CN206158174U - Novel early structure of tearing open is implemented with aluminium frame plank sheathing to early supporting seat of tearing open of square pipe device - Google Patents
Novel early structure of tearing open is implemented with aluminium frame plank sheathing to early supporting seat of tearing open of square pipe device Download PDFInfo
- Publication number
- CN206158174U CN206158174U CN201621030970.7U CN201621030970U CN206158174U CN 206158174 U CN206158174 U CN 206158174U CN 201621030970 U CN201621030970 U CN 201621030970U CN 206158174 U CN206158174 U CN 206158174U
- Authority
- CN
- China
- Prior art keywords
- early
- open
- aluminium frame
- plank sheathing
- square tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a novel early structure of tearing open is implemented with aluminium frame plank sheathing to early supporting seat of tearing open of square pipe device, characterized by: including aluminium frame plank sheathing (1) and early tear open supporting seat (2) of square pipe, (1) four angle of aluminium frame plank sheathing fix four square pipes are early constitute on tearing supporting seat (2) open one whole. The utility model provides an early tear adjustable footstock open that the dismouting is swift, the combination is convenient, bear the weight of the reinforce, safe and reliable to solve current support frame and use all sorts of unfavorable problems, satisfy the various industrial area of the executing demands of closing. Early tear open the supporting seat still the accessible supporting seat realize the early function of tearing open, the concrete solidified the back through three days just can dismantle the template, this footstock utilizes supporting bracket supporting template, as long as the rotating member lock makes the supporting bracket descend and just can easily take out the template through rotatory rotating member lock and the supporting bracket back that descends of loosening, makes template realization secondary have enough to meet the need the use, greatly reduced construction costs, raise the efficiency.
Description
Technical field
The utility model is related to a kind of novel square pipe and early tears support base open with the early constructional device torn open of aluminium frame plank sheathing enforcement.
Background technology
The support major part of existing building template is directly supported by shore frame, and bracing frame is all that iron pipe is handed in length and breadth
Fork, crosspoint is formed with clip or iron wire binding, and template will directly bind with wooden frame and be connected, and connected mode stress is little, and plank is easy
Deformation, assembling is complicated, it has not been convenient to operate.
It is to be connected in single support top to use early to tear support base open, and supporting template, be characterized in ensureing model sheetinstallat positioning,
It is stable, and realize it is early tear function open, it is Stability Analysis of Structures, safe and reliable while by rotation lock template can be conveniently detached.
Utility model content
Technical problem to be solved in the utility model, is just to provide a kind of novel square pipe and early tears support base and aluminium frame wooden model open
Plate implements the early constructional device torn open, is that a kind of dismounting is quick, combination is convenient, bearing capacity is strong, and safe and reliable square tube early tears support open
Seat implements the early constructional device torn open with aluminium frame plank sheathing, to solve the problems, such as that it is a variety of unfavorable that existing bracing frame is used, meets various
Construction site demand.
A kind of novel square pipe early tears support base open and implements the early constructional device torn open with aluminium frame plank sheathing, it is characterized in that:Including aluminium
Frame plank sheathing 1 and square tube early tear support base 2 open;Described 1 four angles of aluminium frame plank sheathing are fixed on four square tubes and early tear open on support base 2
Group is integral.
Described aluminium frame plank sheathing 1 is fixed into a quadra by two strip curb girders 7 and two strip end carriages 8, and it four
Individual right angle is respectively fixed with corner and strengthens parallel with end carriage 8 in the middle of square tube 4, aluminium frame plank sheathing 1 being fixed with some reinforcement horizontal bars
3, bottom is fixed with the glued board 5 suitable with aluminium frame 1 frame size of plank sheathing by rivet 6.
Described square tube early tear open support base 2 including top board 9, supporting square tube 10, baffle plate 11, support jacking 12, alignment pin 13,
Rotational lock 14 and base plate 15;
Described top board 9 and base plate 15 is a square metal sheet element, if described supporting square tube 10 is provided with for surface
The square pipe component of strip of dry circular hole, the two ends of supporting square tube 10 are welded and fixed respectively integral with top board 9 and base plate 15;It is described
Supporting square tube 10 from top to bottom have baffle plate 11, support jacking 12, rotational lock 14 and alignment pin 13 respectively;Described baffle plate 11
For square metal section of jurisdiction, it is welded on supporting square tube 10;Described support jacking 12 is one or four jiaos to be welded with cylindrical support
Rectangular tube hardware, four sides are respectively welded with two draw-in groove tops, and centre passes through supporting square tube 10;Described alignment pin 13
For a cylindrical metal component, size is suitable with circular hole on supporting square tube 10.
Beneficial effect:The utility model provides a kind of novel square pipe and early tears support base open with the early knot torn open of aluminium frame plank sheathing enforcement
Structure device, is that a kind of dismounting is quick, combination is convenient, bearing capacity is strong, and safe and reliable morning tears adjustable supporting footstock open, to solve existing
Support uses a variety of unfavorable problems, meets various construction site demands.Early tear support base open can also realize early tearing open by support base
Function, concrete can just dismantle template after solidification in three days, and the footstock utilizes supporting bracket supporting template, as long as revolving part
After revolving part lock is unclamped in rotation and supporting bracket declines, declining supporting bracket can easily take out template to lock, realize template
It is secondary to be used in turn, building cost is greatly reduced, improve efficiency.
Description of the drawings
Fig. 1 is the structural representation of the utility model device;
Fig. 2 is the aluminium frame wooden formwork structure schematic diagram of the utility model device;
Fig. 3 is that the square tube of the utility model device early tears clamping support schematic diagram open;
Fig. 4 is that the square tube of the utility model device early tears support base side structure schematic diagram open;
Fig. 5 is that the function of the utility model device uses schematic diagram;
In figure:1- aluminium frame plank sheathings, 2- aluminium frame plank sheathings, 3- square tubes early tear support base open, and square tube is strengthened in 4- corners, and 5- is glued
Plate, 6- rivets, 7- curb girders, 8- end carriages, 9- top boards, 10- supporting square tubes, 11- baffle plates, 12- support jackings, 13- alignment pins, 14-
Rotational lock, 15- base plates, 16- mixed muds.
Specific embodiment
As Figure 1-5, a kind of novel square pipe early tears support base and the early constructional device torn open of aluminium frame plank sheathing enforcement open, and it is special
Levying is:Support base 2 is early torn open including aluminium frame plank sheathing 1 and square tube;Described 1 four angles of aluminium frame plank sheathing are fixed on four square tube morning
Tear open and organize on support base 2 integral.
Described aluminium frame plank sheathing 1 is fixed into a quadra by two strip curb girders 7 and two strip end carriages 8, and it four
Individual right angle is respectively fixed with corner and strengthens parallel with end carriage 8 in the middle of square tube 4, aluminium frame plank sheathing 1 being fixed with some reinforcement horizontal bars
3, bottom is fixed with the glued board 5 suitable with aluminium frame 1 frame size of plank sheathing by rivet 6.Using its aluminium chassis plank sheathing 1
Four corners directly hang over square tube and early tear open on support base 2, reach one kind stake tool of engineering floor concrete construction.
Described square tube early tear open support base 2 including top board 9, supporting square tube 10, baffle plate 11, support jacking 12, alignment pin 13,
Rotational lock 14 and base plate 15;
Described top board 9 and base plate 15 is a square metal sheet element, if described supporting square tube 10 is provided with for surface
The square pipe component of strip of dry circular hole, the two ends of supporting square tube 10 are welded and fixed respectively integral with top board 9 and base plate 15;It is described
Supporting square tube 10 from top to bottom have baffle plate 11, support jacking 12, rotational lock 14 and alignment pin 13 respectively;Described baffle plate 11
For square metal section of jurisdiction, it is welded on supporting square tube 10;Described support jacking 12 is one or four jiaos to be welded with cylindrical support
Rectangular tube hardware, four sides are respectively welded with two draw-in groove tops, and centre passes through supporting square tube 10;Described alignment pin 13
For a cylindrical metal component, size is suitable with circular hole on supporting square tube 10.Rotational lock 14 is movable part, for locking and putting
Pine reaches the early use function of tearing open.
Above-described embodiment is the utility model preferably embodiment, but embodiment of the present utility model is not by described
The restriction of embodiment, it is other it is any without departing from the change made under Spirit Essence of the present utility model and principle, modify, replace
Generation, combination, simplification, should be equivalent substitute mode, be included within protection domain of the present utility model.
Claims (3)
1. a kind of novel square pipe early tears support base and the early constructional device torn open of aluminium frame plank sheathing enforcement open, it is characterized in that:Including aluminium frame
Plank sheathing (1) and square tube early tear support base (2) open;Described (1) four angle of aluminium frame plank sheathing is fixed on four square tubes and early tears support open
Organize on seat (2) integral.
2. novel square pipe according to claim 1 early tears support base and the early constructional device torn open of aluminium frame plank sheathing enforcement open, its
It is characterized in that:Described aluminium frame plank sheathing (1) is fixed into a quadra by two strip curb girders (7) and two strip end carriages (8),
Its four right angles are respectively fixed with corner and strengthen in the middle of square tube (4), aluminium frame plank sheathing (1) with end carriage (8) if parallel is fixed with
Dry to strengthen horizontal bar (3), bottom is fixed with the glued board (5) suitable with aluminium frame plank sheathing (1) frame size by rivet (6).
3. novel square pipe according to claim 2 early tears support base and the early constructional device torn open of aluminium frame plank sheathing enforcement open, its
It is characterized in that:Described square tube early tear open support base (2) including top board (9), supporting square tube (10), baffle plate (11), support jacking (12),
Alignment pin (13), rotational lock (14) and base plate (15);
Described top board (9) and base plate (15) is a square metal sheet element, and described supporting square tube (10) is provided with for surface
The square pipe component of strip of some circular holes, supporting square tube (10) two ends are welded and fixed into one with top board (9) and base plate (15) respectively
It is overall;Described supporting square tube (10) from top to bottom has respectively baffle plate (11), support jacking (12), rotational lock (14) and positioning
Pin (13);Described baffle plate (11) is square metal section of jurisdiction, and it is welded on supporting square tube (10);Described support jacking (12)
For one or four jiaos of rectangular tube hardwares for being to be welded with cylindrical support, four sides are respectively welded with two draw-in groove tops, and centre passes through
Supporting square tube (10);Described alignment pin (13) is a cylindrical metal component, and size is suitable with circular hole on supporting square tube (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621030970.7U CN206158174U (en) | 2016-08-31 | 2016-08-31 | Novel early structure of tearing open is implemented with aluminium frame plank sheathing to early supporting seat of tearing open of square pipe device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621030970.7U CN206158174U (en) | 2016-08-31 | 2016-08-31 | Novel early structure of tearing open is implemented with aluminium frame plank sheathing to early supporting seat of tearing open of square pipe device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206158174U true CN206158174U (en) | 2017-05-10 |
Family
ID=58651071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621030970.7U Expired - Fee Related CN206158174U (en) | 2016-08-31 | 2016-08-31 | Novel early structure of tearing open is implemented with aluminium frame plank sheathing to early supporting seat of tearing open of square pipe device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206158174U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343233A (en) * | 2018-02-07 | 2018-07-31 | 中国核电工程有限公司 | The reusable primary quick support construction of floor slab construction for introducing equipment |
CN108411805A (en) * | 2018-02-05 | 2018-08-17 | 哈尔滨工程大学 | A kind of paving helistop unit and airplane parking area soon |
CN108868126A (en) * | 2018-07-03 | 2018-11-23 | 广东奇正科技有限公司 | A kind of round tube cylinder positioning early dismantling head device |
CN108868195A (en) * | 2018-07-03 | 2018-11-23 | 广东奇正科技有限公司 | A kind of support component for tearing U support open with morning of support building template |
-
2016
- 2016-08-31 CN CN201621030970.7U patent/CN206158174U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411805A (en) * | 2018-02-05 | 2018-08-17 | 哈尔滨工程大学 | A kind of paving helistop unit and airplane parking area soon |
CN108411805B (en) * | 2018-02-05 | 2021-02-19 | 哈尔滨工程大学 | Quick-laying helicopter apron unit and apron |
CN108343233A (en) * | 2018-02-07 | 2018-07-31 | 中国核电工程有限公司 | The reusable primary quick support construction of floor slab construction for introducing equipment |
CN108343233B (en) * | 2018-02-07 | 2021-04-16 | 中国核电工程有限公司 | Reusable floor construction rapid supporting structure with one-time introduction equipment |
CN108868126A (en) * | 2018-07-03 | 2018-11-23 | 广东奇正科技有限公司 | A kind of round tube cylinder positioning early dismantling head device |
CN108868195A (en) * | 2018-07-03 | 2018-11-23 | 广东奇正科技有限公司 | A kind of support component for tearing U support open with morning of support building template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206158174U (en) | Novel early structure of tearing open is implemented with aluminium frame plank sheathing to early supporting seat of tearing open of square pipe device | |
CN201665952U (en) | Self-supporting floor deck | |
CN206016225U (en) | One kind is without counterweight fixture type gondola-hanging mechanism | |
CN201962595U (en) | Truss of assembled steel bridge | |
CN206233122U (en) | For bridge cantilever construction with Hanging Basket movable tower crane | |
CN211447422U (en) | Steel bar truss floor support plate | |
CN203834906U (en) | Triangular operation platform used for capital construction slope face | |
CN213741714U (en) | Steel construction anti-wind device | |
CN203213587U (en) | Floor early-dismounting template made of aluminum alloy | |
CN204357138U (en) | Simple steel structure lifting upending frame | |
CN2771386Y (en) | Foldable triangular frame for shuttering support column | |
CN203846777U (en) | Novel aluminum and wood secondary beam | |
CN202787960U (en) | Steel girder grid floor formwork system | |
CN204920241U (en) | Quick construction structures of building modularization | |
CN206376364U (en) | A kind of moveable house assembling type terrace | |
CN201560582U (en) | Supporting piece used for wall, column and girder in construction engineering | |
CN202913716U (en) | Temporary support structure for truss integral lifting | |
CN207090776U (en) | A kind of prefabricated part hanging instrument | |
CN209585620U (en) | A kind of stair construction template clamp device | |
CN214658052U (en) | Assembly type disassembly-free composite template for building outer wall | |
CN207255131U (en) | A kind of column fetal membrane | |
CN203834806U (en) | H-shaped steel floor secondary beam with improved structure | |
CN207469748U (en) | A kind of steel form for stablizing quick assembling splicing | |
CN209398004U (en) | A kind of Fast Installation overturning railing | |
CN210140914U (en) | Assembled house wallboard connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: C2-1, zone 7, Shili industrial city, Beitong Town, Yangdong District, Yangjiang City, Guangdong Province Patentee after: Guangdong Qi Zheng Technology Co., Ltd. Address before: 529500, Yangjiang District, Yangdong Town, Yangdong County, Guangdong Province, ten mile industrial town, seven District, C2-1 Patentee before: SENHY CONSTRUCTION CO., LTD. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170510 Termination date: 20200831 |
|
CF01 | Termination of patent right due to non-payment of annual fee |