CN206132760U - Experimental apparatus is invaded to simulation gas hydrate well drilling gas - Google Patents

Experimental apparatus is invaded to simulation gas hydrate well drilling gas Download PDF

Info

Publication number
CN206132760U
CN206132760U CN201621154787.8U CN201621154787U CN206132760U CN 206132760 U CN206132760 U CN 206132760U CN 201621154787 U CN201621154787 U CN 201621154787U CN 206132760 U CN206132760 U CN 206132760U
Authority
CN
China
Prior art keywords
gas
simulation
inner tube
outer tube
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621154787.8U
Other languages
Chinese (zh)
Inventor
魏纳
陈光凌
李鹏杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201621154787.8U priority Critical patent/CN206132760U/en
Application granted granted Critical
Publication of CN206132760U publication Critical patent/CN206132760U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a gas hydrate well drilling technical field's an experimental apparatus is invaded to simulation gas hydrate well drilling gas, it mainly comprises motor, outer coupling, outer tube, inner tube, drill bit, gas flowmeter, fan, three -phase separator, gas outlet, a baffle, feed hopper, sand basin, hopper, fluidflowmeter and water pump. The fan links to each other with gas flowmeter, the hopper links to each other with fluidflowmeter and water pump, the motor links to each other with inner tube and drill bit, the sleeve pipe of outer tube simulation under true operating mode, the drilling rod under the true operating mode is simulated to the inner tube, the tubular product of outer tube is ya keli glass, and the tubular product of inner tube is the carbon steel no. 45. What put in the sand basin is sand and nylon, and both diameters all are 0.004 meter, and the gas hydrate solid under the true operating mode is simulated to nylon. The utility model discloses use and dismantle simply, can alternate inner tube and outer tube size according to the operating condition at scene to obtain good simulation effect.

Description

One kind simulation gas hydrates drilling well gas cut experimental provision
Technical field
This utility model is related to a kind of simulation gas hydrates drilling well gas cut in gas hydrates drilling technology field Experimental provision.
Background technology
Gas hydrates are the outward appearances formed under the conditions of cryogenic high pressure as the ice but crystal structure cage different from ice Type compound.It is permafrost layer strip and deep-sea where at present gas hydrates in the world are primarily present;For day So exploitation of gas hydrate all launched many researchs both at home and abroad.In gas hydrates drilling process, due to natural gas Hydrate can in a large number decomposite substantial amounts of gas in straight well section with the change of pressure and temperature, and to pit shaft gas cut is produced. Gas cut is one of subject matter of an impact drillng operation, and what is especially produced in gas hydrates drilling process is a large amount of Methane gas brings very big impact to drillng operation;For the gas cut problem in gas hydrates drilling process and should adopt Take which measure is necessary to carry out experimentation.Accordingly, it would be desirable to a kind of simulation gas hydrates drilling well gas cut experimental provision comes There is the mechanism and countermeasuress of gas cut in researching natural gas hydrate drilling process.
The content of the invention
This utility model purpose is:There is provided a kind of simulation gas hydrates drilling well gas cut experimental provision.
The technical scheme that this utility model is adopted is:
A kind of simulation gas hydrates drilling well gas cut experimental provision of this utility model, mainly by motor, outer tube joint, outer Pipe, inner tube, drill bit, gas flowmeter, blower fan, three phase separator, gas outlet, packing plate, charging hopper, sand basin, water storage Groove, fluid flowmeter and water pump composition.Blower fan is connected with gas flowmeter;Hopper is connected with fluid flowmeter and water pump;Electricity Machine is connected with inner tube and drill bit;Outer tube simulates the sleeve pipe under real working condition, the drilling rod under inner tube simulation real working condition;Outer tube Tubing is acrylic glass, and the tubing of inner tube is No. 45 carbon steels.Packing plate is one block of steel plate, and the part that contacts with outer tube is welded, The other end is not welded, for packing plate upper and lower to be separated;What is put in sand basin is sand and nylon, and both diameters are all For 0.004 meter, nylon simulates the gas hydrates solid under real working condition.
Advantage of the present utility model:Dismounting it is simple, easy to use, economize on resources, can well simulate gas hydrates The gas cut produced in drilling process.
Description of the drawings
Fig. 1 is a kind of structural representation of simulation gas hydrates drilling well gas cut experimental provision of this utility model.
In figure:1. motor, 2. outer tube joint, 3. outer tube, 4. inner tube, 5. drill bit, 6. gas flowmeter, 7. blower fan, 8. three Phase separator, 9. gas outlet 10. insulates plate, 11. charging hoppers, 12. sand basins, 13. hoppers, 14. fluid flowmeters, 15. water pumps.
Specific embodiment
This utility model is described further below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of simulation gas hydrates drilling well gas cut experimental provision of this utility model, mainly by motor 1, Outer tube joint 2, outer tube 3, inner tube 4, drill bit 5, gas flowmeter 6, blower fan 7, three phase separator 8, gas outlet 9, packing plate 10, Charging hopper 11, sand basin 12, hopper 13, fluid flowmeter 14 and water pump 15 are constituted.Blower fan 7 is connected with gas flowmeter 6; Hopper 13 is connected with fluid flowmeter 14 and water pump 15;Motor 1 is connected with inner tube 4 and drill bit 5.
As shown in figure 1, specific simulation process is:Motor 1 is first turned on, makes motor 1 drive inner tube 4 and drill bit 5 to carry out Rotate;Open blower fan 7 to bypass air through after gas flowmeter 6 is measured into inside outer tube 3, while opening hopper 13 water is led to Cross the sand and nylon flowed out with sand basin 12 while pressurizeed by water pump 15 after fluid flowmeter 14 is measured to be mixed into outer Inside pipe 3.Now gas, water, sand and nylon are all internally formed mixture into outer tube 3, and motor drives inner tube 4 to be rotated to Simulation gas hydrates drilling process, by changing the discharge capacity of blower fan 7 and water pump 15 come gas cut under simulated field actual condition The size of amount;The mixture solid that gas, water, sand and nylon are formed enters three-phase separate after flowing out from the port of export on the right side of outer tube 3 Gas-liquid-solid three-phase separation is carried out from device 8, gas flows out from gas outlet 9, the sand isolated and nylon flow into sand basin 12 and carries out Recycle, the water isolated flows into hopper 13 and recycled, i.e., simulation process terminates.

Claims (4)

1. a kind of simulation gas hydrates drilling well gas cut experimental provision, mainly by motor (1), outer tube joint (2), outer tube (3), Inner tube (4), drill bit (5), gas flowmeter (6), blower fan (7), three phase separator (8), gas outlet (9), packing plate (10), plus Funnel (11), sand basin (12), hopper (13), fluid flowmeter (14) and water pump (15) composition, it is characterised in that:Blower fan (7) it is connected with gas flowmeter (6);Hopper (13) is connected with fluid flowmeter (14) and water pump (15);Motor (1) and inner tube (4) it is connected with drill bit (5).
2. one kind according to claim 1 simulates gas hydrates drilling well gas cut experimental provision, it is characterised in that:Packing Plate (10) is one block of steel plate, and the part that contacts with outer tube (3) is welded, and the other end is not welded, for will packing plate (10) top and Separate bottom.
3. one kind according to claim 1 simulates gas hydrates drilling well gas cut experimental provision, it is characterised in that:Outer tube (3) sleeve pipe of the simulation under real working condition, the drilling rod under inner tube (4) simulation real working condition;The tubing of outer tube (3) is acrylic glass Glass, the tubing of inner tube (4) is No. 45 carbon steels.
4. one kind according to claim 1 simulates gas hydrates drilling well gas cut experimental provision, it is characterised in that:Sand is store What is put in tank (12) is sand and nylon, and both diameters are all 0.004 meter, and the gas hydrates under nylon simulation real working condition are consolidated Body, uses air simulation methane gas.
CN201621154787.8U 2016-10-31 2016-10-31 Experimental apparatus is invaded to simulation gas hydrate well drilling gas Expired - Fee Related CN206132760U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621154787.8U CN206132760U (en) 2016-10-31 2016-10-31 Experimental apparatus is invaded to simulation gas hydrate well drilling gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621154787.8U CN206132760U (en) 2016-10-31 2016-10-31 Experimental apparatus is invaded to simulation gas hydrate well drilling gas

Publications (1)

Publication Number Publication Date
CN206132760U true CN206132760U (en) 2017-04-26

Family

ID=58576453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621154787.8U Expired - Fee Related CN206132760U (en) 2016-10-31 2016-10-31 Experimental apparatus is invaded to simulation gas hydrate well drilling gas

Country Status (1)

Country Link
CN (1) CN206132760U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387072A (en) * 2017-07-20 2017-11-24 中国石油化工股份有限公司 A kind of HTHP gas-liquid replaces lab simulation evaluating apparatus
CN107780888A (en) * 2017-11-30 2018-03-09 青岛海洋地质研究所 Gas hydrates pilot production analogue means and method
CN111272952A (en) * 2020-02-24 2020-06-12 中国地质大学(北京) Experimental device for gas velocity of dissolving in oil base drilling fluid when survey well drilling gas is invaded

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387072A (en) * 2017-07-20 2017-11-24 中国石油化工股份有限公司 A kind of HTHP gas-liquid replaces lab simulation evaluating apparatus
CN107780888A (en) * 2017-11-30 2018-03-09 青岛海洋地质研究所 Gas hydrates pilot production analogue means and method
CN107780888B (en) * 2017-11-30 2023-08-15 青岛海洋地质研究所 Natural gas hydrate test production simulation device and method
CN111272952A (en) * 2020-02-24 2020-06-12 中国地质大学(北京) Experimental device for gas velocity of dissolving in oil base drilling fluid when survey well drilling gas is invaded
CN111272952B (en) * 2020-02-24 2021-07-13 中国地质大学(北京) Experimental device for gas velocity of dissolving in oil base drilling fluid when survey well drilling gas is invaded

Similar Documents

Publication Publication Date Title
CN206132760U (en) Experimental apparatus is invaded to simulation gas hydrate well drilling gas
CN206114456U (en) Simulation gas hydrate bores horizontal well drilling rod erosion experimental apparatus
CN104234708B (en) A kind of multi-functional pit shaft oil gas water multiphase analogue experiment installation
CN201635659U (en) Gas drilling erosion experimental device
CN201184861Y (en) Test device for simulating erosion worn of gas drilling and boring tool
CN206329293U (en) One kind simulation gas hydrates horizontal well drilling full hole takes rock experimental provision
CN105464606A (en) Experiment device and method for simulating drilling-production double-work-condition pit shaft sand carrying multi-phase flowing
CN104034630A (en) Fracturing liquid performance experimental system for geological transformation of oil and gas reservoir
CN206818589U (en) Experimental provision of the corrosion inhibiter to drilling rod antiseptic effect in a kind of simulation gas drilling
CN107218034B (en) Experimental device for simulating flowing state change of multiple expanding sections of natural gas hydrate drilling well
CN103277092A (en) Horizontal well multistage fracturing variable mass multiphase flow simulation experiment device
CN103256047A (en) Method for researching variable mass multiphase flowing regular in horizontal well fracturing completion method
CN101975078B (en) Gas extraction drilling coupling device and installation and use method thereof
CN110887645A (en) Device and method for testing temporary plugging ball seat seal of hole in shale gas horizontal well pipe
CN204476357U (en) Anti-erosion device for fracturing wellhead
CN211201912U (en) Device for evaluating wellbore sand production and prevention during hydrate exploitation by CO2/N2 displacement method
CN201705283U (en) Leaking stoppage device for drilling fixed points
CN206233886U (en) One kind simulation gas hydrates horizontal well drilling horizontal segment Cutting movement device
CN201187288Y (en) Multifunctional downhole liquid-producing processor
CN206818382U (en) One kind simulation exploitation gas condensate reservoir separates out oil pipe flowing changing rule experimental provision after condensate
CN105114055A (en) Test method for transport simulation of pulverized coal mined and output from coal-bed gas well
CN208520832U (en) A kind of experimental provision for simulating gas hydrates counterflush drilling flow field change
CN204492810U (en) A kind of gas liquid two-phase flow changeable quality experimental device
CN105569612B (en) A kind of coal-bed gas exploitation device and recovery method
CN101624907A (en) Underground oil-water-gas mixed phase flow measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20171031