CN206137909U - Balanced reservoir and have its drinking bowl - Google Patents

Balanced reservoir and have its drinking bowl Download PDF

Info

Publication number
CN206137909U
CN206137909U CN201620443698.9U CN201620443698U CN206137909U CN 206137909 U CN206137909 U CN 206137909U CN 201620443698 U CN201620443698 U CN 201620443698U CN 206137909 U CN206137909 U CN 206137909U
Authority
CN
China
Prior art keywords
water
water tank
balanced reservoir
delivery port
water inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620443698.9U
Other languages
Chinese (zh)
Inventor
王利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Angel Drinking Water Equipment Co Ltd
Original Assignee
Shenzhen Angel Drinking Water Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Angel Drinking Water Equipment Co Ltd filed Critical Shenzhen Angel Drinking Water Equipment Co Ltd
Priority to CN201620443698.9U priority Critical patent/CN206137909U/en
Application granted granted Critical
Publication of CN206137909U publication Critical patent/CN206137909U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Dispensing Beverages (AREA)

Abstract

The utility model provides a balanced reservoir and have its drinking bowl. This balanced reservoir includes first water tank and second water tank, first water tank sets up with second water tank interval, be equipped with first water inlet and first delivery port on the first water tank, the second water tank has second water inlet and second delivery port, first water inlet is used for inputing cold water, first delivery port and second water inlet intercommunication, the second delivery port is used for exporting hot water, the vapor stream that still is equipped with between first water tank and the second water tank in the first water tank of steam inflow that supplies in the second water tank is said all, wherein, the height that highly is higher than or equals the second water inlet of first water inlet, and the height that highly is higher than first water inlet that the vapor stream was said all. Use this balanced reservoir, solved among the prior art drinking bowl and can't in time discharge and pile up the problem inside the water tank heating the steam that the cold water in -process produced in succession, guaranteed hydrothermal water supply volume, stopped the influence of steam to drinking bowl normal water flow path.

Description

Balanced reservoir and the water fountain with it
Technical field
The utility model is related to household electrical appliance technical field, in particular it relates to a kind of balanced reservoir and the drinking-water with it Device.
Background technology
At present, water dispenser on the market is respectively provided with heating function, and general drinking-water will be stored in water storage after cool water heating Take for drinking person in case.In water dispenser, the process for heating cold water is completed in storage tank, and completes cold in heating After water, storage tank has the function of insulation hot water.However, the hot water stored in the storage tank of water dispenser is limited, connect in many people During continuous water intaking, the moisture storage capacity in storage tank cannot meet the demand of many people's water intakings, after the hot water in water tank has been taken, must Could hot water taking again after water dispenser must be waited to continue to complete cool water heating, it is impossible to provide for water intaking person drink heat in time Water.In order to allow, water intaking person can in time, continuously hot water taking be quoted, thus the drinking-water of heating cold water immediately is occurred in that on market Device, but storage tank has still continued to use old water tank pattern, which results in the water produced during laser heating cold water and steams Vapour cannot in time be discharged and accumulated in inside water tank, so that affecting the normal failures of water fountain Jing and being overhauled, have impact on water intaking Person normally drinks water demand.
Utility model content
The purpose of this utility model is to provide a kind of balanced reservoir and the water fountain with it, it is intended to solve prior art The water vapour that middle water fountain is produced during laser heating cold water cannot in time be discharged and accumulate in the problem inside water tank.
To solve above-mentioned technical problem, the technical solution of the utility model is:A kind of balanced reservoir, including the first water are provided Case and the second water tank, the first water tank and the second water tank interval setting, the first water tank is provided with the first water inlet and the first water outlet Mouthful, the second water tank has the second water inlet and the second delivery port, and the first water inlet is used to be input into cold water, the first delivery port and second Water inlet is connected, and the second delivery port is used to export hot water, is additionally provided between the first water tank and the second water tank in the second water tank Water vapour flows into the steam flow channel in the first water tank, wherein, the height of the first water inlet is greater than or equal to the second water inlet Height, and the height of steam flow channel higher than the first water inlet height.
Alternatively, balanced reservoir is made up of lower box and upper box lid assembling, and lower box is separated to form the inner chamber of the first water tank With the inner chamber of the second water tank, the divider plate of junction arranges to form steaming between upper box lid and the first water tank and the second water tank Steam flow circulation passage.
Alternatively, water return outlet, water return outlet and the pipeline connection for being input into cold water are additionally provided with the first water tank, when the first water When cold water water level in case is located between the first water inlet and steam flow channel, water return outlet output cold water.
Alternatively, isolation leg is provided with the first water tank, isolation leg is arranged to isolate water return outlet around water return outlet, and is isolated The height of leg is located between the height of the first water inlet and the height of steam flow channel.
Alternatively, the bottom of the first water tank includes the first bottom and the second bottom, shape between the first bottom and the second bottom Into ledge structure, the first bottom is higher than the second bottom, and water return outlet and isolation leg are arranged on the first bottom, and the first delivery port sets Put on the second bottom.
Alternatively, the first installing hole being provided with leg for installing anti-dry float switch is isolated, anti-dry ball float is opened When closing the cold water height of water level in the first water tank of detection between the height and the height for isolating leg of the first water inlet, second Delivery port exports hot water.
Alternatively, be additionally provided with the 3rd delivery port on the first bottom, isolation leg be arranged on the 3rd delivery port and water return outlet it Between, the 3rd delivery port is used to export cold water to refrigeration plant, and to provide frozen water is drunk.
Alternatively, the bottom inside face of the second water tank is inclined plane, and the second delivery port is opened in the lower position of the inclined plane Place.
Alternatively, the second water tank is provided with for temperature sensor mounted second installing hole, and temperature sensor is used to examine The hot water temperature for surveying the second water inlet.
According to another aspect of the present utility model, there is provided a kind of water fountain, including balanced reservoir and heater, should Balanced reservoir is aforesaid balanced reservoir, wherein, the water inlet of heater is connected with the first delivery port of balanced reservoir, heating The delivery port of device is connected with the second water inlet of balanced reservoir.
In the utility model, the second water tank is input into after the cold water exported from the first water tank passes through heating, then hot water Export via the second delivery port, the water vapour of one rising now will be formed in the second water tank, the water vapour is rising to During steam flow channel between the first water tank and the second water tank, due to being heated inside the second water tank, therefore in the second water tank More than the air pressure in the first water tank, water vapour is flowed in the first water tank air pressure by steam flow channel by the second water tank, and water To the cold liquefaction is instilled in cold water steam for water droplet in the first water tank.Using the technical solution of the utility model, solve existing The water vapour that water fountain is produced during laser heating cold water in technology cannot in time be discharged and accumulate in asking inside water tank Topic, it is ensured that the water outlet quantity delivered of hot water, has prevented impact of the water vapour to current road in water fountain.
Description of the drawings
Fig. 1 is the main structure diagram of the embodiment of balanced reservoir of the present utility model;
Fig. 2 is the overlooking the structure diagram of Fig. 1;
Fig. 3 is the present invention looks up structural representation of Fig. 1;
Fig. 4 is the right side structural representation of Fig. 1;
Fig. 5 is the structural representation opened after upper box lid of the embodiment of balanced reservoir of the present utility model.
In the accompanying drawings:
10th, the first water tank;11st, the first water inlet;12nd, the first delivery port;13rd, water return outlet;
14th, leg is isolated;15th, the first installing hole;16th, the 3rd delivery port;20th, the second water tank;
21st, the second water inlet;22nd, the second delivery port;23rd, the second installing hole;24th, connecting hole;
100th, lower box;110th, the first bottom;120th, the second bottom;210th, bottom inside face.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing and enforcement Example, is further elaborated to the utility model.It should be appreciated that specific embodiment described herein is only to solve The utility model is released, is not used to limit the utility model.
It should be noted that when element is referred to as " being fixed on " or " being arranged at " another element, it can be directly another On one element or it is connected on another element.When an element is referred to as " being connected to " another element, it can be with It is directly to another element or is indirectly connected on another element.
Also, it should be noted that the orientation term such as left and right, upper and lower in the present embodiment, be only each other relative concept or Normal operating condition with product is reference, and be should not be regarded as restrictive.
As shown in Figures 1 to 5, the balanced reservoir of the present embodiment includes the first water tank 10 and the second water tank 20, the first water tank 10 and the interval setting of the second water tank 20, the first water tank 10 is provided with the first water inlet 11 and the first delivery port 12, the second water tank 20 With the second water inlet 21 and the second delivery port 22, the first water inlet 11 is used to be input into cold water, and the first delivery port 12 enters with second The mouth of a river 21 connects, and the second delivery port 22 is used to export hot water, is additionally provided between the first water tank and the second water tank in the second water tank Water vapour flow into the first water tank in steam flow channel, wherein, the height of the first water inlet 11 enters greater than or equal to second The height at the mouth of a river 21, and the height of steam flow channel is higher than the height of the first water inlet 11.
When the cold water exported from the first water tank 10 is input into the second water tank 20 after heating, then hot water goes out via second The mouth of a river 22 exports, and the water vapour of one rising now will be formed in the second water tank 20, and the water vapour is rising to the first water During steam flow channel between the water tank 20 of case 10 and second, due to being heated inside the second water tank 20, therefore in the second water tank 20 Air pressure more than the air pressure in the first water tank 10, water vapour flows into the first water tank 10 by steam flow channel by the second water tank 20 It is interior, and it is that water droplet is instilled in cold water that water vapour liquefies to the cold in the first water tank 10.Using the technical solution of the utility model, solution The water vapour that water fountain is produced during laser heating cold water in prior art of having determined cannot in time be discharged and accumulate in water tank Internal problem, it is ensured that the water outlet quantity delivered of hot water, and will when the water vapour storage capacity in the second water tank 20 is excessive The flow direction on the current road inside water fountain is affected due to the change of water vapour pressure, equilibrium water of the present utility model is applied Case, then prevented impact of the water vapour to current road in water fountain.
Balanced reservoir of the present utility model is made up of the plastic material of tableware rank.
In the present embodiment, balanced reservoir is made up of the assembling (not shown) of lower box 100 and upper box lid, 100 points of lower box Every the inner chamber of the inner chamber and the second water tank 20 for forming the first water tank 10, connect between upper box lid and the first water tank 10 and the second water tank 20 The divider plate at the place of connecing arranges to form steam flow channel.Upper box lid lid is located on lower box 100, and by PUR work Skill is fixedly connected upper box lid with lower box 100.Water vapour is ramped up by the power that heating power rises, and water vapour to the cold it After liquefy, it is achieved thereby that the circulation and stress of water vapour.
In embodiment of the present utility model, the inflow of the first water inlet of balanced reservoir 11 is more than the first delivery port 12 Water yield, when cold water is constantly flowed in the first water tank 10 from the first water inlet 11, the water level in the first water tank 10 is constantly raised, In order to prevent inside of the cold water full of whole first water tank 10, therefore, water return outlet 13, water return outlet 13 are additionally provided with the first water tank 10 With for being input into the pipeline connection of cold water, when the cold water water level in the first water tank 10 is located at the first water inlet 11 with steam stream all When between road, the output cold water of water return outlet 13.The output in the first water tank 10 had so both been ensure that, the first water tank 10 had been also ensure that Water level cause cold water directly to be filled in the second water tank 20 by steam flow channel not over steam flow channel, eliminate The threat that water vapour is intercepted by cold water, while preventing the accident that the quartz heater for heating cold water directly bursts to the cold Occur.
Specifically, isolation leg 14 is provided with the first water tank 10, isolation leg 14 arranges to isolate backwater around water return outlet 13 Mouth 13, and the height of isolation leg 14 is between the height and the height of steam flow channel of the first water inlet 11.Work as cold water Constantly flow into inside the first water tank 10 from the first water inlet 11, during water level constantly rises, the water level of cold water is in certain a period of time It is higher than water return outlet 13 to carve, and the obstruct due to isolating leg 14, cold water will not be back in hydraulic pipeline from water return outlet 12, once Cold water water level has not crossed isolation leg 14 and has reached water return outlet 12, and now cold water is back in hydraulic pipeline from water return outlet 13, so Flowed into by the first water inlet 11 together with the cold water in hydraulic pipeline afterwards.
As shown in Fig. 2 due to the first water tank 10 using water-head factor to the first water inlet 11, the first delivery port 12 and Structural relation between water return outlet 13 is designed, therefore, the bottom of the first water tank 10 includes the first bottom 110 and the second bottom 120, ledge structure is formed between the first bottom 110 and the second bottom 120, the first bottom 110 is higher than the second bottom 120, backwater Mouth 13 and isolation leg 14 are arranged on the first bottom 110, and the first delivery port 12 is arranged on the second bottom 120.So cause There is fixed difference in height between the delivery port 12 of water return outlet 13 and first.Also, it is additionally provided with the 3rd water outlet on the first bottom 110 Mouth 16, isolation leg 14 is arranged between the 3rd delivery port 16 and water return outlet 13, and the 3rd delivery port 16 is used for defeated to refrigeration plant Go out cold water, to provide frozen water is drunk.In order that cold water can be exported from the 3rd delivery port 16, and so that cold water will not be at the first bottom Accumulate in portion 110, therefore, a guiding gutter has been opened up on the first bottom 110, the guiding gutter is to be tilted towards the second bottom 120 Skewed slot, the 3rd delivery port 16 is located on the bottom land of the skewed slot, and positioned at one end of bottom land elevation angle.So cause the 3rd The freeboard of delivery port 16 is slightly below the ponding on water return outlet 13, also, the first bottom 110 can be by guiding gutter runner second Bottom 120.
As shown in Figure 2 and Figure 5, the first bottom 110 for isolating in leg 14 is provided with for installing anti-dry float switch The first installing hole 15, anti-dry float switch detects that the cold water height of water level in the first water tank 10 is located at first water inlet 11 When height is between the height for isolating leg 14, the output hot water of the second delivery port 22.In order to more be accurately controlled heating The work of the heater of cold water, also more accurately prevents heater from dry-fire condition occur, therefore, using anti-dry ball float Switch the water level to the first water tank 10 to detect.Due to quitting work in water fountain, i.e., when water fountain does not provide hot water, first Water tank 10, the second water tank 20 and linker structure is defined positioned at heater between the two, now, the first water tank 10 Height of water level is equal with the height of water level of the second water tank 20, stores water in heater all the time without there is dry combustion method.
As shown in Fig. 2 in order to the hot water flowed in the second water tank 20 is all exported, therefore, the second water tank 20 Bottom inside face 210 is inclined plane, and the second delivery port 22 is opened at the lower position of the inclined plane.
As shown in figure 4, the second water tank 20 is provided with for temperature sensor mounted second installing hole 23, temperature sensor For detecting the hot water temperature at the second water inlet 22, by detecting that the second water inlet 21 exports the temperature of water, and in real time will The water temperature for detecting shows that user passes through the temperature for observing the display, it becomes possible to judge whether heater works just Often, for example, temperature sensor detects the close room temperature of water temperature of the second water inlet 21, then illustrate heater substantially not to cold water Heated, now can determine that heater there occurs failure substantially, need to place under repair.
When needing to change balanced reservoir, anti-dry float switch can not be included on balanced reservoir, changed Complete after balanced reservoir again to reinstall up anti-dry float switch;Can certainly first install on balanced reservoir anti- Dry combustion method float switch, balanced reservoir is changed with anti-dry float switch as an entirety.In the same manner, equilibrium water is being changed During case, temperature sensor can not be included on balanced reservoir, again again pacify temperature sensor after replacing completes balanced reservoir Install;Temperature sensor can also be first installed on balanced reservoir, balanced reservoir is whole as one with temperature sensor Body is changed.
In the present embodiment, the second water inlet 21 is two.Temperature sensor is installed into wherein by the second installing hole 23 After one the second water inlet 21, in order to also detect to the water temperature in another second water inlet 21 simultaneously, now pass through Connecting hole 24 fixes two test sections of temperature sensor parallel with one another, and each test section puts in corresponding second water inlet In 21.
According to another aspect of the present utility model, there is provided a kind of water fountain.The water fountain includes balanced reservoir and heating Device, the balanced reservoir is aforesaid balanced reservoir, wherein, the water inlet of heater and the first delivery port 12 of balanced reservoir Connection, the delivery port of heater is connected with the second water inlet 21 of balanced reservoir.Specifically, the water fountain also includes refrigeration dress Put, so as to freeze to water, and be finally water intaking person by 16 casees refrigerating plant water deliverys of the 3rd delivery port of the balanced reservoir There is provided frozen water to drink.
Preferred embodiment of the present utility model is these are only, it is all in this practicality not to limit the utility model Any modification, equivalent and improvement made within new spirit and principle etc., should be included in guarantor of the present utility model Within the scope of shield.

Claims (10)

1. a kind of balanced reservoir, it is characterised in that including the first water tank (10) and the second water tank (20), first water tank (10) With the second water tank (20) interval setting, first water tank (10) is provided with the first water inlet (11) and the first delivery port (12), second water tank (20) is with the second water inlet (21) and the second delivery port (22), the first water inlet (11) use In input cold water, first delivery port (12) connects with second water inlet (21), and second delivery port (22) is used for Output hot water, is additionally provided with for the water vapour in the second water tank (20) between first water tank (10) and second water tank (20) The steam flow channel in first water tank (10) is flowed into, wherein, the height of first water inlet (11) is greater than or equal to The height of second water inlet (21), and the height of the steam flow channel is higher than the height of first water inlet (11) Degree.
2. balanced reservoir as claimed in claim 1, it is characterised in that the balanced reservoir is by lower box (100) and upper box lid Assembling is constituted, and the lower box (100) is separated to form the interior of the inner chamber of first water tank (10) and second water tank (20) Chamber, the upper box lid lid is located on the lower box (100), the upper box lid and first water tank (10) and second water The divider plate of junction arranges to form the steam flow channel between case (20).
3. balanced reservoir as claimed in claim 1, it is characterised in that be additionally provided with water return outlet on first water tank (10) (13), the water return outlet (13) and the pipeline connection for being input into cold water, the cold water water level position in first water tank (10) When between first water inlet (11) and the steam flow channel, the water return outlet (13) exports cold water.
4. balanced reservoir as claimed in claim 3, it is characterised in that is provided with isolation leg in first water tank (10) (14), isolation leg (14) arranges to isolate the water return outlet (13), and the isolation leg around the water return outlet (13) (14) height is located between the height of the first water inlet (11) and the height of the steam flow channel.
5. balanced reservoir as claimed in claim 4, it is characterised in that the bottom of first water tank (10) includes the first bottom (110) and the second bottom (120), ledge structure is formed between first bottom (110) and second bottom (120), institute State the first bottom (110) to be arranged on higher than second bottom (120), the water return outlet (13) and isolation leg (14) On first bottom (110), first delivery port (12) is arranged on second bottom (120).
6. balanced reservoir as claimed in claim 5, it is characterised in that is provided with anti-dry for installing in the isolation leg (14) First installing hole (15) of float switch is burnt, the anti-dry float switch detects the cold water water level in first water tank (10) When highly between the height and the height for isolating leg (14) of first water inlet (11), second delivery port (22) hot water is exported.
7. balanced reservoir as claimed in claim 5, it is characterised in that be additionally provided with the 3rd water outlet on first bottom (110) Mouth (16), isolation leg (14) is arranged between the 3rd delivery port (16) and the water return outlet (13), and the described 3rd Delivery port (16) drinks frozen water for exporting cold water to refrigeration plant to provide.
8. balanced reservoir as claimed in claim 1, it is characterised in that the bottom inside face (210) of second water tank (20) For inclined plane, second delivery port (22) is opened at the lower position of the inclined plane.
9. balanced reservoir as claimed in claim 1, it is characterised in that second water tank (20) is provided with for installing temperature Second installing hole (23) of sensor, the temperature sensor is used to detect the hot water temperature at the second water inlet (22) place.
10. a kind of water fountain, including balanced reservoir and heater, it is characterised in that the balanced reservoir is claim 1 to 9 Any one of balanced reservoir, wherein, the first delivery port of the water inlet of the heater and the balanced reservoir (12) connect, the delivery port of the heater is connected with second water inlet (21) of the balanced reservoir.
CN201620443698.9U 2016-05-16 2016-05-16 Balanced reservoir and have its drinking bowl Active CN206137909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620443698.9U CN206137909U (en) 2016-05-16 2016-05-16 Balanced reservoir and have its drinking bowl

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620443698.9U CN206137909U (en) 2016-05-16 2016-05-16 Balanced reservoir and have its drinking bowl

Publications (1)

Publication Number Publication Date
CN206137909U true CN206137909U (en) 2017-05-03

Family

ID=58615996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620443698.9U Active CN206137909U (en) 2016-05-16 2016-05-16 Balanced reservoir and have its drinking bowl

Country Status (1)

Country Link
CN (1) CN206137909U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110326973A (en) * 2019-07-17 2019-10-15 宁波福特恩净水设备有限公司 A kind of built at lower part of drinking machine and its vapor separating box
CN113899075A (en) * 2021-09-27 2022-01-07 深圳安吉尔饮水产业集团有限公司 Backflow preheating water supply system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110326973A (en) * 2019-07-17 2019-10-15 宁波福特恩净水设备有限公司 A kind of built at lower part of drinking machine and its vapor separating box
CN110326973B (en) * 2019-07-17 2021-04-02 宁波福特恩净水设备有限公司 Underlying water dispenser and water-vapor separation box thereof
CN113899075A (en) * 2021-09-27 2022-01-07 深圳安吉尔饮水产业集团有限公司 Backflow preheating water supply system

Similar Documents

Publication Publication Date Title
CN104287611A (en) Novel steam oven
CN201481092U (en) Quick electric-heating drinking water machine
CN206137909U (en) Balanced reservoir and have its drinking bowl
CN104781617A (en) Storage boiler
CN103479225B (en) One brews machine and method thereof
CN103134197A (en) Double-water-tank air-exhausting flow-guide separation plate solar water heater
CN107374364A (en) Balanced reservoir and there is its water fountain
CN106139622A (en) Liquid vacuum enrichment facility and method for concentration thereof
CN103505048B (en) One brews machine priming apparatus and method thereof
CN2921683Y (en) Immediate boiling quick heating water boiling machine
CN107661014A (en) A kind of temperature control coffee machine
CN104034033A (en) Heating system and heat pump water heater with same
CN105342459A (en) Water dispensing equipment and quantitative water supply device thereof
CN2893523Y (en) Washing and drinking two-purpose high-temperature water heater
CN202598992U (en) Refrigerator
CN206583091U (en) A kind of fuel gas energy-saving boiler
KR100821369B1 (en) Hot and cold water dispenser with automatic cut-off system
CN104010552B (en) Machine for the dispensing of espresso coffee
CN204049286U (en) Drinking equipment and gauge water feeding mechanism thereof
CN209404467U (en) Pipeline assembly and water treatment system
CN101884495A (en) Automatic water-replenishing water box structure of electric steam box
CN201611162U (en) Vertical electrically heated boiler
CN205878569U (en) Instant heating type domestic gas steam oven and pipe -line system thereof
CN101118084A (en) New style rapid heating drinking machine
CN105411388B (en) Non-secondary pollution speed heat water dispenser and temprature control method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant