CN206125218U - Dig automatic SJH axle device of rig track soon - Google Patents

Dig automatic SJH axle device of rig track soon Download PDF

Info

Publication number
CN206125218U
CN206125218U CN201620821511.4U CN201620821511U CN206125218U CN 206125218 U CN206125218 U CN 206125218U CN 201620821511 U CN201620821511 U CN 201620821511U CN 206125218 U CN206125218 U CN 206125218U
Authority
CN
China
Prior art keywords
sjh
electric putter
electric pushrod
axle
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620821511.4U
Other languages
Chinese (zh)
Inventor
张慧斌
杨小刚
汪玉玲
魏圣华
王瑞芳
宋彦霖
吴新荣
安生亭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU CONSTRUCTION INVESTMENT EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
GANSU CONSTRUCTION INVESTMENT EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU CONSTRUCTION INVESTMENT EQUIPMENT MANUFACTURING Co Ltd filed Critical GANSU CONSTRUCTION INVESTMENT EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201620821511.4U priority Critical patent/CN206125218U/en
Application granted granted Critical
Publication of CN206125218U publication Critical patent/CN206125218U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses dig automatic SJH axle device of rig track soon, including track support, install detachable electric putter installing support and setting mobilizable electric putter on the electric putter installing support in digging the rig frame soon, the company's of setting board on track support sets up limit switch respectively in track support's company board both sides. Electric putter set up in the positive canceling axle direction in electric putter installing support one side. The utility model discloses beneficial effect: the design is novel, structural design equitable, simple operation, safe and reliable, and available automatic control system replaces artifical SJH axle when the track is flexible, solved that artifical SJH axle exists dangerous, work efficiency low, the problem of wasting time and energy.

Description

Rotary drilling rig crawler belt automatic plug pin shaft device
Technical field
This utility model is related to technical field of engineering machinery, and in particular to rotary drilling rig crawler belt automatic plug pin shaft device.
Background technology
Rotary drilling rig is a kind of construction machinery of pore-forming operation in suitable building foundation engineering.It is primarily adapted for use in sand, sticks Property the soil layer construction such as soil, slity soil, extensively should obtain in various foundation basic constructions such as bored concrete pile, diaphragm wall, strengthening of foundation With.Spiral digging machine pore-forming is to make drilling tool be rapidly reached stake position by the own walking function of rig and mast jib lubbing mechanism first, profit Lowering drill pipes being oriented to mast and hosqe bit of the bottom with valve being placed to into hole position, drill power head device is provided for drilling rod Plus-pressure is passed to drilling rod, drill bit by moment of torsion, pressue device by way of the unit head that pressurizes, and bit convolution crushes ground, and Directly it is loaded in drill bit, then by rig lifting device and telescopic drill rod proposes to unload soil outside hole by drill bit again, so follows Ring is reciprocal, constantly fetches earth, unloads soil, until getting into design hole depth.
Used as crawler type rotary drilling rig, crawler belt is one of key fitment of base plate of rotary drill rig, because rotary drilling rig is being carried out During band extension or contraction, staff is needed to get into the pin plugged under base plate of rotary drill rig for fixing two side legs Axle, there is very big danger in this.At present, all it is to get into inserted below borer chassis by staff on domestic rotary drilling rig Pull pin axle, although the number of times of plug bearing pin is not very frequently, but to get into and plug bearing pin not below operating base plate of rotary drill rig Labor intensity is only increased, and the life security to staff constitutes very big threat, and job site place ring Border is possible to very severe, and also inconvenient staff goes down to underbody, meanwhile, the jack of bearing pin is also not easy to upper, therefore, people Work plug bearing pin is not only troublesome but also loses time, also danger close.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, a kind of novel, reasonable in design of proposition, It is simple operation, safe and reliable, can be replaced manually plugging bearing pin with automatic control system when crawler belt is flexible, solve and manually plug Dangerous, inefficiency that bearing pin is present, the rotary drilling rig crawler belt automatic plug pin shaft device of the problem that wastes time and energy.
This utility model rotary drilling rig crawler belt automatic plug pin shaft device, including crawler rack, the device includes being arranged on In rotary drilling rig frame dismountable electric pushrod mounting bracket and moveable electricity is arranged in electric pushrod mounting bracket Dynamic push rod, arranges connecting plate on crawler rack, and in the connecting plate both sides of crawler rack limit switch is respectively provided with.Stretched in crawler belt Cheng Zhong, when electric pushrod position reaches the position of limit switch, then trigger switch action, so as to control electric pushrod fortune It is dynamic, insert or pull out bearing pin.
Described electric pushrod is arranged on electric pushrod mounting bracket side just to bearing pin direction.
The beneficial effect of this utility model rotary drilling rig crawler belt automatic plug pin shaft device:
1) in rotary drilling rig frame dismountable electric pushrod mounting bracket and be arranged on electric pushrod installation Moveable electric pushrod, arranges connecting plate on crawler rack on support, is respectively provided with the connecting plate both sides of crawler rack spacing Switch, in crawler belt telescopic process, when electric pushrod position reaches the position of limit switch, then trigger switch action, So as to control electric pushrod motion, insert or pull out bearing pin, relatively manually got in the past artificial plug bearing pin safety below chassis, It is time saving and energy saving, finally improve work efficiency;
2) novel, reasonable in design, simple operation, safe and reliable, when crawler belt is flexible, available automatically controlling is System replaces artificial plug bearing pin, solves dangerous, inefficiency that artificial plug bearing pin is present, and waste time and energy problem.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is use state figure of the present utility model.
In figure:1st, electric pushrod, 2, electric pushrod mounting bracket, 3, rotary drilling rig frame, 4, bearing pin, 5, crawler rack, 6th, limit switch, 7, connecting plate.
Specific embodiment
Below with reference to accompanying drawing, the utility model is described in further detail.
The specific structure of this utility model is:Including crawler rack 5, the device includes being arranged in rotary drilling rig frame 3 Electric pushrod 1 and be arranged in electric pushrod mounting bracket 2 moveable electric pushrod 1, on crawler rack 5 arrange Connecting plate 7, in the both sides of connecting plate 7 of crawler rack 5 limit switch 6 is respectively provided with.The electric pushrod 1 is arranged on electric pushrod 1 pacifies Dress support side is just to the direction of bearing pin 4.
Can drive external crawler rack 5 along the length direction displacement of track beam by extending the flexible of oil cylinder, enter to exercise it is left, Distance between right external crawler rack 5 is realized extension or is shunk, and is the break-make that electromagnetic valve is controlled by handle, then by electromagnetic valve Control crawler belt telescopic oil cylinder it is flexible realizing, therefore handle is used as the main switch of automatic plug pin shaft device, by spacing Signal of the switch 7 as the action of electric pushrod 1.During extended distance between left and right external crawler rack 5, operation handle action When, automatic plug pin shaft device obtains electric, the action of electric pushrod 1, extracts bearing pin 4, because this device is using with built-in spacing The electric pushrod 1 of switch 6, so electric pushrod 1 will be automatically stopped action after bearing pin 4 is extracted completely, while stretching to control The solenoid signal of contracting oil cylinder, makes oil cylinder start to stretch, when crawler belt expands to target location, electric pushrod mounting bracket 2 The position of limit switch 6 is just moved to, while triggering the action of limit switch 6, flexible oil is controlled when 6 action of limit switch The electromagnetic valve and electric pushrod 1 of cylinder obtains signal simultaneously, and electromagnetism valve events make oil cylinder stop motion, the action of electric pushrod 1, by pin Axle 4 is inserted, same because electric pushrod has built-in limit switch 6, and after bearing pin 4 is fully-inserted action will be automatically stopped.Left, It is identical with the operating principle during extension when distance between right external crawler rack 5 is shunk.

Claims (1)

1. rotary drilling rig crawler belt automatic plug pin shaft device, it is characterised in that:Including crawler rack, installed in rotary drilling rig frame In dismountable electric pushrod mounting bracket and be arranged in electric pushrod mounting bracket moveable electric pushrod, it is described Crawler rack on connecting plate is set, be respectively provided with limit switch in the connecting plate both sides of crawler rack.
CN201620821511.4U 2016-08-01 2016-08-01 Dig automatic SJH axle device of rig track soon Expired - Fee Related CN206125218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620821511.4U CN206125218U (en) 2016-08-01 2016-08-01 Dig automatic SJH axle device of rig track soon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620821511.4U CN206125218U (en) 2016-08-01 2016-08-01 Dig automatic SJH axle device of rig track soon

Publications (1)

Publication Number Publication Date
CN206125218U true CN206125218U (en) 2017-04-26

Family

ID=58563290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620821511.4U Expired - Fee Related CN206125218U (en) 2016-08-01 2016-08-01 Dig automatic SJH axle device of rig track soon

Country Status (1)

Country Link
CN (1) CN206125218U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107855378A (en) * 2017-12-21 2018-03-30 河南省林晓科技开发有限公司 A kind of coalignment for being used for crawler belt in automatic production line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107855378A (en) * 2017-12-21 2018-03-30 河南省林晓科技开发有限公司 A kind of coalignment for being used for crawler belt in automatic production line
CN107855378B (en) * 2017-12-21 2024-01-09 无锡康博数智科技有限公司 Straightening device for crawler belt in automatic production line

Similar Documents

Publication Publication Date Title
CN103758453B (en) Intelligent microdrill
CN201924360U (en) Multifunctional hydraulic static pile press
CN102628336B (en) Construction method of batter pile construction drilling machine
CN206903582U (en) It may move double-arm rock bolting jumbo
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN203584444U (en) Efficient and simple roofbolter
WO2016033707A1 (en) Walker-type traveling rotary drilling rig
CN206125218U (en) Dig automatic SJH axle device of rig track soon
CN210530738U (en) Pile system is planted in drilling in groups
CN106593398B (en) Press-in type isolation well construction method
CN205297310U (en) Automatic rig is dug soon in gyration
CN110924861A (en) Walking type omnibearing rotary hydraulic pile foundation drilling machine
CN204343771U (en) A kind of convenient line bar
CN211173964U (en) Pile machine suitable for drilling in rock block soil
CN204827213U (en) Double dynamical head digs rig soon
CN206437814U (en) A kind of drawstring traction lowering or hoisting gear of Spiral digging machine
CN102913121B (en) Flexible swing pipe vibrator boring machine
CN214836096U (en) Deep stirring pile machine suitable for dense sand layer environment
CN215441884U (en) Drilling and hammering integrated machine
CN214836097U (en) Multifunctional pile extruding machine for shallow and deep rockfill foundation
CN203742442U (en) Walking type multifunctional combination drilling machine
CN210530745U (en) Combined drilling bottom-expanding pile-planting system
CN109371978B (en) Civil engineering foundation ditch is safe supporting construction for support
CN202531026U (en) Drilling machine for construction of inclined pile
CN202755905U (en) Automatic folding device used in pylon

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20170801

CF01 Termination of patent right due to non-payment of annual fee