed display unit includes a polygon prism 60, polygon prism 60 uses six prisms, with second The quantity correspondence of observation window 102.Polygon prism 60 is rotatably arranged in casing 10, each side of polygon prism 60 be provided with construct into Degree bar.Each side of polygon prism 60 then represents a construction speed, and simple structure rotates corresponding side alignment first and observes Window 101 may be viewed by, and check conveniently.
As shown in figure 4, touching unit includes being arranged on the top of polygon prism 60 and each side is corresponding with polygon prism 60 Raised 71, each projection 71 gradually increases along clockwise direction.Control unit includes push rod 72, frizzen 73 and controlling organization, Controlling organization includes depression bar, the second elastic component 78, the 3rd elastic component 77, mounting seat 76 and controlling switch 75, push rod 72 and projection 71 correspondences, and slide laterally and be arranged in casing 10.Elastic component is connected between casing 10 and push rod 72, and frizzen 73 is fixed on On push rod 72, mounting seat 76 is fixed in casing 10, and controlling switch 75 is arranged in mounting seat 76, and the 3rd elastic component 77 is connected to Between depression bar and mounting seat 76, the other end that depression bar is connected with the 3rd elastic component 77 is hinged in casing 10.The number of controlling organization Amount is corresponding with the quantity of observation window, and each controlling switch 75 controls a circuit for electromagnet 20.3rd elastic component 77 It is rubber parts.Rubber parts have good insulating effect, high safety.Second elastic component 78 uses stainless steel pressure Spring, coefficient of elasticity is high, and using effect is good.
During concrete operations, workmen completes an operation and then rotates a construction speed display unit after construction, often, So as to inform monitoring personnel construction speed.Meanwhile, electromagnet 20 can be at conducting state.In addition, when monitoring personnel is applied knowing After the job schedule of workman person, then monitoring unit is controlled so that electromagnet 20 is powered, electromagnet 20 produces magnetic force, you can by iron Piece draws down, and then stretches folding lantern 40 so that the Schedule monitoring bar folded on lantern 40 is located at the second observation window 102 Position, you can the progress of convenient construction personnel's checking monitoring.
After rotating construction speed display unit due to necessary workmen, Schedule monitoring unit can just be in the shape that can be turned on State, monitoring personnel can just carry out the operation of Schedule monitoring unit, effectively avoid the maloperation of monitoring personnel.Enter with traditional Degree supervising device is compared, and this programme can realize Two-way Feedback, and staff and cost personnel are understood well each other, inconvenience In the development of work.
Above-described is only embodiment of the present utility model, and the general knowledge such as known concrete structure and characteristic is herein in scheme Excessive description is not made.It should be pointed out that for a person skilled in the art, not departing from the premise of the utility model structure Under, some deformations and improvement can also be made, these should also be considered as protection domain of the present utility model, and these are all without influence Effect and practical applicability that the utility model is implemented.This application claims protection domain should be with the content of its claim It is defined, specific embodiment in specification etc. records the content that can be used for explaining claim.

Claims (6)

1. a kind of construction costs Schedule monitoring device, it is characterised in that including casing, construction speed display unit, touching unit, Control unit and Schedule monitoring unit, the casing are provided with the first observation window and multiple second observation windows, the construction speed Display unit is correspondingly arranged with the first observation window, and the Schedule monitoring unit is correspondingly arranged with the second observation window, and the touching is single Unit is fixed on construction speed display unit, when the construction speed display unit is rotated, touching unit triggers switch, progress prison Control unit is in can conducting state.
2. a kind of construction costs Schedule monitoring device according to claim 1, it is characterised in that:The construction speed displaying Unit includes polygon prism, and the polygon prism is rotatably arranged in casing, and each side of the polygon prism is provided with construction speed Bar.
3. a kind of construction costs Schedule monitoring device according to claim 2, it is characterised in that:The Schedule monitoring unit Including electromagnet, installing plate, the first elastic component, folding lantern and iron block, the installing plate is fixed in casing, first bullet Property part be connected between installing plate and iron block, it is described fold lantern one end fix on a mounting board, the other end is fixed on iron block On, first elastic component is located at and folds in lantern, and when the electromagnet is powered off, iron block is located at the top of the second observation window, institute When stating electromagnet energization, together with electromagnet attraction, the folding lantern is provided with Schedule monitoring bar to iron block.
4. a kind of construction costs Schedule monitoring device according to claim 3, it is characterised in that:The touching unit includes The top of polygon prism and projection corresponding with each side of polygon prism are arranged on, each projection gradually increases along clockwise direction, Described control unit includes push rod, frizzen and controlling organization, and the controlling organization includes depression bar, the second elastic component, the 3rd bullet Property part, mounting seat and controlling switch, the push rod is corresponding with projection, and slides laterally and be arranged in casing, and the elastic component connects It is connected between casing and push rod, the frizzen is fixed on push rod, the mounting seat is fixed in casing, the controlling switch In mounting seat, the 3rd elastic component is connected between depression bar and mounting seat, and the depression bar is connected with the 3rd elastic component The other end be hinged in casing, the quantity of the controlling organization is corresponding with the quantity of observation window, and each controlling switch One circuit of electromagnet of control.
5. a kind of construction costs Schedule monitoring device according to claim 4, it is characterised in that:3rd elastic component is Rubber parts.
6. a kind of construction costs Schedule monitoring device according to claim 5, it is characterised in that:The surface of the iron block sets There is one layer of antirust coat.
CN201621212755.9U 2016-11-10 2016-11-10 Engineering cost progress monitoring device Expired - Fee Related CN206178969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621212755.9U CN206178969U (en) 2016-11-10 2016-11-10 Engineering cost progress monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621212755.9U CN206178969U (en) 2016-11-10 2016-11-10 Engineering cost progress monitoring device

Publications (1)

Publication Number Publication Date
CN206178969U true CN206178969U (en) 2017-05-17

Family

ID=58684461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621212755.9U Expired - Fee Related CN206178969U (en) 2016-11-10 2016-11-10 Engineering cost progress monitoring device

Country Status (1)

Country Link
CN (1) CN206178969U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114005349A (en) * 2021-11-26 2022-02-01 四川建筑职业技术学院 Construction progress model for building engineering management

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114005349A (en) * 2021-11-26 2022-02-01 四川建筑职业技术学院 Construction progress model for building engineering management

Similar Documents

Publication Publication Date Title
CN106405002B (en) A kind of multi-faceted air detecting device of room air detection
CN206178969U (en) Engineering cost progress monitoring device
CN104197471B (en) Control method, device and the air conditioner of air conditioner and mobile control terminal
CN206906004U (en) A kind of rotary switch test equipment
CN205722240U (en) The efficient alarming device in a kind of construction site
CN204536408U (en) A kind of multi-usage electroscope
CN205655172U (en) Mobilizable stage lamp
CN203432038U (en) Adjustable fresh air inlet
CN203321165U (en) Pedal auxiliary door opening device
CN205735565U (en) A kind of structural sheeting drilling equipment
CN206366553U (en) A kind of multifunction combined vent cabinet
CN209694416U (en) A kind of teaching accounting computerization combined experimental device
CN209280491U (en) A kind of miniaturization weight freely falling body test device
CN207806057U (en) A kind of device for closed guard gate's door leaf to be fixed
CN206936504U (en) A kind of multifunctional cutting machine
CN206474236U (en) A kind of building foundation engineering disposed waste high efficiency treatment machine
CN208298401U (en) A kind of instructional device for pilot's Expert English language training by qualified teachers
CN2884388Y (en) Electrically driving education experimental bench
CN206038791U (en) Testboard of inspection electric control lock performance
CN205297579U (en) High -efficient portable rock drill
CN208110378U (en) A kind of unattended equipment room environment remote centralized control apparatus
CN207390794U (en) A kind of elevator(lift) machine room step device and elevator(lift) machine room
CN205645571U (en) Multi -functional insulating bar of 10kV improved generation
CN210743838U (en) Dual-power switch operating mechanism
CN203227910U (en) Solder bath method solderability tester

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

Termination date: 20211110