CN206089749U - High -efficient automatic steel pipe material feeding unit - Google Patents

High -efficient automatic steel pipe material feeding unit Download PDF

Info

Publication number
CN206089749U
CN206089749U CN201621003748.8U CN201621003748U CN206089749U CN 206089749 U CN206089749 U CN 206089749U CN 201621003748 U CN201621003748 U CN 201621003748U CN 206089749 U CN206089749 U CN 206089749U
Authority
CN
China
Prior art keywords
frame
plate
steel pipe
feeding
efficient automatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621003748.8U
Other languages
Chinese (zh)
Inventor
彭敦林
林虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANJI PENGDA STEEL PIPE Co Ltd
Original Assignee
ANJI PENGDA STEEL PIPE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANJI PENGDA STEEL PIPE Co Ltd filed Critical ANJI PENGDA STEEL PIPE Co Ltd
Priority to CN201621003748.8U priority Critical patent/CN206089749U/en
Application granted granted Critical
Publication of CN206089749U publication Critical patent/CN206089749U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • De-Stacking Of Articles (AREA)

Abstract

The utility model belongs to the steel tube machining field, concretely relates to high -efficient automatic steel pipe material feeding unit. Including feeding agencies and one end hang in the material stacking mechanism of extracting device top, feeding agencies includes the frame, locates two at least feeding plate that have material fetching groove liftable in the frame, material stacking mechanism includes that two at least slopes set up holds the material strip, hold material strip perpendicular to frame length direction sets up, and towards the one end of frame be less than the other end and hang in the frame top, hold material strip hang in the part of frame top to the projection length on the face of frame top lack in the material fetching groove tank bottom is close to the border of material stacking mechanism one side to the projection on the face of frame top to the frame distance. This application simple structure, with low costs, the conveying is high -efficient automatic, and the electrical part is few, conveys accurately, laborsaving.

Description

A kind of high-efficient automatic steel pipe pay-off
Technical field
The utility model belongs to steel pipe manufacture field, and in particular to a kind of high-efficient automatic steel pipe pay-off.
Background technology
Existing steel pipe to be carried out quenching plus man-hour, needs are artificial to be one by one put into steel pipe on conveying mechanism, Or adopt more complicated structure and carry out cooperation with multiple electrical parts and realize self-feeding, the former efficiency is low, cost of labor is high and Danger, the latter's high cost equipment is complicated, high cost, and maintenance is also bothered.
Utility model content
The purpose of this utility model is to provide a kind of high-efficient automatic steel pipe pay-off to solve the above problems.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of high-efficient automatic steel pipe pay-off, including material fetching mechanism and one end be suspended from the code above the material fetching mechanism Material mechanism, the material fetching mechanism includes that frame, in frame at least two have the liftable feeding plate of feeding groove, institute Shu Maliao mechanisms include at least two bearing material bars being obliquely installed, and the bearing material bar is arranged perpendicular to the frame length direction, And be less than the other end and be suspended from the frame top towards one end of frame, the bearing material bar is suspended from the part above the frame Projected length on frame top end face is shorter than the feeding groove bottom land and projects to frame near code material to frame top end face The distance at the edge of mechanism side.
Preferably, the feeding plate includes being connected to the choosing into plate and limiting plate of respective bottom in opposite directions.
Preferably, the bearing material bar two ends are installed with upwards beyond the baffle plate of bearing material bar upper surface.
Preferably, the bearing material bar includes being suspended from feeding head section above the frame, it is described to choose include into plate be located at The bridging piece section being crisscross arranged with the feeding head section on top and the limit material transfer section being connected with the limiting plate positioned at bottom.
Projection of the bridging piece section with feeding head section to the plane perpendicular to frame length direction is intersected, to ensure that steel pipe is chosen Rise.
Preferably, being provided with lift cylinder in the frame, the feeding plate is by being fixedly arranged on the lift cylinder top Jacking pallet be connected with the feeding plate.
Preferably, the jacking pallet includes the platen that two ends can be on frame to the frame, the upper end on platen The vertical support plate being fixed on the feeding plate bottom surface.
Preferably, the frame includes two upper frame bars that are parallel and arranging along steel pipe direction of transfer, the platen position In the top of the upper frame bar and length is more than the spacing between two upper frame bars.
Jacking pallet stabilized structure, intensity is high, and frame in frame, is easy to steel pipe market in turn ensure that by force when not rising Degree.
Preferably, the platen at least includes being respectively fixedly connected with two groups chosen into plate and limiting plate, per group at least includes dividing It is not connected to the two panels platen chosen into plate or limiting plate upper end and middle part.
Preferably, the feeding head section bottom is set up in the frame by connecting rod.
Preferably, angle of the angle chosen into plate and horizontal plane less than limiting plate and horizontal plane, described to choose into plate Be flat board with limiting plate, be respectively crisscross arranged successively two groups of the Ma Liao mechanisms and material fetching mechanism, the bearing material bar with most 80cm is smaller than between the close feeding plate.
The bearing material bar both sides are provided between minor flank or two bearing material bars and are detachably connected with auxiliary support bracket.
Choose into plate and limiting plate angle of inclination small one and large one, so as to ensure to take gently to slip into when choosing into plate section in steel pipe Hopper, it is ensured that steel pipe is without damage or excessive velocities are upspring or skidded off from groove, speed is maximum after steel pipe to bottom land, more oblique limit Position plate effectively prevents steel pipe from routing up upwards by means of power.
It is flat board so that feeding groove is cone tank to choose into plate and limiting plate, so as to ensure to be connect with line between steel pipe and feeding groove Touch, reduce frictional force, it is ensured that material transfer is more smooth.
The setting of minor flank or auxiliary support bracket ensures that steel pipe is stably piled up on support bar, and aids in setting for support bracket To put also can ensure and consolidate between support bar, improve the intensity of Ma Liao mechanisms.
In sum, the utility model has the advantages that:
1st, the application first piles up steel pipe at least two bearing material bars and because bearing material bar is obliquely installed so that foremost Steel pipe be against on baffle plate the steel pipe for guaranteeing foremost all the time and be suspended from frame top and on feeding position, will be taken by cylinder Flitch top is lifted up steel pipe so that choosing into plate, when steel pipe bottom is higher than height of baffle plate departing from the stop of gear analysis, Slip in feeding groove along choosing plate by choosing the angle of inclination steel pipe of plate again, and ensure that steel pipe is more than to the distance at frame edge , to ensure that steel pipe smoothly falls with feeding plate, transmitted to the distance at frame edge feeding head section end.
2nd, the application simple structure, low cost, transmission is efficiently automatic, and electrical part is few, and transmission is accurate, laborsaving.
Description of the drawings:
Fig. 1 is the application structural representation one.
Fig. 2 is the application structural representation two.
Fig. 3 is bearing material strip side minor flank structural representation.
Fig. 4 is bearing material band auxiliary support bracket structural representation.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to restriction of the present utility model, ability to explanation of the present utility model Field technique personnel can make as needed the modification without creative contribution after this specification is read to the present embodiment, but As long as all being protected by Patent Law in right of the present utility model.
Embodiment one:
A kind of high-efficient automatic steel pipe pay-off, including material fetching mechanism and one end be suspended from the code above the material fetching mechanism Material mechanism, the material fetching mechanism includes that frame 2, in frame at least two have the liftable feeding of feeding groove 31 Plate, the Ma Liao mechanisms include at least two bearing material bars 4 being obliquely installed, and the bearing material bar is perpendicular to the frame length direction Arrange, and be less than the other end towards one end of frame and be suspended from the frame top, the bearing material bar is suspended from the frame top Part to frame top end face on projected length be shorter than project to frame of the feeding groove bottom land to frame top end face and lean on The distance at the edge of Jin Maliao mechanisms side.
The feeding plate includes being connected to the choosing into plate 11 and limiting plate 12 of respective bottom in opposite directions.
The bearing material bar two ends are installed with upwards beyond the baffle plate 41 of bearing material bar upper surface.The bearing material bar includes being suspended from institute State the feeding head section above frame, it is described choose into plate include the superposed bridging piece section being crisscross arranged with the feeding head section and Positioned at the limit material transfer section being connected with the limiting plate of bottom.Bridging piece section is with feeding head section to perpendicular to the flat of frame length direction The projection in face is intersected, to ensure that steel pipe is provoked.
It is provided with lift cylinder in the frame, the feeding plate is by being fixedly arranged on the jacking pallet on the lift cylinder top It is connected with the feeding plate.The jacking pallet includes the platen 51 that two ends can be on frame to the frame, upper on platen End is fixed on the vertical support plate 52 on the feeding plate bottom surface.
The frame includes two upper frame bars 21 that are parallel and arranging along steel pipe direction of transfer, and the platen is located at the top The top of frame bar and length are more than the spacing between two upper frame bars.Jacking pallet stabilized structure, intensity is high, and does not rise When frame in frame, be easy to steel pipe market in turn ensure that intensity.
The platen at least includes being respectively fixedly connected with two groups chosen into plate 11 and limiting plate 12, and per group at least includes connecting respectively In choosing the two panels platen into plate 11 or the upper end of limiting plate 12 and middle part.The feeding head section bottom is set up in described by connecting rod In frame.
Embodiment two:
Place unlike the embodiments above is the folder chosen and limiting plate and horizontal plane are less than into plate and the angle of horizontal plane Angle, described choosing into plate and limiting plate is flat board, be respectively crisscross arranged successively two groups of the Ma Liao mechanisms and material fetching mechanism, institute The 80cm that is smaller than between bearing material bar and the immediate feeding plate is stated, the bearing material bar both sides are provided with minor flank 6.
Choose into plate and limiting plate angle of inclination small one and large one, so as to ensure to take gently to slip into when choosing into plate section in steel pipe Hopper, it is ensured that steel pipe is without damage or excessive velocities are upspring or skidded off from groove, speed is maximum after steel pipe to bottom land, more oblique limit Position plate effectively prevents steel pipe from routing up upwards by means of power.
It is flat board so that feeding groove is cone tank to choose into plate and limiting plate, so as to ensure to be connect with line between steel pipe and feeding groove Touch, reduce frictional force, it is ensured that material transfer is more smooth.
Embodiment three:
Place unlike the embodiments above is that auxiliary support bracket 7 is detachably connected between two bearing material bars.
Bearing material bar side is provided with the slot for being formed that caved inward by bearing material bar body, minor flank or auxiliary support bracket end Local is inserted in slot, and by being spirally connected fixation located at minor flank or auxiliary support bracket upper junction plate and slot.
The setting of minor flank or auxiliary support bracket ensures that steel pipe is stably piled up on support bar, and aids in setting for support bracket To put also can ensure and consolidate between support bar, improve the intensity of Ma Liao mechanisms.
The application first piles up steel pipe at least two bearing material bars and because bearing material bar is obliquely installed so that foremost Steel pipe is against all the time on baffle plate the steel pipe for guaranteeing foremost and is suspended from frame top and on feeding position, by cylinder by feeding Top of the plate is lifted up steel pipe so that choosing into plate, when steel pipe bottom is higher than height of baffle plate departing from the stop of gear analysis, then Slip in feeding groove along choosing plate by the angle of inclination steel pipe of plate is chosen, and ensure that steel pipe is more than to the distance at frame edge and send , to ensure that steel pipe smoothly falls with feeding plate, transmitted to the distance at frame edge stub bar section end.

Claims (10)

1. a kind of high-efficient automatic steel pipe pay-off, it is characterised in that:The reclaimer is suspended from including material fetching mechanism and one end Ma Liao mechanisms above structure, the material fetching mechanism includes frame(2), in frame at least two have feeding groove(31)'s Liftable feeding plate, the Ma Liao mechanisms include at least two bearing material bars being obliquely installed(4), the bearing material bar is perpendicular to institute The setting of frame length direction is stated, and is less than the other end and is suspended from the frame top towards one end of frame, the bearing material bar hangs Projected length on part above the frame to frame top end face is shorter than the feeding groove bottom land to frame top end face Project to distance of the frame near the edge of Ma Liao mechanisms side.
2. a kind of high-efficient automatic steel pipe pay-off according to claim 1, it is characterised in that:The feeding plate includes Choosing into plate for respective bottom is connected in opposite directions(11)And limiting plate(12).
3. a kind of high-efficient automatic steel pipe pay-off according to claim 1, it is characterised in that:The bearing material bar two ends It is installed with upwards beyond the baffle plate of bearing material bar upper surface(41).
4. a kind of high-efficient automatic steel pipe pay-off according to claim 2, it is characterised in that:The bearing material bar includes The feeding head section being suspended from above the frame, described choosing include superposed with choosing that the feeding head section is crisscross arranged into plate Plate section and the limit material transfer section being connected with the limiting plate positioned at bottom.
5. a kind of high-efficient automatic steel pipe pay-off according to claim 4, it is characterised in that:It is provided with the frame Lift cylinder, the feeding plate is connected by being fixedly arranged on the jacking pallet on the lift cylinder top with the feeding plate.
6. a kind of high-efficient automatic steel pipe pay-off according to claim 5, it is characterised in that:The jacking pallet bag Include the platen that two ends can be on frame to the frame(51), the upper end on platen is fixed on vertical on the feeding plate bottom surface Plate(52).
7. a kind of high-efficient automatic steel pipe pay-off according to claim 6, it is characterised in that:The frame includes two Bar it is parallel and along steel pipe direction of transfer arrange upper frame bar(21), the platen is located at the top of the upper frame bar and length is more than Spacing between two upper frame bars.
8. a kind of high-efficient automatic steel pipe pay-off according to claim 6, it is characterised in that:The platen is at least wrapped Include to be respectively fixedly connected with and choose into plate(11)And limiting plate(12)Two groups, per group at least includes being connected to and choosing into plate(11)Or it is spacing Plate(12)Upper end and the two panels platen at middle part.
9. a kind of high-efficient automatic steel pipe pay-off according to claim 4-8 any claim, its feature exists In:The feeding head section bottom is set up in the frame by connecting rod.
10. a kind of high-efficient automatic steel pipe pay-off according to claim 2, it is characterised in that:It is described choose into plate with Less than the angle of limiting plate and horizontal plane, described choosing into plate and limiting plate is flat board to the angle of horizontal plane, the Ma Liao mechanisms and Respectively be crisscross arranged successively two groups of material fetching mechanism, being smaller than between the bearing material bar and the immediate feeding plate 80cm。
CN201621003748.8U 2016-08-31 2016-08-31 High -efficient automatic steel pipe material feeding unit Active CN206089749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621003748.8U CN206089749U (en) 2016-08-31 2016-08-31 High -efficient automatic steel pipe material feeding unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621003748.8U CN206089749U (en) 2016-08-31 2016-08-31 High -efficient automatic steel pipe material feeding unit

Publications (1)

Publication Number Publication Date
CN206089749U true CN206089749U (en) 2017-04-12

Family

ID=58477546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621003748.8U Active CN206089749U (en) 2016-08-31 2016-08-31 High -efficient automatic steel pipe material feeding unit

Country Status (1)

Country Link
CN (1) CN206089749U (en)

Similar Documents

Publication Publication Date Title
CN202337588U (en) Stack unpiling and piling device for electric energy meter turnover box
CN204823359U (en) Cardboard loading attachment
CN202193400U (en) Feeding lifting device of aluminum sheets
CN206089749U (en) High -efficient automatic steel pipe material feeding unit
CN208854688U (en) A kind of corrugated board corner protector cutting machine
CN206089734U (en) Environment -friendly steel pipe input device
CN206634704U (en) Workpiece time transport mechanism
CN206417560U (en) A kind of high-efficiency and energy-saving type feeder in steel pipe quenching technical
CN2853719Y (en) Automatic correction frame for pallet stacking
CN206089748U (en) Pay -off structure among steel pipe equipment for heat treatment
CN206728908U (en) A kind of frame structure of cage culture
CN204528475U (en) Automatic some brick machine
CN203410726U (en) Side frame storage device
CN203921270U (en) A kind of folded bundling device for rectangular tube
CN208531569U (en) A kind of pallet buffer storage
CN206511699U (en) Batch printing paper rack
CN206141900U (en) A pipe collecting device for on automatic packaging system of steel pipe
CN206068805U (en) Bolt automatic charging device
CN204777353U (en) Automatic feed and eat device
CN206826283U (en) A kind of carving machine device
CN202575201U (en) Power transmission apparatus with sensor
CN205962363U (en) Quick -witted mount of feeding
CN207524568U (en) A kind of novel pipe carriage
CN203952080U (en) A kind of novel trough
CN203728019U (en) Automatic steel tube containing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant