CN206145393U - Flow velocity monitoring is stores pylon for appearance - Google Patents

Flow velocity monitoring is stores pylon for appearance Download PDF

Info

Publication number
CN206145393U
CN206145393U CN201621219278.9U CN201621219278U CN206145393U CN 206145393 U CN206145393 U CN 206145393U CN 201621219278 U CN201621219278 U CN 201621219278U CN 206145393 U CN206145393 U CN 206145393U
Authority
CN
China
Prior art keywords
fixed
flow monitoring
monitoring instrument
plate
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621219278.9U
Other languages
Chinese (zh)
Inventor
曾庆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Wei Qi Polytron Technologies Inc
Original Assignee
Sichuan Wei Qi Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Wei Qi Polytron Technologies Inc filed Critical Sichuan Wei Qi Polytron Technologies Inc
Priority to CN201621219278.9U priority Critical patent/CN206145393U/en
Application granted granted Critical
Publication of CN206145393U publication Critical patent/CN206145393U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model relates to a flow velocity monitoring is stores pylon for appearance because the both sides of driving fixed bolster are symmetrical arrangement's form setting the counter weight is put up and is born the support, and counter weight frame weight is adjustable, avoids carrying on water utilities prison time measuring, and the flow velocity monitoring appearance has ensured because of the uneven luffing motion that causes that the flow velocity monitoring appearance is the contained angle of fixed angle all the time with the river course plane, guaranteed the accuracy of flow velocity monitoring data.

Description

A kind of flow monitoring instrument hanger
Technical field
This utility model is related to water utilities monitoring field sensor, more particularly to applies the flow velocity prison that field is monitored in water utilities Survey instrument hanger.
Background technology
At present, the flow monitoring instrument that water utilities monitors field is applied to, during use, flow monitoring instrument triangle is fixed on into typically Driving simultaneously realizes that by the dragging of motor the dragging back and forth by flow monitoring instrument in river course two sides is monitored, motor drag process In, the vibration being arranged only at due to flow monitoring instrument when the side of triangle driving and motor drag easily causes driving both sides to receive Force unbalance, Jing are often susceptible to swinging back and forth for flow monitoring process intermediate cam driving, in turn result in the inaccurate of test data Really.It is accurate how the flow monitoring instrument hanger for designing a reasonable for this problem becomes solution flow monitoring DATA REASONING The key of property.
Utility model content
The purpose of this utility model is the defect existed for above-mentioned background technology, there is provided one kind can ensure that and be mounted in flow velocity prison Survey instrument hanger on flow monitoring instrument all the time with river course plane in fixed angle flow monitoring instrument hanger.
For achieving the above object, a kind of flow monitoring instrument hanger of this utility model, it is adaptable to which water utilities monitors field, the stream Slowdown monitoring instrument hanger includes a driving fixed support being fixed in triangle driving, and the driving fixed support further includes two Pedestal in " H " type and four fixed columns that two pedestals interfix, one is fixed adjustably to fixed support top of driving a vehicle Solar energy installing rack, inclination are fixed on the counter-balanced carriage on the pedestal, and the counter-balanced carriage passes through one first mounting plate It is fixed in two relative fixed columns of the pedestal, regulation flow monitoring instrument is provided with the counter-balanced carriage and is balanced with hanger Counterweight fixing device, the counterweight fixing device is fixed on the counterweight fixed column on counter-balanced carriage by one, one for by the counterweight What balancing weight in fixed column was locked compress locking nut and one it is set in the spacer in the counterweight fixed column;One relative institute State the bearing support that counter-balanced carriage is fixed in another two relative fixed columns of the pedestal;One is sleeved on the bearing support Flow monitoring instrument protective cover and one be sleeved on the heat shield outside the flow monitoring instrument protective cover with having spacing.
Further, the bearing support further includes that one is solid by the second installation being fixed on the pedestal Fixed board, an equipment mounting bracket being weldingly fixed on second mounting plate and one are fixed on the equipment diagonally downward Flow monitoring instrument mounting box in mounting bracket.
Further, the flow monitoring instrument protective cover includes a unequal protection plate, a lateral margin water of the unequal protection plate Flat to be bent to form a horizontal fixed plate, another relative lateral margin bends straight down to protrude out and is formed with a water fender, the water The bending downwards of the flat fixed plate edge tilt relative with water fender is protruded out and is formed with a weather board, and another the two of the unequal protection plate The bending straight down simultaneously of relative lateral margin is protruded out and is formed with the two protection side plates being parallel to each other, and the two protections side plate is along level Fixed plate direction protrudes out and is formed with two relative fixed sides, the top edge of two fixed side and the horizontal fixed plate and Two relative lateral margins of water fender are concordantly described to protect side plate at the water fender lateral margin relative with unequal protection plate and phase A bevelled leading edge is formed with for the second mounting plate direction inclines to cut.
Further, heat shield includes that the two solar heat protection side plates being parallel to each other, an inclination heat shield panel, a horizontal heat shield panel are enclosed Form.
Further, some louvres are offered on the solar heat protection side plate, inclination heat shield panel and horizontal heat shield panel..
Further, the equipment mounting bracket further includes a fixed frame in the shape of a frame, and the fixed frame both side edges are same Protrude out to level and be formed with two and be parallel to each other the first fixed arm, the another both side edges level in the same direction of the fixed frame is protruded out and is formed with two The welding arm being parallel to each other, the fixed frame one on lateral margin protrude out diagonally downward and be formed with a water-retaining arm, the welding arm with The water-retaining arm is arranged in the same side of the fixed frame, and a root edge level of the fixed frame is protruded out and is formed with a loading plate, Two relative lateral margins of the loading plate protrude out straight up and are formed with two the second fixed arms being parallel to each other, the water-retaining arm and Welding arm is welded on second mounting plate by way of welding, and the water-retaining arm is installed with described second and fixed A guiding gutter is formed with after interfixing between plate, the guiding gutter can be by the water entered along the pedestal to the welding arm both sides Shunting.
Further, second fixed arm, the first fixed arm are arranged in the same side of the fixed frame, and described first Length of the fixed arm lengths more than second fixed arm.
Further, one end of the flow monitoring instrument mounting box is welded on first fixed arm, other end welding On first fixed arm, and a lateral margin of the flow monitoring instrument mounting box be folded upward at protruding out be formed with one hold it is described The gripper shoe of unequal protection plate.
In sum, a kind of flow monitoring instrument hanger of this utility model is due in the support bracket fastened both sides of the driving being in The form being arranged symmetrically arranges the counter-balanced carriage and bearing support, and counter-balanced carriage weight-adjustable, it is to avoid when carrying out water utilities monitoring, stream Slowdown monitoring instrument is because of swinging up and down that imbalance is caused, it is ensured that flow monitoring instrument all the time with river course plane in fixed angle folder Angle, it is ensured that the accuracy of flow monitoring data.
Description of the drawings
Fig. 1 is a kind of one side schematic diagram of flow monitoring instrument hanger of this utility model.
Fig. 2 is an a kind of schematic perspective view of flow monitoring instrument hanger of this utility model.
Fig. 3 is an a kind of schematic perspective view of the bearing support of flow monitoring instrument hanger of this utility model.
Two three-dimensional signals of the Fig. 4 for a kind of different visual angles of the bearing support of flow monitoring instrument hanger of this utility model Figure.
Specific embodiment
To describe technology contents of the present utility model, structural features, institute's reached purpose and effect in detail, reality is hereby enumerated below Apply example and coordinate accompanying drawing to be explained in detail.
Refer to Fig. 1 to Fig. 4, a kind of flow monitoring instrument hanger 100, it is adaptable to which water utilities monitors field, the flow monitoring Instrument hanger 100 includes a driving fixed support 1 being fixed on triangle driving (not illustrating in figure), the driving fixed support 1 further includes two pedestals 11 in " H " type and four fixed columns 12 that two pedestals 11 interfix.
The one solar energy installing rack 2 for being fixed adjustably to 1 top of driving fixed support.
One inclines the counter-balanced carriage 3 being fixed on the pedestal 11, and the counter-balanced carriage 3 passes through one first mounting plate 31 and nut (not indicating in figure) be fixed in two relative fixed columns 12 of the pedestal 11, on the counter-balanced carriage 3 arrange There is the counterweight fixing device 32 for adjusting 100 balance of flow monitoring instrument hanger, the counterweight fixing device 32 is fixed on counterweight by one The counterweight fixed column 321, one for adding is for by the balancing weight in the counterweight fixed column 321 locked compression locking nut (figure In do not illustrate) and one be set in the spacer 322 in the counterweight fixed column 321.
One counter-balanced carriage 3 relatively is fixed on the bearing support 4 in another two relative fixed columns 12 of the pedestal 11.
The one flow monitoring instrument protective cover 5 and being sleeved on the bearing support 4 is sleeved on the flow velocity with having spacing Heat shield 6 outside monitor protective cover 5,.
The bearing support 4 further includes that one is fixed on the pedestal second by bolt (not indicating in figure) The equipment mounting bracket 42 and one that mounting plate 41, is weldingly fixed on second mounting plate 41 is solid diagonally downward The flow monitoring instrument mounting box 43 being scheduled in the equipment mounting bracket 42.
The flow monitoring instrument protective cover 5 is in substantially " inside casing " shape, and which includes a unequal protection plate 51, the unequal protection plate A 51 lateral margin horizontal buckling is formed with a horizontal fixed plate 52, and another relative lateral margin bends straight down to protrude out and is formed with one Water fender 53, the bending downwards of the edge tilt relative with water fender 53 of the horizontal fixed plate 52 are protruded out and are formed with a weather board 54, the bending downwards simultaneously of another two relative lateral margins of the unequal protection plate 51 vertically protrude out be formed with two be parallel to each other to guarantor Shield side plate 55, the two protections side plate 55 are protruded out along 52 direction of horizontal fixed plate and are formed with two relative fixed sides 56, described The top edge of two fixed sides 56 is concordant with two relative lateral margins of the horizontal fixed plate 52 and water fender 53, the protection side Plate 55 is inclined at the lateral margin relative with unequal protection plate 51 of the water fender 53 and relative to 41 direction of the second mounting plate Cut and be formed with a bevelled leading edge 551.
The heat shield 6 includes that the two solar heat protection side plates 61, being parallel to each other incline heat shield panel 62, a horizontal heat shield panel (figure In do not illustrate) enclose and form, the shape of the solar heat protection side plate 61 is substantially the same with the protection side plate 55.
Some louvres are offered on the solar heat protection side plate 61, inclination heat shield panel 62 and horizontal heat shield panel (not indicate in figure Go out).As the heat shield 6 is set in outside the flow monitoring instrument protective cover 5, simultaneously as the heat shield 6 with having spacing On the thermolysis of louvre that opens up, nationality and effectively the heat distributed by the electrical equipment of the bearing support 4 can be led to Cross flow monitoring instrument protective cover 5 quickly to distribute.
Two through hole is offered on each fixed side 56 and each solar heat protection side plate 61.
The equipment mounting bracket 42 further includes a fixed frame 421 in the shape of a frame, and 421 both side edges of fixed frame are in the same direction Level protrudes out and is formed with two and is parallel to each other the first fixed arm 422, and the another both side edges level in the same direction of the fixed frame 421 protrudes out to be formed Have two welding arms 423 being parallel to each other, the fixed frame 421 one on lateral margin protrude out diagonally downward and be formed with a water-retaining arm 424, The welding arm 423 is arranged in the same side of the fixed frame 421, a root edge of the fixed frame 421 with the water-retaining arm 424 Level is protruded out and is formed with a loading plate 425, and two relative lateral margins of the loading plate 425 protrude out that to be formed with two mutual straight up The second parallel fixed arm 426.The water-retaining arm and welding arm are welded on second mounting plate by way of welding On, and a guiding gutter 428 after interfixing between the water-retaining arm 424 and second mounting plate 41, is formed with, this is led The water entered along the pedestal 11 effectively can be shunted by tank 428 to 423 both sides of the welding arm, be installed with avoiding water from instilling In the electrical equipments such as the battery on the bearing support 4, battery charger, radio station.
Second fixed arm 426, the first fixed arm 422 are arranged in the same side of the fixed frame 421, and described first Length of 422 length of fixed arm more than second fixed arm 426.
One end of the flow monitoring instrument mounting box 43 is welded on first fixed arm 422, and the other end is welded on institute State on the first fixed arm, and a lateral margin of the flow monitoring instrument mounting box 43 is folded upward at protruding out being formed with one and holding and described inclines The gripper shoe 431 of oblique protection board 51.
Offer on the side frame of the fixed frame 421 and one a pair of through hole on the fixed side 56 and solar heat protection side plate 61 The screwed hole (not indicating in figure) answered.
One antenna (not indicating in figure) is installed on the inclination heat shield panel 62 of the heat shield 6.
During assembling, the counter-balanced carriage passes through the first mounting plate described in one and is bolted on the pedestal, described Bearing support 4 is fixed on pedestal described in the driving fixed support 1 by second mounting plate 41 and nut, electricity Pond, battery charger, radio station etc. are fixed on the bearing support 4, and flow monitoring instrument (not indicating in figure) is installed in described In flow monitoring instrument mounting box 43, by bolt, through hole, screwed hole cooperation by the flow monitoring instrument protective cover 5 and described Heat shield 6 is sleeved on the bearing support 4 successively, and the gripper shoe 431 is held on the unequal protection plate 51.
The flow monitoring instrument that a kind of flow monitoring instrument hanger 100 of this utility model is loaded is electric wave flow monitoring instrument.
In sum, a kind of flow monitoring instrument of this utility model with hanger 100 due to it is described driving fixed support 1 two The form that side is arranged symmetrically arranges the counter-balanced carriage 3 and bearing support 4, and counter-balanced carriage weight-adjustable, it is to avoid carry out water utilities prison During survey, flow monitoring instrument is because of swinging up and down that imbalance is caused, it is ensured that flow monitoring instrument is all the time with river course plane in fixed angles The angle of degree, it is ensured that the accuracy of flow monitoring data.
Techniques discussed above scheme is only a kind of preferred embodiment of flow monitoring instrument of this utility model hanger 100, Any equivalent transformation made on the basis of a kind of flow monitoring instrument hanger of this utility model 100 or replacement are included in this specially Within the protection domain of profit.

Claims (8)

1. a kind of flow monitoring instrument hanger, it is adaptable to which water utilities monitors field, the flow monitoring instrument hanger includes that one is fixed on Driving fixed support in triangle driving, the driving fixed support further include two pedestals in " H " type and by two pedestal phases Four fixed columns mutually fixed, one is fixed adjustably to the solar energy installing rack on driving fixed support top, it is characterised in that:
Inclination is fixed on the counter-balanced carriage on pedestal, and the counter-balanced carriage is fixed on described by one first mounting plate In two pedestals, two relative fixed column, the counterweight that regulation flow monitoring instrument hanger balance is provided with the counter-balanced carriage fixes dress Put, the counterweight fixing device by one be fixed on counter-balanced carriage counterweight fixed column, one for by matching somebody with somebody in the counterweight fixed column What pouring weight was locked compresses locking nut and one is set in the spacer in the counterweight fixed column;
One relatively described counter-balanced carriage is fixed on the bearing support in another two relative fixed columns of the pedestal;
The one flow monitoring instrument protective cover being sleeved on the bearing support and one it is sleeved on the flow monitoring instrument with having spacing Heat shield outside protective cover.
2. a kind of flow monitoring instrument hanger as claimed in claim 1, it is characterised in that:The bearing support is further included One the second mounting plate being fixed on the pedestal, one are weldingly fixed on the equipment on second mounting plate Mounting bracket and one the flow monitoring instrument mounting box in the equipment mounting bracket is fixed on diagonally downward.
3. a kind of flow monitoring instrument hanger as claimed in claim 1 or 2, it is characterised in that:The flow monitoring instrument protection Cover includes a unequal protection plate, and a lateral margin horizontal buckling of the unequal protection plate is formed with a horizontal fixed plate, another relative Lateral margin bends straight down to protrude out and is formed with a water fender, and the horizontal fixed plate edge tilt relative with water fender is turned under Folding is protruded out and is formed with a weather board, and the another two relative lateral margins bending straight down simultaneously of the unequal protection plate is protruded out and is formed with The two protection side plates being parallel to each other, the two protections side plate are protruded out along horizontal fixed plate direction and are formed with two relative affixed sides Plate, the top edge of two fixed side are concordant with two relative lateral margins of the horizontal fixed plate and water fender, the protection Side plate cuts shape at the water fender lateral margin relative with unequal protection plate and relative to the inclination of the second mounting plate direction Cheng Youyi bevelled leading edges.
4. a kind of flow monitoring instrument hanger as claimed in claim 2, it is characterised in that:The heat shield includes that two is mutually flat Capable solar heat protection side plate, an inclination heat shield panel, a horizontal heat shield panel are enclosed and are formed.
5. a kind of flow monitoring instrument hanger as claimed in claim 4, it is characterised in that:The solar heat protection side plate, inclination solar heat protection Some louvres are offered on plate and horizontal heat shield panel.
6. a kind of flow monitoring instrument hanger as claimed in claim 2, it is characterised in that:The equipment mounting bracket is further Including a fixed frame in the shape of a frame, the fixed frame both side edges level in the same direction protrudes out and is formed with two and is parallel to each other the first fixed arm, institute The another both side edges level in the same direction for stating fixed frame is protruded out and is formed with two welding arms being parallel to each other, the fixed frame one on lateral margin incline Protrude out obliquely and be formed with a water-retaining arm, the welding arm is arranged in the same side of the fixed frame with the water-retaining arm, described One root edge level of fixed frame is protruded out and is formed with a loading plate, and two relative lateral margins of the loading plate protrude out to be formed straight up There are two the second fixed arms being parallel to each other, the water-retaining arm and welding arm that described second is welded on by way of welding and install solid In fixed board, and a guiding gutter is formed with after interfixing between the water-retaining arm and second mounting plate, the guiding gutter The water entered along the pedestal can be shunted to the welding arm both sides.
7. a kind of flow monitoring instrument hanger as claimed in claim 6, it is characterised in that:Second fixed arm, first are consolidated Determine the same side that arm is arranged in the fixed frame, and described first fixes length of the arm lengths more than second fixed arm.
8. a kind of flow monitoring instrument hanger as claimed in claim 7, it is characterised in that:The flow monitoring instrument mounting box One end is welded on first fixed arm, and the other end is welded on first fixed arm, and the flow monitoring instrument is installed One lateral margin of box is folded upward at protruding out and is formed with a gripper shoe for holding the unequal protection plate.
CN201621219278.9U 2016-11-11 2016-11-11 Flow velocity monitoring is stores pylon for appearance Expired - Fee Related CN206145393U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621219278.9U CN206145393U (en) 2016-11-11 2016-11-11 Flow velocity monitoring is stores pylon for appearance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621219278.9U CN206145393U (en) 2016-11-11 2016-11-11 Flow velocity monitoring is stores pylon for appearance

Publications (1)

Publication Number Publication Date
CN206145393U true CN206145393U (en) 2017-05-03

Family

ID=58625989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621219278.9U Expired - Fee Related CN206145393U (en) 2016-11-11 2016-11-11 Flow velocity monitoring is stores pylon for appearance

Country Status (1)

Country Link
CN (1) CN206145393U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071922A (en) * 2016-11-11 2018-05-25 四川炜麒科技股份有限公司 A kind of flow monitoring instrument hanger

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071922A (en) * 2016-11-11 2018-05-25 四川炜麒科技股份有限公司 A kind of flow monitoring instrument hanger

Similar Documents

Publication Publication Date Title
CN103411659B (en) Wind driven generator blade and method and system for monitoring tower barrel states
CN206145393U (en) Flow velocity monitoring is stores pylon for appearance
CN204286780U (en) A kind of flexible hinge rotational stiffness experimental apparatus for testing
CN104599568B (en) A kind of transmission pressure wind and rain causes the analogue experiment installation that shakes
CN207703430U (en) Damper wind excited vibration analogue test platform
CN106314793A (en) Multifunctional UAV (unmanned aerial vehicle)
CN108071922A (en) A kind of flow monitoring instrument hanger
CN209258669U (en) A kind of thin solar energy back-panel glass thickness detection apparatus convenient for clamping
CN202837152U (en) Corrosion test device for galvanic couple in soil medium
CN102135462B (en) Dynamic loading testing machine for three-dimensional force transducer
CN209085938U (en) A kind of electrical system testboard bay
CN113063561B (en) Wind tunnel inner support testing device for guaranteeing binary flow characteristics of segment model
CN206248332U (en) The measurement apparatus of chassis torsion rigidity
CN202338737U (en) Multi-view angle display mounting rack
CN207036445U (en) Damping layer vibration attenuation performance test apparatus and its support
CN208215282U (en) A kind of overturning tooling of the girder of blade of wind-driven generator
CN110552512B (en) Anti-slip device for assisting installation of net rack
CN208325171U (en) A kind of automobile engine maintaining rollover stand
CN214899179U (en) Improved electrical equipment grounding device
CN205352540U (en) Display protector of electron platform scale
CN205300741U (en) Horizontal anti -shake protection casing of electronic balance
CN220490172U (en) Material level measuring device for bulk material discharge hopper
CN217406492U (en) Photovoltaic system check out test set for equipment
CN216559051U (en) Legal metrological verification mechanism
CN219935853U (en) Adjustable reinforced concrete member explosion test device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503

Termination date: 20211111

CF01 Termination of patent right due to non-payment of annual fee