CN206157690U CN201621054587.5U CN201621054587U CN206157690U CN 206157690 U CN206157690 U CN 206157690U CN 201621054587 U CN201621054587 U CN 201621054587U CN 206157690 U CN206157690 U CN 206157690U
Authority
CN
China
Prior art keywords
water
valve
drainage
storage reservoir
charging pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621054587.5U
Other languages
Chinese (zh)
Inventor
和扁
严丽
周杰
胡雄峰
汪德楼
曹春建
郑应霞
方杰
刘文辉
袁静
张宝勇
舒崚峰
钱瑭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201621054587.5U priority Critical patent/CN206157690U/en
Application granted granted Critical
Publication of CN206157690U publication Critical patent/CN206157690U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model relates to an upper storage reservoir fills water and drainage system. The utility model aims at providing a safe and reliable's upper storage reservoir fills water and drainage system is for experimental and initial debugging and experimental water source and the drainage mode that provides reliable of debugging that start of unit of water -storage power station water delivery system. The utility model provides a: an upper storage reservoir fills water and drainage system which characterized in that, the system layout is in water -storage power station underground factory building spiral case layer unit section, and this system has two sets of parallel connection's a drainage unit that fills, and every fills drainage unit and delays by a charging pump, one that manual valve is normally opened to closed check valve, at least one worm and gear transmission valve, one and a bypass drainage needle valve is formed. The utility model is suitable for a water -storage power station.

Description

A kind of upper storage reservoir water-filling and drainage system
Technical field
The utility model is related to a kind of upper storage reservoir water-filling and drainage system.Suitable for hydroenergy storage station.
Background technology
For the hydroenergy storage station that upper storage reservoir does not have the supply of natural rainwash, by natural conditions, construction period etc. because Element affects, and when first operating unit starts first, upper storage reservoir does not typically possess larger reservoir storage, it is considered to during the retaining of upper storage reservoir Between, the requirement for filling drainage test and unit generation progress of water-carriage system, power station needs to arrange safe and reliable upper storage reservoir to be filled Water and drainage system.According to the characteristics of hydroenergy storage station, water-conveyance tunnel system is built up before putting into operation to be needed to carry out water-filling guarantor Pressure and drainage test, need the water yield that certain elevation is pre-filled with upstream canal, to meet unit starting before unit starting Requirement.Therefore, the security reliability of upper storage reservoir water-filling and drainage system directly affects debugging and the production time in power station.
The head difference of hydroenergy storage station often all than larger, even up to more than 800 meters for having, such upper storage reservoir water-filling system The design pressure and discharge pressure of system is just often higher, and security especially will draw attention.According to the defeated of hydroenergy storage station Water system feature, filled water amount often reaches tens of thousands of cubes, it is desirable to which water-filling equipment can continuously run, and the reliability of such system is just especially It is important.
The content of the invention
The technical problems to be solved in the utility model is:For above-mentioned problem, there is provided a kind of safe and reliable upper Reservoir water-filling and drainage system, for the test of hydroenergy storage station water-carriage system and unit, first Start-up and Adjustment provides reliable debugging With test water source and drainage pattern.
The technical scheme that the utility model is adopted is:A kind of upper storage reservoir water-filling and drainage system, it is characterised in that described System is arranged in Pumped Storage Plant Underground Powerhouse spiral case layer unit section, the system have two sets be connected in parallel fill draining list Unit, each fill drainage cell by a charging pump, slow closed check damper, at least one turbine worm transmission valve, one Normally opened hand-operated valve and a bypass draining needle-valve composition, wherein:
The entrance point of the charging pump sequentially passes through normally opened hand-operated valve, charging pump intake pipe, public water supply house steward and public Water main's intake pipe is followed by lower storage reservoir tail water discharge;
The port of export of the charging pump sequentially pass through slow closed check damper, turbine worm transmission valve, charging pump lifting pipe and With upstream pressure fastener for connection after penstock drainpipe, the other end of upstream pressure steel pipe connects with corresponding generating set;
Water-filling is drawn on pipeline between the slow closed check damper and turbine worm transmission valve by arranging a threeway Pump bypasses and installs in the bypass bypass draining needle-valve;
Storehouse water-filling pump discharge cross over pipe connection on Jing between two charging pump lifting pipes for filling drainage cell, and in the connection Normally closed hand-operated valve is installed on pipe;
The public water supply house steward Jing water-carriage systems fill drainage test pipeline and are connected to machine set repairing drain system.
The turbine worm transmission valve is provided with two and is connected in series;The threeway is located at two turbine worms and is driven valve It is middle.
Low-pressure lateral pressure table is housed between the charging pump entrance point and normally opened hand-operated valve.
Between the slow closed check damper and adjacent turbine worm transmission valve, two neighboring turbine worm transmission valve it Between and turbine worm transmission valve and normally closed hand-operated valve between be mounted on high side pressure table.
The outlet side of the bypass draining needle-valve is equipped with bypass discharge pressure table.
Penstock drainage ball valve is housed on the penstock drainpipe.
The beneficial effects of the utility model are:Setting two is standby each other in the utility model, and what is also can started simultaneously fills Water pump (i.e. multistage segmental formula centrifugal water pump), increased reliability and the flexibility of the system, i.e., safe and reliable, economical and effective Solve water-filling and draining that water-carriage system fills drainage test, and unit starts first the water-filling of front upstream pressure steel pipe; Water-carriage system test draining carries out draining by arranging bypass draining needle-valve, i.e., safe and reliable and can flexibly to control draining fast Rate, and bypass draining needle-valve can temporarily using the permanent draining needle-valve of unit of unit itself, so as to save equipment investment cost.
Description of the drawings
Fig. 1 is schematic diagram of the present utility model.
Specific embodiment
As shown in figure 1, the implementation case is a kind of upper storage reservoir water-filling and drainage system, the system is arranged in water-storage electricity Underground workshop spiral case of standing layer unit section, with two sets be connected in parallel fill drainage cell, each fills drainage cell and is filled by one 3, one, water pump (multistage segmental formula centrifugal water pump) slow closed check damper 4, two turbine worm, 6, one, valve of transmission is normally opened manually Valve 1 and a bypass draining needle-valve 9 are constituted.
In this example, two sets of charging pumps 3 filled in drainage cell are standby each other, also can start simultaneously;Two are filled drainage cell Charging pump lifting pipe 103 between on Jing storehouse water-filling pump discharge cross over pipe 106 connect, and install on the communicating pipe it is normally closed manually Valve 7.
The entrance point of charging pump 3 sequentially passes through normally opened hand-operated valve 1, charging pump intake pipe 102, the and of public water supply house steward 105 Public water supply house steward intake pipe 108 is followed by lower storage reservoir tail water discharge;And between the entrance point of charging pump 3 and normally opened hand-operated valve 1 Equipped with low-pressure lateral pressure table 2;Wherein, public water supply house steward 105 is connected to unit inspection and Jing water-carriage systems fill drainage test pipeline 107 Repair drainage system.
The port of export of charging pump 3 sequentially passes through slow closed check damper 4, turbine worm transmission valve 6, charging pump lifting pipe 103 It is connected with upstream pressure steel pipe 13 with after penstock drainpipe 104, the other end of upstream pressure steel pipe 13 and corresponding generating Unit connects;Wherein, turbine worm transmission valve 6 is provided with two and is connected in series;Slow closed check damper 4 and adjacent turbine worm Between transmission valve 6, between two neighboring turbine worm transmission valve 6 and between turbine worm transmission valve 6 and normally closed hand-operated valve 7 It is mounted on high side pressure table 5;Generating set is connected by the permanent draining needle-valve 11 of unit with penstock drainpipe 104, And penstock drainage ball valve 12 is installed on penstock drainpipe 104.
(two are particularly located on pipeline between slow closed check damper 4 and turbine worm transmission valve 6 by arranging a threeway In the middle of individual turbine worm transmission valve 6) draw charging pump bypass 101 and bypass draining needle-valve 9 and bypass row are installed in the bypass Water pressure table 10.
The main operational principle and function of the present embodiment is as follows:
1st, meet water-carriage system filling water test and unit starts first the front water-filling of upstream pressure steel pipe 13:First 1# is filled into row The turbine worm of the normally opened hand-operated valve 1, port of export of the entrance point of charging pump 3 of water unit is driven valve 6 and installed in upper storehouse charging pump Outlet cross over pipe 106 on normally closed hand-operated valve 7 close, by public water supply house steward's 108 → public water supply of intake pipe house steward 105 → 1# fill the charging pump 102 → 1# of intake pipe of drainage cell (left side of Fig. 1) fill drainage cell charging pump bypass 101 → 1# fill row Charging pump 103 → penstock of lifting pipe drainpipe 104 of water unit upstream water-filling of penstock 13, and using downstream tail water Concora crush is carried out to upstream pressure steel pipe 13 and is filled with water to the level of tail water, the time that whole water-carriage system fills drainage test can be shortened;So Open the normally opened hand-operated valve 1 that 1# fills drainage cell again afterwards, the bypass closed on turbine worm transmission valve 6 and charging pump bypass 101 Draining needle-valve 9, carries out afterwards charging pump 3 and makes pressure startup, and constantly regulate turbine worm is driven the aperture of valve 6, runs charging pump 3 In stability range, while realizing continuous water-filling in upstream penstock 13;Meet water-carriage system filling water test and unit is first The water-filling of upstream pressure steel pipe 13 is required before secondary startup.
1# fills the limited case in the water filling process of charging pump 3 of drainage cell also dependent on water-carriage system water-filling speed and opens 2# fills the charging pump 3 on drainage cell (right side of Fig. 1), realizes two charging pumps while the upstream water-filling of penstock 13, so as to Shorten the filling time;In water filling process, can close 1# when the charging pump 3 that 1# fills drainage cell breaks down and fill drainage cell The turbine worm transmission valve 6 of the port of export of charging pump 3, opens normally closed hand-operated valve 7, and the charging pump 3 that 1# fills drainage cell is isolated into inspection Repair, using 2# the charging pump 3 of the drainage cell upstream water-filling of penstock 13 is filled, water-carriage system filling water test is ensure that well With the progress of unit regulation.
2nd, water-carriage system drainage test draining is met:Due to carrying out during water-carriage system drainage test, unit does not have toward contact Installation, did not possess water condition, it is impossible to carry out the draining of upstream pressure steel pipe 13 by the permanent draining needle-valve 11 of unit.Now It is accomplished by carrying out draining by charging pump bypass 101, i.e., is filled by upstream pressure steel pipe 13 → penstock, 104 → 1# of drainpipe Charging pump 103 → the 1# of lifting pipe of drainage cell fills the charging pump of drainage cell and bypasses the charging pump that 101 → 1# fills drainage cell Intake pipe 102 → public water supply, 105 → water-carriage system of house steward fills drainage test pipeline 107 and is connected to machine set repairing drain system and carries out Draining.First, closing 1# fills the turbine worm transmission valve of the normally opened hand-operated valve 1, port of export of the entrance point of charging pump 3 of drainage cell 6 and bypass draining needle-valve 9, then it is mounted in concora crush before and after the penstock drainage ball valve 12 on penstock drainpipe 104 After open the ball valve, afterwards small guide vane opens bypass draining needle-valve 9, aperture flow restriction curve according to bypass draining needle-valve 9, Bypass discharge pressure table 10 shows that pressure and water-carriage system drainage rates require to adjust the aperture of bypass draining needle-valve 9, strict control Drain discharge processed, it is ensured that the pressure after bypass draining needle-valve 9 is maintained in the range of the safe pressure of pipe-line system permission, due to side Road draining needle-valve 9 has all carried out strict shop test and inspection, reliable in quality before often dispatching from the factory, conveniently adjust, thus very The good security reliability that ensure that drainage test.

Claims (6)

1. a kind of upper storage reservoir water-filling and drainage system, it is characterised in that:The system is arranged in Pumped Storage Plant Underground Powerhouse Spiral case layer unit section, the system have two sets be connected in parallel fill drainage cell, each fills drainage cell by a charging pump (3), slow closed check damper (4), at least one turbine worm transmission valve (6), a normally opened hand-operated valve (1) and a bypass Draining needle-valve (9) is constituted, wherein:
The entrance point of the charging pump (3) sequentially passes through normally opened hand-operated valve (1), charging pump intake pipe (102), public water supply house steward (105) it is followed by lower storage reservoir tail water discharge with public water supply house steward's intake pipe (108);
The port of export of the charging pump (3) sequentially passes through slow closed check damper (4), turbine worm transmission valve (6), charging pump and pumps up water Pipe (103) and penstock drainpipe (104) are connected afterwards with upstream pressure steel pipe (13), the other end of upstream pressure steel pipe (13) With the connection of corresponding generating set;
Filled by arranging a threeway extraction on pipeline between the slow closed check damper (4) and turbine worm transmission valve (6) Water pump bypasses (101) and bypass draining needle-valve (9) is installed in the bypass;
Storehouse water-filling pump discharge cross over pipe (106) connection on Jing between two charging pump lifting pipes (103) for filling drainage cell, and Normally closed hand-operated valve (7) is installed on the communicating pipe;
Public water supply house steward (105) the Jing water-carriage systems fill drainage test pipeline (107) and are connected to machine set repairing drain system.
2. upper storage reservoir water-filling according to claim 1 and drainage system, it is characterised in that:The turbine worm is driven valve (6) two are provided with and are connected in series, the threeway is located at the centre of two turbine worms transmission valve (6).
3. upper storage reservoir water-filling according to claim 1 and 2 and drainage system, it is characterised in that:The charging pump (3) import Low-pressure lateral pressure table (2) is housed between end and normally opened hand-operated valve (1).
4. upper storage reservoir water-filling according to claim 2 and drainage system, it is characterised in that:The slow closed check damper (4) Between adjacent turbine worm transmission valve (6), two neighboring turbine worm is driven between valve (6) and turbine worm is driven High side pressure table (5) is mounted between valve (6) and normally closed hand-operated valve (7).
5. upper storage reservoir water-filling according to claim 4 and drainage system, it is characterised in that:Bypass draining needle-valve (9) Outlet side equipped with bypass discharge pressure table (10).
6. upper storage reservoir water-filling according to claim 1 and drainage system, it is characterised in that:The penstock drainpipe (104) penstock drainage ball valve (12) is housed on.
CN201621054587.5U 2016-09-14 2016-09-14 Upper storage reservoir fills water and drainage system Withdrawn - After Issue CN206157690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621054587.5U CN206157690U (en) 2016-09-14 2016-09-14 Upper storage reservoir fills water and drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621054587.5U CN206157690U (en) 2016-09-14 2016-09-14 Upper storage reservoir fills water and drainage system

Publications (1)

Publication Number Publication Date
CN206157690U true CN206157690U (en) 2017-05-10

Family

ID=58650866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621054587.5U Withdrawn - After Issue CN206157690U (en) 2016-09-14 2016-09-14 Upper storage reservoir fills water and drainage system

Country Status (1)

Country Link
CN (1) CN206157690U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284241A (en) * 2016-09-14 2017-01-04 中国电建集团华东勘测设计研究院有限公司 A kind of upper storage reservoir water-filling and drainage system
CN111005352A (en) * 2019-11-25 2020-04-14 中水淮河规划设计研究有限公司 Intelligent automatic water filling and draining system for rubber dam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284241A (en) * 2016-09-14 2017-01-04 中国电建集团华东勘测设计研究院有限公司 A kind of upper storage reservoir water-filling and drainage system
CN111005352A (en) * 2019-11-25 2020-04-14 中水淮河规划设计研究有限公司 Intelligent automatic water filling and draining system for rubber dam

Similar Documents

Publication Publication Date Title
CN201874614U (en) Drainage structure for emptying overhaul of derivation tunnel
CN206157690U (en) Upper storage reservoir fills water and drainage system
CN203420745U (en) Steam cylinder pre-heating system for turbines
CN104912152A (en) Safe operation scheduling system and safe operation scheduling method for water conveyance project in hilly region
CN208363053U (en) A kind of long diversion power station high head and large flow energy dissipating decompression drainage system
CN203197017U (en) Water supply and water return system of bar water-cooling device
CN106930252A (en) A kind of Novel flush storage station water system
CN103556611B (en) The cushion pool filling and drainage system that can generate electricity
CN104832977B (en) System and method for adjusting pressure of heat supply pipe
CN106443278A (en) Method for testing first startup of first machines of pumped storage power stations
CN107419789A (en) The drainage system and water discharge method of the turbine-generator units in the higher river of tailwater level
CN208604556U (en) Multifunctional ecological for extra-high rock-fill dams is for water hole arragement construction
CN104514532A (en) Multi-well wellhead concentrated foam scrubbing and concentrated defoaming foam drainage system
CN114017241A (en) Mixed arrangement structure of pumping unit and conventional unit of pumping power station
CN204826043U (en) Hillock district's water delivery engineering safety operation schedule system
CN205134292U (en) High arch dam construction diversion hole structure
CN106284241B (en) A kind of upper storage reservoir water-filling and drainage system
CN201671609U (en) Closed tank-free oilfield water injection system with controllable pressure and flow
CN105887964A (en) Long-distance water transfer project system and energy-saving general arrangement method
CN105133698B (en) Energy gathering pumping device and pumping method thereof
CN203730467U (en) Bucket wheel mechanism and material taking machine
CN104564510A (en) Method and device using conical valve for realizing pressure adjusting and ecological drainage functions in hydropower station
CN105804030A (en) Method for setting rupture disk detonating pressure
CN105020085A (en) Cooling tower water return power generation device and power generation method by using same
CN105862964A (en) Energy saving method for water pump operation of long-distance water conveyance project system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170510

Effective date of abandoning: 20190201

AV01 Patent right actively abandoned

Granted publication date: 20170510

Effective date of abandoning: 20190201

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned