CN206174900U - Underground drilling equipment - Google Patents
Underground drilling equipment Download PDFInfo
- Publication number
- CN206174900U CN206174900U CN201621065993.1U CN201621065993U CN206174900U CN 206174900 U CN206174900 U CN 206174900U CN 201621065993 U CN201621065993 U CN 201621065993U CN 206174900 U CN206174900 U CN 206174900U
- Authority
- CN
- China
- Prior art keywords
- storage tank
- water
- resilient sleeve
- drilling device
- elastic sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to an underground drilling equipment, including drilling rod, elastic sleeve, storage water tank with be located the water pump of storage water tank, the bottom of storage water tank is equipped with the through -hole, and the through -hole is located to the elastic sleeve stopper, and the one end of elastic sleeve is located the storage water tank, and the other end stretches out the storage water tank, and one end that the drilling rod was equipped with the drill bit is located the elastic sleeve, and the other end passes the storage water tank, the logical water system of drilling rod and the delivery port intercommunication of water pump. Because the elastic sleeve has elasticity, during drilling, the scalable pressure of elastic sleeve forms a sealing sink on ground with the ground face bonding, and the earth grit gets into in the elastic sleeve along with rivers to spill over to the storage water tank in from the elastic sleeve, can not arrange the city underground piping, avoid causing the jam to the city underground piping, reduce environmental pollution, and get into water in the storage water tank and pass through the water pump and carry again to the water system of drilling rod, make hydroenergy enough obtain cyclic utilization, save the water resource.
Description
Technical field
This utility model is related to earth drilling technical field, more particularly to a kind of earth drilling device.
Background technology
With tunnel and the Fast Construction of the exploitation of underground space high intensity and railway traffic engineering, the engineering properties of ground is received
The great attention of the correlation construction unit such as Construction Company, designing institute, unit in charge of construction is arrived, during underground development, geology is bored
Due to small volume and conveniently moving, find broad application in city construction engineering.Rig needs constantly offer in boring procedure
Water source ability stability and high efficiency work, traditional water system is persistently supplied water by water storage vehicle, generally bores the water consumption of 20 metre hole
About 500 liters, water consumption is very big, and at the construction field (site) Jing is often because insufficient water leads to not phenomenon of spudding in;And in boring procedure,
Water resource is lost in a large number, adds the subsidiary soil sandstone of drilling, and as current are discharged to urban Underground pipeline, environmental pollution is big, holds
Easily cause urban discharging pipeline clogging.
Utility model content
The purpose of this utility model is to provide a kind of earth drilling device, can cycling use of water, save water resource, and keep away
Exempt to result in blockage urban Underground pipeline, reduce environmental pollution.
To realize the purpose of this utility model, adopt the technical scheme that:
A kind of earth drilling device, including drilling rod, resilient sleeve, storage tank and the water pump in storage tank, storage tank
Bottom is provided with through hole, and resilient sleeve plug is located at through hole, and one end of resilient sleeve is located in storage tank, and the other end stretches out storage tank, bores
Bar is provided with one end of drill bit in the resilient sleeve, and the other end passes through storage tank, the water outlet of the water passage system of drilling rod and the water pump
Mouth connection.
Because resilient sleeve has elasticity, during drilling, resilient sleeve is scalable to be pressed in ground, and with ground a sealing is combined to form
Tank, soil sandstone is entered in resilient sleeve with current, and is spilled in storage tank from resilient sleeve, will not be discharged to Urban Underground pipe
Road, it is to avoid result in blockage to urban Underground pipeline, reduces environmental pollution;And conveyed again by water pump into the water in storage tank
To the water system of drilling rod, enable water to be recycled, save water resource.
Technical scheme is further illustrated below:
It is further that resilient sleeve is stretched out one end of storage tank and is provided with horn mouth.Resilient sleeve is set to be easier to be fitted with ground
Sealed cistern is formed, the effect for inhaling toilet gum cover is reached, it is adaptable to which level land or slope, the suitability is more preferable.
It is further that earth drilling device also includes the cartridge filter being fixed in storage tank, resilient sleeve is located at storage tank
Interior one end is located in cartridge filter.In boring procedure, soil sandstone is overflowed after resilient sleeve with current, is introduced into cartridge filter, by
There is certain height in cartridge filter, part soil sandstone is deposited in the bottom of cartridge filter, reaches the function of filtration, makes water pump defeated
The water for delivering to drilling rod is cleaner, also allows in the future to the cleaning of soil sandstone.
It is further that earth drilling device also includes for storage tank being divided into bilevel drainage screen, and water pump is located at
The top of drainage screen, resilient sleeve stretches into the lower section that one end of storage tank is located at drainage screen.In boring procedure, soil sandstone is with water
Slime flux goes out after resilient sleeve, and into the bottom of drainage screen, drainage screen is filtered to impurity, reaches the function of filtration, filtered
Boring water enter drainage screen top, make water pump be delivered to drilling rod water it is cleaner, make the work of drilling rod more stable.
It is further on earth drilling device also includes the cartridge filter that is fixed in storage tank and is divided into storage tank
The drainage screen of lower two-layer, water pump is located at the top of drainage screen, and cartridge filter is located at the lower section of drainage screen.In boring procedure, soil sand
Stone is overflowed after resilient sleeve with current, is introduced into cartridge filter, because cartridge filter has certain height, part soil sandstone precipitation
In the bottom of cartridge filter, boring water is filtered for the first time;Because cartridge filter is located at the lower section of drainage screen, flow out from cartridge filter
The water for coming, drainage screen carries out second filtration to boring water to the further filtration of impurity, and filtered boring water was entered
Filter screen top, make water pump be delivered to drilling rod water it is cleaner, make the work of drilling rod more stable.
It is further that earth drilling device also includes the water supply tank being located in storage tank, water supply tank is provided with and storage tank
The water supplement port of connection.When the insufficient water sources in storage tank, by the water supplement port of water supply tank to storage tank make-up water source, water is prevented
Pump dallies, it is ensured that the normal operation of earth drilling device.
It is further that earth drilling device also includes the liquid level sensor being located in storage tank and liquid level sensor electricity
Property connection controller, water supplement port be provided with controller be electrically connected with control valve.By liquid level sensor in storage tank
Liquid level detected, and by the feedback of the information for detecting to controller, when the liquid level in storage tank is less than setting value, controller
Drive control valve is opened, and the water in water supply tank is automatically replenished to storage tank, prevents water pump from dallying, it is ensured that earth drilling device
Normal operation, make the more accurate intelligence of control.
It is further that the driving means of water pump and drilling rod are electrically connected with controller.Make the control of earth drilling device
The more accurate intelligence of system.
It is further that the bottom of storage tank is provided with universal wheel.It is easy to the movement of earth drilling device, using more convenient.
It is further that resilient sleeve is rubber sleeve.
Compared with prior art, this utility model has the advantages that:
This utility model has elasticity due to resilient sleeve, and during drilling, resilient sleeve is scalable to be pressed in ground, and with ground shape is combined
Into a sealed cistern, soil sandstone is entered in resilient sleeve with current, and is spilled in storage tank from resilient sleeve, will not be discharged to
Urban Underground pipeline, it is to avoid result in blockage to urban Underground pipeline, reduces environmental pollution;And pass through water into the water in storage tank
Pump is delivered to the water system of drilling rod again, enables water to be recycled, and saves water resource;This utility model is boring 20 meters
About 200 liters of hole hourly water consumption, compared with traditional mode save 300 liters of water consumptions, and two people be it is operable complete, without the need for be equipped with
Water transport personnel, reduce the input of manpower and materials.
Description of the drawings
Fig. 1 is the external structure schematic diagram of this utility model embodiment earth drilling device;
Fig. 2 is the internal structure schematic diagram of this utility model embodiment earth drilling device;
Fig. 3 is the assembling schematic diagram of this utility model embodiment drilling rod, resilient sleeve and cartridge filter.
Description of reference numerals:
10. drilling rod, 110. drill bits, 20. resilient sleeve, 210. horn mouths, 30. storage tanks, 40. water pumps, 50. cartridge filters, 60.
Drainage screen, 70. water supply tanks, 710. water supplement ports, 80. universal wheels.
Specific embodiment
Embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings:
As depicted in figs. 1 and 2, a kind of earth drilling device, including drilling rod 10, resilient sleeve 20, storage tank 30 and positioned at storage
Water pump 40 in water tank 30, the bottom of storage tank 30 is provided with through hole (accompanying drawing is not identified), and the plug of resilient sleeve 20 is located at through hole, resilient sleeve
It is very close to each other between 20 and through hole, and one end of resilient sleeve 20, in storage tank 30, the other end stretches out storage tank 30, drilling rod 10
One end of drill bit 110 is provided with resilient sleeve 20, the other end passes through storage tank 30, water passage system and the water pump 40 of drilling rod 10
Outlet is connected.
Because resilient sleeve 20 has elasticity, during drilling, resilient sleeve 20 is scalable to be pressed in ground, axis and the ground of resilient sleeve 20
Face is arranged vertically and combines to form a sealed cistern with ground, and soil sandstone is entered in resilient sleeve 20, and from bullet with current
Property set 20 be spilled in storage tank 30, urban Underground pipeline will not be discharged to, it is to avoid urban Underground pipeline is resulted in blockage, reduce ring
Pollute in border;And it is delivered to the water system of drilling rod 10 again by water pump 40 into the water in storage tank 30, enable water to obtain
Recycle, save water resource;This utility model is boring about 200 liters of 20 metre hole hourly water consumption, saves compared with traditional mode
300 liters of water consumptions, and two people be it is operable complete, without the need for being equipped with water transport personnel, reduce the input of manpower and materials.
In the present embodiment, resilient sleeve 20 is rubber sleeve, and resilient sleeve 20 can also according to actual needs adopt other materials;
, using geology drilling row drilling, earth drilling device can also according to actual needs using the brill of other forms for earth drilling device
Tool.
As shown in figure 3, resilient sleeve 20 stretches out one end of storage tank 30 is provided with horn mouth 210, make resilient sleeve 20 be easier with
Ground fits to form sealed cistern, reaches the effect for inhaling toilet gum cover, it is adaptable to which level land or slope, the suitability is more preferable.
As shown in Figures 2 and 3, earth drilling device also includes the cartridge filter 50 being fixed in storage tank 30, resilient sleeve 20
One end in storage tank 30 is located in cartridge filter 50.In boring procedure, soil sandstone is overflowed after resilient sleeve 20 with current,
Cartridge filter 50 is introduced into, because cartridge filter 50 has certain height, part soil sandstone is deposited in the bottom of cartridge filter 50, right
Boring water is filtered for the first time, make water pump 40 be delivered to drilling rod 10 water it is cleaner, also allow in the future to the clear of soil sandstone
Reason.
In the present embodiment, the height of cartridge filter 50 is 25cm, and the height of cartridge filter 50 can also set according to actual needs
It is set to other values.
As shown in Fig. 2 earth drilling device also includes for storage tank 30 being divided into bilevel drainage screen 60, water pump 40
Positioned at the top of drainage screen 60, cartridge filter 50 is located at the lower section of drainage screen 60.In boring procedure, flow out from cartridge filter 50
Water, drainage screen 60 carries out second filtration to boring water to the further filtration of impurity, and filtered boring water is entered and filtered
The top of net 60, make water pump 40 be delivered to drilling rod 10 water it is cleaner, make the work of drilling rod 10 more stable.
In the present embodiment, the size of mesh opening of drainage screen 60 is 3 × 3mm, can be fallen contaminant filter again while permeable,
The grid of drainage screen 60 can also according to actual needs adopt other sizes.
As shown in figure 1, earth drilling device also includes the water supply tank 70 being located in storage tank 30, water supply tank 70 is provided with and storage
The water supplement port 710 of the connection of water tank 30, water supply tank 70 is located at the top of drainage screen 60.When the insufficient water sources in storage tank 30, lead to
The water supplement port 710 of water supply tank 70 is crossed to the make-up water source of storage tank 30, prevents water pump 40 from dallying, it is ensured that earth drilling device it is normal
Operating.
Earth drilling device also includes liquid level sensor (accompanying drawing is not identified) and the liquid level sensor being located in storage tank 30
The controller (accompanying drawing is not identified) of electric connection, water supplement port 710 be provided with controller be electrically connected with control valve (accompanying drawing is not marked
Know).The liquid level in storage tank 30 is detected by liquid level sensor, and by the feedback of the information for detecting to controller, when
Liquid level in storage tank 30 be less than setting value when, controller drive control valve open, make the water in water supply tank 70 be automatically replenished to
In storage tank 30, prevent water pump 40 from dallying, it is ensured that the normal operation of earth drilling device, make the more accurate intelligence of control.Water pump 40
Also it is electrically connected with controller with the driving means of drilling rod 10, further improves the intelligent of earth drilling device control.
As depicted in figs. 1 and 2, the bottom of storage tank 30 is provided with universal wheel 80, is easy to the movement of earth drilling device, uses
It is more convenient.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more concrete and detailed,
But therefore can not be interpreted as the restriction to utility model patent scope.It should be pointed out that for the common skill of this area
For art personnel, without departing from the concept of the premise utility, some deformations and improvement can also be made, these are belonged to
Protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be defined by claims.
Claims (10)
1. a kind of earth drilling device, it is characterised in that including drilling rod, resilient sleeve, storage tank and in the storage tank
Water pump, the bottom of the storage tank is provided with through hole, and the resilient sleeve plug is located at the through hole, and one end of the resilient sleeve is located at
In the storage tank, the other end stretches out the storage tank, and the drilling rod is provided with one end of drill bit in the resilient sleeve, another
Through the storage tank, the water passage system of the drilling rod is connected with the outlet of the water pump at end.
2. earth drilling device according to claim 1, it is characterised in that the resilient sleeve stretches out the one of the storage tank
End is provided with horn mouth.
3. earth drilling device according to claim 1, it is characterised in that also including the mistake being fixed in the storage tank
Filter cylinder, the resilient sleeve is located at the one end in the storage tank and is located in the cartridge filter.
4. earth drilling device according to claim 1, it is characterised in that also include being divided into the storage tank up and down
The drainage screen of two-layer, the water pump is located at the top of the drainage screen, and the resilient sleeve stretches into one end of the storage tank and is located at
The lower section of the drainage screen.
5. earth drilling device according to claim 1, it is characterised in that also including the mistake being fixed in the storage tank
Filter cylinder and the storage tank is divided into into bilevel drainage screen, the water pump is located at the top of the drainage screen, the mistake
Filter cylinder is located at the lower section of the drainage screen.
6. earth drilling device according to claim 1, it is characterised in that also include the moisturizing being located in the storage tank
Case, the water supply tank is provided with the water supplement port connected with the storage tank.
7. earth drilling device according to claim 6, it is characterised in that also include the liquid level being located in the storage tank
The controller that sensor and the liquid level sensor are electrically connected with, the water supplement port is provided with and controller electric connection
Control valve.
8. earth drilling device according to claim 7, it is characterised in that the driving means of the water pump and the drilling rod
It is electrically connected with the controller.
9. the earth drilling device according to any one of claim 1 to 8, it is characterised in that the bottom of the storage tank sets
There is universal wheel.
10. the earth drilling device according to any one of claim 1 to 8, it is characterised in that the resilient sleeve is rubber
Set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621065993.1U CN206174900U (en) | 2016-09-19 | 2016-09-19 | Underground drilling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621065993.1U CN206174900U (en) | 2016-09-19 | 2016-09-19 | Underground drilling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206174900U true CN206174900U (en) | 2017-05-17 |
Family
ID=58676257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621065993.1U Expired - Fee Related CN206174900U (en) | 2016-09-19 | 2016-09-19 | Underground drilling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206174900U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223883A (en) * | 2016-09-19 | 2016-12-14 | 广州市盾建地下工程有限公司 | Earth drilling device |
CN112554788A (en) * | 2020-12-08 | 2021-03-26 | 中煤地质集团有限公司 | Multi-functional geological survey probing device |
-
2016
- 2016-09-19 CN CN201621065993.1U patent/CN206174900U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223883A (en) * | 2016-09-19 | 2016-12-14 | 广州市盾建地下工程有限公司 | Earth drilling device |
CN112554788A (en) * | 2020-12-08 | 2021-03-26 | 中煤地质集团有限公司 | Multi-functional geological survey probing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105298490B (en) | Underground fluid Stratified Sampling apparatus and method based on U-tube technology | |
CN206174900U (en) | Underground drilling equipment | |
CN206578131U (en) | Soil and groundwater remediation system | |
CN205369282U (en) | Well point dewatering of sluice construction usefulness | |
CN105043949A (en) | Simulation experiment device and method for coal powder output in vertical well bore | |
CN109047305A (en) | Chemical pollution place soil and groundwater in-situ remediation system and restorative procedure | |
CN107127211A (en) | Pollutant site remediation system and method based on regional pollution amount | |
CN209287958U (en) | Chemical pollution place soil and groundwater in-situ remediation system | |
CN204782937U (en) | Special sump oil water recovery unit in environment -friendly oil field | |
CN206129244U (en) | Colliery water resources regionalization is mining system in advance | |
CN203285444U (en) | Vault pressure supporting system in earth pressure shield excavation | |
CN202380515U (en) | Multi-purpose rainwater utilization system | |
CN106223883A (en) | Earth drilling device | |
CN101279157B (en) | Method for air-water backwashing and surface cleaning natural filter bed filter material and a cleaning control system thereof | |
CN205894090U (en) | Job site fire water cyclic utilization device | |
CN202788746U (en) | Drilling tool device for drilling, grouting and wall protection | |
CN109879465A (en) | A kind of loose sand heat storage underground heat recovery well underground Filtration-Precipitation device | |
CN207093043U (en) | Tubing string is adopted in a kind of coal bed gas and compact sandstone gas underground altogether | |
CN202466679U (en) | Ecological storage system for road rainwater | |
CN211819495U (en) | Water adding device for underground coal mine explosion-proof water bag | |
CN207741951U (en) | A kind of research removes the experimental provision of seepage well periphery blocking suspended matter | |
CN207878508U (en) | A kind of backward flowing preventing device in cable shaft | |
CN103669333A (en) | Slide-resistant pile facilitating vacuum rainfall | |
CN102535579A (en) | Ecological storing system for road rainwater | |
CN202324034U (en) | Sediment removal device for water reservoir |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 Termination date: 20190919 |
|
CF01 | Termination of patent right due to non-payment of annual fee |