CN206143629U - Super roomy gauge last quarter inspection trolley of compound section steel structure bridge - Google Patents

Super roomy gauge last quarter inspection trolley of compound section steel structure bridge Download PDF

Info

Publication number
CN206143629U
CN206143629U CN201621196159.6U CN201621196159U CN206143629U CN 206143629 U CN206143629 U CN 206143629U CN 201621196159 U CN201621196159 U CN 201621196159U CN 206143629 U CN206143629 U CN 206143629U
Authority
CN
China
Prior art keywords
bridge
steel
truss
compound section
portal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621196159.6U
Other languages
Chinese (zh)
Inventor
周伟明
李龙
刘鹤
梅军
吴腾飞
朱光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201621196159.6U priority Critical patent/CN206143629U/en
Application granted granted Critical
Publication of CN206143629U publication Critical patent/CN206143629U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a super roomy gauge last quarter inspection trolley of compound section steel structure bridge, characterized by inspection trolley include track set spare, truss structure, portal frame, rail trucks, lift platform, locking device and electric system, track set spare is disposed under the compound section steel structure bridge both sides steel longeron, the rail trucks reversal of the natural order of things is in the recess of the I -steel track of track set spare, the portal frame is equipped with two pin altogether, corresponds through the round pin axle and connects in both sides rail trucks's below, and the truss structure penetrates the inside at two pin portal frames to hang on the portal frame, lift platform sets up the operation platform who regards as or go up and down on the truss structure, locking device is the emergency brake arrangement who sets up between portal frame and I -steel track. The utility model discloses a super roomy gauge last quarter inspection trolley is particularly useful for the super wide steel structure bridge in compound section, its simple structure, safe and reliable.

Description

Steel structure bridge ultra-wide big gauge lower edge in compound section checks car
Technical field
This utility model is related to highway bridge and checks equipment, and more particularly to a kind of compound section steel construction is used for The lower edge of the big gauge of bridge ultra-wide checks car.
Background technology
In order to ensure bridge structure safe, bridge maintenance and maintenance are a requisite job, associated bridge Beam inspection car is the important leverage for conserving and keeping in repair.Its major function is to provide bridge failure degree information, detects bridge in good time Structure deterioration, on-call maintenance, elimination harm bridge situation etc..Therefore bridge inspection vehicle is with its special function and effect, one As indispensable " auxiliary products " in a little large bridge designs.
At present, because steel structure bridge is mostly using steel box-girder or steel truss structure, width mostly also 20-30m it Between, checking that bassinet structure design is complicated for the lower edge of above-mentioned bridge structure type, gauge arrangement is little and adopts manual actuation mostly, Working strength is big, and safety coefficient is low.It is to save construction material and completion time of project, municipal bridge with the development of bridge construction level The ultra-wide steel structure bridge that steel longeron is combined with orthotropic steel bridge deck is occurred in that in beam construction, is the inspection for being suitable for the type bridge Repair, the length and gauge for checking car is both needed to increase on traditional basis, therefore traditional bridge lower edge checks that bassinet structure cannot expire The maintenance of sufficient the type bridge.
Utility model content
This utility model is to avoid the weak point existing for above-mentioned prior art, there is provided a kind of simple structure, safety The big gauge lower edge of reliable, compound section steel structure bridge ultra-wide easy to use checks car.
This utility model is adopted the following technical scheme that to solve technical problem:
Steel structure bridge ultra-wide big gauge lower edge in this utility model compound section checks being structurally characterized in that for car:The inspection Car includes rail assembly, truss structure, portal frame, running mechanism, hoistable platform, locking device and electrical system;The track Component is arranged on the lower section of compound section steel structure bridge both sides steel longeron;The running mechanism hangs upside down the I-shaped in rail assembly In the groove of steel track;The portal frame is provided with altogether two Pin, and by bearing pin correspondence the lower section of both sides running mechanism is connected to, described Truss structure is penetrated in the inside of two Pin portal frames, and is suspended on portal frame;The hoistable platform is arranged on truss structure As or lifting operating platform;The locking device is provided in the dress of the brake hard between portal frame and i-beam track Put.
Steel structure bridge ultra-wide big gauge lower edge in this utility model compound section checks that the construction featuress of car lie also in:It is described Rail assembly is made up of connecting seat with i-beam track, and the connecting seat is welded on compound section steel structure bridge both sides steel and indulges The bottom of beam, i-beam track is articulated in the bottom of connecting seat using bolt;The truss structure includes being suspended on two Pin gantry Horizontal truss on frame, office horizontal truss two ends vertical truss, and the electric support being arranged in the middle part of horizontal truss, The electrical system is arranged on electric support.
Steel structure bridge ultra-wide big gauge lower edge in this utility model compound section checks that the construction featuress of car lie also in:Institute The bottom surface for stating truss structure is covered with checkered steel plate, direction across bridge laying walking rails, the hoistable platform on the checkered steel plate It is supported on the walking rails, and energy direction across bridge is elapsed back and forth.
Steel structure bridge ultra-wide big gauge lower edge in this utility model compound section checks that the construction featuress of car lie also in:Constitute Each rod member of the truss structure adopts square tube.
Compared with the prior art, this utility model has the beneficial effect that:
1st, this utility model is that the big gauge lower edge of ultra-wide checks car, is particularly suited for compound section ultra-wide steel structure bridge;
2nd, this utility model simple structure, it is safe and reliable, easy to use, the tunneling boring maintenance of whole beam body lower section can be realized, There is provided bridge failure degree information, on-call maintenance, it is ensured that bridge structure uses safety.
Description of the drawings
Fig. 1 is this utility model structural representation;
Fig. 2 is the B-B profiles of Fig. 1;
Fig. 3 is the A-A profiles of Fig. 1;
Fig. 4 is rail assembly detail drawing;
Fig. 5 is running mechanism detail drawing;
Fig. 6 is locking device detail drawing.
Label in figure:1 steel longeron, 2 rail assemblies, 201 connecting seats, 202 i-beam tracks, 3 truss structures, 301 is vertical Truss, 302 horizontal truss, 303 electric supports, 304 checkered steel plates, 305 walking rails, 4 portal frames, 5 running mechanisms, 501 rows Walk roller, 6 hoistable platforms, 7 locking devices, 8 electrical systems.
Specific embodiment
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 6, in the present embodiment under the big gauge of compound section steel structure bridge ultra-wide String checks that the structure setting of car includes rail assembly 2, truss structure 3, portal frame 4, running mechanism 5, hoistable platform 6, locking dress Put 7 and electrical system 8.
Rail assembly 2 is arranged on the lower section of compound section steel structure bridge both sides steel longeron 1, is by connecting seat 201 and work Word steel track 202 is constituted, and connecting seat 201 is welded on the bottom of compound section steel structure bridge both sides steel longeron 1, i-beam track 202 bottoms that connecting seat 201 is articulated in using bolt, form reversely hung Yong track, a pair of the walking rollers 501 in running mechanism 5 Hang upside down in the groove of the i-beam track 202 of rail assembly 2;Portal frame 4 is provided with altogether two Pin, and by bearing pin correspondence two are connected to The lower section of side running mechanism 5, truss structure 3 is penetrated in the inside of two Pin portal frames 4, and is suspended on portal frame 4;Hoistable platform 6 operating platforms for being arranged on truss structure 3 as or lifting;Locking device 7 is provided in portal frame 4 and i-beam track Emergency braking apparatus between 202.
In the present embodiment, truss structure 3 includes the horizontal truss 302 being suspended on two Pin portal frames 4, and office is in horizontal girder The two ends of frame 302 and vertical truss 301 bolted with horizontal truss 302, and arrange be bolted to horizontal truss 302 The electric support 303 at middle part, electrical system 8 is arranged on electric support 303, constitutes each rod member of truss structure 3 using side Pipe;Checkered steel plate 304 is covered with the bottom surface of truss structure 3, direction across bridge laying walking rails 305, lifting on checkered steel plate 304 Platform 6 is supported on walking rails 305, and energy direction across bridge is elapsed back and forth.
Installation process:
Step 1, truss structure 3, portal frame 4, hoistable platform 6 and electrical system 8 installed and fixed on the ground;
Step 2, by running mechanism 5 be arranged on rail assembly 2 on;
Step 3, mounted integrated member in step 1 is lifted into running mechanism 5 and rail assembly 2 using two loop wheel machines Lower section, using jack calabash lifting is carried out, and is docked with running mechanism 5, truss frame for connecting structure 3 and running mechanism 5, is installed Locking device 7;
Step 4, debugged manually after by come into operation.

Claims (4)

1. a kind of big gauge lower edge of compound section steel structure bridge ultra-wide checks car, it is characterized in that:The inspection car includes track Component (2), truss structure (3), portal frame (4), running mechanism (5), hoistable platform (6), locking device (7) and electrical system (8);The rail assembly (2) is arranged on the lower section of compound section steel structure bridge both sides steel longeron (1);The running mechanism (5) hang upside down in the groove of the i-beam track (202) of rail assembly (2);The portal frame (4) is provided with altogether two Pin, by pin Axle correspondence is connected to the lower section of both sides running mechanism (5), and the truss structure (3) is penetrated in the inside of two Pin portal frames (4), and It is suspended on portal frame (4);The operating platform that the hoistable platform (6) is arranged on truss structure (3) as or lifts;It is described Locking device (7) is provided in the emergency braking apparatus between portal frame (4) and i-beam track (202).
2. the big gauge lower edge of steel structure bridge ultra-wide in compound section according to claim 1 checks car, it is characterized in that:It is described Rail assembly (2) is made up of connecting seat (201) with i-beam track (202), and the connecting seat (201) is welded on compound section The bottom of steel structure bridge both sides steel longeron (1), i-beam track (202) is articulated in the bottom of connecting seat (201) using bolt; The truss structure (3) includes the horizontal truss (302) being suspended on two Pin portal frames (4), and office is in horizontal truss (302) two The vertical truss (301) at end, and the electric support (303) being arranged in the middle part of horizontal truss (302), the electrical system (8) It is arranged on electric support (303).
3. the big gauge lower edge of steel structure bridge ultra-wide in compound section according to claim 1 checks car, it is characterized in that:Institute The bottom surface for stating truss structure (3) is covered with checkered steel plate (304), the direction across bridge laying walking rails on the checkered steel plate (304) (305), the hoistable platform (6) is supported on the walking rails (305), and energy direction across bridge is elapsed back and forth.
4. the big gauge lower edge of steel structure bridge ultra-wide in compound section according to claim 1 checks car, it is characterized in that:Constitute Each rod member of the truss structure (3) adopts square tube.
CN201621196159.6U 2016-10-28 2016-10-28 Super roomy gauge last quarter inspection trolley of compound section steel structure bridge Expired - Fee Related CN206143629U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621196159.6U CN206143629U (en) 2016-10-28 2016-10-28 Super roomy gauge last quarter inspection trolley of compound section steel structure bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621196159.6U CN206143629U (en) 2016-10-28 2016-10-28 Super roomy gauge last quarter inspection trolley of compound section steel structure bridge

Publications (1)

Publication Number Publication Date
CN206143629U true CN206143629U (en) 2017-05-03

Family

ID=58625792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621196159.6U Expired - Fee Related CN206143629U (en) 2016-10-28 2016-10-28 Super roomy gauge last quarter inspection trolley of compound section steel structure bridge

Country Status (1)

Country Link
CN (1) CN206143629U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442247A (en) * 2018-04-13 2018-08-24 云南省公路科学技术研究院 Cable-stayed bridge repair apparatus
CN108677710A (en) * 2018-05-30 2018-10-19 河南新科起重机股份有限公司 A kind of voluntarily truss-type bridge tool car
CN110373995A (en) * 2019-07-29 2019-10-25 成都市新筑路桥机械股份有限公司 A kind of deck railway arch bridge crosses pier bridge-checking vehicle
CN112442945A (en) * 2020-12-16 2021-03-05 重庆交通大学 Steel structure bridge overhauling system
CN112813822A (en) * 2021-01-07 2021-05-18 衡橡科技股份有限公司 Rail automatic deviation rectifying beam bottom inspection vehicle
CN112962452A (en) * 2021-02-23 2021-06-15 长江勘测规划设计研究有限责任公司 Pavement arrangement form of hidden steel box girder inspection trolley

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442247A (en) * 2018-04-13 2018-08-24 云南省公路科学技术研究院 Cable-stayed bridge repair apparatus
CN108677710A (en) * 2018-05-30 2018-10-19 河南新科起重机股份有限公司 A kind of voluntarily truss-type bridge tool car
CN110373995A (en) * 2019-07-29 2019-10-25 成都市新筑路桥机械股份有限公司 A kind of deck railway arch bridge crosses pier bridge-checking vehicle
CN112442945A (en) * 2020-12-16 2021-03-05 重庆交通大学 Steel structure bridge overhauling system
CN112813822A (en) * 2021-01-07 2021-05-18 衡橡科技股份有限公司 Rail automatic deviation rectifying beam bottom inspection vehicle
CN112813822B (en) * 2021-01-07 2022-08-02 衡橡科技股份有限公司 Rail automatic deviation rectifying beam bottom inspection vehicle
CN112962452A (en) * 2021-02-23 2021-06-15 长江勘测规划设计研究有限责任公司 Pavement arrangement form of hidden steel box girder inspection trolley

Similar Documents

Publication Publication Date Title
CN206143629U (en) Super roomy gauge last quarter inspection trolley of compound section steel structure bridge
CN205501818U (en) Steel trussed arch bridge bridge tool car
CN103306200B (en) Elevated bridge of high speed railway beam detects and rescue operation vehicle
CN102862580B (en) Overline operation crane for high-speed railways
CN201801818U (en) Bridge erecting machine capable of erecting double-track twin beams at tunnel entrance by zero distance
KR100991190B1 (en) The bridge inspection and the repair method for which a circular travelling rail mobile bridge inspection car and this were used
CN203639826U (en) Steel truss girder bridge inspection vehicle
CN203496955U (en) Movable type lifting trolley
CN106044552A (en) Multi-leg rubber-tired track-laying crane and construction method thereof
CN106285020A (en) High-altitude precoated plate fitting machine
CN103835195A (en) Rail layer low-position jacking and rapid transversely-moving span changing device and method
CN108221667A (en) Slip self-balancing cable saddle system
CN102837705B (en) Traveling bogie in steel box
CN202879487U (en) Transfer carriage in steel box
CN202298476U (en) Bridge variable cross-section box girder surface operation trolley
CN203334180U (en) High-speed railway overhead bridge detection and rescue working truck
CN206438395U (en) One kind can cross the double girders of pier formula railway and check dolly
CN205932963U (en) Many landing legs tire formula tracklaying crane
CN214245366U (en) Movable operation platform for bridge construction
CN203729163U (en) Track laying machine low-position jacking fast shifting span-changing device
CN212425191U (en) Subway evacuation platform floor device based on major diameter shield constructs
CN104724619B (en) A kind of railway breakdown crane can traveling leg system
CN210530862U (en) Tunnel construction trolley
CN206781776U (en) Re-railing block
CN103395426B (en) A kind of maintenance double girder crane Trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503