CN206174468U - Pre -buried chock and be equipped with pre -buried subassembly of this pre -buried chock - Google Patents

Pre -buried chock and be equipped with pre -buried subassembly of this pre -buried chock Download PDF

Info

Publication number
CN206174468U
CN206174468U CN201621164891.5U CN201621164891U CN206174468U CN 206174468 U CN206174468 U CN 206174468U CN 201621164891 U CN201621164891 U CN 201621164891U CN 206174468 U CN206174468 U CN 206174468U
Authority
CN
China
Prior art keywords
chock
buried
built
fitting
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621164891.5U
Other languages
Chinese (zh)
Inventor
卢艳君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mingsheng Drawin Technology Investment Co Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201621164891.5U priority Critical patent/CN206174468U/en
Application granted granted Critical
Publication of CN206174468U publication Critical patent/CN206174468U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a pre -buried chock and be equipped with pre -buried subassembly of this pre -buried chock, pre -buried chock are equipped with one end open -ended cavity, include the chock main part and locate the sealed lid of chock main part one end, the chock main part can take out accept with inserting in the built -in fitting the cavity, sealed lid is used for sealing the open end of cavity with clearance between the chock main part. Above -mentioned pre -buried chock can make things convenient for in the built -in fittings such as filling in the line box fast with the shutoff built -in fitting, avoids installing built -in fitting on the wall body and receives at the site operation in -process and polluting or the shutoff to the engineering time has been saved. And open end and the clearance between the chock main part that sealed lid can seal the cavity of built -in fitting to be in order to reach better closed effect, make things convenient for the work progress in the wall body scrape binding off process greasy and that whitewash the mortar construction. In addition, this pre -buried chock can use repeatedly, has reduced the waste of resource.

Description

Pre-buried chock and it is provided with the fastener inserts of the pre-buried chock
Technical field
The utility model is related to construction aid field, more particularly to a kind of pre-buried chock and to be provided with this pre-buried The fastener inserts of chock.
Background technology
During decoration construction, carrying out Puttying, painting the finishing operation crossed construction such as mortar and built-in fitting threading When, it is easily caused the built-in fittings such as the line box that is installed on wall and is blocked and polluted by mortar, putty etc., it is preset in the electricity in built-in fitting Line also easily stretches out and is contaminated or even is damaged.
Generally, in order to avoid built-in fitting is blocked and polluted in work progress, constructor can be by built-in fitting adhesive plaster, bubble The materials such as foam are blocked, and use the built-in fitting after which closure, the closing in out-of-flatness of periphery Puttying, and live adhesive tape holds It is easily destroyed, do not have protective effect.Additionally, increased labor hour with adhesive tape and plug foam blocking built-in fitting, and adhesive tape, Foam is also required to lost labor when removing, so as to reduce efficiency of construction and decoration quality.
Utility model content
Based on this, it is necessary to easily blocked and pollution problem in work progress for wall body built-in fitting, there is provided one Planting can avoid wall body built-in fitting from being blocked and the pre-buried chock for polluting and the fastener inserts for being provided with the pre-buried chock.
A kind of pre-buried chock, for blocking built-in fitting, the built-in fitting is provided with the cavity of one end open, it is characterised in that The pre-buried chock includes chock main body and the closure located at described chock main body one end, and the chock main body is received in which can pull and push The cavity of the built-in fitting is dissolved in, the closure is used to seal between the openend of the cavity and the chock main body Gap.
Above-mentioned pre-buried chock, can quickly and easily fill in the built-in fittings such as line box to block built-in fitting, it is to avoid installed in wall Built-in fitting on body is contaminated in work progress or blocks at the scene, and saves the engineering time.Also, closure can be closed Gap between the openend of the cavity of built-in fitting and chock main body to reach more preferable sealing effect, wall during convenient construction Body scrapes the greasy closing in operation with rendering mortar construction.Additionally, the pre-buried chock can Reusability, reduce the waste of resource.
Wherein in one embodiment, the shape of the chock main body and the form fit of the built-in fitting are can be contained in In the cavity of the built-in fitting, the closure protrudes the edge of the chock main body to cover the openend of the cavity With the gap between the chock main body.
Wherein in one embodiment, the side wall of the chock main body is provided with groove, and the groove is from the chock main body It is provided with described closure one end and extends to one end relative with the closure.
Wherein in one embodiment, the pre-buried chock offers reception hole away from described closure one end.
Wherein in one embodiment, the pre-buried chock also includes located at the closure away from the chock main body one The handle of side.
Wherein in one embodiment, the closure on the end face of the chock body side away from offering dismounting Groove.
Wherein in one embodiment, the pre-buried chock is made of elastomeric material.
A kind of fastener inserts, including built-in fitting and above-mentioned pre-buried chock.
Wherein in one embodiment, the chock main body and the cavity of the built-in fitting are the square being mutually adapted Shape, and the cross section of the closure is rectangle.
Wherein in one embodiment, the built-in fitting is line box.
Brief description of the drawings
Fig. 1 is the structural representation of the pre-buried chock of an implementation method.
Specific embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings State.Preferred embodiment of the present utility model is given in accompanying drawing.But, the utility model can come in many different forms Realize, however it is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments is made to of the present utility model The understanding of disclosure is more thorough comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can directly on another element Or can also there is element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or may be simultaneously present centering elements.Term as used herein " vertical ", " level ", " left side ", " right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with technology of the present utility model is belonged to The implication that the technical staff in domain is generally understood that is identical.It is herein to be in term used in the description of the present utility model The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include The arbitrary and all of combination of one or more related Listed Items.
As shown in figure 1, a kind of pre-buried chock 100 of this preferred embodiment, the cavity of one end open is provided with for blocking Built-in fitting.In other embodiments, the pre-buried chock 100 can also be used to fill pre-buried hole to avoid the pre-buried cavity from being fitted up Material is blocked.
Specifically, the pre-buried chock 100 includes chock main body 20 and the closure 40 located at the one end of chock main body 20, chock Main body 20 is contained in the cavity of built-in fitting in which can pull and push, and closure 40 is used between the openend of seal cavity and chock main body 20 Gap.
Above-mentioned pre-buried chock 100, can quickly and easily fill in the built-in fittings such as line box to block built-in fitting, it is to avoid be arranged on Built-in fitting on wall is contaminated in work progress or blocks at the scene, and saves the engineering time.Also, closure 40 can The gap between the openend of the cavity of built-in fitting and chock main body 20 is closed to reach more preferable sealing effect, convenient construction mistake Wall scrapes the greasy closing in operation with rendering mortar construction in journey.Additionally, the pre-buried chock 100 can Reusability, reduce resource Waste.
Please continue to refer to Fig. 1, the shape of chock main body 20 and the form fit of built-in fitting that can be contained in built-in fitting and Fitted with the inwall of built-in fitting, pollution or closure cavity are blocked so as to prevent finishing material from entering in the cavity of built-in fitting.Enter One step ground, closure 40 protrudes the edge of chock main body 20 to cover the gap between the openend of cavity and chock main body 20, And further prevent built-in fitting contaminated or block.
In the present embodiment, chock main body 20 is generally rectangular shaped with the cross section of closure 40, with the shape with built-in fitting Shape coordinates.It is appreciated that the shape not limited to this of chock main body 20 and closure 40, can according to the shape of built-in fitting set with The form fit of built-in fitting, reaches good plugging effect.
Two relative side walls of chock main body 20 are provided with groove 22, and groove 22 is provided with closure 40 1 from chock main body 20 End extends to one end relative with closure 40, coordinates with built-in fitting.It is appreciated that the shape of groove 22 is not limited to position This, can be set with the form fit with built-in fitting according to the shape of built-in fitting.
Pre-buried chock 100 offers reception hole 24 away from the one end of closure 40, the placement for being easy to electric wire in built-in fitting With protection.In this way, the electric wire in built-in fitting can be contained in reception hole 24 and avoid exposure to outer being subjected to and pollute and damage.At this In embodiment, the cross section of reception hole 24 is circle.It is appreciated that the shape not limited to this of reception hole 24, can also be not provided with receiving Receive hole 24.
In the present embodiment, pre-buried chock 100 also includes the handle 60 located at closure 40 away from the side of chock main body 20. Specifically, the handle 60 includes the connecting portion 62 of column and the holding part 64 located at the one end of connecting portion 62, and the holding part 64 is in It is spherical, therefore with good grip sense in order to win the pre-buried chock 100 from built-in fitting.In this way, operator can be conveniently The pre-buried chock 100 is quickly installed or dismantled, is that operator brings facility so as to save the engineering time.
In another embodiment, (figure is not away from dismounting groove is offered on the end face of the side of chock main body 20 for closure 40 Show), consequently facilitating winning pre-buried chock 100.Specifically, the dismounting groove is L-shaped, consequently facilitating operator wins pre-buried chock 100。
Further, pre-buried chock 100 is made of elastomeric material.In the present embodiment, pre-buried chock 100 uses rubber Material is made, therefore with certain elasticity adapting to various sizes of built-in fitting, it is to avoid because the reasons such as foozle cannot have Prevent built-in fitting contaminated to effect or block.
Above-mentioned pre-buried chock 100, can fill in built-in fitting to prevent the electric wire in built-in fitting and built-in fitting contaminated or block And win conveniently, and do not interfere with the placement of electric wire in built-in fitting.And, the pre-buried chock 100 is reusable, so as to save About resource.
As shown in figure 1, a kind of fastener inserts (not shown) of this preferred embodiment, including built-in fitting and above-mentioned pre-buried chock 100.In the present embodiment, the built-in fitting is line box.
Specifically, the built-in fitting is provided with the cavity of one end open, and chock main body 20 is to be mutually adapted with the cavity of built-in fitting Rectangle, and the cross section of closure 40 is rectangle, and chock main body 20 is contained in built-in fitting, and the size of closure 40 is more than pre- Embedded part size is being connected to built-in fitting edge and close the openend of built-in fitting.In this way, chock main body 20 it is overall be contained in it is pre-buried To block built-in fitting in part, between size is more than between the openend of the seal cavity of closure 40 of built-in fitting and chock main body 20 Gap is simultaneously closely abutted with the metope around built-in fitting, further to prevent job site from carrying out Puttying or paint the operations such as mortar When, built-in fitting covers closure by mortar.
Above-mentioned fastener inserts, due to being provided with pre-buried chock 100, therefore can avoid built-in fitting in work progress by mortar etc. Ornament materials pollutes or blocks, and avoids the electric wire in built-in fitting from being contaminated or damage, and facilitates Puttying and paint mortar Closing in work during construction, it is to avoid carry out later stage repairing and increase man-hour.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed, But therefore can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to Protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

1. a kind of pre-buried chock (100), for blocking built-in fitting, the built-in fitting is provided with the cavity of one end open, and its feature exists In the pre-buried chock (100) includes chock main body (20) and the closure (40) located at described chock main body (20) one end, institute The cavity that chock main body (20) is contained in the built-in fitting in which can pull and push is stated, the closure (40) is for sealing the chamber Gap between the openend of body and the chock main body.
2. pre-buried chock (100) according to claim 1, it is characterised in that the shape of the chock main body (20) and institute The form fit of built-in fitting is stated can be contained in the cavity of the built-in fitting, closure (40) protrusion chock The edge of main body (20) is covering the gap between the openend of the cavity and the chock main body.
3. pre-buried chock (100) according to claim 1, it is characterised in that the side wall of the chock main body (20) is provided with Groove (22), the groove (22) is provided with the closure (40) one end and extends to and the sealing from the chock main body (20) The relative one end of lid (40).
4. pre-buried chock (100) according to claim 1, it is characterised in that the pre-buried chock (100) is away from described close Capping (40) one end offers reception hole (24).
5. pre-buried chock (100) according to claim 1, it is characterised in that the pre-buried chock (100) also includes being located at Handle (60) of the closure (40) away from chock main body (20) side.
6. pre-buried chock (100) according to claim 1, it is characterised in that the closure (40) is away from the chock Dismounting groove is offered on the end face of main body (20) side.
7. pre-buried chock (100) according to claim 1, it is characterised in that the pre-buried chock (100) is using elastic material Material is made.
8. a kind of fastener inserts, it is characterised in that the pre-buried plug including built-in fitting and as described in claim 1~7 any one Block (100).
9. fastener inserts according to claim 8, it is characterised in that the institute of the chock main body (20) and the built-in fitting It is the rectangle being mutually adapted to state cavity, and the cross section of the closure (40) is rectangle.
10. fastener inserts according to claim 8, it is characterised in that the built-in fitting is line box.
CN201621164891.5U 2016-11-01 2016-11-01 Pre -buried chock and be equipped with pre -buried subassembly of this pre -buried chock Active CN206174468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621164891.5U CN206174468U (en) 2016-11-01 2016-11-01 Pre -buried chock and be equipped with pre -buried subassembly of this pre -buried chock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621164891.5U CN206174468U (en) 2016-11-01 2016-11-01 Pre -buried chock and be equipped with pre -buried subassembly of this pre -buried chock

Publications (1)

Publication Number Publication Date
CN206174468U true CN206174468U (en) 2017-05-17

Family

ID=58679849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621164891.5U Active CN206174468U (en) 2016-11-01 2016-11-01 Pre -buried chock and be equipped with pre -buried subassembly of this pre -buried chock

Country Status (1)

Country Link
CN (1) CN206174468U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322501A (en) * 2018-11-14 2019-02-12 中建八局第建设有限公司 A kind of aperture SMC epoxy construction protecting device
CN111719886A (en) * 2020-06-16 2020-09-29 五冶集团上海有限公司 Plugging method for electrical pre-buried bottom box

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322501A (en) * 2018-11-14 2019-02-12 中建八局第建设有限公司 A kind of aperture SMC epoxy construction protecting device
CN109322501B (en) * 2018-11-14 2023-10-17 中建八局第一建设有限公司 SMC drill way epoxy construction protection device
CN111719886A (en) * 2020-06-16 2020-09-29 五冶集团上海有限公司 Plugging method for electrical pre-buried bottom box

Similar Documents

Publication Publication Date Title
CN206174468U (en) Pre -buried chock and be equipped with pre -buried subassembly of this pre -buried chock
CN208056637U (en) A kind of concrete shear force wall sealing hole device
CN103291072A (en) Method for reserving holes in floors by aid of PVC (polyvinyl chloride) sleeves
CN106958716A (en) A kind of PCCP pipe joints caulking joint construction method
UA90890C2 (en) apparatus and method for removing paint and sealant
WO2007087202A3 (en) Paintbrush and roller head cover and method for manufacturing the same
CN103794470B (en) Silicon wafer front surface protection method
WO2014144333A4 (en) Tank assemblies with a liner, liner, apparatus for attaching a hose and a valve to a manhole lid and methods of installing a liner in a tank
CN206801020U (en) A kind of rubber fastening band shield jig
JP2007051268A (en) Sealing material for gas piping
US8349110B1 (en) Method to apply texture to a wall surface
US20190217560A1 (en) Underwater repair method and system
EP3599029A1 (en) Spray foam gun cover
CN206393812U (en) Steel cylinder pipe die has and pipe of concrete manufacture system
CA2314629C (en) Method of removing hazardous insulation material
US5955020A (en) Apparatus and method for injecting corrosion control compounds into pipe flanges and the like
JP2009019441A (en) Method for repairing concrete
KR101513077B1 (en) Niche construction method using water spray waterproof housing and the injection housing niche
CN205436128U (en) Novel spraying tool
US20100012656A1 (en) Spackle container lid
US20090090078A1 (en) Combination pipe test cap and concrete sleeve
JP3230373U (en) Anchor bolt hole repair patch
KR200482854Y1 (en) Cap for Wall Socket
KR100466235B1 (en) Fidding paint device of sprayer for White Letter Part of Tire
CN211622624U (en) Template entrance to a cave repair tools subassembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Pre -buried chock and be equipped with pre -buried subassembly of this pre -buried chock

Granted publication date: 20170517

License type: Common License

Record date: 20190102