CN206110680U - Concrete feeding pump line securing device - Google Patents

Concrete feeding pump line securing device Download PDF

Info

Publication number
CN206110680U
CN206110680U CN201621107420.0U CN201621107420U CN206110680U CN 206110680 U CN206110680 U CN 206110680U CN 201621107420 U CN201621107420 U CN 201621107420U CN 206110680 U CN206110680 U CN 206110680U
Authority
CN
China
Prior art keywords
floor
pump line
lower floor
pull ring
securing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621107420.0U
Other languages
Chinese (zh)
Inventor
谭应松
龙晓玲
张顺东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING GIANT CAN CONSTRUCTION GROUP CONSTRUCTION AND INSTALLATION ENGINEERING Co Ltd
Original Assignee
CHONGQING GIANT CAN CONSTRUCTION GROUP CONSTRUCTION AND INSTALLATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING GIANT CAN CONSTRUCTION GROUP CONSTRUCTION AND INSTALLATION ENGINEERING Co Ltd filed Critical CHONGQING GIANT CAN CONSTRUCTION GROUP CONSTRUCTION AND INSTALLATION ENGINEERING Co Ltd
Priority to CN201621107420.0U priority Critical patent/CN206110680U/en
Application granted granted Critical
Publication of CN206110680U publication Critical patent/CN206110680U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a concrete feeding pump line securing device, pump line pass lower floor's floor and upper floor perpendicularly, overlap the staple bolt on the pump line lies in the pipe shaft between upper floor and the lower floor's floor admittedly, are equipped with the three first pull ring of pressing circumference evenly distributed on this staple bolt set up the three second pull ring of pressing circumference evenly distributed on lower floor's floor, the centre of a circle of three second pull ring place circumference lies in the central line of pump line, and the diameter of three second pull ring place circumference is lighter than the distance between staple bolt and the lower floor's floor, three second pull ring and three first pull ring one -to -one, first pull ring passes through wire rope and the second pull ring that corresponds is connected, and the contained angle more than or equal to 45 between wire rope and the lower floor's floor. The utility model relates to a rationally, simple structure, implementation be easy, the installation effectiveness is high, can control the shaking amplitude in the pump line use effectively to can reduce because of the pump line rocks the damage that causes the floor, thereby protect floor finished product quality.

Description

A kind of concrete delivery pump pipe securing device
Technical field
This utility model belongs to technical field of building construction, and specifically, more particularly to a kind of concrete delivery pump pipe is steady It is fixedly mounted with and puts.
Background technology
In construction concreting process, particularly in high-rise concreting, it is necessary to added using delivery pump Concrete is delivered to and pours position by pressure by delivery pump pipe, and the installation of pump line vertical direction and fixation are typically employed on top board and reserve The circular opening of 300 × 300mm squares hole or diameter 200-300mm, pump line along each construction floor spreading upwards, pump line with Gap between floorboard is fastened using the timber wedge back of the body, and sets up well cabinet frame to lock pump line in each floor.Because pump line is adopted Rigidly fix, in use shaking amplitude is larger, inevitably molding floor is caused to damage.
Utility model content
In view of the drawbacks described above of prior art, technical problem to be solved in the utility model is to provide a kind of concrete Delivery pump pipe securing device.
Technical solutions of the utility model are as follows:A kind of concrete delivery pump pipe securing device, including upper strata floor, lower floor Plate and pump line, the pump line passes perpendicularly through lower floor's floor and upper strata floor, it is characterised in that:Upper strata floor is located in the pump line Anchor ear is covered admittedly with the pipe shaft between lower floor floor, and the anchor ear is provided with three circumferentially equally distributed first draw rings, in institute State and arrange on lower floor's floor three circumferentially equally distributed second draw rings, the center of circle of three the second draw ring place circumference is located at pump On the centrage of pipe, the diameter of three the second draw ring place circumference less than the distance between anchor ear and lower floor's floor, three second Draw ring and three the first draw rings are corresponded, and first draw ring is connected by steel wire rope with corresponding second draw ring, and steel wire Angle between rope and lower floor's floor is more than or equal to 45 °.
The fixed form of pump line is changed to flexible fixation by rigidly fixing by this utility model, is circumferentially uniformly divided using three The steel wire rope of cloth tenses pump line, on the one hand simple to operate, quick, and installation effectiveness is high;On the other hand, can efficiently control pump line makes Shaking amplitude with during, it is also possible to reduce because pump line rocks the damage caused to floor, so as to protect floor into quality Amount.
In order to strengthen the fixing that anchor ear is installed on pump line, and prevent pump line from damaging, in the anchor ear and pump line Between be provided with high-tension rubber ring.
In order to simplify structure, facilitate processing and fabricating and assembling, reduce production cost, the anchor ear is hinged by two Semi-circular sheet steel is constituted, and the free-end of the two semi-circular sheet steels is bolted to connection.
First draw ring and the second draw ring are " Ω " shape, and are formed by reinforcing bar bending.Above structure draw ring moulding Simply, make easy, intensity is good, be not susceptible to damage.
Preferably, the upper and lower ends of the steel wire rope are each passed through the first draw ring and the second draw ring, fastened by rope OK a karaoke club It is fixed.
Preferably, threading sleeve pipe is provided with outside the steel wire rope, and the outer surface of the threading sleeve pipe is provided with The safe enamelled coating of the alternate setting of two kinds of colors.
Beneficial effect:This utility model is reasonable in design, simple structure, implement easy, and installation effectiveness is high, can efficiently control Shaking amplitude during pump line use, and can reducing because pump line rocks the damage caused to floor, so as to protect floor into Quality.
Description of the drawings
Fig. 1 is the structural representation of the specific embodiment of this utility model one.
Fig. 2 is the open mode figure of anchor ear.
Fig. 3 is the closure state figure of anchor ear.
Fig. 4 is holding state diagram of the anchor ear on pump line.
Specific embodiment
With reference to the accompanying drawings and examples the utility model is described in further detail:
As shown in Figure 1, Figure 2, Figure 3, Figure 4, upper strata floor 1 and lower floor's floor 2 are parallel to each other, and pump line 3 passes perpendicularly through lower floor Floor 2 and upper strata floor 1.It is located on the pipe shaft between upper strata floor 1 and lower floor's floor 2 in pump line 3 and is set with anchor ear 4, the anchor ear 4 It is made up of two semi-circular sheet steels being hinged, the free-end of the two semi-circular sheet steels is bolted to connection, so Anchor ear 4 is held tightly on pump line 3, and high-tension rubber ring is provided between anchor ear 4 and pump line 3.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, anchor ear 4 is provided with three circumferentially equally distributed first draw rings 5, and first draws Ring 5 is preferably " Ω " shape, and is formed by reinforcing bar bending.Pre-buried three circumferentially equally distributed second on lower floor's floor 2 Draw ring 6, the center of circle of three place circumference of the second draw ring 6 is located on the centrage of pump line 3, three place circumference of the second draw ring 6 Diameter is less than the distance between anchor ear 4 and lower floor's floor 2.Second draw ring 6 preferably also " Ω " shape, is formed using reinforcing bar bending. Three the second draw rings 6 are corresponded with three the first draw rings 5, and the first draw ring 5 is connected by steel wire rope 7 with corresponding second draw ring 6 Connect, and the angle between steel wire rope 7 and lower floor's floor 2 is more than or equal to 45 °.Preferably, the upper and lower ends of steel wire rope 7 are worn respectively The first draw ring 5 and the second draw ring 6 are crossed, is fastened by multiple rope OK a karaoke clubs.The outside of steel wire rope 7 is provided with threading sleeve pipe, and wears The outer surface of thread casing is provided with the safe enamelled coating that reddish yellow is met each other.
According to field experience, closer to operation layer, in concreting, pump line rocks more severe, therefore this utility model Installed for per layer preferably on the top of Proximity operation layer, if necessary can one layer install 2-3;Lower floor can interlayer pacified If.
Preferred embodiment of the present utility model described in detail above.It should be appreciated that the ordinary skill people of this area Member just can make many modifications and variations without the need for creative work according to design of the present utility model.Therefore, all this technology necks Technical staff passes through on the basis of existing technology logical analyses, reasoning or limited reality according to design of the present utility model in domain Available technical scheme is tested, all should be in the protection domain being defined in the patent claims.

Claims (6)

1. a kind of concrete delivery pump pipe securing device, including upper strata floor (1), lower floor's floor (2) and pump line (3), the pump Pipe (3) passes perpendicularly through lower floor's floor (2) and upper strata floor (1), it is characterised in that:In the pump line (3) positioned at upper strata floor (1) With cover anchor ear (4) on the pipe shaft between lower floor's floor (2) admittedly, the anchor ear (4) is provided with three circumferentially equally distributed first Draw ring (5), arranges three circumferentially equally distributed second draw rings (6), three the second draw rings on lower floor's floor (2) (6) center of circle of place circumference is located on the centrage of pump line (3), and the diameter of three the second draw ring (6) place circumference is less than anchor ear (4) the distance between with lower floor's floor (2), three the second draw rings (6) correspond with three the first draw rings (5), and described first Draw ring (5) is connected by steel wire rope (7) with corresponding second draw ring (6), and the folder between steel wire rope (7) and lower floor's floor (2) Angle is more than or equal to 45 °.
2. concrete delivery pump pipe securing device as claimed in claim 1, it is characterised in that:In the anchor ear (4) and pump line (3) high-tension rubber ring is provided between.
3. concrete delivery pump pipe securing device as claimed in claim 1 or 2, it is characterised in that:The anchor ear (4) is by two The semi-circular sheet steel being hinged is constituted, and the free-end of the two semi-circular sheet steels is bolted to connection.
4. concrete delivery pump pipe securing device as claimed in claim 3, it is characterised in that:First draw ring (5) and Two draw rings (6) are " Ω " shape, and are formed by reinforcing bar bending.
5. the concrete delivery pump pipe securing device as described in claim 1 or 2 or 4, it is characterised in that:The steel wire rope (7) Upper and lower ends be each passed through the first draw ring (5) and the second draw ring (6), fastened by rope OK a karaoke club.
6. concrete delivery pump pipe securing device as claimed in claim 5, it is characterised in that:In the outer of the steel wire rope (7) Face is provided with threading sleeve pipe, and the outer surface of the threading sleeve pipe is provided with the safe enamelled coating of the alternate setting of two kinds of colors.
CN201621107420.0U 2016-10-09 2016-10-09 Concrete feeding pump line securing device Active CN206110680U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621107420.0U CN206110680U (en) 2016-10-09 2016-10-09 Concrete feeding pump line securing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621107420.0U CN206110680U (en) 2016-10-09 2016-10-09 Concrete feeding pump line securing device

Publications (1)

Publication Number Publication Date
CN206110680U true CN206110680U (en) 2017-04-19

Family

ID=58528940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621107420.0U Active CN206110680U (en) 2016-10-09 2016-10-09 Concrete feeding pump line securing device

Country Status (1)

Country Link
CN (1) CN206110680U (en)

Similar Documents

Publication Publication Date Title
CN206110680U (en) Concrete feeding pump line securing device
CN203783171U (en) Assembled-type overhanging protective canopy for high-rise building construction
CN206554511U (en) A kind of improved water-stop opposite-pulling screw rod device
CN206318594U (en) Handrail in a kind of lift car
CN204001791U (en) A kind of built with ribbed bricks wall prefabricated construction lifting binding apparatus
CN206988672U (en) Ground pump pipe union bracing means and ruggedized construction
CN206335073U (en) A kind of reinforcing bar renovates straightener
CN208981753U (en) Key slot type scaffold is fixedly connected device
CN206008584U (en) Flat mouth blender
CN208748838U (en) Cantilever steel girder anchor structure
CN108086696A (en) A kind of building bar means of transport
CN208650551U (en) A kind of construction and decoration floor tile provision for disengagement
CN107587723A (en) Top plate spool protection device and its construction method
CN205663298U (en) Security rail
CN106081917A (en) Tower crane OPS with water tank
CN207437076U (en) A kind of support template for small-sized vertical shaft concrete support
CN205296358U (en) Floor drain protection device
CN214828340U (en) Pipeline hoisting mould
CN205976451U (en) Scaffold connecting device for building engineering
CN206053190U (en) A kind of special-shaped tetragon stone material post
CN205522764U (en) Mould stone molding back up coat
CN206220501U (en) A kind of floor slab preformed hole device
CN205444959U (en) Safety protection device for building
CN204850408U (en) Base with adjustable internal shaft connection
CN209622213U (en) A kind of gas pipeline roof bushing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant