CN206174635U - Pre -buried subassembly and use its skating rink board - Google Patents
Pre -buried subassembly and use its skating rink board Download PDFInfo
- Publication number
- CN206174635U CN206174635U CN201621054984.2U CN201621054984U CN206174635U CN 206174635 U CN206174635 U CN 206174635U CN 201621054984 U CN201621054984 U CN 201621054984U CN 206174635 U CN206174635 U CN 206174635U
- Authority
- CN
- China
- Prior art keywords
- fastener inserts
- board
- connecting portion
- main body
- rod member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides a pre -buried subassembly and use its skating rink board, including a member, the symmetry is equipped with a pair of first nut at the both ends of this member, be equipped with the double -screw bolt that has the internal thread hole on the member, the outside at this double -screw bolt is equipped with location portion on the surface, cooperate through a bolt and two first nuts being located two adjacent pre -buried subassembly tip and realize two adjacent pre -buried subassemblies and be connected, connect soon mutually through the internal thread hole of fixing bolt and double -screw bolt in the board main part and realize the board main part and install on pre -buried subassembly, the area of contact of pre -buried subassembly and collar tie beam by concrete placement formed can be increased through location portion, and then increase frictional force is in order to prevent that pre -buried subassembly from taking place the shake or sliding, and then the installation steadiness of improvement skating rink board.
Description
Technical field
This utility model is related to a kind of fastener inserts and the ice stadium board using it.
Background technology
At present, skating/dry skating is the sports that a kind of people like very much, and the development of this kind of sports items needs place
Hold, and the main building structure that skating/roller rink is built is the ice stadium board for surrounding closed area.
For example, the Patent Publication of Application No. CN201420795675.5 provides a kind of outdoor glass of antiwind resistance
Roller rink board, on body of wall top glass baffle plate is provided with, and in the bottom of the body of wall connector is provided with, in work progress, need by
Connector passes through bolt pre-connection with the preformed hole on ground.Again for example, the patent of Application No. CN201420651080.2 is public
Text is opened there is provided a kind of Provincial Rink board structure, in the bottom of board board bottom nozzle mounts are provided with, poured by bolt drilling
Build the fixation that concrete realizes total body.It can be seen that, in aforementioned two technical scheme, it is both needed to formed by concreting
Collar tie beam in form preformed hole in advance, then recycle bolt to be fastened on the preformed hole positioned at the connector of board bottom,
Thus it is fixed to realize the entirety to board structure.
However, being both needed in the collar tie beam formed by concreting form reserved in advance in aforementioned two technical scheme
Hole, easily produces error during preformed hole construction, causes in the board installation process of ice stadium that problem is numerous, is unfavorable for that simplification is applied
Work operation.
Utility model content
In view of this, main purpose of the present utility model is, there is provided a kind of fastener inserts and the ice stadium circle using it
Wall, by arranging the fastener inserts working procedure of ice stadium board and the installation accuracy of raising ice stadium board can be simplified.
The utility model discloses a kind of fastener inserts, including a rod member, it is provided with to realize phase at the two ends of the rod member
The first connecting portion of adjacent two fastener inserts connection, is provided with the second connecting portion of connection on the rod member, in second company
Location division is provided with the outside of socket part.
Using this structure, the working procedure and operation difficulty of ice stadium board can be simplified, while also helping guarantee ice
The installation of boundary wall fills true property, it is to avoid larger alignment error occur.In addition, by the location division can increase fastener inserts with
The contact area of the collar tie beam formed by concreting, and then increasing friction force is preventing fastener inserts from shake or sliding occurring
It is dynamic, and then improve the installation steadiness of ice stadium board.
Preferably, the first connecting portion is a pair first nuts for being symmetricly set on the same rod member two ends, is passed through
One bolt is engaged with two first nuts for being mutually connected end positioned at two neighboring fastener inserts and realizes two neighboring institute
State the connection of fastener inserts.
Using this structure, the firm company of the two neighboring fastener inserts can be realized by simple attachment structure
Connect.
Preferably, the second connecting portion include one perpendicular to the rod member axially arranged, the spiral shell with internal thread hole
Post.
Using this structure, the attachment structure of the fastener inserts and ice stadium curtain wall can be simplified.
Preferably, the second connecting portion also includes the axially arranged connecting pole perpendicular to the rod member, the stud
It is fixed on the top of the connecting pole.
Preferably, the location division is arranged on the side surface outside of the stud.
Preferably, the location division is made up of the nut being fixed in the second connecting portion.
This utility model also proposed a kind of ice stadium board, including board main body, also including any one of aforementioned
Fastener inserts, the connector being engaged with the second connecting portion, the board main body are provided with the bottom of the board main body
It is engaged in the fastener inserts with the second connecting portion by the connector.
Using this structure, the working procedure and operation difficulty of ice stadium board can be simplified, while also helping guarantee ice
The installation of boundary wall fills true property, it is to avoid larger alignment error occur.In addition, by the location division can increase fastener inserts with
The contact area of the collar tie beam formed by concreting, and then increasing friction force is preventing fastener inserts from shake or sliding occurring
It is dynamic, and then improve the installation steadiness of ice stadium board.
Preferably, the connector be bolt, the second connecting portion include one perpendicular to the rod member it is axially arranged,
Stud with internal thread hole, the board main body is tightened on the internal thread hole of the stud by the bolt and is arranged on described
In fastener inserts.
Preferably, the connector and the second white silk connecting portion are multiple and both one-to-one corresponding.
Description of the drawings
Fig. 1 is the overall schematic of ice stadium board;
Fig. 2 is the front view of fastener inserts;
Fig. 3 is the top view of fastener inserts shown in Fig. 2;
Fig. 4 is the left view of fastener inserts shown in Fig. 2.
Specific embodiment
Referring to Fig. 1~Fig. 4 to fastener inserts described in the utility model and being embodied as using its ice stadium board
Mode is described in detail.
Generally by multistage board body, along ice stadium, circumferentially linking is formed ice stadium board, and single hop board body mainly includes board main body
1 and the fence 2 that is arranged in the board main body 1.Wherein, board main body 1 includes supporting the main body frame of installation and is encapsulated in
Multiple panels of the main body frame outer surface, this multiple panel include being arranged on the base plate of main body frame bottom.Fence 2 includes setting
Put in the fence main body 21 of the top surface of board main body 1 and the fence installation group to be fixed on fence main body 21 in board main body 1
Part, wherein, fence main body 21 is generally made up of safety glass, and fence mounting assembly mainly includes a base, is supported on the bottom
Rail bar 3 on seat, support member to support fence main body 21 is supported on base, ice stadium board in the mounted state, encloses
The edge side of hurdle main body 21 is inserted on rail bar 3, and its bottom is connected to the top of support member.
It is of the present utility model mainly to the improvement is that there is provided a kind of to realize what ice stadium board was quick and precisely installed
Fastener inserts, the length of the fastener inserts is corresponded with the length of multistage board body, fastener inserts to realize and its
The installation of corresponding single hop board body.As shown in Figure 2 to 4, single fastener inserts include a rod member 41, and the rod member 41 can be by reality
Heart metallic rod or hollow metal tube are constituting.A pair first nuts 42 are arranged near its top side at the both ends of rod member 41,
First connecting portion is constituted by first nut 42.Be provided with rod member 41 be uniformly distributed, perpendicular to axially arranged many of rod member 41
Individual connecting pole 43, at the top of the connecting pole 43 stud 44 with internal thread hole is formed with, by connecting pole 43 and thereon
Stud 44 constitute second connecting portion.A location division 45, in the present embodiment, the location division are provided with the outside of the side surface of stud 44
45 are made up of the nut being fixed on stud 44 by welding manner, also, the nut is with its axial direction and the axial direction of rod member 41
Perpendicular mode is arranged.
Before ice stadium curtain wall shown in Fig. 1 is installed, need to bury in the collar tie beam formed by concreting in advance
If fastener inserts shown in Fig. 2~Fig. 4.In work progress, single fastener inserts are embedded in collar tie beam, and single fastener inserts are buried
If depth keeps flushing being defined by the top surface of stud 44 and collar tie beam surface, positioned at two neighboring fastener inserts the two of end are mutually connected
The individual alignment of first nut 42 is arranged, and the two first nuts 42 are tightened together using bolt, is achieved in two neighboring pre-
The connection of embedded component.As shown in figure 1, equally distributed multiple bolts 11 are being provided with the base plate of the bottom of board main body 1, it is single
The number of the bolt 11 on segment limit body of wall should be consistent and correspond with the number of the connecting pole 43 in single fastener inserts,
When installing ice stadium board, multiple bolts 11 of the bottom of board main body 1 are aligned one by one with the multiple studs 44 in fastener inserts, pass through
Bolt 11 is tightened on the internal thread hole of stud 44 realizes that board main body 1 is arranged in fastener inserts, and multistage is realized by that analogy
The installation of board body is fixed.
With directly opening up compared with the mating holes that bolt 11 is engaged, using this utility model on collar tie beam at the construction field (site)
The fastener inserts, have multiple interior spiral shells due to burying in the collar tie beam formed by concreting in advance in work progress
The fastener inserts of pit, when ice stadium board is installed, only need to be by the multiple bolts 11 in board main body 1 and corresponding internal thread hole
Screw together, the working procedure and operation difficulty of ice stadium board can be simplified.Simultaneously as directly one on rod member 41
Body is formed or is welded and fixed multiple connecting poles 43 and the stud with internal thread hole 44, ensure that the setting of multiple internal thread holes
Precision, and then advantageously ensure that the installation accuracy of ice stadium board, it is to avoid there is larger alignment error.In addition, by positioning
Portion 45 can increase the contact area of fastener inserts and the collar tie beam formed by concreting, and then increasing friction force is pre- to prevent
There is shake or slide in embedded component, and then improve the installation steadiness of ice stadium board.
Preferred embodiment of the present utility model is the foregoing is only, not to limit this utility model.It is all this
Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in this utility model
Protection domain within.
For example, in the above-described embodiments, a pair first nuts 42 are provided with the two ends of rod member 41, by this pair first nuts
42 realize the first connecting portion of adjacent two fastener inserts connection to constitute, but are not limited to this, can also be at single pre-buried group
The wherein one end of the rod member 41 of part arranges Access Division, arranges with the supporting setting in the Access Division by clamping in its other end
Portion, by the Access Division-by clamping parts the connection of adjacent two fastener inserts is realized.
Again for example, in the above-described embodiments, location division 45 by the nut being fixed on by welding manner on stud 44 come
Constitute, but be not limited to this, the location division 45 can be by constituting with erose metal derby.
Claims (9)
1. a kind of fastener inserts, it is characterised in that including a rod member (41), be provided with to realize phase at the two ends of the rod member (41)
The first connecting portion of adjacent two fastener inserts connection, is provided with the second connecting portion of connection on the rod member (41), this
Location division (45) is provided with the outside of two connecting portions.
2. fastener inserts according to claim 1, it is characterised in that the first connecting portion is to be symmetricly set on same institute
A pair first nuts (42) at rod member (41) two ends are stated, end is mutually connected with positioned at two neighboring fastener inserts by a bolt
Two first nuts (42) are engaged the connection for realizing the two neighboring fastener inserts.
3. fastener inserts according to claim 1, it is characterised in that the second connecting portion includes perpendicular to the bar
Axially arranged, the stud (44) with internal thread hole of part (41).
4. fastener inserts according to claim 3, it is characterised in that the second connecting portion is also included perpendicular to the bar
The axially arranged connecting pole (43) of part (41), the stud (44) is fixed on the top of the connecting pole (43).
5. fastener inserts according to claim 3, it is characterised in that the location division (45) is arranged on the stud (44)
Side surface outside.
6. fastener inserts according to claim 1 or 5, it is characterised in that the location division (45) is by being fixed on described
A nut on two connecting portions is constituting.
7. a kind of ice stadium board, including board main body (1), it is characterised in that also including any one of claim 1~6
Fastener inserts, the connector being engaged with the second connecting portion, the board are provided with the bottom of the board main body (1)
Main body (1) is engaged in the fastener inserts by the connector with the second connecting portion.
8. ice stadium board according to claim 7, it is characterised in that the connector is bolt, the second connecting portion
Including one perpendicular to the rod member (41) axially arranged, the stud (44) with internal thread hole, the board main body (1) passes through
The bolt is tightened on the internal thread hole of the stud (44) and is arranged in the fastener inserts.
9. the ice stadium board according to claim 7 or 8, it is characterised in that the connector and the second white silk connecting portion are
Multiple and both one-to-one corresponding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621054984.2U CN206174635U (en) | 2016-09-13 | 2016-09-13 | Pre -buried subassembly and use its skating rink board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621054984.2U CN206174635U (en) | 2016-09-13 | 2016-09-13 | Pre -buried subassembly and use its skating rink board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206174635U true CN206174635U (en) | 2017-05-17 |
Family
ID=58675700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621054984.2U Active CN206174635U (en) | 2016-09-13 | 2016-09-13 | Pre -buried subassembly and use its skating rink board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206174635U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112922448A (en) * | 2021-01-25 | 2021-06-08 | 北京华体体育场馆施工有限责任公司 | Ice rink boundary wall |
-
2016
- 2016-09-13 CN CN201621054984.2U patent/CN206174635U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112922448A (en) * | 2021-01-25 | 2021-06-08 | 北京华体体育场馆施工有限责任公司 | Ice rink boundary wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4767881B2 (en) | Fence beam mounting structure | |
CN206174635U (en) | Pre -buried subassembly and use its skating rink board | |
KR100876098B1 (en) | Wood guardrail assembling structure | |
CN210289329U (en) | Embedded part for installing street lamp pole | |
KR101199507B1 (en) | Prop connection structure for Installation of Road Traffic Facilities | |
KR200433150Y1 (en) | upholder for street lamppost | |
KR101235006B1 (en) | Road sign | |
KR101474736B1 (en) | A roadlamp post fixing apparatus | |
KR100915804B1 (en) | Parapet | |
WO2019185922A1 (en) | Fence post with attaching means and a modular fencing system | |
JP6637722B2 (en) | Construction method and support structure of charging pole support | |
CN211313608U (en) | Pole setting subassembly and protection railing | |
KR102094462B1 (en) | Base structure easy to replace pillar | |
KR100725843B1 (en) | Utility pole assembly in a line of electric power distribution | |
KR101576416B1 (en) | Assembly-type foundation structure | |
KR101284055B1 (en) | Guardrail assembling structure | |
CN208856818U (en) | A kind of tower crane anchor | |
KR20120001426U (en) | A Crossbar Coupling Device of Handrail | |
JP2004084379A (en) | Pipe fence | |
KR20120060305A (en) | Assembly type integrated streetlight | |
CN218781217U (en) | Mounting structure of lamp pole | |
CN215978723U (en) | Telegraph pole mounting base | |
KR19990013079U (en) | Column for mesh fence | |
KR200392074Y1 (en) | Trussed supporting post for easily constructing concrete structures | |
KR20200000550A (en) | A Solar Photovoltaic Generation Module Supporting Structure and A Structuring Method Using Thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |