CN206091355U - 一种混凝土厂房柱抽柱结构 - Google Patents
一种混凝土厂房柱抽柱结构 Download PDFInfo
- Publication number
- CN206091355U CN206091355U CN201620690654.6U CN201620690654U CN206091355U CN 206091355 U CN206091355 U CN 206091355U CN 201620690654 U CN201620690654 U CN 201620690654U CN 206091355 U CN206091355 U CN 206091355U
- Authority
- CN
- China
- Prior art keywords
- newly
- built
- joist
- upper prop
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
提供一种混凝土厂房柱抽柱结构,包括抽柱两侧厂房柱、被保留上柱、新建吊车梁、新建托梁、外包钢板、槽钢承重梁、传力梁;被保留上柱通过外包钢板与槽钢承重梁固定连接;槽钢与传力梁搭接;传力梁与新建吊车梁和新建托梁固定连接;新建吊车梁和新建托梁由H型钢焊接,新建吊车梁和新建托梁的两端与抽柱两侧厂房柱连接。被保留上柱与外包钢板通过螺纹连接;被保留上柱与外包钢板之间打磨平整的接触面采用胶粘剂粘接。其优点是:不需设置临时支撑、节省资源;施工快捷、简单;对生产影响小、施工造价低。
Description
技术领域:
本实用新型涉及各类工业厂房结构设计及改造技术领域,特别是涉及一种混凝土厂房柱抽柱结构。
背景技术:
在现有技术中,各种工业厂房使用时,经常因为生产工艺和设备的改进需要对生产车间的原有柱距进行改造,进行调整抽柱以实现新设备的安装或者过跨,这其中有大量的工程涉及到厂房柱距改变,而按照传统设计及施工方法需要对厂房结构进行较大范围的改造,这样的改造对生产的影响较大,造价也比较高。对于混凝土结构的厂房柱通常做法是将需要抽柱的厂房柱拆除,在屋面设置托架或者托梁,承担抽柱所对应的屋面梁或者屋架的荷载,施工工期较长,拆除的工作量较大,而且拆除柱子的工程中,需要设置大量的支架进行临时支撑,施工较为繁琐。
发明内容:
本实用新型的目的是克服现有技术存在的不足,通过结构设计和对结构受力的调整来改变荷载传递方式,并采取相应的加固措施,提供一种对原有厂房结构影响最小的混凝土厂房柱抽柱结构。
本实用新型解决其技术问题所采用的方案是:提供一种混凝土厂房柱抽柱结构,包括抽柱两侧厂房柱、被保留上柱:其特征在于:还包括新建吊车梁、新建托梁、外包钢板、槽钢承重梁、传力梁;被保留上柱通过外包钢板与槽钢承重梁固定连接;槽钢与传力梁搭接;传力梁与新建吊车梁和新建托梁连接;新建吊车梁和新建托梁由H型钢焊接,新建吊车梁和新建托梁的两端与抽柱两侧厂房柱连接。其特征还在于:被保留上柱与外包钢板通过螺栓连接;被保留上柱与外包钢板之间打磨平整的接触面采用胶粘剂粘接。
本实用新型的有益效果是:由于在抽掉厂房柱抽柱下柱过程中,采用新建吊车梁及新建托梁承担抽柱后被保留上柱的荷载,不需设置临时支撑,仅对所抽柱下柱进行切除,不影响上柱及其连接,实施本实用新型,可以在不动厂房屋面结构的情况下,最简单最快捷的完成抽柱施工,由于新建吊车梁、新建托梁、外包钢板、槽钢承重梁和传力梁都可以在工厂中预制,而不需要在现场制作,而且抽柱两侧厂房柱的加固也可以在安装施工之前完成,不占用安装停产时间,这将极大的缩短安装施工时间,将对生产的影响降低到最小。并且在造价方面,由于省去了大量的结构拆除及屋面加托梁或者托架的费用,充分利用原有的厂房柱上柱作为受力结构,使得抽柱改造结构造价更低。
附图说明:
图1是本实用新型实施例一种混凝土厂房柱抽柱结构平面布置图;
图2是图1的A-A视图;
图3是图1的B-B视图;
图4是新建吊车梁1的主视图;
图5是图4的左视图;
图6是新建托梁2的主视图;
图7是图6的左视图;
图8是抽柱两侧厂房柱3主视图。
附图中:1.新建吊车梁;2.新建托梁;3.抽柱两侧厂房柱;4.被保留上柱;5.外包钢板;6.槽钢承重梁;7.传力梁;8.螺栓。
具体实施方式:
下面结合附图对本实用新型实施例作进一步详
细说明:如图1~图8所示的一种混凝土厂房柱抽柱结构,由新建吊车梁1、新建托梁2、抽柱两侧厂房柱3、被保留上柱4、外包钢板5、槽钢承重梁6、传力梁7、螺栓8组成。被保留上柱4通过外包钢板5与槽钢承重梁6固定连接;槽钢承重梁6与传力梁7搭接;传力梁7与新建吊车梁1和新建托梁2连接;新建吊车梁1和新建托梁2采用焊接H型钢,新建吊车梁1和新建托梁2两端与抽柱两侧厂房柱3连接。被保留上柱4与外包钢板5通过穿孔螺栓8连接为一个整体;被保留上柱4与外包钢板5之间接触面还可以打磨平整后采用胶粘剂粘接;被保留上柱4通过外包钢板5与槽钢承重梁6采用栓焊连接;槽钢承重梁6与传力梁7采用搭焊连接;传力梁7与新建吊车梁1及新建托梁2连接;新建吊车梁1和新建托梁2两端与抽柱两侧厂房柱连接;本实用新型工作原理为:抽柱处所对应的屋面荷载仍然由抽柱后被保留上柱承担,被保留的上柱落在两个槽钢承重梁上,并将屋面荷载及自身自重传递给槽钢承重梁,两个槽钢承重梁将荷载传递给搭接的传力梁,传力梁则将荷载传递给新建吊车梁及新建托梁,新建吊车梁和新建托梁则与抽柱两侧厂房柱连接并将荷载通过抽柱两侧厂房柱传递给基础。设计方案按照改造后的计算模型进行计算,根据计算结果对抽柱两侧厂房柱及抽柱所在排架其它厂房柱进行加固设计。而施工则是先进行加固施工,同时对钢结构构件进行加工,最后进行现场安装。
Claims (3)
1.一种混凝土厂房柱抽柱结构,包括抽柱两侧厂房柱(3)、被保留上柱(4):其特征在于:还包括新建吊车梁(1)、新建托梁(2)、外包钢板(5)、槽钢承重梁(6)、传力梁(7);被保留上柱(4)通过外包钢板(5)与槽钢承重梁(6)固定连接;槽钢承重梁(6)与传力梁(7)搭接;传力梁(7)与新建吊车梁(1)和新建托梁(2)连接;新建吊车梁(1)和新建托梁(2)由H型钢焊接而成,新建吊车梁(1)和新建托梁(2)的两端与抽柱两侧厂房柱(3)连接。
2.根据权利要求1所述的一种混凝土厂房柱抽柱结构,其特征在于:被保留上柱(4)与外包钢板(5)通过螺栓(8)连接。
3.根据权利要求1所述的一种混凝土厂房柱抽柱结构,其特征在于:被保留上柱(4)与外包钢板(5)之间打磨平整的接触面采用胶粘剂粘接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620690654.6U CN206091355U (zh) | 2016-07-01 | 2016-07-01 | 一种混凝土厂房柱抽柱结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620690654.6U CN206091355U (zh) | 2016-07-01 | 2016-07-01 | 一种混凝土厂房柱抽柱结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206091355U true CN206091355U (zh) | 2017-04-12 |
Family
ID=58465626
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620690654.6U Active CN206091355U (zh) | 2016-07-01 | 2016-07-01 | 一种混凝土厂房柱抽柱结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206091355U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110388088A (zh) * | 2019-07-26 | 2019-10-29 | 江苏省建筑工程集团有限公司 | 一种钢结构厂房的增跨改造方法 |
CN113530292A (zh) * | 2021-07-13 | 2021-10-22 | 机械工业第六设计研究院有限公司 | 无支撑连续施工的钢框架抽柱改造加固方法 |
CN114674154A (zh) * | 2022-03-24 | 2022-06-28 | 广东韶钢松山股份有限公司 | 一种用于热风炉的维修方法 |
-
2016
- 2016-07-01 CN CN201620690654.6U patent/CN206091355U/zh active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110388088A (zh) * | 2019-07-26 | 2019-10-29 | 江苏省建筑工程集团有限公司 | 一种钢结构厂房的增跨改造方法 |
CN113530292A (zh) * | 2021-07-13 | 2021-10-22 | 机械工业第六设计研究院有限公司 | 无支撑连续施工的钢框架抽柱改造加固方法 |
CN114674154A (zh) * | 2022-03-24 | 2022-06-28 | 广东韶钢松山股份有限公司 | 一种用于热风炉的维修方法 |
CN114674154B (zh) * | 2022-03-24 | 2024-01-09 | 广东韶钢松山股份有限公司 | 一种用于热风炉的维修方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204876059U (zh) | 一种预制装配式型钢混凝土框架结构体系 | |
KR101381866B1 (ko) | ㄱ형강을 이용한 선조립 철골철근콘크리트 구조 | |
CN107143034A (zh) | 一种装配式混凝土框架结构梁柱刚性连接节点 | |
CN103132708B (zh) | 一种梁柱节点加固方法及其加固装置 | |
CN105696747A (zh) | 高空大跨度钢筋混凝土梁的施工方法 | |
CN103924680B (zh) | 无粘结预应力与普通钢筋连接预制混凝土梁方矩形钢管混凝土柱组合节点 | |
CN206091355U (zh) | 一种混凝土厂房柱抽柱结构 | |
CN206352391U (zh) | 承插型键槽式快拆支撑体系 | |
CN105507470A (zh) | 一种周边叠合整体装配式楼板及其施工方法 | |
CN201133085Y (zh) | 一种提高体外预应力效应的结构 | |
CN206157913U (zh) | 一种装配式方钢管混凝土柱与钢梁连接节点 | |
CN203213344U (zh) | 工业化率高的装配整体式钢筋混凝土剪力墙结构体 | |
CN208534081U (zh) | 一种老建筑构造柱的改造结构 | |
CN204023777U (zh) | 预制装配式混凝土梁柱的连接节点 | |
CN202577580U (zh) | 一种多层大跨度装配整体式空间钢网格建筑结构 | |
CN112302210A (zh) | 装配式内置波纹钢板增强混凝土十形截面构件及施工工艺 | |
CN203701386U (zh) | 一种钢结构楼板组 | |
CN213897670U (zh) | 装配式内置波纹钢板增强混凝土十形截面构件 | |
CN101775876A (zh) | 空间钢桁架屋架 | |
CN213539881U (zh) | 一种钢管混凝土柱H型梁支撑π形组合式中柱底部节点 | |
CN103938732A (zh) | 预应力与普通钢筋连接预制混凝土梁方矩形钢管混凝土柱组合节点 | |
CN207905388U (zh) | 可装配临时作业棚 | |
CN211922308U (zh) | 一种用于桥梁简支t梁湿接缝浇筑混凝土模板固定简易装置 | |
CN207582769U (zh) | 一种h型钢天窗架 | |
CN202227516U (zh) | 一种组合剪力墙结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |