CN206084061U - Welding machines of getting ready more - Google Patents

Welding machines of getting ready more Download PDF

Info

Publication number
CN206084061U
CN206084061U CN201620950661.5U CN201620950661U CN206084061U CN 206084061 U CN206084061 U CN 206084061U CN 201620950661 U CN201620950661 U CN 201620950661U CN 206084061 U CN206084061 U CN 206084061U
Authority
CN
China
Prior art keywords
bonding machine
welding
welding gun
machine shell
timer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620950661.5U
Other languages
Chinese (zh)
Inventor
许欣
王金凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Three Letter (tianjin) Automation Equipment Co Ltd
Original Assignee
Three Letter (tianjin) Automation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Three Letter (tianjin) Automation Equipment Co Ltd filed Critical Three Letter (tianjin) Automation Equipment Co Ltd
Priority to CN201620950661.5U priority Critical patent/CN206084061U/en
Application granted granted Critical
Publication of CN206084061U publication Critical patent/CN206084061U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Resistance Welding (AREA)

Abstract

The utility model provides a welding machines of getting ready more, includes: welding machine shell, control system, power equipment, welding system, wherein, control system include: control panel, operating panel and welding timer, the control panel fix in welding machine shell side, operating panel fixed mounting outside at the welding machine shell, control panel and operating panel are connected with the welding timer through the circuit, the welding timer install inside the welding machine shell, welding system include: welder, storage press pump and drain line, wherein, the storage press pump fix at welding machine shell top, the utility model discloses revise equipment and adopt multiple spot welded structure, can carry out the multiple spot and weld simultaneously, saved weld time, be used for specially having obtained very big promotion to the big batch weldment work efficiency of specific products, greatly practiced thrift the time cost.

Description

It is a kind of to get bonding machine ready more
Technical field
The utility model belongs to field of welding devices, more particularly to one kind gets bonding machine ready more.
Background technology
Welding is exactly the process for coupling metal parts with various fusible alloys (scolding tin).The fusing point ratio of scolding tin is by wlding That what is expected is low, and such part will occur intermolecular contact and terminate welding in the case where not being melted by its surface.Welding Ensure that metallic continuity.On the one hand, two kinds of metals are got in touch with together each other by bolt-connection or physical attachment, table It is now a strong metal entirety, but this connection is discontinuous, and sometimes metallic surface is if oxide insulating film, Then they are even to wrong physical contact.Mechanical attachment is that contact surface continuation generation oxidation is made with another defect of welding analogy With and cause the addition of resistance.In addition, vibration and other mechanical shocks can also make joint looseness.It is difficult that welding then eliminates these There is no relative movement in topic, welding position, contact surface will not be aoxidized, and continuous conductive method is adhered to.In addition, common welding All it is single-point welding, inefficiency, yield is relatively low, wastes substantial amounts of manpower and materials and time cost.
The content of the invention
In order to solve above-mentioned technical problem, the utility model provides one kind and gets bonding machine ready more, can carry out multiple spot and weld simultaneously Connect, it is cost-effective, strengthen weld strength.
It is a kind of to get bonding machine ready more, including:Bonding machine shell, control system, power equipment, welding system, wherein, it is described Control system include:Control panel, guidance panel and welding timer, described control panel is fixed on bonding machine shell side, Described guidance panel is fixedly mounted on bonding machine housing exterior, and control panel and guidance panel are by circuit and welding timer phase Connection;Described welding timer is arranged on bonding machine enclosure;Described welding system includes:Welding gun, storage and are entered press pump Water lines, wherein, described storage press pump is fixed on bonding machine cover top portion;Welding gun is installed with bonding machine outer surface of outer cover Delivery port, in welding gun pad periphery cooling water inlet and cooling backwater pipeline are provided with;Described welding gun delivery port lower section is arranged There is pneumatic triple piece;Described bonding machine enclosure is provided with tool switching mounting table.
Further, described power equipment includes switch box and transformer, and described switch box is fixed on outside bonding machine Shell back, described switch box passes through circuit with transformer to being connected, and described transformer is fixed on switch box lower section.
Further, described guidance panel top is provided with tri coloured lantern.
Further, described guidance panel bottom is provided with bleed pressure table.
Further, described bonding machine enclosure is provided with pressure switch.
Further, described welding gun delivery port quantity is at least two, horizontally arranged between welding gun discharge outlet.
The utility model provides one kind and gets bonding machine ready more, and simple structure is easy to use, and apparatus modifications are adopted into multiple spot Welding structure, can carry out multiple spot and weld simultaneously, weld interval be saved, dedicated for the high-volume Welder to specific products Great lifting has been obtained as efficiency, time cost has greatly been saved.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is structural representation of the present utility model.
Wherein, 1, inlet pipeline;2nd, switch box;3rd, welding timer;4th, transformer;5th, control panel;6th, welding gun delivery port 7th, pneumatic triple piece;8th, press pump is stored up;9th, tri coloured lantern;10th, guidance panel;11st, bleed pressure table;12nd, tool switching mounting table; 13rd, pressure switch.
Specific embodiment
Below in conjunction with accompanying drawing and preferred embodiment, to the specific embodiment, structure, the feature that provide according to the utility model And its effect, describe in detail as after.
It is a kind of to get bonding machine ready more, including:Bonding machine shell, control system, power equipment, welding system, wherein, it is described Control system include:Control panel 5, guidance panel 10 and welding timer 3, described control panel 5 is fixed on bonding machine shell Side, described guidance panel 10 is fixedly mounted on bonding machine housing exterior, and control panel 5 and guidance panel 10 are by circuit and weldering Connect timer 3 to be connected;Described welding timer 3 is arranged on bonding machine enclosure;Described welding system includes:Weldering Rifle, storage press pump 8 and inlet pipeline 1, wherein, described storage press pump 8 is fixed on bonding machine cover top portion;In bonding machine housing exterior Face is installed with welding gun cooling pipe road, and the side of welding gun delivery port 6 is provided with inlet pipeline 1;Under described welding gun delivery port 6 Side is provided with pneumatic triple piece 7;Described bonding machine enclosure is provided with tool switching mounting table 12.Described power equipment Including switch box 2 and transformer 4, described switch box 2 is fixed on bonding machine case back, and described switch box 2 passes through circuit With transformer 4 to being connected, described transformer 4 is fixed on the lower section of switch box 2.The described top of guidance panel 10 is provided with three colors Lamp 9.The described bottom of guidance panel 10 is provided with bleed pressure table 11.Described bonding machine enclosure is provided with pressure switch 13.Described welding gun delivery port quantity is at least two, horizontally arranged between welding gun delivery port 6.
The utility model provides one kind and gets bonding machine ready more, and simple structure is easy to use, and apparatus modifications are adopted into multiple spot Welding structure, can carry out multiple spot and weld simultaneously, weld interval be saved, dedicated for the high-volume Welder to specific products Great lifting has been obtained as efficiency, time cost has greatly been saved.
It has been described in detail to of the present utility model above by embodiment, but the content is only of the present utility model Preferred embodiment, it is impossible to be considered as limiting practical range of the present utility model.It is all to be made according to the utility model application range Impartial change with improve etc., all should still belong within patent covering scope of the present utility model.

Claims (6)

1. it is a kind of to get bonding machine ready more, including:Bonding machine shell, control system, power equipment, welding system, wherein, it is described Control system includes:Control panel, guidance panel and welding timer, described control panel is fixed on bonding machine shell side, institute The guidance panel stated is fixedly mounted on bonding machine housing exterior, and control panel and guidance panel are connected by circuit with welding timer Connect;Described welding timer is arranged on bonding machine enclosure;Described welding system includes:Welding gun, storage press pump and water inlet Pipeline, wherein, described storage press pump is fixed on bonding machine cover top portion;Welding gun is installed with bonding machine outer surface of outer cover to go out The mouth of a river, in welding gun pad periphery cooling water inlet and cooling backwater pipeline are provided with;Described welding gun delivery port lower section is provided with Pneumatic triple piece;Described bonding machine enclosure is provided with tool switching mounting table.
2. one kind according to claim 1 gets bonding machine ready, it is characterised in that:Described power equipment includes switch box And transformer, described switch box is fixed on bonding machine case back, described switch box by circuit and transformer to being connected, Described transformer is fixed on switch box lower section.
3. one kind according to claim 1 gets bonding machine ready, it is characterised in that:Described guidance panel top is provided with Tri coloured lantern.
4. one kind according to claim 1 gets bonding machine ready, it is characterised in that:Described guidance panel bottom is provided with Bleed pressure table.
5. one kind according to claim 1 gets bonding machine ready, it is characterised in that:Described bonding machine enclosure is arranged There is pressure switch.
6. one kind according to claim 1 gets bonding machine ready, it is characterised in that:Described welding gun delivery port quantity be to It is few two, it is horizontally arranged between welding gun discharge outlet.
CN201620950661.5U 2016-08-27 2016-08-27 Welding machines of getting ready more Expired - Fee Related CN206084061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620950661.5U CN206084061U (en) 2016-08-27 2016-08-27 Welding machines of getting ready more

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620950661.5U CN206084061U (en) 2016-08-27 2016-08-27 Welding machines of getting ready more

Publications (1)

Publication Number Publication Date
CN206084061U true CN206084061U (en) 2017-04-12

Family

ID=58469277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620950661.5U Expired - Fee Related CN206084061U (en) 2016-08-27 2016-08-27 Welding machines of getting ready more

Country Status (1)

Country Link
CN (1) CN206084061U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106624245A (en) * 2016-08-27 2017-05-10 三之信(天津)自动化设备有限公司 Multi-spotting welding machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106624245A (en) * 2016-08-27 2017-05-10 三之信(天津)自动化设备有限公司 Multi-spotting welding machine

Similar Documents

Publication Publication Date Title
CN103706928B (en) The straight seam buried arc welding method of corrosion resistance metallurgical composite bimetal steel tube
CN203738209U (en) Arc voltage induction type automatic welding head
CN206084061U (en) Welding machines of getting ready more
CN206296601U (en) A kind of small triangle robot welding system
CN201615295U (en) Metal pipe welding structure
CN204584527U (en) A kind of gate-type submerged arc welding machine
CN101722354A (en) Liner welding method
CN106624245A (en) Multi-spotting welding machine
CN201988840U (en) Electroslag welding slag leakage preventing device
CN203737426U (en) Liquid skimming pipe of scraper centrifuge
CN103949765B (en) A kind of production welding method for roadway support steel bar ladder ellbeam
CN206122876U (en) Indirect arc stud welding frock
CN201954125U (en) Steel-based three-layer composite steel pipe
CN207464512U (en) A kind of muffler welds special nitrogen charging tooling
CN201217123Y (en) Air-cooled argon arc welding gun
CN207646293U (en) A kind of end socket production pickler
CN201792085U (en) Carbon dioxide gas protection semi-automatic welding machine
CN206572812U (en) A kind of bend pipe structure
CN205673745U (en) Fixed welding gun group
CN208513894U (en) Seam welder welding Water cooling cable mechanism
CN205520056U (en) Resistance welder of robot
CN101152683A (en) Welding method of sealing opens of metal tube member
CN105202832B (en) Connection method of liquid storage device
CN212384425U (en) Thin-wall round tube closing tool
CN202349422U (en) Argon arc-welded thin-walled stainless steel pipe connector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20180827