CN206167997U - Sedimentation tank chamber in pit - Google Patents
Sedimentation tank chamber in pit Download PDFInfo
- Publication number
- CN206167997U CN206167997U CN201621154679.0U CN201621154679U CN206167997U CN 206167997 U CN206167997 U CN 206167997U CN 201621154679 U CN201621154679 U CN 201621154679U CN 206167997 U CN206167997 U CN 206167997U
- Authority
- CN
- China
- Prior art keywords
- ditch
- chamber
- water
- tunnel
- flashboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model provides a sedimentation tank chamber in pit, including setting up chamber, precipitation water storehouse, the slope of entrying in the tunnel, go out ditch, play water board and ditch flashboard during constitutes, the chamber is arranged in one side that there is the ditch in the tunnel, the precipitation water position in storehouse is in the chamber, the lateral wall in the ditch in high -end and the tunnel on slope of entrying meets, and the low side stretches into precipitation water storehouse bottom, the end of intaking that goes out the ditch is connected with one side that the tunnel was kept away from in the precipitation water storehouse, and the play water end (W. E. ) is connected with the ditch, it installs in a ditch to go out the water board, the ditch flashboard is installed in the ditch and is lain in the precipitation water storehouse and go out between the ditch. The utility model discloses introduce the precipitation water storehouse with the sewage in the ditch, make mud in the precipitation water storehouse with the separation of water, the clear water of isolating flows back to the ditch in the tunnel along going out a ditch, deposit the silt that and concentrate the clearance by following scraper that the slope of entrying got into the precipitation water storehouse, with regard to like this greatly reduced the clearance degree of difficulty of mud, improved the cleaning efficiency of mud, guaranteed going on smoothly of producing.
Description
Technical field
The utility model is related to a kind of down-hole sedimentation basin chamber, is capable of achieving effective precipitation of ditch sludge and quick cleaning,
Belong to separation technology field.
Background technology
Have water mineral deposit adopt cut and exploitation process in, when ditch and sump mud accumulation to a certain extent when, just need
It is cleared up.Because the working face in ditch is long, sump cleaning workload is big, causes its cleaning efficiency low, disposal costs
Greatly, and scale removal process can to production affect.In order that mud is precipitated in advance, many mines near ditch all
It is provided with interim sump or water nest, but sedimentation effect is unsatisfactory and interim sump or water nest cleaning difficulty are larger.Therefore how
Effective precipitation of ditch sludge and quick cleaning are realized, just becomes the difficult problem that relevant technical staff faces.
Utility model content
The purpose of this utility model is the drawback for prior art, there is provided a kind of down-hole sedimentation basin chamber, to reduce
The cleaning difficulty of ditch sludge, improves the cleaning efficiency of sludge, it is ensured that production is smoothed out.
Problem described in the utility model is with following technical proposals realization:
A kind of down-hole sedimentation basin chamber, composition includes the chamber being arranged in tunnel, settling sump, enters water slope, water outlet
Ditch, water outlet flashboard and ditch flashboard, the chamber is located at the side in tunnel Zhong You ditches;The settling sump is located in chamber;
It is described enter water slope high-end and tunnel in the side wall in ditch connect and less than the upper edge of ditch side wall, low side stretches into settling sump
Bottom;The exhalent canal is located at the side of settling sump, and the side of the water inlet end of exhalent canal with settling sump away from tunnel is connected,
Water side is connected with ditch;The water outlet flashboard is arranged in exhalent canal;The ditch flashboard is arranged in ditch and is located at and sinks
Between shallow lake sump and exhalent canal.
Above-mentioned down-hole sedimentation basin chamber, the side and side corresponding with exhalent canal away from tunnel of the settling sump set
There is sedimentation basin wall, the sedimentation basin wall is provided with plate brick pier, between the plate brick pier and chamber side wall exhalent canal is formed.
Above-mentioned down-hole sedimentation basin chamber, the water outlet flashboard and ditch flashboard can be substituted by dash sandbag.
The utility model using enter water slope by ditch sewage introduce settling sump, make sludge in settling sump with water
Separate, the ditch that the clear water isolated is flowed back in tunnel along exhalent canal, the mud being settled out by can along enter water slope enter precipitation water
The scraper in storehouse carries out concentration cleaning, is so greatly lowered the cleaning difficulty of sludge, improves the cleaning efficiency of sludge, protects
Being smoothed out for production is demonstrate,proved.
Description of the drawings
Fig. 1 is top view of the present utility model;
Fig. 2 is A-A sectional views;
Fig. 3 is B-B sectional views.
Respectively it is numbered in figure:1st, ditch, 2, enter water slope, 3, settling sump, 4, sedimentation basin wall, 5, plate brick pier, 6, water outlet
Ditch, 7, chamber, 8, water outlet flashboard, 9, ditch flashboard, 10, tunnel.
Specific embodiment
Below in conjunction with the accompanying drawings the utility model is described in further detail.
Referring to Fig. 1, Fig. 2 and Fig. 3, the utility model is mainly included into water slope 2, settling sump 3, sedimentation basin wall 4, plate brick
Pier 5, exhalent canal 6, chamber 7, water outlet flashboard 8 and ditch flashboard 9.Enter water slope 2, settling sump 3, sedimentation basin wall 4, exhalent canal 6
It is respectively positioned on inside chamber 7 with plate brick pier 5.Enter water slope 2 to be arranged between ditch 1 and settling sump 3, sedimentation basin wall 4 only two
Face, it is L-shaped, it is attached on the inwall of chamber 7;Plate brick pier 5 is poured with the top surface of sedimentation basin wall 4 and is connected, to form exhalent canal
6.The top of chamber 7 to the top of vertical height and chamber 7 for entering water slope 2 can make scraper to the vertical height of the bottom of settling sump 3
Machine is passed through.Entering the gradient on water slope 2 can be such that the scraper under heavy duty normally runs.
During the normal use of the utility model, water outlet flashboard 8 should be opened, close ditch flashboard 9, make ditch 1 at this
Place's obstruction, dirty current to be covered and flow into settling sump 3 along entering water slope 2 behind ditch 1.It is heavy that sewage stands in settling sump 3
Behind shallow lake, the clear water on top to be covered and flow into ditch 1 by exhalent canal 6 after sedimentation basin wall 4.
After mud accumulation to a certain extent in sump to be precipitated 3, water outlet flashboard 8 is closed, while opening ditch flashboard
9, the current for making dirt directly pass through ditch 1.Afterwards scraper clears up mud along entering to enter under water slope 2 settling sump 3.Treat that mud is clear
After reason is finished, then water outlet flashboard 8 is opened, ditch flashboard 9 is closed.
The utility model can be precipitated effectively in advance to the sewage in ditch, it is to avoid mud is a large amount of in ditch and sump
Deposition, not only reduces the cleaning frequency of ditch and sump, it is ensured that production is smoothed out, and reduces the cleaning of mud
Difficulty and cleaning up cost.
Claims (3)
1. a kind of down-hole sedimentation basin chamber, is characterized in that, composition includes being arranged at tunnel(10)Interior chamber(7), precipitation water
Storehouse(3), enter water slope(2), exhalent canal(6), water outlet flashboard(8)With ditch flashboard(9), the chamber(7)Positioned at tunnel(10)In
There is ditch(1)Side;The settling sump(3)Positioned at chamber(7)It is interior;It is described enter water slope(2)High-end and tunnel(10)In
Ditch(1)Side wall connect and less than ditch(1)The upper edge of side wall, low side stretches into settling sump(3)Bottom;The exhalent canal
(6)Positioned at settling sump(3)Side, exhalent canal(6)Water inlet end and settling sump(3)Away from tunnel(10)Side connect
Connect, water side and ditch(1)Connection;The water outlet flashboard(8)Installed in exhalent canal(6)It is interior;The ditch flashboard(9)It is arranged on
Ditch(1)It is interior and positioned at settling sump(3)With exhalent canal(6)Between.
2. a kind of down-hole sedimentation basin chamber according to claim 1, is characterized in that, the settling sump(3)Away from lane
Road(10)Side and and exhalent canal(6)Corresponding side is provided with sedimentation basin wall(4), the sedimentation basin wall(4)It is provided with
Plate brick pier(5), the plate brick pier(5)With chamber(7)Exhalent canal is formed between the wall of side(6).
3. a kind of down-hole sedimentation basin chamber according to claim 1 and 2, is characterized in that, the water outlet flashboard(8)And ditch
Flashboard(9)Can be substituted by dash sandbag.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621154679.0U CN206167997U (en) | 2016-10-31 | 2016-10-31 | Sedimentation tank chamber in pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621154679.0U CN206167997U (en) | 2016-10-31 | 2016-10-31 | Sedimentation tank chamber in pit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206167997U true CN206167997U (en) | 2017-05-17 |
Family
ID=58679198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621154679.0U Active CN206167997U (en) | 2016-10-31 | 2016-10-31 | Sedimentation tank chamber in pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206167997U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108386224A (en) * | 2018-04-27 | 2018-08-10 | 山西拓普沃特工程技术有限公司 | A kind of mine sump structure and its construction method |
-
2016
- 2016-10-31 CN CN201621154679.0U patent/CN206167997U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108386224A (en) * | 2018-04-27 | 2018-08-10 | 山西拓普沃特工程技术有限公司 | A kind of mine sump structure and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210645245U (en) | Flushable sand settling system | |
CN206167997U (en) | Sedimentation tank chamber in pit | |
CN207462730U (en) | A kind of boat form settlement of sewage processing unit | |
CN206604231U (en) | A kind of grating type desilting device | |
CN206081768U (en) | Sewage sedimentation tank | |
CN210002533U (en) | municipal branch rainwater collecting and discharging system | |
CN106994269A (en) | A kind of family daily life collects flusher automatically with water | |
CN208415478U (en) | A kind of filtering sedimentation well | |
CN206308771U (en) | The complementary sewerage system of bilateral | |
CN206288999U (en) | One kind cone bottom skewed culvert filter residue air floatation machine | |
WO2019010876A1 (en) | Self-silting soft dam system for preventing and controlling gully erosion in loess area | |
CN207627998U (en) | The drainage sedimentation device of deep basal pit | |
CN204637669U (en) | Flat flow primary sedimentation pond | |
CN200984480Y (en) | Tunnel ground water filtering basin | |
CN209367894U (en) | A kind of gas return-air washes inclined plate inclined tube-type settler | |
CN203043625U (en) | Precipitating-oil separating tank | |
CN208440940U (en) | Convenient for the roadbed sewer structure of dredging | |
CN207101981U (en) | Sand sediment trap construction in sewage disposal system | |
CN102219317A (en) | Sewage pretreatment tank | |
CN201990517U (en) | Sewage pretreatment pool | |
CN203291573U (en) | Co-current flow filtering basin adopting gangue residue filling materials | |
CN211230547U (en) | Multifunctional deep tunnel drainage system shaft | |
CN216366750U (en) | Grit aggregate washing wastewater recovery unit | |
CN204753370U (en) | Bridge draining system | |
CN216839768U (en) | Side slope toe water conservancy diversion structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |