CN206092031U - Tunnel 5cm seismic joint water guide formula back of body pastes waterstop - Google Patents

Tunnel 5cm seismic joint water guide formula back of body pastes waterstop Download PDF

Info

Publication number
CN206092031U
CN206092031U CN201621143085.XU CN201621143085U CN206092031U CN 206092031 U CN206092031 U CN 206092031U CN 201621143085 U CN201621143085 U CN 201621143085U CN 206092031 U CN206092031 U CN 206092031U
Authority
CN
China
Prior art keywords
waterstop
tunnel
anchor body
formula back
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621143085.XU
Other languages
Chinese (zh)
Inventor
徐瑞祥
谭忠盛
喻渝
李炯
韩文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Feng Ze intelligent equipment Limited by Share Ltd
Original Assignee
Fengze Engineering Rubber S&t Devel Opment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fengze Engineering Rubber S&t Devel Opment Co Ltd filed Critical Fengze Engineering Rubber S&t Devel Opment Co Ltd
Priority to CN201621143085.XU priority Critical patent/CN206092031U/en
Application granted granted Critical
Publication of CN206092031U publication Critical patent/CN206092031U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to the technical field of the waterstop, a tunnel 5cm seismic joint water guide formula back of body pastes waterstop is disclosed. Its main technical characteristics does: include to be located the anchor body of both sides and to be located two deformation bodies between the anchor body one side of anchor body has fixed foot, warp the body and be " U " type warp the body upper end and be provided with the connection offset plate of connecting both sides anchor body, be close to it is provided with " V " type recess to connect the offset plate intermediate position. Building the in -process, avoiding debris such as concrete to drop on and be out of shape that this is internal to avoided warping the body when shortening, debris are pressed against and are badly warp the body, cause and warp the leak emergence of scheduling problem of body, have prolonged the life of waterstop. Under normal condition, " V " type recess can warp by covariant shape body together, when the earthquake takes place, and the fracture of " V " type groove to the reduction reaches the stagnant water ability of the effort of fixing the foot, protection waterstop to the anchor body.

Description

Tunnel 5cm aseismatic joint water guides formula back of the body patch waterstop
Technical field
This utility model belongs to tunnel back of the body patch waterstop technical field, more particularly to a kind of tunnel 5cm aseismatic joints water guide formula Back of the body patch waterstop.
Background technology
Back of the body patch waterstop is one of material that concrete seam is generally adopted in tunnel construction, outside tunnel double-lining Enclose, be covered on movement joint, be adapted to the thin tail sheep deformation of movement joint and do not lose water stopping function.The back of the body patch for using at present is stopped Water band mainly has two kinds:First, the deformation body including the anchor body positioned at both sides and between two anchor bodies, With fixed foot, the deformation body is " U " type for the side of the anchor body, and the deformation body upper end is provided with connection The connection offset plate of both sides anchor body, the connection offset plate upper surface with the anchor body upper surface on same horizontal plane, The stretcher strain of below 3cm can be born, when deformation is more than 3cm, the connection offset plate of waterstop will be stretched thinning, same to time-varying Pulling force can be passed to anchor body by shape body, make anchor body while tension-thining, makes to produce between waterstop and concrete Gap, the water of tunnel internal can bypass waterstop along this gap, and drainage occurs in tunnel, and this is also the reason for waterstop fails One of;Second, being that waterstop deformed area is designed to U-type groove, the gap of a wide about 4mm is left in U-type groove, this gap Presence can be such that the debris of tunnel internal fall into inside water stop U type groove, particularly evident, the debris when waterstop occurs stretcher strain After falling into U-type groove inside, when waterstop occurs compression, waterstop can be broken by debris, make waterstop lose sealing work With.
In the high area of earthquake intensity, due to earthquake reason, cause geology soft, due to length of tunnel it is very long, by this The tunnel in area will have very big deformation.During Tunnel Design, a plurality of width of segment design the resisting up to 5cm in tunnel total length is needed Earthquake is caused the deformation in tunnel to be distributed in each aseismatic joint, for adapting to the deformation that earthquake is caused by shake seam.Due to aseismatic joint Width reaches 5cm, and existing back of the body patch waterstop is no longer suitable for.
Utility model content
Problem to be solved in the utility model is just to provide that a kind of deflection is big, prevent debris enter waterstop deformed area and The tunnel 5cm aseismatic joint water guides formula back of the body patch waterstop of water guide structure.
To solve the above problems, the technical scheme that this utility model tunnel 5cm aseismatic joint water guides formula back of the body patch waterstop is adopted For:Deformation body including the anchor body positioned at both sides and between two anchor bodies, the one of the anchor body With fixed foot, the deformation body is " U " type for side, and the deformation body upper end is provided with the company of connection both sides anchor body Connect offset plate, the connection offset plate upper surface with the anchor body upper surface on same horizontal plane, near the connection glue Plate centre position is provided with " V " type groove.
Its additional technical feature is:
Keep at a certain distance away in " V " the type groove and be provided with infiltration slot apertures;
The infiltration slot apertures is bar shaped, the equal length of interval and infiltration slot apertures between the seam between the slot apertures that seeps water;
The thickness of the connection offset plate is 2-4mm;
" V " the type depth of groove is connect offset plate thickness 2/3;
The connection offset plate upper surface is with the anchor body upper surface on same horizontal plane.
Tunnel 5cm aseismatic joint water guides formula provided by the utility model back of the body patch waterstop compared with prior art, with Lower advantage:First, due to including the deformation body positioned at the anchor body of both sides and between two anchor bodies, described With fixed foot, the deformation body is " U " type for the side of anchor body, and the deformation body upper end is provided with connection both sides The connection offset plate of anchor body, is being provided with " V " type groove near the connection offset plate centre position, during installation, will fixed foot Be cast in concrete, in casting process, it is to avoid the debris such as concrete fall deformation this in vivo, so as to avoid in deformation When body shortens, debris press against bad deformation body, cause the generation of the problems such as deforming body leak, extend the use longevity of waterstop Life;Under normal circumstances, " V " type groove can deform with deformation body, when earthquake occurs, the fracture of " V " type groove, So as to reduce the active force to anchor body and fixed foot, the sealing ability of waterstop is protected;Second, due in " V " type Keep at a certain distance away in groove and be provided with infiltration slot apertures, tunnel periphery water can flow into deformation originally in vivo from infiltration slot apertures, from Deformation this in vivo derive, it is to avoid the infiltration of peripheral water;Third, as the infiltration slot apertures is bar shaped, between infiltration slot apertures The equal length of interval and infiltration slot apertures between seam, under normal circumstances, force-extension infiltration slot apertures can deform, and tensile elongation is entered One step is increased, and range of application is wider;Fourth, as the thickness of the connection offset plate is 2-4mm, connection offset plate has certain strong Degree, it is to avoid the debris such as concrete fall into;Fifth, due to " V " the type depth of groove be connect offset plate thickness 2/3, have Some strength, produce in the case of active force is stretched it is certain deform, tensile elongation increase, and can be with when there is earthquake Easily break in " V " type groove, so as to reduce the active force to anchor body and fixed foot, protect the sealing of waterstop Ability;Fifth, due to the connection offset plate upper surface with the anchor body upper surface on same horizontal plane, it is to avoid it is miscellaneous Thing is piled up.
Description of the drawings
Fig. 1 is the structural representation of this utility model tunnel 5cm aseismatic joint water guides formula back of the body patch waterstop;
Fig. 2 is the enlarged drawing of " V " type groove in Fig. 1;
Fig. 3 is the top view of " V " type groove amplification in Fig. 1.
Specific embodiment
With reference to the accompanying drawings and detailed description to this utility model tunnel 5cm aseismatic joint water guides formula back of the body patch waterstop Structure and use principle are described in further details.
As shown in Figure 1, Figure 2 and Figure 3, it is that tunnel 5cm aseismatic joint water guides formula carries on the back the structural representation for pasting waterstop, including position Deformation body 2 in the anchor body 1 of both sides and between two anchor bodies 1, in the side of anchor body 1 with fixation Foot 3, deformation body 2 are " U " type, 2 upper end of deformation body are provided with the connection offset plate 4 of connection both sides anchor body 1, close 4 centre position of connection offset plate is provided with " V " type groove 5.During installation, fixed foot 3 is cast in concrete, in casting process In, so as to avoid when the shortening of body 2 is deformed, debris press against bad deformation body 2, cause sending out for the problems such as deforming 2 leak of body It is raw, extend the service life of waterstop.Under normal circumstances, " V " type groove 5 can deform with deformation body 2, on ground When shaking generation, rupture at " V " type groove 5, so as to reduce the active force to anchor body 1 and fixed foot 3, protect stopping for waterstop Outlet capacity.
Keep at a certain distance away in " V " type groove 5 and be provided with infiltration slot apertures 6, tunnel periphery water can be from infiltration slot apertures 6 Flow in deformation body 2, derive from deformation body 2, it is to avoid the infiltration of peripheral water.
Infiltration slot apertures 6 is bar shaped, the equal length of interval 7 and infiltration slot apertures 6 between the seam between the slot apertures 6 that seeps water, normal In the case of, force-extension infiltration slot apertures 6 can deform, and tensile elongation is further increased, and range of application is wider, occur in earthquake When, due to the presence for having infiltration slot apertures 6, between seam, interval 7 is easy to be pulled off, so as to reduce to anchor body 1 and fixed foot 3 Active force, protect waterstop sealing ability.
The thickness of connection offset plate 4 is 2-4mm, and connection offset plate 4 has some strength, it is to avoid the debris such as concrete fall into.
5 depth of " V " type groove is connect 4 thickness of offset plate 2/3, with some strength, is being stretched active force situation It is lower to produce certain deformation, tensile elongation increase, and easily can break at " V " type groove 5 when there is earthquake, from And the active force to anchor body and fixed foot is reduced, protect the sealing ability of waterstop.
Connection 4 upper surface of offset plate and 1 upper surface of anchor body be on same horizontal plane, it is to avoid debris accumulations.
Protection domain of the present utility model is not limited solely to above-described embodiment, as long as structure and this utility model tunnel 5cm aseismatic joint water guides formula back of the body patch Water stop structure is identical, just falls in the scope of this utility model protection.

Claims (6)

1. the tunnel 5cm aseismatic joints water guide formula back of the body pastes waterstop, it is characterised in that:Including the anchor body positioned at both sides and be located at two Deformation body between individual anchor body, in the side of the anchor body with fixed foot, the deformation body is " U " type, The deformation body upper end is provided with the connection offset plate of connection both sides anchor body, near the connection offset plate centre position It is provided with " V " type groove.
2. the tunnel 5cm aseismatic joint water guides formula back of the body according to claim 1 pastes waterstop, it is characterised in that:In " V " type Keep at a certain distance away in groove and be provided with infiltration slot apertures.
3. the tunnel 5cm aseismatic joint water guides formula back of the body according to claim 2 pastes waterstop, it is characterised in that:The permeable joints Hole is bar shaped, the equal length of interval and infiltration slot apertures between the seam between the slot apertures that seeps water.
4. the tunnel 5cm aseismatic joint water guides formula back of the body according to claim 1 pastes waterstop, it is characterised in that:The connection glue The thickness of plate is 2-4mm.
5. the tunnel 5cm aseismatic joint water guides formula back of the body according to claim 1 pastes waterstop, it is characterised in that:" V " type is recessed Groove depth is connect offset plate thickness 2/3.
6. the tunnel 5cm aseismatic joint water guides formula back of the body according to claim 1 pastes waterstop, it is characterised in that:The connection glue Plate upper surface is with the anchor body upper surface on same horizontal plane.
CN201621143085.XU 2016-10-21 2016-10-21 Tunnel 5cm seismic joint water guide formula back of body pastes waterstop Active CN206092031U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621143085.XU CN206092031U (en) 2016-10-21 2016-10-21 Tunnel 5cm seismic joint water guide formula back of body pastes waterstop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621143085.XU CN206092031U (en) 2016-10-21 2016-10-21 Tunnel 5cm seismic joint water guide formula back of body pastes waterstop

Publications (1)

Publication Number Publication Date
CN206092031U true CN206092031U (en) 2017-04-12

Family

ID=59976468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621143085.XU Active CN206092031U (en) 2016-10-21 2016-10-21 Tunnel 5cm seismic joint water guide formula back of body pastes waterstop

Country Status (1)

Country Link
CN (1) CN206092031U (en)

Similar Documents

Publication Publication Date Title
CN207512793U (en) Buried steel side waterstop fixing device for installing in one kind
CN107268433A (en) A kind of waterstop and bridge expansion joint installation
CN206092031U (en) Tunnel 5cm seismic joint water guide formula back of body pastes waterstop
CN206092032U (en) Tunnel 5cm seismic joint water guide wherein buries waterstop
CN207701152U (en) Support system for coal road weak broken top plate
CN103835379A (en) Combined water stop system of waterproof concrete wall
CN207277183U (en) A kind of waterstop and bridge expansion joint installation
CN106437786A (en) Water diversion type water-stop belt of tunnel 5 cm seismic joint
CN207227945U (en) Modular expansion device and bridge with pressure-bearing connection
CN106948226B (en) Elastic cushion vibration-damping ballast easy to maintain
CN202073026U (en) Vertical spacing and anti-drop-beam structure of bridge
CN205296096U (en) High strength hydraulic pressure dam
CN202731942U (en) Super-soft ultra-thick coal seam large section open-off cut support device
CN203755469U (en) Waterproof concrete wall combined water stopping system
KR101566317B1 (en) Flange penetrating external tendon type girder
CN204455871U (en) For the stiff skeleton structure of closure of bridge structure
CN209178935U (en) A kind of gas shield dam sealing safeguard structure
CN209307955U (en) A kind of copper sheet waterstop with splice welding
CN206721667U (en) A kind of bridge expanssion joint waterstop
CN203795445U (en) Water stop template of caisson fender mouth
CN207277334U (en) Anchorage for anchor cable tensioning again of failing
CN105803928A (en) Dual-anti-drawing isolation support
CN204570621U (en) Bank embedded part at the bottom of a kind of gate of hydropower station
CN218643311U (en) Ultrahigh rubber dam bag fixing device
CN205604066U (en) Isolation bearing is pulled out to dual tensile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 053000 rubber and plastics Road 15, north industrial base, Hengshui Economic Development Zone, Hebei

Patentee after: Feng Ze intelligent equipment Limited by Share Ltd

Address before: 053000 rubber and plastics Road 15, north industrial base, Hengshui Economic Development Zone, Hebei

Patentee before: Fengze Engineering Rubber S&T Devel Opment Co., Ltd.