CN206126856U - Graphite alkene calender - Google Patents

Graphite alkene calender Download PDF

Info

Publication number
CN206126856U
CN206126856U CN201621048677.3U CN201621048677U CN206126856U CN 206126856 U CN206126856 U CN 206126856U CN 201621048677 U CN201621048677 U CN 201621048677U CN 206126856 U CN206126856 U CN 206126856U
Authority
CN
China
Prior art keywords
roller group
pressure roller
compression roller
finished product
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621048677.3U
Other languages
Chinese (zh)
Inventor
张海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621048677.3U priority Critical patent/CN206126856U/en
Application granted granted Critical
Publication of CN206126856U publication Critical patent/CN206126856U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)
  • Carbon And Carbon Compounds (AREA)

Abstract

The utility model relates to a graphite alkene processing equipment, especially graphite alkene calender, it includes that material book, strain roll, carry over pinch rolls, first compression roller group, second compression roller group, third compression roller group, first finished product book, second finished product roll up and third finished product book, the material is rolled up and is installed at the frame left end through the body frame, the strain roll is installed on the frame of right -hand member is rolled up to the material through the movable support that lives, still install carry over pinch rolls, first compression roller group, second compression roller group, third compression roller group and third finished product book in proper order through the support in the frame of strain roll right -hand member, frame below between first compression roller group and the second compression roller group is provided with first material book through the support, frame below between second compression roller group and the third compression roller group is provided with second material book through the support. Diamond compression roller through the rigid mounting can prevent effectively that compression roller itself is out of shape the product quality problem of bringing, does the cooperation of rolling up through material book, compression roller group and finished product in addition realize 1 3 the production of layer graphite alkene.

Description

Graphene calender
Technical field
This utility model is related to a kind of Graphene process equipment, especially Graphene calender.
Background technology
Graphene calender is a kind of equipment for grapheme material to be rolled into product desired thickness.Existing calendering Machine can only typically provide a kind of product of thickness specification.In monolayer, the switching of double-deck or even multi-layered product, changing machine is needed Device.Increased enterprise's production capacity.
The content of the invention
For the deficiencies in the prior art, this utility model provides a kind of Graphene calender for producing multiple product.
The technical solution of the utility model is:
Graphene calender, it is characterised in that:It includes material volume, strain roll, carry-over pinch rolls, the first pressure roller group, the second pressure Roller group, the 3rd pressure roller group, the first finished product volume, the second finished product volume and the 3rd finished product volume, the material volume are arranged on machine by body frame Frame left end, the strain roll are arranged on material by travel(l)ing rest and roll up in the frame of right-hand member, in the frame of the strain roll right-hand member Carry-over pinch rolls, the first pressure roller group, the second pressure roller group, the 3rd pressure roller group and the 3rd finished product volume is sequentially installed with by support also;
First material volume is provided with by support below frame between the first pressure roller group and the second pressure roller group, it is described Second material volume is provided with by support below frame between second pressure roller group and the 3rd pressure roller group.
The pressure roller of the pressure roller group adopts diamond pressure roller.As the calendering thickness of Graphene calendering is molecular level, therefore only Can be using its indeformable diamond pressure roller (diamond pressure roller) of rigidity.
The calendering state gap of the first pressure roller group is 762pm, produces three layer graphenes;The second pressure roller group calendering State gap is 522pm, produces bilayer graphene;The calendering state gap of the 3rd pressure roller group is 182pm, produces monolayer stone Black alkene.
The first finished product volume, the second finished product volume and the 3rd finished product volume are equipped with corresponding unloading manipulator, to improve work Industry safety and efficiency.
Three road calendering procedures are respectively provided with independent circuits switch, produce three kinds of different Graphenes as required respectively and produce Product, so as to safer flexible;After in before machine, significantly position is respectively provided with three red emergency stop button (full machines of control Device) and its support circuit, it is therefore an objective to protect operating personnel safe and some other fortuitous event under use.
The beneficial effects of the utility model are:This utility model simple structure, by the diamond pressure roller energy of rigid mounting The product quality problem for effectively preventing pressure roller deformation itself from bringing;Additionally by the cooperation of material volume, pressure roller group and finished product volume, can To realize the production of 1-3 layer graphenes.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure, 1, material volume;2nd, strain roll;3rd, carry-over pinch rolls;4th, the first pressure roller group;5th, the second pressure roller group;6th, the 3rd pressure roller Group;7th, the first finished product volume;8th, the second finished product volume;9th, the 3rd finished product volume;10th, travel(l)ing rest.
Specific embodiment
Below in conjunction with the accompanying drawings specific embodiment of the present utility model is described further:
As shown in figure 1, Graphene calender, it is characterised in that:It includes material volume 1, strain roll 2, carry-over pinch rolls 3, first Pressure roller group 4, the second pressure roller group 5, the 3rd pressure roller group 6, the first finished product roll up the 7, second finished product volume 8 and the 3rd finished product volume 9, the material Volume 1 is arranged on frame left end by body frame, and the strain roll 2 is arranged on material by travel(l)ing rest 10 and rolls up in the frame of 1 right-hand member, In the frame of 2 right-hand member of the strain roll also by support be sequentially installed with carry-over pinch rolls 3, the first pressure roller group 4, the second pressure roller group 5, Three pressure roller groups 6 and the 3rd finished product volume 7;
First material volume 7 is provided with by support below frame between the first pressure roller group 4 and the second pressure roller group 5, Second material volume 8 is provided with by support below frame between the second pressure roller group 5 and the 3rd pressure roller group 6.
The pressure roller of the pressure roller group adopts diamond pressure roller.As the calendering thickness of Graphene calendering is molecular level, therefore only Can be using its indeformable diamond pressure roller (diamond pressure roller) of rigidity.
The calendering state gap of the 3rd pressure roller group 6 is 182pm, produces single-layer graphene;The second pressure roller group 5 is pressed Prolong state gap for 522pm, production bilayer graphene;The calendering state gap of the first pressure roller group 4 is 762pm, produces three Layer graphene.
First finished product rolls up the 7, second finished product volume 8 and the 3rd finished product volume 9 is equipped with corresponding unloading manipulator, to improve Operational security and efficiency.
Using method of the present utility model:
Raw materials for production are that (effect of counterdie is Graphene when facilitating calendering to roll after terminating to the volume of the ultra-thin graphite slice with counterdie Adhesion).
Produce three layer graphenes:Material volume unreel, material volume bottom discharge and coiled material behind the top of strain roll again Around the lower section of carry-over pinch rolls, the tightness for unreeling can be adjusted by adjusting elasticity support, coiled material is after the first pressure roller group Rolled up by the retracting of the first finished product.
Production bilayer graphene:Material volume unreel, material volume bottom discharge and coiled material behind the top of strain roll again Around the lower section of carry-over pinch rolls, the tightness for unreeling can be adjusted by adjusting elasticity support, coiled material through the first pressure roller group and Rolled up by the retracting of the second finished product after second pressure roller group.
Production single-layer graphene:Material volume unreel, material volume bottom discharge and coiled material behind the top of strain roll again Around the lower section of carry-over pinch rolls, the tightness for unreeling can be adjusted by adjusting elasticity support, coiled material through the first pressure roller group, Rolled up by the retracting of the 3rd finished product after two pressure roller groups and the 3rd pressure roller group.
Described in above-described embodiment and description is to illustrate principle of the present utility model and most preferred embodiment, is not being taken off On the premise of this utility model spirit and scope, this utility model also has various changes and modifications, these changes and improvements Both fall within the range of claimed this utility model.

Claims (4)

1. Graphene calender, it is characterised in that:It includes material volume, strain roll, carry-over pinch rolls, the first pressure roller group, the second pressure roller Group, the 3rd pressure roller group, the first finished product volume, the second finished product volume and the 3rd finished product volume, the material volume are arranged on frame by body frame Left end, the strain roll are arranged on material by travel(l)ing rest and roll up in the frame of right-hand member, in the frame of the strain roll right-hand member also Carry-over pinch rolls, the first pressure roller group, the second pressure roller group, the 3rd pressure roller group and the 3rd finished product volume is sequentially installed with by support;
Support is provided with first material below frame between the first pressure roller group and the second pressure roller group to roll up, described second Second material volume is provided with by support below frame between pressure roller group and the 3rd pressure roller group.
2. Graphene calender according to claim 1, it is characterised in that:The pressure roller of the pressure roller group adopts diamond pressure Roller.
3. Graphene calender according to claim 2, it is characterised in that:The calendering state gap of the first pressure roller group For 762pm;The second pressure roller group calendering state gap is 522pm;The calendering state gap of the 3rd pressure roller group is 182pm。
4. Graphene calender according to claim 3, it is characterised in that:First finished product volume, the second finished product volume and 3rd finished product volume is equipped with corresponding unloading manipulator.
CN201621048677.3U 2016-09-12 2016-09-12 Graphite alkene calender Expired - Fee Related CN206126856U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621048677.3U CN206126856U (en) 2016-09-12 2016-09-12 Graphite alkene calender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621048677.3U CN206126856U (en) 2016-09-12 2016-09-12 Graphite alkene calender

Publications (1)

Publication Number Publication Date
CN206126856U true CN206126856U (en) 2017-04-26

Family

ID=58568989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621048677.3U Expired - Fee Related CN206126856U (en) 2016-09-12 2016-09-12 Graphite alkene calender

Country Status (1)

Country Link
CN (1) CN206126856U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111844841A (en) * 2020-07-20 2020-10-30 徐州吉赛飞新材料科技有限公司 Graphene heat dissipation film vacuum calendering device
CN116969449A (en) * 2023-09-22 2023-10-31 云南欣城防水科技有限公司 Graphene calendaring equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111844841A (en) * 2020-07-20 2020-10-30 徐州吉赛飞新材料科技有限公司 Graphene heat dissipation film vacuum calendering device
CN116969449A (en) * 2023-09-22 2023-10-31 云南欣城防水科技有限公司 Graphene calendaring equipment
CN116969449B (en) * 2023-09-22 2023-12-08 云南欣城防水科技有限公司 Graphene calendaring equipment

Similar Documents

Publication Publication Date Title
CN206126856U (en) Graphite alkene calender
WO2016004682A1 (en) Continuous casting machine sector section for deep pressing of continuous casting blank solidification tail end and deep pressing method for continuous casting blank solidification tail end
JP2019537230A (en) A pole strip rolling system that can extrude and stretch the current collector of the battery pole piece
CN104260261A (en) Semi-wrapped graphite membrane calendering and die cutting technological method and device
CN104690871A (en) Novel calendering distance-adjusting device
CN103058002B (en) A kind of bilayer film superposition cutting device and method
CN106865313A (en) A kind of winding machine for being provided with flattening mechanism
CN204400252U (en) A kind of Winding device for spinning
CN109366834A (en) The calendering device of the compound film production line of TPU
CN208359656U (en) A kind of package artificial graphite membrane pressure rolling equipment
CN204220620U (en) A kind of high-precision electronics Copper Foil apparatus for cold rolling
CN204674043U (en) Depressor is rolled in a kind of composite paving
CN203919930U (en) A kind of Novel film laminating machine
CN104192627A (en) Double-station center reeling unreeling device for laminating layering tape
CN203143751U (en) Tape compression winding device
CN202022602U (en) Thermoplastic polyurethane (TPU) shoe material pressurizing and coiling equipment
CN206562200U (en) Rewinding machine is peeled off in a kind of deburring
CN105436222B (en) A kind of copper strips paper tinsel closes winding apparatus
CN105944983A (en) Scraper with multiple air bags
CN206344430U (en) Multifilm flexibility pressing and forming device
CN203317844U (en) Plastic extruding and laminating device
CN203331323U (en) Rubber compression roller
CN204109328U (en) Advertising cloth all-in-one production line
CN105437573A (en) Corona machine
CN216403293U (en) Floating frame tension roller adjusting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20180912

CF01 Termination of patent right due to non-payment of annual fee