CN206171038U - Integrated truckle of building engineering construction apparatus - Google Patents
Integrated truckle of building engineering construction apparatus Download PDFInfo
- Publication number
- CN206171038U CN206171038U CN201621153865.2U CN201621153865U CN206171038U CN 206171038 U CN206171038 U CN 206171038U CN 201621153865 U CN201621153865 U CN 201621153865U CN 206171038 U CN206171038 U CN 206171038U
- Authority
- CN
- China
- Prior art keywords
- shaft
- frame
- building engineering
- engineering construction
- construction apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Handcart (AREA)
Abstract
The utility model provides an integrated truckle of building engineering construction apparatus belongs to the architectural engineering technology field, and its structure includes main part stay tube, main part horizontal stand and walking wheel, and the middle part pipe shaft periphery of main part stay tube is provided with rolling bearing, and the lower part pipe shaft periphery of main part stay tube is provided with the flat housing carousel, the bottom mounting of main part stay tube is provided with the main part horizontal stand, and relative revolver frame and right wheel carrier about fixed being provided with in bottom of main part horizontal stand has set up the shaft between the preceding extension of revolver frame and right wheel carrier, takes turns the epaxial walking wheel that is provided with, pedal and brake pads are around the downward rotary motion of articulated shaft, brake pads roof pressure brake pad, brake pad and walking wheel rim rubbing contact. This integrated truckle of building engineering construction apparatus's purpose of design makes the construction take one's place with the quick convenient removal of indoor steel pipe scaffold frame operation platform, uses manpower sparingly and the time.
Description
Technical field
This utility model is related to construction engineering technical field, the integrated foot of specifically a kind of building engineering construction apparatus
Wheel.
Background technology
It is general, scene builds by laying bricks or stones, plaster and other interior decoration decoration constructions during, commonly used steel pipe feet
Hand cradle operating platform cannot be moved efficiently, and a dead lift is very painstaking and expends the time.
The content of the invention
Technical assignment of the present utility model is to solve the deficiencies in the prior art, there is provided a kind of building engineering construction apparatus is integrated
Castor.
The technical solution of the utility model realizes in the following manner, the integrated castor of building engineering construction apparatus, its
Structure includes body supports pipe, main body horizontal stand and road wheel,
Body supports pipe is vertically arranged,
The middle part pipe shaft periphery of body supports pipe is provided with rolling bearing, and the bottom pipe shaft periphery of body supports pipe is provided with
Plane bearing rotating disk;
The bottom of body supports pipe is fixedly installed main body horizontal stand, and body supports pipe sets perpendicular to main body horizontal stand
Put;
The bottom of main body horizontal stand is fixedly installed the relative revolver frame in left and right and right wheel frame,
Revolver frame and right wheel frame are respectively arranged with horizontal part and forward extension, and forward extension is tilted towards lower section and extends,
The top of the horizontal part of revolver frame and right wheel frame is fixedly installed on the bottom surface of main body horizontal stand;
Setting up between the forward extension of revolver frame and right wheel frame has wheel shaft, and road wheel is provided with wheel shaft;
Setting up between the horizontal part of revolver frame and right wheel frame has jointed shaft, is fixedly installed on the axle body of jointed shaft and tramples
Plate, pedal rearward extends, and in the front end of pedal sagging brake block is fixedly installed;
Be provided with brake rubber block between the revolver frame and the horizontal part of right wheel frame of walking wheel rim, the top of brake rubber block with
Horizontal part is fixedly connected, and brake rubber block is extended downwardly along walking wheel rim;
Pedal and brake block around jointed shaft the motion that is rotated down, brake block top pressure brake rubber block, brake rubber block and road wheel
Wheel rim CONTACT WITH FRICTION.
Plane bearing rotating disk is provided with lower and upper disk, and lower wall is fixedly connected with body supports pipe pipe shaft, upper disk and lower wall
Between rotated by Plane Ball or plane needle roller confronting coaxial.
Body supports pipe rolling bearing periphery is socketed with scaffold tube, and in the upper disk card of plane bearing rotating disk foot is provided with
Hand cradle pipe rest seat.
Wheel shaft is set to the total accepted way of doing sth wheel shaft of rolling bearing.
Jointed shaft adopts damping rotary jointed shaft.
The upper surface of main body horizontal stand prolongs direction control lever before being fixedly connected with.
This utility model beneficial effect produced compared with prior art is:
The purpose of design of the integrated castor of building engineering construction apparatus is to make construction interior steel pipe scaffold operating platform
Quickly and easily move in place, save manpower and time.
Welded still pipe sleeve pipe on road wheel, is easy to be socketed with scaffolding steel pipe;
Before prolong direction control lever and be easy to manually adjust castor direction;
The control for brake of pedal, brake block, brake rubber block to road wheel, is easy to control road wheel rotation, reduces operation wind
Danger.Damping rotary jointed shaft, pedal is coordinated to step on braking, pedal provokes release.
The integrated castor of building engineering construction apparatus is easy to process quick, is easy to construction usage, also can be timely after damage
Change, be adapted to job site operating platform and use, operating platform movement can be made with more convenient, be easy to scene to enter in time
Row operating platform is moved, and lifts workman's efficiency of construction, reduces workman's working strength.
The integrated caster design of building engineering construction apparatus rationally, simple structure, it is safe and reliable, easy to use, be easy to dimension
Shield, has good value for applications.
Description of the drawings
Accompanying drawing 1 is dimensional structure diagram of the present utility model;
Accompanying drawing 2 is of the present utility model to look up dimensional structure diagram.
Labelling in accompanying drawing is represented respectively:
1st, body supports pipe, 2, rolling bearing, 3, plane bearing rotating disk,
4th, main body horizontal stand,
5th, revolver frame, 6, right wheel frame,
7th, horizontal part, 8, forward extension,
9th, wheel shaft, 10, road wheel,
11st, jointed shaft, 12, pedal, 13, brake block, 14, brake rubber block,
15th, scaffold tube, 16, scaffold tube rest seat,
17th, it is front to prolong direction control lever.
Specific embodiment
The integrated castor of building engineering construction apparatus of the present utility model is described in detail below below in conjunction with the accompanying drawings.
As shown in drawings, the integrated castor of building engineering construction apparatus of the present utility model, its structure include body supports pipe,
Main body horizontal stand and road wheel,
Body supports pipe 1 is vertically arranged,
The middle part pipe shaft periphery of body supports pipe 1 is provided with rolling bearing 2, and the bottom pipe shaft periphery of body supports pipe is arranged
There is plane bearing rotating disk 3;
The bottom of body supports pipe 1 is fixedly installed main body horizontal stand 4, and body supports pipe 1 is perpendicular to main body level
Frame 4 is arranged;
The bottom of main body horizontal stand 4 is fixedly installed the relative revolver frame 5 in left and right and right wheel frame 6,
Revolver frame 5 and right wheel frame 6 are respectively arranged with horizontal part 7 and forward extension 8, and forward extension 8 is tilted towards lower section and extends,
The top of the horizontal part 7 of revolver frame 5 and right wheel frame 6 is fixedly installed on the bottom surface of main body horizontal stand 4;
Setting up between the forward extension 8 of revolver frame 5 and right wheel frame 6 has wheel shaft 9, and road wheel 10 is provided with wheel shaft 9;
Setting up between the horizontal part 7 of revolver frame 5 and right wheel frame 6 has jointed shaft 11, is fixedly installed on the axle body of jointed shaft 11
There is pedal 12, pedal 12 rearward extends, in the front end of pedal sagging brake block 13 is fixedly installed;
Brake rubber block 14, the top of brake rubber block are provided between the revolver frame and the horizontal part of right wheel frame of walking wheel rim
It is fixedly connected with horizontal part, brake rubber block is extended downwardly along walking wheel rim;
Pedal 12 and brake block 13 around jointed shaft the motion that is rotated down, brake block top pressure brake rubber block 14, brake rubber block 14
With the wheel rim CONTACT WITH FRICTION of road wheel 10.
Plane bearing rotating disk 3 is provided with lower and upper disk, and lower wall is fixedly connected with body supports pipe pipe shaft, upper disk and lower wall
Between rotated by Plane Ball or plane needle roller confronting coaxial.
Body supports pipe rolling bearing periphery is socketed with scaffold tube 15, is provided with the upper disk card of plane bearing rotating disk
Scaffold tube rest seat 16.
Wheel shaft 9 is set to the total accepted way of doing sth wheel shaft of rolling bearing.
Jointed shaft 11 adopts damping rotary jointed shaft.
The upper surface of main body horizontal stand 4 prolongs direction control lever 17 before being fixedly connected with.
The steel pipe of different-diameter is welded on the basis of conventional castor, diameter of steel tube is less than scaffolding steel pipe internal diameter 2-
3mm, can make it entangle fixation firm, and four foots of steel pipe scaffold operating platform are loaded on after the completion of welding, after fixation,
Can use.In order that castor adjustment direction is convenient, the adjustment of a handle travel direction is welded in castor upper lateral, while
In castor rear portion fixing device for installing, castor is fixed after operating platform is in place, prevent from being operated during construction operation and put down
Platform is moved, and positioning is caused danger.
The integrated castor of building engineering construction apparatus can also be synthesized using other materials, such as angle steel, channel-section steel, foot
Wheel can adopt the common castor in market, the big I of castor to be actually needed determination according to scene.Can also be used in actually used each
In planting corollary equipment with well, the steel pipe scaffold operating platform at scene is not limited to.
Claims (6)
1. the integrated castor of building engineering construction apparatus, it is characterised in that including body supports pipe, main body horizontal stand and road wheel,
Body supports pipe is vertically arranged,
The middle part pipe shaft periphery of body supports pipe is provided with rolling bearing, and the bottom pipe shaft periphery of body supports pipe is provided with plane
Bearing rotating disk;
The bottom of body supports pipe is fixedly installed main body horizontal stand, and body supports pipe is arranged perpendicular to main body horizontal stand;
The bottom of main body horizontal stand is fixedly installed the relative revolver frame in left and right and right wheel frame,
Revolver frame and right wheel frame are respectively arranged with horizontal part and forward extension, and forward extension is tilted towards lower section and extends,
The top of the horizontal part of revolver frame and right wheel frame is fixedly installed on the bottom surface of main body horizontal stand;
Setting up between the forward extension of revolver frame and right wheel frame has wheel shaft, and road wheel is provided with wheel shaft;
Setting up between the horizontal part of revolver frame and right wheel frame has jointed shaft, and on the axle body of jointed shaft pedal is fixedly installed, and steps on
Pedal rearward extends, and in the front end of pedal sagging brake block is fixedly installed;
Brake rubber block, the top of brake rubber block and level are provided between the revolver frame and the horizontal part of right wheel frame of walking wheel rim
Portion is fixedly connected, and brake rubber block is extended downwardly along walking wheel rim;
Pedal and brake block around jointed shaft the motion that is rotated down, brake block top pressure brake rubber block, brake rubber block and walking wheel rim
CONTACT WITH FRICTION.
2. the integrated castor of building engineering construction apparatus according to claim 1, it is characterised in that:Plane bearing rotating disk is arranged
There is lower and upper disk, lower wall is fixedly connected with body supports pipe pipe shaft, rolled by Plane Ball or plane between upper disk and lower wall
Pin confronting coaxial is rotated.
3. the integrated castor of building engineering construction apparatus according to claim 2, it is characterised in that:Body supports pipe rotary shaft
Hold periphery and be socketed with scaffold tube, in the upper disk card of plane bearing rotating disk scaffold tube rest seat is provided with.
4. the integrated castor of building engineering construction apparatus according to claim 1, it is characterised in that:Wheel shaft is set to the axis of rolling
Hold total accepted way of doing sth wheel shaft.
5. the integrated castor of building engineering construction apparatus according to claim 1, it is characterised in that:Jointed shaft is turned using damping
Dynamic jointed shaft.
6. the integrated castor of building engineering construction apparatus according to claim 1, it is characterised in that:Main body horizontal stand it is upper
Prolong direction control lever before being fixedly connected with surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621153865.2U CN206171038U (en) | 2016-10-31 | 2016-10-31 | Integrated truckle of building engineering construction apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621153865.2U CN206171038U (en) | 2016-10-31 | 2016-10-31 | Integrated truckle of building engineering construction apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206171038U true CN206171038U (en) | 2017-05-17 |
Family
ID=58679335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621153865.2U Active CN206171038U (en) | 2016-10-31 | 2016-10-31 | Integrated truckle of building engineering construction apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206171038U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117905259A (en) * | 2024-03-20 | 2024-04-19 | 陕西惠延机械有限公司 | Mobile supporting platform for tunnel engineering construction |
CN117905259B (en) * | 2024-03-20 | 2024-06-04 | 陕西惠延机械有限公司 | Mobile supporting platform for tunnel engineering construction |
-
2016
- 2016-10-31 CN CN201621153865.2U patent/CN206171038U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117905259A (en) * | 2024-03-20 | 2024-04-19 | 陕西惠延机械有限公司 | Mobile supporting platform for tunnel engineering construction |
CN117905259B (en) * | 2024-03-20 | 2024-06-04 | 陕西惠延机械有限公司 | Mobile supporting platform for tunnel engineering construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205590250U (en) | Movable support for construction | |
CN204754127U (en) | Building veneer device | |
CN108583661A (en) | A kind of carrying construction equipment trolley of novel labour saving | |
CN206171038U (en) | Integrated truckle of building engineering construction apparatus | |
CN113119046B (en) | Supporting device convenient to adjust for maintenance of aviation parts | |
CN203229070U (en) | Pipeline placing device special for civil engineering | |
CN114471028B (en) | Automatic water mist dust settling device for green building construction | |
CN206842914U (en) | Vertical elevator pivot stud structure | |
CN109649463A (en) | A kind of hand-push trolley cement pavement upward slope power assisting device using relative pressure | |
CN214010883U (en) | Energy-conserving recycled concrete's intensity detection device | |
CN212228396U (en) | Novel microcomputer bicycle tester | |
CN114346482A (en) | Self-clamping adjustable laser cutting device | |
CN210396599U (en) | Movable ladder | |
CN207260527U (en) | A kind of roof decoration construction device | |
CN207670458U (en) | A kind of constructing device of building lot | |
CN113775159B (en) | Better auxiliary device is used in construction engineering construction of stability | |
CN218893924U (en) | Cement road surface embossing device for machine tillage road construction | |
CN205976419U (en) | A mobile device for piping installation | |
CN216165630U (en) | Oil spraying device for leather shoes | |
CN211856281U (en) | Permeameter convenient to move | |
CN215629681U (en) | Dust device for construction | |
CN214311452U (en) | A environmental monitoring device for building engineering | |
CN216341847U (en) | Double ladder for electric power installation engineering convenient to remove | |
CN203615845U (en) | Trolley for packing emulsion explosives | |
CN217453269U (en) | Portable ceiling is covered with paint putty and is ground flat device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |