CN206148889U - Pipeline fixing support - Google Patents
Pipeline fixing support Download PDFInfo
- Publication number
- CN206148889U CN206148889U CN201621049587.6U CN201621049587U CN206148889U CN 206148889 U CN206148889 U CN 206148889U CN 201621049587 U CN201621049587 U CN 201621049587U CN 206148889 U CN206148889 U CN 206148889U
- Authority
- CN
- China
- Prior art keywords
- card
- snap arm
- arm
- pipeline
- shaped ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model provides a pipeline fixing support, pipeline fixing support be including insulating ply -yarn drill, and at the bottom of the card that insulating ply -yarn drill includes two card arms and is connected two card arms, block the arm and enclose the card wire casing with blocking the end, pipeline fixing support is including connecting two card arms, preventing the open lock piece of card arm. Through using this support for when the card arm of solution on insulating ply -yarn drill is longer, results in the card arm to be out of shape, to block the wire casing opening easily and open and make the problem that the pipeline is deviate from from the opening.
Description
Technical field
The utility model is related to a kind of pipeline fixed support.
Background technology
Cable in productive life generally needs to be fixed on setting position, and at this stage conventional fixation is to use wire harness
Clamping apparatus fix wire harness, and wire harness clamping apparatus include insulation line card, and insulation line card includes two snap arm and connection two
The card bottom of snap arm end, two snap arm and card bottom surround cable clamping interface.In order that insulation line card can accommodate many wire harness, that is, adopt
The longer insulation line card of snap arm, now cable clamping interface is longer, you can to insulate at one on line card while the multiple wire harness of fixation, save
Wire harness installation fixing position is put, and makes cable arrange neat orderliness, but due on the line card that insulate snap arm it is longer, be easily caused snap arm change
Shape, card line channel opening open and make wire harness come off from card line channel opening.
Utility model content
The purpose of this utility model is to provide a kind of pipeline fixed support, for solve when the snap arm on insulation line card compared with
When long, the problem that card line channel opening opens, pipeline is slipped is easily caused.
For achieving the above object, the support bracket fastened technical scheme of the utility model pipeline is:Including insulation line card, insulated wire
Card includes that two snap arm surround cable clamping interface with the card bottom of two snap arm, snap arm is connected with card bottom, and the pipeline fixed support includes
Two snap arm of connection, the lock piece for preventing snap arm from opening.
The lock piece is C-shaped ring of the rolling assembling in a snap arm, and C-shaped ring hooks block with another snap arm.
In hinge hole is provided with card line channel opening in one of them described snap arm, the inward at both ends of the C-shaped ring is curved
Roll over and be inserted into respectively the two ends of hinge hole.
Another described snap arm is provided with and is snapped in so as to carry out the hook groove of block to the snap arm for C-shaped ring.
The beneficial effects of the utility model are:Because using the longer cable clamping interface of snap arm, two sides of the line card that insulate are elongated,
Will wire harness load cable clamping interface after, the snap arm of card line channel opening both sides can deform, open, even if card line channel opening opens, and lead
Pipeline is caused to come off from opening, by using the lock piece that locking is carried out to card line channel opening, by opening locking, it is to avoid opening
Open, and block can be carried out to the pipeline for loading, make fixing-stable reliability of the pipeline fixed support to pipeline.
Description of the drawings
Fig. 1 is the structural representation of the utility model pipeline fixed support embodiment one;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is the cooperation schematic diagram of movable interface arrangment 7 and slideway 5 in the present embodiment one;
Fig. 5 is the structural representation of the utility model pipeline fixed support embodiment two.
Specific embodiment
Embodiment of the present utility model is described further below in conjunction with the accompanying drawings.
The support bracket fastened specific embodiment one of pipeline of the present utility model, as shown in Figures 1 to 4, pipeline fixed support bag
Insulation line card 1 is included, insulation line card 1 is provided with cable clamping interface 2, the line card 1 that insulate includes being located at two snap arm 9 of card line channel opening both sides
With positioned at the card bottom of cable clamping interface open back, elongated cable clamping interface is made in order to increase the carrying capacity of cable clamping interface 2, i.e., absolutely
Edge line card has longer snap arm, so can simultaneously load multiple wire harness in a cable clamping interface, saves erection space, makes line
Beam layout orderliness is neat.
Because snap arm 9 is longer, after loading wire harness, snap arm is easily deformed and causes card line channel opening to open, and opens up into certain
After degree, the wire harness in cable clamping interface will be deviate from, so lock piece is set in the side snap arm near the opening of cable clamping interface 2, with
Prevent from card line channel opening from becoming to open greatly.
In the present embodiment, lock piece is C-shaped ring 8, and the rolling assembling of C-shaped ring 8 is to the side card at card line channel opening
On arm 9, herein, snap arm is provided with hinge hole, and hinge hole is relative two blind hole, and in other embodiments, hinge hole may be used also
To be through hole, two terminations at the opening of C-shaped ring 8 bend inwards part respectively from the two ends of hinge hole insertion hinge hole, real
Existing C-shaped ring is rotatably assorted with hinge hole, and one end of C-shaped ring open back can be with opposite side snap arm 9 on insulation line card
Block is carried out, i.e., is provided with hook groove 13 at card line channel opening in opposite side snap arm, can be by the portion of C-shaped ring open back
Divide and snap in hook groove 13, realize block of the C-shaped ring to snap arm.After wire harness is fitted in cable clamping interface 2, C-shaped ring 8, pressing are rotated
Snap arm 9 at card line channel opening, makes snap arm 9 to middle shrinkage, during then C-shaped ring to be latched in the hook groove 13 in snap arm, stops
Only press, make C-shaped ring be in normal operating conditions with snap arm 9.
On insulation line card 1, the snap arm 9 positioned at the side of the opening of cable clamping interface 2 is provided with interface arrangment, in the present embodiment
In, interface arrangment includes a fixed interface arrangment 4 in snap arm 9 and a movable interface arrangment 7.Interface arrangment is set
Insulated wire card 1 can be made in snap arm to overhang partly shorter, it is less for the tilting moment of clamping position, make the support to wire harness
It is more solid and reliable.Clamping more firm stable of the pipeline fixed support to wire harness can be made using two interface arrangments, and
Using a fixed interface arrangment and a movable interface arrangment, can be adjusted between the two by mobile activity interface arrangment
Distance so that in two holes of insertion needed for both are just aligned so that flexible when pipeline fixed support is used,
Reduce the support bracket fastened installation difficulty of pipeline.In the present embodiment, pipeline fixed support is inserted in into existing electricity on vehicle body
In swimming hole, vehicle frame resource itself can be made full use of.
Fixed interface arrangment 4 and the insulation one moulding by casting of line card 1, in the snap arm of the opening side of cable clamping interface 2.Gu
It is list structure to determine interface arrangment 4, and its cross section is two sections of radius identical isocentric circular arcs, and fixed interface arrangment 4 is in per section of circle
A circumferentially extending projection 3 is respectively equipped with the outer surface of arc, two projections 3 are located on same cross section.
In the present embodiment, raised 3 section is triangular form, i.e., raised 3 inserting along the fixed insertion electrophoresis of interface arrangment 4 hole
The both sides in front and back for connecing direction have guiding surface, and two guiding surfaces are to middle merging.
Movable interface arrangment 7 by slideway 5 with insulation line card 1 realize it is relative slip, slideway 5 be from bottom shown in Fig. 1 to
Upper to extend the T-shaped counterbore for opening up, the extended distance of slideway 5 is less than the fixed position of interface arrangment 4.
The big end slideway 10 of T-shaped counterbore is located at the inner side of insulation line card 1, and in big end slideway 10 locking slide block 6, locking are provided with
Slide block 6 is spin-ended with big end slideway 10 and can slide along big end slideway 10, and the width of locking slide block 6 is more than small end slideway 11
Width, makes locking slide block 10 not deviate from from the small end slideway 11 positioned at the outside of insulation line card 1, and small end slideway 11 supplies activity clamping
The bottom of structure 7 is oriented to wherein slides.
Tapped through hole is provided with the middle of locking slide block 6, movable interface arrangment 7 is located at the part in small end slideway with clutch disk
Form be integrated, and be provided with jackscrew in disk bottom, the jackscrew is connected with the tapped through hole on locking slide block 6, screws
After jackscrew, jackscrew is pressed on the inner surface of slideway 5, active card binding structure 7 can be made relative with insulation line card realization
It is fixed, and can prevent locking slide block 6 and active card binding by applying pretightning force to the jackscrew in the state of not use
Structure 7 is deviate from along T-shaped counterbore porch.In other embodiments, can be by the bottom of movable interface arrangment and locking slide block one
Body is arranged, and makes movable interface arrangment have a thicker bottom, and arranging one in its bottom is used to insert jackscrew, insertion
Screwed hole.
When using, according to the distance between support bracket fastened electrophoresis hole of required insertion pipeline, adjustment activity clamping on vehicle frame
Structure 7, unscrews first the jackscrew between movable interface arrangment 7 and locking slide block 6, but does not screw out, slip active lock limited slip block 7,
Make it drive locking slide block 6 to slide in slideway 5, until sliding into and fixing the distance between interface arrangment 4 two electricity are equal to
The distance between swimming hole, stops sliding, and the screw thread then screwed between movable interface arrangment 7 and locking slide block 6 coordinates, and makes activity
The jackscrew of the bottom of interface arrangment 7 closely compresses the bottom of T-shaped slideway 5, the fixation of realization activity interface arrangment 7 and insulation line card 1.
Then the two electrophoresis holes movable interface arrangment 7 for adjusting spacing being aligned with fixed interface arrangment 4 on vehicle frame
Insertion, makes pipeline fixed support be fixed on vehicle frame by electrophoresis hole, and the diameter in electrophoresis hole should be with the diameter phase of interface arrangment
When so that both can produce reliable and stable cooperation, and raised 3 diameter is greater than electrophoresis bore dia, in other enforcements
In mode, the diameter of interface arrangment can be arranged multiple specifications, to meet various sizes of electrophoresis bore dia.During insertion, according to
By the guide effect of the guiding surface in raised 3 outside, along with two concentric minor arcs of each interface arrangment are to center of circle direction bullet
Property shrink, movable interface arrangment 7 can be passed through electrophoresis hole with fixed interface arrangment 4;Through after electrophoresis hole, each interface arrangment
Two concentric minor arc elastic recoverys, and by the guiding surface of raised 3 inner side, pipeline fixed support can be made firmly to block
In being connected on electrophoresis hole.
Wire harness is arranged into neat loading after cable clamping interface 2, using the elasticity of device itself, two snap arm 9 of extruding insulation line card 1
Opening is set to diminish, turn C-shaped ring 8, C-shaped ring is snapped in the hook groove 13 in snap arm carries out block locking to snap arm, it is to avoid
Card line channel opening becomes situation that is big and making wire harness deviate from from opening.
As the support bracket fastened specific embodiment two of the utility model pipeline, as shown in figure 5, it is different from embodiment one it
Place is, lock piece can also be latch hook, latch hook rolling assembling in the side snap arm of insulation line card, latch hook can with it is another
Side snap arm hooks locking.In other embodiments, lock piece can also be the screw for being horizontally through two snap arm, by screwing spiral shell
Nail realizes the locking to snap arm, and lock piece can also be wire harness, using snap arm of the wire harness winding at card line channel opening, prevents
Two snap arm deform and cause card line channel opening to become big.
As the support bracket fastened specific embodiment three of the utility model pipeline, it is with the difference of embodiment one, absolutely
The jointed shaft being provided with card line channel opening in the side snap arm of edge line card, is provided with relative two hole at C-shaped ring two ends, lead to
Cross the two holes C-shaped ring is set on jointed shaft.
As the support bracket fastened specific embodiment four of the utility model pipeline, it is with the difference of embodiment one, absolutely
The side snap arm for carrying out block to C-shaped ring of edge line card, at opening, is provided with a projection, when using, pressing
Snap arm makes opening diminish, and C-shaped ring rotation is pushed through into projection, stops extruding after snap arm reset, and C-shaped ring is prevented from card using projection
Take off on arm, so as to realize locking of the C-shaped ring to snap arm.
As the support bracket fastened specific embodiment five of the utility model pipeline, it is with the difference of embodiment one, Gu
It is clutch disk shape to determine interface arrangment bottom, by arranging screw at its bottom and arranging spiral shell in the relevant position on line card of insulating
Pit, is threaded connection and realizes being relatively fixed for fixed interface arrangment and the line card that insulate, in other embodiments, fixing card
Binding structure realizes that tightening is fixed by the jackscrew located at its bottom with insulation line card, or using rivet will fixed interface arrangment and
Insulated wire card is fixedly installed, and can also be carries out bonding to realize being relatively fixed by both.
As the support bracket fastened specific embodiment six of the utility model pipeline, it is with the difference of embodiment five, will
Chute opens up the position that fixed interface arrangment is located, that is, fix interface arrangment bottom in chute, by making in chute
With the fixation realized with identical fixed form in embodiment two with insulation line card.
It is to live with the difference of embodiment one as the support bracket fastened specific embodiment seven of the utility model pipeline
The bottom of dynamic interface arrangment is provided with ball, the relative motion of the scrolling realization by ball on slideway and insulation line card, living
The bottom of dynamic interface arrangment is additionally provided with jackscrew, when movable interface arrangment is adjusted to appropriate location by the rolling of ball,
Jackscrew is screwed, realization is relatively fixed with insulation line card.
It is not make with the difference of embodiment one as the support bracket fastened specific embodiment eight of the utility model pipeline
Use locking slide block, and T-shaped piece that the bottom of movable interface arrangment is set to be adapted with T-shaped slideway, this T-shaped piece and slideway friction
Slide so as to can slide along slideway in the presence of external force is applied, can not move with respect to slideway when not applying external force, it is real
Now it is relatively fixed with insulation line card, in this way adjusting the distance between movable interface arrangment and fixed interface arrangment,
In other embodiment, part of the movable interface arrangment inside T-shaped slideway can be round table-like or polygon-shaped.
As the support bracket fastened specific embodiment nine of the utility model pipeline, it is with the difference of embodiment one, Gu
It is semicircle to determine interface arrangment or the convex cross section on movable interface arrangment, is inserted using the semi circular surface of both sides before and after grafting direction
Guiding is connect, in making the fixation of pipeline fixed support and vehicle frame electrophoresis hole.
As the support bracket fastened specific embodiment ten of the utility model pipeline, it is with the difference of embodiment one, should
Pipeline fixed support can be additionally used in other occasions, such as the use occasion of gas pipeline, or use occasion of aqueduct etc..
Claims (4)
1. a kind of pipeline fixed support, including insulation line card, insulation line card includes two snap arm and the card bottom for being connected two snap arm,
Snap arm surrounds cable clamping interface with card bottom, it is characterised in that:The pipeline fixed support includes two snap arm of connection, prevents snap arm from opening
Lock piece.
2. pipeline fixed support according to claim 1, it is characterised in that:The lock piece is rolling assembling in a card
C-shaped ring on arm, C-shaped ring hooks block with another snap arm.
3. pipeline fixed support according to claim 2, it is characterised in that:In near card line in one of them described snap arm
Hinge hole is provided with channel opening, the inward at both ends of the C-shaped ring bends and be inserted into respectively the two ends of hinge hole.
4. pipeline fixed support according to claim 3, it is characterised in that:Another described snap arm is provided with and supplies C-shaped ring
Snap in so as to carry out the hook groove of block to the snap arm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621049587.6U CN206148889U (en) | 2016-09-12 | 2016-09-12 | Pipeline fixing support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621049587.6U CN206148889U (en) | 2016-09-12 | 2016-09-12 | Pipeline fixing support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206148889U true CN206148889U (en) | 2017-05-03 |
Family
ID=58619524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621049587.6U Expired - Fee Related CN206148889U (en) | 2016-09-12 | 2016-09-12 | Pipeline fixing support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206148889U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114614402A (en) * | 2022-03-29 | 2022-06-10 | 国网山西省电力公司临汾供电公司 | Electric wire grip |
-
2016
- 2016-09-12 CN CN201621049587.6U patent/CN206148889U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114614402A (en) * | 2022-03-29 | 2022-06-10 | 国网山西省电力公司临汾供电公司 | Electric wire grip |
CN114614402B (en) * | 2022-03-29 | 2023-12-19 | 国网山西省电力公司临汾供电公司 | Electric wire holding device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201656162U (en) | Fixing frame for connector | |
CN206148889U (en) | Pipeline fixing support | |
UA124571C2 (en) | INSULATOR | |
CN206135344U (en) | Pipeline fixed bolster and use car of this support | |
CN117353230B (en) | Pre-twisted double suspension clamp | |
CN115579687A (en) | Cable connecting device for power engineering | |
CN206497773U (en) | A kind of rigid gas insulated power line | |
CN208862488U (en) | A kind of power transmission cable fixture | |
CN207780324U (en) | Optical cable wire clamp | |
EP3993176A1 (en) | Waterproof electric power access device | |
CN107785747B (en) | Electric connector | |
CN110571750B (en) | Combined adjustable electric power splicing fitting | |
CN210443726U (en) | Tensile data line | |
CN219867758U (en) | Anti-pulling wire rod and lamp | |
CN208589756U (en) | A kind of underground cable installation fixed card buckle component | |
CN211127034U (en) | Anti-fracture strain clamp | |
CN208335782U (en) | A kind of cable being stably connected with | |
CN115733108A (en) | Many adaptations type fixture suitable for optical cable, leaky cable centre gripping | |
CN206657877U (en) | A kind of cable switching device | |
CN220732246U (en) | Cable fixing structure | |
CN221009280U (en) | Drainage wire clamp | |
CN220457031U (en) | Multistage knot formula optical cable fixture | |
CN218480432U (en) | Screen projector angle adjusting device | |
CN104183980A (en) | Socket structure capable of preventing falling of plug | |
CN218920560U (en) | RRU hanger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170503 Termination date: 20210912 |