CN206110649U - A template for concreting construction - Google Patents
A template for concreting construction Download PDFInfo
- Publication number
- CN206110649U CN206110649U CN201621029741.3U CN201621029741U CN206110649U CN 206110649 U CN206110649 U CN 206110649U CN 201621029741 U CN201621029741 U CN 201621029741U CN 206110649 U CN206110649 U CN 206110649U
- Authority
- CN
- China
- Prior art keywords
- longeron
- threaded rod
- template
- housing
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A template for concreting construction is including frame, longeron, bottom plate, the frame is the framework that adopts metal material to make, penetrating space in the bottom plate closing cap frame and with frame fixed connection, still include the threaded rod and with threaded rod threaded connection's nut, it has a plurality of threaded rods to distribute on the bottom plate, threaded rod one end and bottom plate fixed connection, the threaded rod other end wear to penetrate behind the longeron with nut and threaded connection, screw up the nut, bottom plate and longeron looks fastening connection.
Description
Technical field
This utility model is related to the template for pouring construction.
Background technology
The metal form of pouring construction is presently used for, usual employing mode is combined into one structure, due to using welding knot
Structure, therefore recycling cannot be realized;Because of change in size, need to do original template cutting process when reusing, then weld group
Dress;Therefore there is the problems such as assembling is loaded down with trivial details, and assembly cost is high in it, cannot generally realize recycling, there is wasting of resources phenomenon.
Utility model content
It is to solve the problems, such as prior art that the purpose of this utility model is, there is provided one kind assembling precisely efficiently, can
The template for pouring construction recycled.
The technical solution adopted in the utility model is as follows:For the template of pouring construction, including housing, longeron, base plate;Institute
It is that, using framework made by metal material, base plate covers the open space of outer inframe and is fixedly connected with housing, and it is special to state housing
Levying is:Also include threaded rod and the nut being threadedly coupled with threaded rod, some threaded rods, threaded rod one are distributed with the base plate
End is fixedly connected with base plate, and the threaded rod other end is worn to penetrate after longeron and is connected with nut thread;Nut is tightened, base plate is mutually tight with longeron
It is solidly connected.
Further, the housing is provided with and is available for threaded rod to wear the through hole penetrated, will using nut after threaded rod penetrated through via holes
Housing is fastenedly connected with base plate.
Further, the longeron includes two channel-section steel, the contiguous blocks for arranging back-to-back;Contiguous block is located at two back-to-back settings
Between channel-section steel, contiguous block is fixedly connected with two channel-section steels;Have between two channel-section steels for arranging back-to-back between being available for threaded rod to wear penetrating
Gap.
Further, the metal material for making housing is angle steel.
Further, the housing is using rectangular frame made by some angle steel, using fastening between angle steel and angle steel
Part connects.
Further, also including crossbeam, the crossbeam is C-shaped channel steel, and crossbeam is provided with and is available for threaded rod to wear the perforate penetrated, horizontal
Erection above longeron, wear to penetrate and be connected with nut thread after longeron, crossbeam by threaded rod;Tighten nut, base plate and longeron, crossbeam
It is fastenedly connected.
Further, the two ends of the longeron contradict housing.
Further, the two ends of the crossbeam contradict housing.
Further, also including pad, pad is located on two channel-section steels for arranging back-to-back, and threaded rod is worn and penetrates longeron, tightens spiral shell
Mother, base plate is fastenedly connected with longeron.
This utility model is had the advantage that compared to existing technology:This utility model forms mould by the combination of each part
Plate, the template has size adjustable, is capable of achieving to be iteratively repeated the advantage for utilizing, and overall high by force intensity.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the cross section structure diagram of A-A shown in Fig. 1.
Fig. 3 is the partial enlargement structural representation in B portions shown in Fig. 2.
Specific embodiment
This utility model is described in detail with reference to specific embodiment.Following examples will be helpful to this area
Technical staff further understands this utility model, but does not limit this utility model in any form.It should be pointed out that to ability
For the those of ordinary skill in domain, without departing from the concept of the premise utility, some deformations and improvement can also be made.
These belong to protection domain of the present utility model.
Embodiment 1
As shown in Figure 1 to Figure 3, the template of pouring construction, including housing 1, longeron 2, base plate 3 are used for described in the present embodiment;
The housing 1 is that, using framework made by metal material, the open space in the capping housing 1 of base plate 3 simultaneously fixes company with housing 1
Connect, additionally including threaded rod 4 and the nut 5 being threadedly coupled with threaded rod 4, some threaded rods 4 be distributed with the base plate 3,
The one end of threaded rod 4 is fixedly connected with base plate 3, and the other end of threaded rod 4 is worn to penetrate after longeron 2 and is threadedly coupled with nut 5;Nut 5 is tightened,
Base plate 3 is fastened and connected with longeron 2.Shown housing 1, longeron 2, the three of base plate 3 are combined into one by way of removing and installing
Structure, can reuse according to the change of size.
Housing 1 described in the present embodiment is provided with and is available for threaded rod 4 to wear the through hole 10 penetrated, and adopts after the penetrated through via holes 10 of threaded rod 4
Housing 1 is fastenedly connected with base plate 3 with nut 5.
Longeron 2 described in the present embodiment includes two channel-section steel 21, the contiguous blocks 22 for arranging back-to-back;Contiguous block 22 is leaned against positioned at two
Between the channel-section steel 21 that the back of the body is arranged, contiguous block 22 is fixedly connected with two channel-section steels 21;Having between two channel-section steels 21 for arranging back-to-back can
The gap penetrated is worn for threaded rod 4.Additionally include pad 7, pad 7 is located on two channel-section steels 21 for arranging back-to-back, and threaded rod 4 is worn
Longeron is penetrated, nut 5 is tightened, base plate 5 is fastenedly connected with longeron 2.The advantages of longeron 2 has intensity height, install convenient.
The metal material that housing 1 is made described in the present embodiment is angle steel.
Housing 1 described in the present embodiment is using rectangular frame made by some angle steel, using tight between angle steel and angle steel
Firmware connects.
Also include crossbeam 6 described in the present embodiment, the crossbeam 6 is C-shaped channel steel, and crossbeam 6 is provided with and is available for threaded rod 4 to wear penetrating
Perforate, crossbeam 6 is erected at the top of longeron 2, and threaded rod 4 is worn to penetrate and is threadedly coupled with nut 5 after longeron 2, crossbeam 6;Tighten nut
5, base plate 3 is fastenedly connected with longeron 2, crossbeam 6.
The two ends of longeron 2 described in the present embodiment contradict housing 1.
The two ends of crossbeam 6 described in the present embodiment contradict housing 1.
Specific embodiment of the utility model is described above.It is to be appreciated that this utility model not office
It is limited to above-mentioned particular implementation, those skilled in the art can within the scope of the claims make various modifications or modification,
This has no effect on flesh and blood of the present utility model.
Claims (9)
1. the template of pouring construction, including housing, longeron, base plate are used for;The housing is to adopt framework made by metal material,
Base plate covers the open space of outer inframe and is fixedly connected with housing, it is characterized in that:Also include threaded rod and with threaded rod screw thread
The nut of connection, is distributed with some threaded rods on the base plate, threaded rod one end is fixedly connected with base plate, and the threaded rod other end is worn
Penetrate after longeron and be connected with nut thread;Nut is tightened, base plate is fastened and connected with longeron.
2. the template for being used for pouring construction as claimed in claim 1, is characterized in that:The housing is provided with and is available for threaded rod to wear
The through hole penetrated, is fastenedly connected housing with base plate using nut after threaded rod penetrated through via holes.
3. the template for being used for pouring construction as claimed in claim 1 or 2, is characterized in that:The longeron sets back-to-back including two
Channel-section steel, the contiguous block put;Contiguous block is located between two channel-section steels for arranging back-to-back, and contiguous block is fixedly connected with two channel-section steels;Lean against
Having between two channel-section steels that the back of the body is arranged is available for threaded rod to wear the gap penetrated.
4. the template for being used for pouring construction as claimed in claim 1, is characterized in that:The metal material for making housing is angle
Steel.
5. the template for being used for pouring construction as claimed in claim 4, is characterized in that:The housing is using some angle steel systems
Into rectangular frame, between angle steel and angle steel using securing member connect.
6. the template for being used for pouring construction as claimed in claim 3, is characterized in that:Also include crossbeam, the crossbeam is C-shaped channel
Steel, crossbeam is provided with and is available for threaded rod to wear the perforate penetrated, beam erection above longeron, threaded rod wear penetrate after longeron, crossbeam with
Nut thread connects;Nut is tightened, base plate is fastenedly connected with longeron, crossbeam.
7. the template for being used for pouring construction as claimed in claim 3, is characterized in that:The two ends of the longeron contradict housing.
8. the template for being used for pouring construction as claimed in claim 6, is characterized in that:The two ends of the crossbeam contradict housing.
9. the template for being used for pouring construction as claimed in claim 3, is characterized in that:Also include pad, pad is located at two and leans against
On the channel-section steel that the back of the body is arranged, threaded rod is worn and penetrates longeron, tightens nut, and base plate is fastenedly connected with longeron.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621029741.3U CN206110649U (en) | 2016-08-31 | 2016-08-31 | A template for concreting construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621029741.3U CN206110649U (en) | 2016-08-31 | 2016-08-31 | A template for concreting construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206110649U true CN206110649U (en) | 2017-04-19 |
Family
ID=58519233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621029741.3U Active CN206110649U (en) | 2016-08-31 | 2016-08-31 | A template for concreting construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206110649U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763643A (en) * | 2018-12-24 | 2019-05-17 | 中建三局集团有限公司 | A kind of cavity double side molding plate reinforcing device and its construction methods within the walls of built-in pipeline |
-
2016
- 2016-08-31 CN CN201621029741.3U patent/CN206110649U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763643A (en) * | 2018-12-24 | 2019-05-17 | 中建三局集团有限公司 | A kind of cavity double side molding plate reinforcing device and its construction methods within the walls of built-in pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204645623U (en) | Aluminium alloys wafts window template system | |
CN104153555B (en) | The detachable pre-buried fixing device of overhanging type steel beam containing horizontal fixation kit | |
CN203923914U (en) | Solely stub bent cap support | |
CN104088227A (en) | Rear pull rod | |
CN103967166A (en) | Low-yield-point steel plate shear wall with two connected edges | |
CN206110649U (en) | A template for concreting construction | |
CN107503513B (en) | Wall template split bolt constructing device and construction method | |
CN206844715U (en) | A kind of novel building ergonomic support device | |
CN204826699U (en) | Fixing device of life rope support | |
CN203247601U (en) | Tower crane assembled base | |
CN203716508U (en) | Fork lug pin type anchoring pull cable tensioning device | |
CN210855055U (en) | Convenient dismouting of standard festival platform cat ladder is put | |
CN204899030U (en) | Steel case roof beam cross slab | |
CN206928440U (en) | One kind is encorbelmented I-steel fixing device | |
CN203096731U (en) | Pre-stressed hollow square pile assembly without end plate at one end | |
CN207277389U (en) | A kind of end template structure of deformation joint | |
CN202183563U (en) | Power distribution cabinet body for ship | |
CN205804947U (en) | A kind of concrete steel | |
CN204940844U (en) | A kind of quick supporting mechanism based on standard combination template | |
CN204126086U (en) | A kind of efficient joint material curtain wall-connecting structure | |
CN204475854U (en) | Reserved opening hangs die device | |
CN204456883U (en) | A kind of prefabricated detachable discharging platform | |
CN216531197U (en) | Light and quick type photovoltaic frame easy to install | |
CN212026606U (en) | Steel structure supporting frame | |
CN203938975U (en) | A kind of connecting rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |