- CN206144679U CN206144679U CN201621172589.4U CN201621172589U CN206144679U CN 206144679 U CN206144679 U CN 206144679U CN 201621172589 U CN201621172589 U CN 201621172589U CN 206144679 U CN206144679 U CN 206144679U
- Authority
- CN
- China
- Prior art keywords
- natural gas
- lng
- gas
- integral type
- water bath
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/10—Internal combustion engine [ICE] based vehicles
- Y02T10/30—Use of alternative fuels, e.g. biofuels
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model relates to an improved generation is from generating electricity integral type charging system, including water water bath vaporizer, the LNG dewar bottle, natural gas line, the gas relief pressure valve, gas turbine generator group and fill electric pile, liquefied natural gas is equipped with in the LNG dewar bottle, be equipped with the liquefied natural gas's that is used for maring filler on the LNG dewar bottle, liquefied natural gas in the LNG dewar bottle passes through pipe connection to water water bath vaporizer, natural gas line is connected to the water water bath vaporizer other end, the natural gas line other end is connected with the gas relief pressure valve, the gas relief pressure valve passes through metal pipeline and metal collapsible tube connects the air inlet that gas turbine generator organized, it goes into on the binding post of gas turbine generator group reservation to fill electric pile's input electric wire termination, compared with the prior art, the utility model, realized the purpose that electricity generation certainly and integral type charge, the short slab of having filled in present charging system is blank, is the energy conversion mode of an environmental protection, is worth popularizing and applying.
Description
[technical field]
This utility model is related to generating-charging technical field, specifically a kind of improved self-generating integral type Charging
System.
[background technology]
In recent years, as country promotes energetically the development of electric automobile and uses, electric automobile industry has obtained swift and violent sending out
Exhibition, the vertical industry being thus derived also is expected to quickly grow, such as lithium battery as new industry the past in two years
Achievement is to hold a safe lead.Although the achievement of this 2 years charging piles does not embody well, the development of this industry
Can the phase.The producer for doing traditional charging pile at present is very more, and some products are also made highly developed.But it is such a by
Traditional fuel oil serves as the particular time that the market of Automobile drive changes to the electricity of environmental protection, and public utility is also not fully.This
So that a kind of integral type electrically-charging equipment of self power generation described herein has the chance for playing its function.
At present, the charging pile on market can only be installed on certain, and must connect civil power.And in highway, without solid
Determine charging pile or without civil power where, or have a power failure when, cannot just give charging electric vehicle.Also have using too on market
The storing up electricity facility and electrically-charging equipment of positive energy, and directly utilize reserve battery and carry out the facility of storing up electricity transmission of electricity.They can be
Generated electricity or storing up electricity in a period of time, solar energy is not enough to support the power consumption of electric automobile if rainy weather, and stores up
The then great majority of energy formula can only meet the energy transmission of several hours.
[utility model content]
The purpose of this utility model seeks to solve above-mentioned deficiency and provide a kind of improved self-generating integral type and charge
System, realizes the purpose that self power generation and integral type charge, and the short slab for having filled up existing charging system is blank, is a kind of environmental protection
Energy conversion mode.
Design a kind of improved self-generating integral type charging system for achieving the above object, including water bath type vaporizer 1,
LNG Dewar flasks 2, natural gas line 3, gas pressure-reducing valve 4, jet dynamic control 5 and charging pile 6, in the LNG Dewar flasks 2
Equipped with liquefied natural gas, the LNG Dewar flasks 2 are provided with the filler for filling liquefied natural gas, the LNG Dewar flasks 2
Interior liquefied natural gas is connected to water bath type vaporizer 1, the other end of the water bath type vaporizer 1 connection natural gas tube by pipeline
Road 3, the other end of the natural gas line 3 is connected with gas pressure-reducing valve 4, and the gas pressure-reducing valve 4 is by metallic conduit and metal
The air inlet of hose connection jet dynamic control 5, the input wire ends of the charging pile 6 access what jet dynamic control 5 was reserved
On binding post.
The medium that heat dissipation tank flows out in the jet dynamic control 5 flows through radiating groove, and the radiating groove is by pipeline and water
Closed circuit is formed between the tube side of bath carburator 1, the liquefied natural gas in the LNG Dewar flasks 2 is connected to by pipeline
The shell side of water bath type vaporizer 1.
The water bath type vaporizer 1, gas pressure-reducing valve 4, charging pile 6 are respectively by line connection control system, the combustion
Gas generating set 5 is with independent control system.
Combustible gas alarming instrument is equiped with the natural gas line 3, the combustible gas alarming instrument passes through connection
Control system.
Sound insulation and noise reduction device is added on the jet dynamic control 5.
The water bath type vaporizer 1, LNG Dewar flasks 2, natural gas line 3, gas pressure-reducing valve 4, jet dynamic control 5, fill
Electric stake 6, control system is packaged in casing, and the box house is provided with gas leakage alarming device, the gas leakage
Alarm device passes through line connection control system.
The LNG Dewar flasks 2 are provided with two, and two LNG Dewar flasks 2 are arranged in parallel and are used interchangeably, two institutes
The outfan for stating LNG Dewar flasks 2 is provided with three-way magnetic valve, the outfan connection natural gas line 3 of the three-way magnetic valve, institute
Three-way magnetic valve is stated by line connection control system.
Fluid level transmitter is separately installed with two LNG Dewar flasks 2, the fluid level transmitter passes through connection control
System processed.
This utility model compared with the existing technology, by LNG Dewar flasks, jet dynamic control, charging pile and other pipelines
And conduit fittingss etc. are combined into and become one, charging pile connects the jet dynamic control of upstream, jet dynamic control
Air inlet connection natural gas upstream pipeline, natural gas upstream pipeline is connected with LNG Dewar flasks, and liquefied natural gas is by LNG Du
Filler filling on watt bottle is entered integral device, and an entirety is integrated into together with electric control system, so as to by by LNG
After liquefied natural gas gasifying and intensification in Dewar flask, reduced pressure through gas pressure-reducing valve, then be conveyed to jet dynamic control,
Jet dynamic control is driven to generate electricity, industry clearing of doing business of going forward side by side to charging electric vehicle finally by charging pile realize self power generation
And the purpose that integral type charges;Because the solar electrical energy generation type charger occurred on market cannot be stablized to rainy weather
Continuously power supply, and adopt the electrically-charging equipment of reserve battery also cannot long-time stable transmission of electricity, therefore, this practicality is new
Charging modes described in type are that this short slab on market has filled up blank, are a kind of energy conversion modes of environmental protection, are worth pushing away
Wide application.
[description of the drawings]
Fig. 1 is structural representation of the present utility model;
In figure:1st, water bath type vaporizer 2, LNG Dewar flasks 3, natural gas line 4, gas pressure-reducing valve 5, fuel gas generation
Unit 6, charging pile.
[specific embodiment]
Below in conjunction with the accompanying drawings further explained below is made to this utility model:
As shown in drawings, this utility model provides a kind of integral type electrically-charging equipment of self power generation, mainly including water-bath type
Carburator 1, LNG Dewar flasks 2, natural gas line 3, gas pressure-reducing valve 4, jet dynamic control 5, charging pile 6 and other correlations
Equipment and conduit fittingss, LNG Dewar flasks 2 are provided with for filling liquefied natural gas built with liquefied natural gas, LNG Dewar flasks 2
Filler, the liquefied natural gas in LNG Dewar flasks 2 is connected to water bath type vaporizer 1 by pipeline, and water bath type vaporizer 1 is another
One end connects natural gas line 3, and the other end of natural gas line 3 is connected with gas pressure-reducing valve 4, and gas pressure-reducing valve 4 passes through metal tube
The air inlet in road and connection by metal hose jet dynamic control 5, the input wire ends access jet dynamic control 5 of charging pile 6 is pre-
On the binding post for staying;The medium that heat dissipation tank flows out in jet dynamic control 5 flows through radiating groove, and radiating groove is by pipeline and water-bath
Closed circuit is formed between the tube side of formula carburator 1, the liquefied natural gas in LNG Dewar flasks 2 is connected to water-bath type by pipeline
The shell side of carburator 1.
Wherein, water bath type vaporizer 1, gas pressure-reducing valve 4, jet dynamic control 5, charging pile 6 are pacified respectively after assembling
It is mounted in an integrated casing, water bath type vaporizer 1, gas pressure-reducing valve 4, charging pile 6 pass through respectively line connection control system
System, jet dynamic control 5 is provided with combustible gas alarming instrument with independent control system, in casing, installs additional on jet dynamic control 5
There is sound insulation and noise reduction device, combustible gas alarming instrument passes through line connection control system.The water bath type vaporizer 1, LNG Dewar flasks 2,
Natural gas line 3, gas pressure-reducing valve 4, jet dynamic control 5, charging pile 6, control system are packaged in casing, box house
Gas leakage alarming device is installed, gas leakage alarming device passes through line connection control system.And, LNG Dewar flasks 2 set
Two are equipped with, two LNG Dewar flasks 2 are arranged in parallel and are used interchangeably, the outfan of two LNG Dewar flasks 2 is provided with three energizations
Magnet valve, the outfan connection natural gas line 3 of three-way magnetic valve, three-way magnetic valve is by line connection control system, two LNG
Fluid level transmitter is separately installed with Dewar flask 2, fluid level transmitter passes through line connection control system.
In this utility model, water bath type vaporizer is carried on LNG Dewar flasks, natural gas upstream pipeline and water-bath type vapour
Change device to be connected, gas pressure-reducing valve upstream is connected with water bath type vaporizer, downstream is by natural gas line and metal hose and combustion gas
Generating set is connected, and charging pile connects the jet dynamic control of trip, and liquefied natural gas is by the filler filling on LNG Dewar flasks
Enter, the input electric wire of charging pile is accessed on the reserved binding post of jet dynamic control, and by above-mentioned all devices, pipeline
Valve, other pipelines adnexa and electrical equipment such as control system it is integrated in the casing of a closing, become an entirety.
The system, once there is the situation of gas leakage, will report to the police built with combustible gas alarming instrument, by controlling system
System notifies that person skilled is overhauled, and safe handling can be fully ensured that in this way.It is additionally, since combustion gas to send out
Noise is larger when motor works, and this utility model has also installed sound insulation and noise reduction device additional on facility, is disturbed residents with preventing
Situation occur.Therefore, the system can meet and supply to electric automobile long-term and stably in the case of similar without civil power etc.
Electricity.
Operation principle of the present utility model is:Using the liquefied natural gas in LNG Dewar flasks, gaseous day is become after gasification
So gas, drives jet dynamic control operation, concurrently after the inlet pressure that gas pressure-reducing valve decompression reaches jet dynamic control
The alternating current of electricity output 380V, after charging pile is connected with jet dynamic control by electric wire, be by the AC conversion of generation
Charging modes on market needed for common electric automobile.It is that downstream is electronic finally by the ac/dc charging gun on charging pile
Automobile charges, industry clearing of doing business of going forward side by side.Under original state, the liquefied natural gas in LNG Dewar flasks some can in Dewar flask
The volatilization of interior liquid medium top becomes the gaseous natural gas of low temperature, the air relief valve decompression outside bottle, transports to jet dynamic control,
Jet dynamic control brings into operation, and hot water is produced during operation, by the cooling water tank on jet dynamic control to combustion gas
Generating set radiates, while taken away the thermal medium of jet dynamic control carries out heat by the water-bath type heat exchanger on LNG Dewar flasks
Exchange that the liquefied natural gas in LNG Dewar flasks is continually gasified, and combustion gas can be given after thermal medium is cooled
Generating set is lowered the temperature, and realizes benign cold cycling, is effectively utilized the energy.Jet dynamic control generates electricity and produces 380V exchanges
Electricity, by the conversion of the electric energy I/O mode of charging pile, for electric automobile power is provided.
Due to from water bath type vaporizer out after gaseous gas pressure it is higher than the admission pressure of jet dynamic control,
A gas pressure-reducing valve is increased into before jet dynamic control in natural gas, to adjust pressure, it is ensured that using for equipment is pacified
Entirely.In addition, the amount of the natural gas consumed during to charging electric vehicle and many, in order that whole system always can 24h fill
Continual steady operation, this application is divided to use the method that two LNG Dewar flasks are used interchangeably.In two LNG Dewar flasks
After three-way magnetic valve is installed, and be mounted with fluid level transmitter on LNG Dewar flasks, liquid level signal is uploaded to into control system,
And early warning signal is set, when liquid level reaches early warning position then automatic switching three-way electromagnetic valve, by Channel-shifted to another LNG Dewars
Bottle.In addition, because natural gas leaking can cause very serious consequence, the program combustion gas to be provided with equipment box and is let out
Alarm device is failed to report, signal is uploaded to control system by the device, once finding there is gas leakage, alarm signal is sent at once, from
And the staff near reminding carries out investigating failsafe safety.
This utility model is not limited by above-mentioned embodiment, other any real without departing from spirit of the present utility model
Matter and the change, modification, replacement made under principle, combine, simplify, should be equivalent substitute mode, being included in this practicality
Within new protection domain.
Claims (8)
1. a kind of improved self-generating integral type charging system, it is characterised in that:Including water bath type vaporizer (1), LNG Dewar flasks
(2), natural gas line (3), gas pressure-reducing valve (4), jet dynamic control (5) and charging pile (6), the LNG Dewar flasks (2)
Built with liquefied natural gas, the LNG Dewar flasks (2) are provided with the filler for filling liquefied natural gas, the LNG Dewars
Liquefied natural gas in bottle (2) is connected to water bath type vaporizer (1) by pipeline, and water bath type vaporizer (1) other end connects
Natural gas line (3) is connect, natural gas line (3) other end is connected with gas pressure-reducing valve (4), the gas pressure-reducing valve (4)
By metallic conduit and the air inlet of connection by metal hose jet dynamic control (5), the input electric wire of the charging pile (6) is terminated
Enter on the reserved binding post of jet dynamic control (5).
2. improved self-generating integral type charging system as claimed in claim 1, it is characterised in that:The jet dynamic control
(5) medium that interior heat dissipation tank flows out flows through radiating groove, and the radiating groove passes through between pipeline and the tube side of water bath type vaporizer (1)
Closed circuit is formed, the liquefied natural gas in the LNG Dewar flasks (2) is connected to the shell of water bath type vaporizer (1) by pipeline
Journey.
3. improved self-generating integral type charging system as claimed in claim 1 or 2, it is characterised in that:The water-bath type vapour
Change device (1), gas pressure-reducing valve (4), charging pile (6) and pass through line connection control system respectively.
4. improved self-generating integral type charging system as claimed in claim 3, it is characterised in that:The natural gas line
(3) combustible gas alarming instrument is equiped with, the combustible gas alarming instrument passes through line connection control system.
5. improved self-generating integral type charging system as claimed in claim 4, it is characterised in that:The jet dynamic control
(5) sound insulation and noise reduction device is added on.
6. improved self-generating integral type charging system as claimed in claim 5, it is characterised in that:The water bath type vaporizer
(1), LNG Dewar flasks (2), natural gas line (3), gas pressure-reducing valve (4), jet dynamic control (5), charging pile (6), control system
System is packaged in casing, and the box house is provided with gas leakage alarming device, and the gas leakage alarming device passes through
Line connection control system.
7. improved self-generating integral type charging system as claimed in claim 6, it is characterised in that:The LNG Dewar flasks (2)
Two are provided with, two LNG Dewar flasks (2) are arranged in parallel and are used interchangeably, the output of two LNG Dewar flasks (2)
End is provided with three-way magnetic valve, and outfan connection natural gas line (3) of the three-way magnetic valve, the three-way magnetic valve passes through
Line connection control system.
8. improved self-generating integral type charging system as claimed in claim 7, it is characterised in that:Two LNG Dewars
Fluid level transmitter is separately installed with bottle (2), the fluid level transmitter passes through line connection control system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621172589.4U CN206144679U (en) | 2016-10-26 | 2016-10-26 | Improved generation is from generating electricity integral type charging system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621172589.4U CN206144679U (en) | 2016-10-26 | 2016-10-26 | Improved generation is from generating electricity integral type charging system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206144679U true CN206144679U (en) | 2017-05-03 |
Family
ID=58623060
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621172589.4U Active CN206144679U (en) | 2016-10-26 | 2016-10-26 | Improved generation is from generating electricity integral type charging system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206144679U (en) |
-
2016
- 2016-10-26 CN CN201621172589.4U patent/CN206144679U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20160006066A1 (en) | Energy conversion system | |
Fang et al. | Optimal power-hydrogen networked flow scheduling for residential carpark with convex approximation | |
Qin et al. | New framework of low-carbon city development of China: Underground space based integrated energy systems | |
Chyong et al. | Electricity and gas coupling in a decarbonised economy | |
AU2018344229B2 (en) | Fuel cell system | |
CN206144679U (en) | Improved generation is from generating electricity integral type charging system | |
CN103322410B (en) | Unpowered prying-mounted liquefied natural gas refueling station | |
CN203826016U (en) | Fixed platform type floating nuclear power plant | |
Flavin et al. | The role of natural gas in a low-carbon energy economy | |
Taylor | Energy storage | |
Hord et al. | Economics of hydrogen | |
Gammon et al. | Hydrogen and renewables integration (HARI) | |
Schüth | Energy storage strategies | |
RU2679685C1 (en) | System of local consumers energy supply | |
CN104235607B (en) | A kind of liquefied natural gas fluid reservoir and the method for Electromagnetic Heating gasification LNG | |
Chen | Direct wind-to-heat energy systems integrated with storage for electricity and heat generation | |
CN219413945U (en) | Natural gas pipeline heating device capable of preventing water compounds from being generated | |
CN220999870U (en) | Hydrogenation field and module assembly matched with hydrogenation field with safer operation cost | |
KR102201251B1 (en) | Floating and storage power plant, and arrangement structure of exhaausted gas duct its | |
Bonadio | The emerging hydrogen market of Australia: A 2020 update | |
Smith | Small scale and micro combined heat and power. | |
Franzén | Evaluating electrolyser setups for hydrogen production from offshore wind power: A case study in the Baltic Sea | |
Boehme et al. | WindStore—Large-Scale Energy Storage Offshore | |
Crotogino | Compressed air energy storage caverns to integrate fluctuating wind energy within transmission grids in Germany | |
Hasengst | An analysis of the energy storage requirements of the Austrian federal state of Tyrol depending on transmission network capacities in 2050 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |