CN206110452U - Compact integration suspended ceiling system of quick installation - Google Patents

Compact integration suspended ceiling system of quick installation Download PDF

Info

Publication number
CN206110452U
CN206110452U CN201621119310.6U CN201621119310U CN206110452U CN 206110452 U CN206110452 U CN 206110452U CN 201621119310 U CN201621119310 U CN 201621119310U CN 206110452 U CN206110452 U CN 206110452U
Authority
CN
China
Prior art keywords
ceiling
ceiling board
board
furred
edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621119310.6U
Other languages
Chinese (zh)
Inventor
李季
曾大方
葛文金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Kaizhuang Construction Technology Co ltd
Original Assignee
Shanghai Conjoint Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Conjoint Building Technology Co Ltd filed Critical Shanghai Conjoint Building Technology Co Ltd
Priority to CN201621119310.6U priority Critical patent/CN206110452U/en
Application granted granted Critical
Publication of CN206110452U publication Critical patent/CN206110452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a compact integration suspended ceiling system of quick installation, including furred ceiling board, fossil fragments, rotation knot, cement nail, receipts strake, receipts strake base, rotation round pin, hanging fossil fragments and screw rod perpendicularly, polylith furred ceiling board splices the constitution furred ceiling, and marginal all fixed connection of furred ceiling board receive the strake, and a plurality of rotatory round pins in the receipts strake base of receipts strake card preinstallation on the wall of furred ceiling flange reason, are installed all through many fossil fragments of rotation knot fixed connection to the reverse side of furred ceiling board in the receipts strake base, sell through the rotation to compress tightly the receipts strake. This practicality has broken through the interior decoration trade unable problem that breaks through at present from material, structure, spare part, construction process, cost control, adopts plastics, steel, aluminium alloy material, promoted the product thermal -insulated, give sound insulation, the fire resistance, created brand -new compact integral structure, quick safe mounting means and brand -new construction process systemicly.

Description

A kind of compact integrated ceiling system of Fast Installation
Technical field
This utility model is related to building decoration field, the compact integrated ceiling system of specifically a kind of Fast Installation.
Background technology
Furred ceiling is the top finishing construction in architecture indoor space, is one of pith of interior decoration.Furred ceiling has dress Decorations, heat-insulated, the function of sound insulation, be also electrically, air conditioner, the hidden layer of the engineering such as communication and fire prevention, warning line equipment.
Traditional carpenter's ceiling construction can carry out at the scene it is large-area cut, batch face putty and sand flat, can produce at the scene Substantial amounts of plasterboard, timber, chip, dust, coating, paint, glue.Waste of material is big, and the various harm such as dust, abnormal smells from the patient can make Into the healthy of operator and surrounding resident.
Existing aluminum-pinch furred ceiling needs for screw rod to be fixed to ceiling, reuses various connectors by two grades of Os Draconis of one-level It is attached with screw rod, Os Draconis connect again with sheet material, take the space of a large amount of vertical heights, and amount of parts is more, mounting process Complexity, whole installation process needs operation of ascending a height, and installs heavy, slow, and operation has certain dangerous.
Wood-plastic board furred ceiling in the market is directly routed on ceiling using wood moulding integrated wall plate, and furred ceiling plate thickness is 9 to 10 millimeters, hollow flat board is shaped as, wooden Os Draconis are first ceiling mounted according to sheet edge position, spiral shell is leaned on during installation The edge and rough ground of silk fixed plate, central area cannot be fixed by screw, if connect sheet material and Os Draconis with glue can produce The aging fracture of life.Because sheet material zone line cannot connect with Os Draconis, thus can produce sagging, intensity in the middle of ceiling board it is not enough, The problem of performance difference, rough ground cannot possess fire protecting performance, affect building safety.
Utility model content
The purpose of this utility model is to provide a kind of compact integrated ceiling system of Fast Installation, above-mentioned to solve The problem proposed in background technology.
For achieving the above object, this utility model provides following technical scheme:
A kind of compact integrated ceiling system of Fast Installation, including ceiling board, Os Draconis, turn buckle, cement nail, receipts side Bar, edge closing bar pedestal, rotating dog, vertical hanging keel and screw rod, polylith ceiling board is spliced to form furred ceiling, and the edge of ceiling board is equal Edge closing bar is fixedly connected, the reverse side of ceiling board is fixedly connected many bar keels, the edge closing bar card at ceiling board edge by turn buckle In the edge closing bar pedestal pre-installed on wall, multiple rotating dogs are installed in edge closing bar pedestal, edge closing bar are compressed by rotating dog, By cement nail, either screw rod is fixedly connected in original body of wall, ceiling or structural beams the Os Draconis.
As further program of the utility model:The furred ceiling is divided into one-level furred ceiling according to mounting means and two grades are hung Top, by two grades of furred ceiling side panel connections between one-level furred ceiling and two grades of furred ceilings, and two grades of furred ceiling side panels are fixedly connected pre- peace It is mounted on the side board mount on roof.
As further program of the utility model:The width of the ceiling board is 300 to 600 millimeters, 10 millimeters of height Left and right, both sides offer respectively public bayonet socket and female bayonet, and adjacent two pieces of ceiling boards are described successively according to male and female bayonet socket order grafting Cavity is provided with the middle part of ceiling board, the back side of the ceiling board opens up a ceiling board groove every a segment distance, and ceiling board is recessed The cross sectional shape of groove is trapezoidal or T-shaped, and trapezoidal bottom comers are circular arc.
As further program of the utility model:The shape of cross section of the Os Draconis is U-shaped, and the surface of the Os Draconis is opened There are circular hole and installing hole that several are crisscross arranged, spine material adopts mild steel.
As further program of the utility model:The turn buckle is made up of the handle and contiguous block that are vertically connected with, even The shape of block and the form fit of ceiling board groove are connect, the lower section both sides of turn buckle are designed with circular arc at two.
As further program of the utility model:Mounting structure of the furred ceiling at structural beams is, positioned at structural beams 90 degree of one side of one piece of ceiling board of top bending downwards constitutes lower bending structure, the height of lower bending structure in the vertical direction For the half of structure depth of beam, by rotating latch connection hanging keel, the hanging keel passes through water at the back side of lower bending structure Mud nail is arranged in structural beams;One side of another piece of ceiling board below structural beams is folded upward at 90 degree, bends in composition Structure, upper bending structure is also the half of structural beams in the height of vertical direction, and upper bending structure and lower bending structure are using public The fit structure connection of bayonet socket and female bayonet;The cross sectional shape of hanging keel is U-shaped, and the surface of hanging keel also offers Circular hole and installing hole, one end bending of vertical hanging keel is configured to suspension hook, the furred ceiling after being installed in place on next piece of ceiling board The edge of plate groove is just inserted on suspension hook.
As further program of the utility model:The bottom of the rotating dog is provided with cross recess, and the back side of ceiling board leads to Cross the circular hole of turn buckle connection side locking plate and side locking plate is fixedly connected on into the back side of ceiling board, rotating dog can be automatically inserted into In gap between side locking plate and ceiling board, the envisaged underneath of the edge strip pedestal has connection corresponding with edge closing bar top grab Draw-in groove.
As further program of the utility model:One end of the screw rod connects Quick-connecting locking plate by two nuts The zigzag opening of top, the T-shaped plug receptacle of locking plate bottom is connected with the installing hole on Os Draconis.
As further program of the utility model:The edge closing bar includes the edge closing bar with light bar, the receipts side with light bar The side of bar is light bar chamber, and opposite side is ceiling board inserting groove, for inserting ceiling board, is inclined upwardly below light bar chamber Arrange, form the diffuse-reflectance of light for zigzag fashion above.
As further program of the utility model:Furred ceiling position corresponding with window arranges multiple pelmets, window The side panel of curtain box is used as the side panel of two grades of furred ceilings, and the top panel of pelmet is used for blocking floor, and pelmet is plugged on The bottom of pelmet suspension holdfast, the top horizontal direction of pelmet suspension holdfast and vertical direction are respectively fixed to by screw rod Body of wall and floor, then with nut check pelmet suspension holdfast and screw rod.
Compared with prior art, the beneficial effects of the utility model are:
This practicality breaches the current nothing of interior decoration industry from material, structure, parts, construction technology, cost control The problem that method breaks through, using plastics, steel, aluminum alloy materials, improves the heat-insulated of product, sound insulation, fire resistance, systematically creates Brand-new compact integrated structure, fast and safely mounting means and brand-new construction technology are made.This practicality can be adopted Streamline is produced in enormous quantities, realizes batch production, the industrialization of product.
Description of the drawings
Fig. 1 is the structural representation of one-level furred ceiling.
Fig. 2 is the Structure explosion diagram of one-level furred ceiling.
Fig. 3 is the structural representation of two grades of furred ceilings.
Fig. 4 is the Structure explosion diagram of two grades of furred ceilings.
Fig. 5 is ceiling board side structure schematic diagram.
Fig. 6 is a kind of structural representation of ceiling board groove.
Fig. 7 is another kind of structural representation of ceiling board groove.
Fig. 8 is the structural representation of ceiling board upper semi-circle shape dress ornamental thread.
Fig. 9 is the structural representation of Os Draconis.
Figure 10 is the structural representation of turn buckle.
Figure 11 is the mounting structure schematic diagram of Os Draconis and ceiling board.
Figure 12 is the structural representation of hanging keel.
Figure 13 is fixedly connected the structural representation of ceiling for Os Draconis.
Figure 14 is mounting structure schematic diagram of the furred ceiling at structural beams.
Figure 15 is the polycrystalline substance schematic diagram of edge closing bar pedestal.
Figure 16 is the schematical top view of edge closing bar pedestal.
Figure 17 is the structural representation that side locking plate is connected with ceiling board edge.
Figure 18 is the structural representation of edge closing bar pedestal and original wall connecting.
Figure 19 is the structural representation of Quick-connecting locking plate.
Figure 20 is the attachment structure schematic diagram of screw rod.
Figure 21 is the structural representation of the edge closing bar with light bar.
Figure 22 is the structural representation that two grades of furred ceilings are connected with two grades of furred ceiling side panels.
Figure 23 is the structural representation that two grades of furred ceilings are connected with two grades of furred ceiling side panels.
Figure 24 is the structural representation that two grades of furred ceiling side panels are connected with side board mount.
Figure 25 is the structural representation that pelmet is connected with pelmet suspension holdfast.
Figure 26 is pelmet suspension holdfast and body of wall and the attachment structure schematic diagram of floor.
In figure:Ceiling board 1, Os Draconis 2, turn buckle 3, cement nail 4, edge closing bar 5, edge closing bar pedestal 6, rotating dog 7, vertically hang Hang Os Draconis 8, screw rod 9, ceiling board groove 10, circular hole 11, suspension hook 12, installing hole 13, structural beams 14, public bayonet socket 15, female bayonet 16, Pedestal 17, nut 18, side locking plate 19, original body of wall 20, ceiling 21, LED 22, one-level furred ceiling 23, quick connection lock Piece 24, semicircle decorative thread 25, handle 26, contiguous block 27, the edge closing bar 28 with light bar, light bar chamber 28a, ceiling board inserting groove 28b, two grades of furred ceilings 29, two grades of furred ceiling side panels 30, side board mount 31, screw 32, pelmet 33, pelmet suspension holdfasts 34th, bracing frame 35, wallboard 36, zigzag opening 37, T-shaped plug receptacle 38, circular arc 39.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of this utility model protection.
Such as Fig. 1~2, in this utility model embodiment, the compact integrated ceiling system of a kind of Fast Installation, including hanging Top board 1, Os Draconis 2, turn buckle 3, cement nail 4, edge closing bar 5, edge closing bar pedestal 6, rotating dog 7, vertical hanging keel 8 and screw rod 9, Polylith ceiling board 1 is spliced to form furred ceiling, and the edge of ceiling board 1 is fixedly connected with edge closing bar 5, and the reverse side of ceiling board 1 is by rotation Turn button 3 and be fixedly connected many bar keels 2, the edge closing bar 5 at the edge of ceiling board 1 is stuck in the edge closing bar pedestal 6 pre-installed on wall, receives Multiple rotating dogs 7 are installed in edge strip pedestal 6, edge closing bar 5 is compressed by rotating dog 7.The Os Draconis 2 are by cement nail 4 or spiral shell Bar 9 is fixedly connected in original body of wall 20, ceiling 21 or structural beams 14.
Such as Fig. 3~4, the furred ceiling is divided into one-level furred ceiling 23 and two grades of furred ceilings 29 according to mounting means, one-level furred ceiling 23 with Connected by two grades of furred ceiling side panels 30 between two grades of furred ceilings 29, and two grades of furred ceiling side panels 30 are fixedly connected and are pre-installed on roof Side board mount 31 on.
Such as Fig. 5~8, the width of the ceiling board 1 is 300 to 600 millimeters, 10 millimeters of height, and both sides open up respectively Have public bayonet socket 15 and female bayonet 16, for the splicing of polylith ceiling board 1 to expand furred ceiling plate suqare, adjacent two pieces of ceiling boards 1 according to It is secondary according to male and female bayonet socket order grafting;The back side of the ceiling board 1 opens up a ceiling board groove 10, furred ceiling every a segment distance The cross sectional shape of plate groove 10 is trapezoidal or T-shaped, and trapezoidal bottom comers are circular arc;The front of the ceiling board 1 can be with The semicircle decorative thread 25 that depth is 2 millimeters is opened up every 10mm or so, is covered with whole surface;In the ceiling board 1 Portion is designed as cavity and can leave certain reinforcement proof strength with material-saving;The structure of so ceiling board becomes hollow, up and down Air between materials at two layers can prevent to a certain extent the cold air or hot-air of interior to scatter and disappear by floor conduction, together When prevent noise upstairs through the incoming interior of floor, ceiling board materials'use plastics, it is also possible to according to southern and northern local climate Difference selects Wood-plastic material, aluminum alloy materials.
Such as Fig. 9, the shape of cross section of the Os Draconis 2 is matched for the width of U-shaped, its length and ceiling board 1, the Os Draconis 2 Surface be provided with circular hole 11 and the installing hole 13 that several are crisscross arranged, spine material adopts mild steel.
Such as Figure 10, the turn buckle 3 is made up of the handle 26 and contiguous block 27 that are vertically connected with, the shape of contiguous block 27 with hang The form fit of top board groove 10, be ensure turn buckle can in ceiling board groove smooth rotation, the lower section both sides of turn buckle 3 set In respect of circular arc 39 at two.
When the assembling of Os Draconis 2 and ceiling board 1 is carried out, Os Draconis 2 are placed on such as Figure 11 the reverse side of ceiling board 1 during assembling, dragon Width of the length direction of bone 2 parallel to ceiling board 1;First Os Draconis apart from some distances in ceiling board edge, on Os Draconis 2 Several circular holes 11 just align with some ceiling board grooves 10 of ceiling board, by the contiguous block of the lower section of turn buckle 3 successively first Circular hole 11 and ceiling board groove 10 are inserted perpendicularly into, then turn 90 degrees the dextrorotation of turn buckle 3, the contiguous block of the lower section of turn buckle 3 The connection of Os Draconis and ceiling board will be rapidly completed with the auto lock of ceiling board groove 10, every Os Draconis assemble some rotations Button, every piece of ceiling board needs some Os Draconis to be engaged, has certain intervals per distance between two Os Draconis according to physical length;When Ceiling board 1 and Os Draconis 2 are formed the ceiling components of an integration with to be onstructed after the completion of assembling, and this connection procedure is fast It is fast simple, it is not necessary to which that operation of ascending a height is completed, any instrument and other materials are not used on ground at the construction field (site) or in factory Material can be completed, it is to avoid currently available technology by operation of ascending a height can just make ceiling board be connected to the hard work and danger of Os Draconis Danger, Os Draconis thickness is 20 millimeters plus the height exposed after turn buckle installation, compares other ceiling systems and greatlys save installation Space, the ceiling height after installation can be substantially improved, and be truly realized compact integrated suspended ceiling model.
One end of Os Draconis is longer than ceiling board after the construction technique of ceiling board 1, such as Figure 13, Os Draconis 2 and the connection of ceiling board 1 Go out 20 millimeters, the installing hole 13 on Os Draconis 2 just stretches out ceiling board, will be carried through installing hole 13 using cement nail 4 during installation The Os Draconis 2 of ceiling board 1 are directly installed on ceiling 21 using electric drill, till furred ceiling plate level;Then second piece is hung The female bayonet of the public bayonet socket of top board 1 and previous piece of ceiling board 1 is mutually inserted, the installation method of mounting means and previous piece of ceiling board 1 Equally, install successively.
The modular construction and construction technology of the furred ceiling right angle setting occasion is as shown in figure 14, right in construction when construction As above running into during difference in height structure, by 90 degree of the bending downwards of one side of one piece of ceiling board 1 above, lower bending structure is constituted 1a, the height of lower bending structure 1a in the vertical directions is the half of the height of structural beams 14, and cross-directional length is any, lower bending The back side of structure 1a connects hanging keel 8 by rotating latch 3, and the installing hole 13 on the hanging keel 8 just stretches out ceiling board, Using cement nail 4 hanging keel 8 is installed in structural beams using electric drill through installing hole 13 during installation, until ceiling board 1 is erected Till straight;Then one side of underlying another piece of ceiling board 1 is folded upward at into 90 degree, bending structure 1b in composition is upper curved Folded structure 1b is also the half of structural beams in the height of vertical direction, and the length of horizontal direction arbitrarily, is tied upper bending during construction Structure 1b and lower bending structure 1a is connected using the fit structure of public bayonet socket 15 and female bayonet 16.Traditional furred ceiling is horizontal direction peace Dress, must be laid on the lower section of beam, it is impossible to be vertically coated on the two of beam under the occasion for running into indoor ceiling and stretching out structural beams Individual side, the vertical hanging keel in this practicality can realize this function, and by two sides of beam and bottom surface, all decoration covers Lid.
As shown in figure 12, the cross sectional shape of hanging keel 8 is U-shaped, and the surface of hanging keel 8 also offers circular hole 11 With installing hole 13, one end bending of vertical hanging keel 8 is configured to suspension hook 12, hanging on next piece of ceiling board 1 after being installed in place The edge of top board groove 10 is just inserted on suspension hook 12, and using suspension hook 12 weight of next piece of ceiling board is supported.
Such as Figure 15~16, the bottom of rotating dog 7 is provided with cross recess 26, can be rotated by 90 ° with screwdriver in lower section.
Such as Figure 17, the back side of ceiling board 1 connects the circular hole 11 of side locking plate 19 by turn buckle 3, and by side locking plate 19 The back side of ceiling board 1 is fixedly connected on, edge during installation by the edge of side locking plate 19 to its side of ceiling board 1.
Gap between ceiling board and indoor wall is processed, such as Figure 18, using edge closing bar 5 and the structure of edge closing bar pedestal 6, To cover the gap between ceiling board and indoor wall, while serving decoration effect.Another work(of edge closing bar pedestal 6 Can be the weight for supporting the edge after the completion of whole ceiling board, the water in advance mud of edge closing bar pedestal 6 nail 4 is according to ceiling board Highly it is arranged on original body of wall 20, rotating dog 7 is housed on edge closing bar pedestal 6, the initial position of rotating dog 7 is hidden in edge closing bar base In seat;During construction after ceiling board 1 is installed in place alignment edge closing bar pedestal 6, operator is with screwdriver rotation edge closing bar pedestal 6 7 nine ten degree of rotating dog, at this time rotating dog 7 can be automatically inserted in the gap between side locking plate 19 and ceiling board 1, so hang The weight at the edge of top board 1 has been delivered on original body of wall 20 by rotating dog 7 and edge closing bar pedestal 6, is realized in overall structure Safety and reliability;The top that the envisaged underneath of the edge strip pedestal 6 has draw-in groove, edge closing bar 5 is designed with grab, so receives side Bar 5 can pass through in the draw-in groove of the direct quick insertion edge closing bar pedestal 6 of grab, complete whole construction, and edge closing bar 5 adopts aluminium alloy Material, can be sprayed into random color according to design requirement.
In the occasion for needing to increase furred ceiling height if any water pipe, air-conditioner pipe, need using existing screw rod on market Connection increases ceiling board height, and this practicality achieves that this function, such as Figure 19 using screw rod 9 and Quick-connecting locking plate 24 ~20, the zigzag opening 37 of the top of one end Quick-connecting locking plate 24 of screw rod 9 can prevent screw rod from exiting, the bottom of locking plate 24 T-shaped plug receptacle 38 quickly can be connected with the installing hole 13 on Os Draconis 2, highly beneficial to the regulation of furred ceiling plate level;During assembling The T-shaped plug receptacle of the bottom of screw rod Quick-connecting locking plate 24 is inserted in the installing hole 13 of Os Draconis 2, is rotated by 90 ° and just complete and dragon The connection of bone 2, by screw rod 9 the zigzag opening of the top of screw rod Quick-connecting locking plate 24 is connected to two nuts 18 during construction again Connection can be completed, if to adjust the height of ceiling board, position of the adjusting nut 18 on screw rod 9 is only needed.
As Figure 21, the edge closing bar 5 include the edge closing bar 28 with light bar, material is aluminum alloy materials, the receipts side with light bar The side of bar 28 is light bar chamber 28a, and opposite side is ceiling board inserting groove 28b, ceiling board 1 is may be inserted into, in order that LED 22 high lights for sending can mildly reflex to outside, design angled below light bar chamber 28a, be above zigzag fashion Form the diffuse-reflectance of light.Edge closing bar is the main connecting elements between horizontal ceiling board and vertical body of wall, vertical side panel.
Such as Figure 22~24, the both sides edge closing bar 5 of two grades of furred ceilings 29 is fixedly connected two grades of furred ceilings by screw 32 respectively The one side and metope of side panel 30, the another side of two grades of furred ceiling side panels 30 is fixedly connected the correspondence of one-level furred ceiling 23 by screw 32 Side edge closing bar 5, edge closing bar 5 can on demand from having lighting function or do not have the aluminium alloy element of lighting function.
Such as Figure 25~26, furred ceiling position corresponding with window arranges multiple pelmets 33, the side panel of pelmet 33 Use as the side panel of two grades of furred ceilings, the top panel of pelmet 33 is used for blocking floor, and pelmet 33 is plugged on pelmet and hangs The bottom of hanging bracket 34, the top horizontal direction of pelmet suspension holdfast 34 and vertical direction are respectively fixed to wall by screw rod 9 Body and floor, then lock pelmet suspension holdfast 34 and screw rod 9 with nut 18.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, can in other specific forms realize that this practicality is new Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type is by claims rather than described above is limited, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in this utility model.Any reference in claim should not be considered as restriction Involved claim.
Moreover, it will be appreciated that although this specification is been described by according to embodiment, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of description is only that for clarity those skilled in the art should Using description as an entirety, the technical scheme in each embodiment can also Jing it is appropriately combined, form those skilled in the art Understandable other embodiment.

Claims (10)

1. a kind of compact integrated ceiling system of Fast Installation, including ceiling board, Os Draconis, turn buckle, cement nail, receipts side Bar, edge closing bar pedestal, rotating dog, vertical hanging keel and screw rod, it is characterised in that polylith ceiling board is spliced to form furred ceiling, hangs The edge of top board is fixedly connected with edge closing bar, and the reverse side of ceiling board is fixedly connected many bar keels, furred ceiling edges of boards by turn buckle The edge closing bar of edge is stuck in the edge closing bar pedestal pre-installed on wall, and multiple rotating dogs are installed in edge closing bar pedestal, by rotation Pin compresses edge closing bar, and by cement nail, either screw rod is fixedly connected in original body of wall, ceiling or structural beams the Os Draconis.
2. the compact integrated ceiling system of a kind of Fast Installation according to claim 1, it is characterised in that described to hang Top is divided into one-level furred ceiling and two grades of furred ceilings according to mounting means, and two grades of furred ceiling side panels are passed through between one-level furred ceiling and two grades of furred ceilings Connection, and two grades of furred ceiling side panels are fixedly connected on the side board mount for being pre-installed on roof.
3. the compact integrated ceiling system of a kind of Fast Installation according to claim 1, it is characterised in that described to hang The width of top board is 300 to 600 millimeters, and 10 millimeters of height, both sides offer respectively public bayonet socket and female bayonet, adjacent two pieces Ceiling board is provided with cavity successively according to male and female bayonet socket order grafting in the middle part of the ceiling board, the back side of the ceiling board every One segment distance opens up a ceiling board groove, and the cross sectional shape of ceiling board groove is trapezoidal or T-shaped, and trapezoidal bottom comers are Circular arc.
4. a kind of compact integrated ceiling system of Fast Installation according to claim 1, it is characterised in that the dragon The shape of cross section of bone is U-shaped, and the surface of the Os Draconis is provided with circular hole and installing hole that several are crisscross arranged, and spine material is adopted Use mild steel.
5. a kind of compact integrated ceiling system of Fast Installation according to claim 1, it is characterised in that the rotation Turn button to be made up of the handle and contiguous block that are vertically connected with, the shape of contiguous block and the form fit of ceiling board groove, turn buckle Lower section both sides are designed with circular arc at two.
6. the compact integrated ceiling system of a kind of Fast Installation according to claim 1, it is characterised in that described to hang Withstanding on the mounting structure at structural beams is, 90 degree of one side bending downwards of above structural beams piece ceiling board is curved under constituting Folded structure, the height of lower bending structure in the vertical direction is the half of structure depth of beam, and the back side of lower bending structure is by rotation Twist lock button connects hanging keel, and the hanging keel is arranged in structural beams by cement nail;Another piece below structural beams One side of ceiling board is folded upward at 90 degree, bending structure in composition, and upper bending structure is also structural beams in the height of vertical direction Half, upper bending structure and lower bending structure using public bayonet socket and female bayonet fit structure connection;The section of hanging keel U-shaped is shaped as, and the surface of hanging keel also offers circular hole and installing hole, one end bending of vertical hanging keel is configured to Suspension hook, the edge of the ceiling board groove after being installed in place on next piece of ceiling board is just inserted on suspension hook.
7. a kind of compact integrated ceiling system of Fast Installation according to claim 1, it is characterised in that the rotation The bottom shipped and resell on another market is provided with cross recess, and the back side of ceiling board connects the circular hole of side locking plate and fixes side locking plate by turn buckle The back side of ceiling board is connected to, rotating dog can be automatically inserted in the gap between side locking plate and ceiling board, the edge strip pedestal Envisaged underneath has the draw-in groove of connection corresponding with edge closing bar top grab.
8. a kind of compact integrated ceiling system of Fast Installation according to claim 1, it is characterised in that the spiral shell One end of bar connects the zigzag opening above Quick-connecting locking plate, T-shaped plug receptacle and the dragon of locking plate bottom by two nuts Installing hole connection on bone.
9. a kind of compact integrated ceiling system of Fast Installation according to claim 1, it is characterised in that the receipts Edge strip includes the edge closing bar with light bar, and the side of the edge closing bar with light bar is light bar chamber, and opposite side is ceiling board inserting groove, is used In insertion ceiling board, be inclined upwardly setting below light bar chamber, forms the diffuse-reflectance of light for zigzag fashion above.
10. the compact integrated ceiling system of a kind of Fast Installation according to claim 1, it is characterised in that described Furred ceiling position corresponding with window arranges multiple pelmets, and the side panel of pelmet is used as the side panel of two grades of furred ceilings, window The top panel of curtain box is used for blocking floor, and pelmet is plugged on the bottom of pelmet suspension holdfast, the top of pelmet suspension holdfast Portion is horizontally and vertically respectively fixed to body of wall and floor by screw rod, then with nut check pelmet suspension holdfast and Screw rod.
CN201621119310.6U 2016-10-13 2016-10-13 Compact integration suspended ceiling system of quick installation Active CN206110452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621119310.6U CN206110452U (en) 2016-10-13 2016-10-13 Compact integration suspended ceiling system of quick installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621119310.6U CN206110452U (en) 2016-10-13 2016-10-13 Compact integration suspended ceiling system of quick installation

Publications (1)

Publication Number Publication Date
CN206110452U true CN206110452U (en) 2017-04-19

Family

ID=58529885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621119310.6U Active CN206110452U (en) 2016-10-13 2016-10-13 Compact integration suspended ceiling system of quick installation

Country Status (1)

Country Link
CN (1) CN206110452U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948537A (en) * 2017-04-28 2017-07-14 浙江丽尚建材科技有限公司 Two grades of roof constructions
CN106996155A (en) * 2017-05-19 2017-08-01 合肥荣事达电子电器集团有限公司 A kind of seamless aluminum-pinch furred ceiling of plug-in type and its installation method
CN107435407A (en) * 2017-08-30 2017-12-05 江苏建筑职业技术学院 Furred ceiling may be reversed
CN108118864A (en) * 2018-01-02 2018-06-05 浙江爱尔菲集成家居有限公司 A kind of combined top line of integrated wall
CN108547402A (en) * 2018-05-14 2018-09-18 嘉兴领创电气科技有限公司 A kind of Multi-functional ceiling
CN108678261A (en) * 2018-06-15 2018-10-19 东宁晟(北京)数字科技有限公司 A kind of assembled finishing furred ceiling
CN112227588A (en) * 2020-09-29 2021-01-15 浙江绿筑集成科技有限公司 Hook type ceiling mounting method
CN112780019A (en) * 2021-01-26 2021-05-11 山东集顶装饰科技有限公司 Corner reinforcement for ceiling keel and connecting structure thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948537A (en) * 2017-04-28 2017-07-14 浙江丽尚建材科技有限公司 Two grades of roof constructions
CN106996155A (en) * 2017-05-19 2017-08-01 合肥荣事达电子电器集团有限公司 A kind of seamless aluminum-pinch furred ceiling of plug-in type and its installation method
CN107435407A (en) * 2017-08-30 2017-12-05 江苏建筑职业技术学院 Furred ceiling may be reversed
CN107435407B (en) * 2017-08-30 2023-02-17 江苏建筑职业技术学院 Turnover suspended ceiling
CN108118864A (en) * 2018-01-02 2018-06-05 浙江爱尔菲集成家居有限公司 A kind of combined top line of integrated wall
CN108547402A (en) * 2018-05-14 2018-09-18 嘉兴领创电气科技有限公司 A kind of Multi-functional ceiling
CN108678261A (en) * 2018-06-15 2018-10-19 东宁晟(北京)数字科技有限公司 A kind of assembled finishing furred ceiling
CN112227588A (en) * 2020-09-29 2021-01-15 浙江绿筑集成科技有限公司 Hook type ceiling mounting method
CN112780019A (en) * 2021-01-26 2021-05-11 山东集顶装饰科技有限公司 Corner reinforcement for ceiling keel and connecting structure thereof

Similar Documents

Publication Publication Date Title
CN206110452U (en) Compact integration suspended ceiling system of quick installation
US5014488A (en) Method for installation of building tiles without adhesive materials and standardized tiles for implementing the same
CN107268865A (en) A kind of modularization falls grade suspended ceiling device and installation method
CN107268866A (en) A kind of combined type falls grade furred ceiling and installation method
CN101363244A (en) Inner wall board system and mounting method thereof
CN210947364U (en) High strength furred ceiling decorative structure
CN108868139A (en) A kind of method of furred ceiling
CN207436353U (en) A kind of the oblique of good muffling effect hangs ceiling
CN106760298A (en) A kind of detachable decoration wallboard and its installation method
US2226332A (en) Building structure
CN208168112U (en) A kind of curved section bars combination furred ceiling
CN202899393U (en) Unit assembly type suspended ceiling connection structure
CN204983333U (en) Light gauge steel rolls over light trough structure
CN111139966A (en) Nailing-free module ceiling structure
CN207092350U (en) A kind of modularization falls a grade suspended ceiling device
CN109577541A (en) Light trough and its installation method
CN207063280U (en) A kind of combined type falls a grade furred ceiling
CN206607774U (en) A kind of detachable decoration wallboard
CN210151992U (en) Double-layer sound-insulation hanging plate decoration inner wall with hidden lamp strip
CN207700506U (en) A kind of splicing keel fire prevention ceiling structure
CN210288849U (en) Suspended ceiling structure
CN211774818U (en) Partition wall
CN112443076A (en) Connecting member of ceiling decorative panel, ceiling system and mounting method
CN206844449U (en) A kind of small step furred ceiling of lightgage steel joist
CN104847047B (en) A kind of double ceiling grid system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 5th Floor, No. 58 Wansheng Street, Hengdian Town, Dongyang City, Jinhua City, Zhejiang Province, 322118

Patentee after: Zhejiang Kaizhuang Construction Technology Co.,Ltd.

Country or region after: China

Address before: Room 401-39, 4th Floor, Building 1, No. 38 Debao Road, Pudong New Area Free Trade Pilot Zone, Shanghai, 200120

Patentee before: SHANGHAI CONJOINT BUILDING TECHNOLOGY Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address