CN206128445U - Reserve solid post of prefabrication of plug hole - Google Patents

Reserve solid post of prefabrication of plug hole Download PDF

Info

Publication number
CN206128445U
CN206128445U CN201621187313.3U CN201621187313U CN206128445U CN 206128445 U CN206128445 U CN 206128445U CN 201621187313 U CN201621187313 U CN 201621187313U CN 206128445 U CN206128445 U CN 206128445U
Authority
CN
China
Prior art keywords
post
plug hole
pillar
floor
prefabrication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621187313.3U
Other languages
Chinese (zh)
Inventor
李聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621187313.3U priority Critical patent/CN206128445U/en
Application granted granted Critical
Publication of CN206128445U publication Critical patent/CN206128445U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a reserve solid post of prefabrication of plug hole, it is by the concrete post that the prefabrication becomes with the reinforcing bar, if the reinforcing bar in the outside is stretched out futilely at the post both ends, the post bottom is equipped with the taper cavity, communicates the plug hole on the cavity. During the installation, can utilize the overhanging steel bar connection of reinforcing bar coupler between with the post fixed, erect the post mould in the upper portion and the lower part of post, pass through the plug hole in the post lower part and pour into a mould the post to set up the floor in post top, water the position of being connected of full post and floor in the floor top, make whole of post and floor formation. The utility model discloses reserve solid post of prefabrication of plug hole, the sum of distribution of post reinforcing bar is connected can directly adopt the existing building technical specification, very big improvement assembly type structure's quality.

Description

A kind of prefabricated solid post of reserved plug hole
Technical field
This utility model belongs to building field, specifically a kind of prefabricated solid post of reserved plug hole.
Background technology
Pillar for building is generally all that scene concrete and reinforcing bar are poured and made in prior art, the system of this pillar Make complicated process, construction cost height, raw materials consumption is big, waste many, engineering time length, inefficiency, serious environment pollution The shortcomings of.In addition, the cast-in-place amount of precast hollow pillar is larger, column interior can not prick diagonal stirrup, it is difficult to ensure pillar intensity.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of prefabricated solid post of reserved plug hole, existing to overcome There are complex manufacturing process, construction cost height, big raw materials consumption, many, the engineering time length of waste, the work efficiency of technology pillar Low, serious environment pollution and the cast-in-place amount of precast hollow pillar are larger, and column interior can not prick diagonal stirrup, it is difficult to ensure post The problems such as sub- intensity.
This utility model solves the technical scheme that its technical problem adopted:A kind of reserved plug hole it is prefabricated solid Post, it is the pillar by made by concrete and steel bar preassembling, and pillar two ends are provided with some reinforcing bars for stretching out outside, and bottom of the pillar is provided with Taper cavity, connects plug hole on cavity.During installation, it is possible to use rebar connector is solid by the protruding bar connection between pillar It is fixed, pillar mould is set up in the upper and lower of pillar, pillar, and the frame above pillar are poured into a mould by plug hole in pillar bottom If floor, the connecting portion of full pillar and floor is poured above floor, make pillar and floor form an entirety.
The prefabricated solid post of above-mentioned reserved plug hole, bar construction presses existing building technical specification point in the cylinder Cloth, it is ensured that the quality of assembled architecture.
The prefabricated solid post of above-mentioned reserved plug hole, the reinforcing bar that outside is stretched out at the pillar two ends is different in size, described Mutually stagger end reinforced position.
Using the prefabricated solid post of the reserved plug hole of this utility model, the connection of pillar reinforcing bar can be connected using existing building Connection technology standard operation, that is, ensure that the bond strength of assembly node, greatly improve the quality of assembled architecture.With it is prefabricated Hollow pillar is compared, and cast-in-place amount is little, and column interior can prick diagonal stirrup, it is ensured that pillar intensity.Compared to the prior art, have Manufacturing process is simple, raw materials consumption is few, the engineering time is short, high working efficiency, the advantages of be conducive to the protection of environment.
Description of the drawings
Fig. 1 is the agent structure schematic diagram of the prefabricated solid post of the reserved plug hole of this utility model.
Fig. 2 is Fig. 1 elevational schematic views.
In figure:1-protruding bar
2-cylinder
3-plug hole
4-conical cavity
Specific embodiment
The structure of the prefabricated solid post of the reserved plug hole of this utility model is further described below in conjunction with the accompanying drawings:
As depicted in figs. 1 and 2, the prefabricated solid post of the reserved plug hole of this utility model is prefabricated into by concrete and reinforcing bar Pillar, including cylinder 2, pillar two ends stretch out outside protruding bar 1, bottom of the pillar taper cavity 4 and cavity on connect Logical plug hole 3.
As depicted in figs. 1 and 2, the prefabricated solid post of the reserved plug hole of this utility model be by concrete and reinforcing bar it is prefabricated and Into the reinforcing bar in cylinder 2 extends to form protruding bar 1 to pillar two ends, and protruding bar 1 is different in size, end reinforced position phase Mutually stagger.The bottom of cylinder 2 is provided with taper cavity 4 and the coconnected plug hole 3 of cavity.During installation, it is possible to use bar connecting Part is connected the protruding bar 1 between pillar, and in the upper and lower of pillar pillar mould is set up, and passes through in pillar bottom Plug hole 3 pours into a mould pillar, and floor is set up above pillar, and the connecting portion of full pillar and floor is poured above floor, makes post Son and floor form an entirety.After cast-in-place concrete setting, pillar mould is pulled down.
The prefabricated solid post of the reserved plug hole of this utility model, the conical cavity that bottom of the pillar is arranged, in cast concrete When be conducive to the discharge of gas, enable concrete to be full of whole pillar, it is ensured that the quality of pillar after cast.

Claims (3)

1. a kind of prefabricated solid post of reserved plug hole, it is characterised in that it is the pillar by made by concrete and steel bar preassembling, post Sub- two ends are provided with some reinforcing bars for stretching out outside, and bottom of the pillar is provided with taper cavity, plug hole is connected on cavity.
2. the prefabricated solid post of reserved plug hole according to claim 1, it is characterised in that bar construction in the cylinder It is distributed by existing building technical specification.
3. the prefabricated solid post of reserved plug hole according to claim 1, it is characterised in that stretch out outer in the pillar two ends The reinforcing bar of side is different in size, and end reinforced position is mutually staggered.
CN201621187313.3U 2016-11-04 2016-11-04 Reserve solid post of prefabrication of plug hole Expired - Fee Related CN206128445U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621187313.3U CN206128445U (en) 2016-11-04 2016-11-04 Reserve solid post of prefabrication of plug hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621187313.3U CN206128445U (en) 2016-11-04 2016-11-04 Reserve solid post of prefabrication of plug hole

Publications (1)

Publication Number Publication Date
CN206128445U true CN206128445U (en) 2017-04-26

Family

ID=58577789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621187313.3U Expired - Fee Related CN206128445U (en) 2016-11-04 2016-11-04 Reserve solid post of prefabrication of plug hole

Country Status (1)

Country Link
CN (1) CN206128445U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252619A (en) * 2017-07-14 2019-01-22 李聪 A kind of open tubular column and its construction method with top pillar

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252619A (en) * 2017-07-14 2019-01-22 李聪 A kind of open tubular column and its construction method with top pillar

Similar Documents

Publication Publication Date Title
CN103758291B (en) A kind of shearing enhancement mode half grout sleeve
CN207003479U (en) A kind of cast-in-place city integrated piping lane entirety formwork system
CN206267422U (en) A kind of assembly concrete superposed column
CN108678218A (en) Assembly concrete shear wall and its method of construction based on multipurpose thin-wall steel tube
CN209369031U (en) A kind of assembled steel reinforced concrete frame node attachment device
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN206128445U (en) Reserve solid post of prefabrication of plug hole
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN109537775A (en) The method for preparing assembly concrete shear wall using local corrugated thin-wall steel pipe
CN105735470A (en) Precast concrete frame system using high-performance materials differentially
CN103866866B (en) Super High Core Walls Structure and housing water node after setting a roof beam in place
CN206784661U (en) The steel plate concrete combined shear wall of steel plate built in the middle part of the outsourcing of end
CN206048468U (en) A kind of horizontal piping lane mould
CN205591349U (en) Strong prestressing tendons's precast concrete beam post node in adoption
CN207647031U (en) A kind of reinforced column shaft segment structure for building industrialization
CN105625571B (en) The precast concrete bean column node of strength prestressed muscle in a kind of use
CN202850017U (en) Modified type prestress high-strength concrete hollow square pile
CN206233359U (en) A kind of assembled architecture reinforced concrete member
CN103243691A (en) Prefabricated steel formwork for gallery top arch of dam absorption basin
CN205712471U (en) A kind of prefabricated building structure post
CN204225360U (en) A kind of prefabricated post and the syndeton with precast beam
CN210086647U (en) Composite concrete superposed beam
CN209179203U (en) Column and basic connection component and frame structure system
CN209244001U (en) A kind of precast shear wall
CN103184781A (en) Pre-stress confined concrete member and manufacturing method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20191104