CN206076866U - Grid type cable-management crane span structure - Google Patents
Grid type cable-management crane span structure Download PDFInfo
- Publication number
- CN206076866U CN206076866U CN201620885901.8U CN201620885901U CN206076866U CN 206076866 U CN206076866 U CN 206076866U CN 201620885901 U CN201620885901 U CN 201620885901U CN 206076866 U CN206076866 U CN 206076866U
- Authority
- CN
- China
- Prior art keywords
- crane span
- span structure
- plate
- management
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model is related to a kind of grid type cable-management crane span structure, including crane span structure, the coupling assembly for connecting multiple crane span structures, the plug-in heavy frame for carrying crane span structure and cable management accessories, crane span structure is located on plug-in heavy frame, cable management accessories are located on crane span structure, crane span structure is that circular parallel and cross section are constituted for the radial line of rectangle by cross section, the cross section of crane span structure is U-type groove shape, and radial line is fixed on the outside of parallel, and crane span structure includes at least one straight-through and at least one horizontal threeway.The utility model has the advantage of, possess modular standard architecture and such as lead directly to, the standard module component such as horizontal threeway, justify the structure of latitude in square footpath, enhance product bearing capacity, simplified coupling assembly is convenient to be installed, and plug-in heavy frame can carry multichannel crane span structure, coordinates self-produced rack to save the set-up time, the cable management accessories of combined can cabling, wiring for greater flexibility, be current unique solution in like product on the market.
Description
Technical field
The utility model relates generally to the technical field of cable testing bridge, more particularly to a kind of grid type cable-management crane span structure.
Background technology
Grid bridge has the special feature that:Make all of cable all root roots visible, can management and control wiring installation comprehensively quality;
Allow from arbitrfary point outlet, very easily can couple together with various machinery equipments, can arbitrarily change outlet point;Fire protecting performance
By force;Simplicity flexible for installation, maintenance are convenient.At present, structure of the general grid bridge at turning is unfavorable for cabling and crane span structure peace
Dress, the component for connecting two segment mesh crane span structures need screw and nut, and the structure of grid bridge bracing frame is more single, therefore this
Utility model is the improvement to existing structure.
Utility model content
The utility model is directed to the problems referred to above, it is therefore intended that provide a kind of grid type cable-management crane span structure.
The purpose of this utility model can be realized by following technical proposals:
The utility model is related to a kind of grid type cable-management crane span structure, including crane span structure, for connecting multiple crane span structures
Coupling assembly, the plug-in heavy frame for carrying the crane span structure and cable management accessories, the crane span structure are located at the clamping
On formula heavy frame, the cable management accessories are located on the crane span structure, and the crane span structure is circular parallel and transversal by cross section
Face is constituted for the radial line of rectangle, and the cross section of the crane span structure is U-type groove shape, and the radial line is fixed on the outside of the parallel, institute
Stating crane span structure includes at least one straight-through and at least one horizontal threeway, and the horizontal threeway is connected as a single entity by Part I and Part II
Constitute, it is jaggy straight-through that the Part I is that avris wall place placed in the middle opens, the Part II be one for connect it is straight-through,
Shorter is straight-through, and the Part II is arranged on the indentation, there of the Part I, and the parallel of the Part II is connected to institute
State on the parallel of Part I, the side wall of the Part I and Part II is connected by a transition wall, the connection group
Part includes an at least connecting plate one and at least two connecting plates two, and described leading directly to mutually is interconnected by the coupling assembly with Part II
Connect.
Further, the transition wall is in straight flange and equal with the side wall angle of the Part I and Part II that are connected
In degree, the Part I and Part II are mutually perpendicular to.
Further, to homonymy flexibility, the connecting plate one is provided with the top edge and lower limb of the connecting plate one
One circular hole and multiple strip holes, the connecting plate two are provided with multiple circular holes.
Further, the circular hole is centrally positioned on the connecting plate one, and the quantity of the strip hole is six, institute
Three left and right sides that the circular hole is distributed on into a row of strip hole are stated, the circular hole quantity on the connecting plate two is three, and
Equidistantly, it is centrally positioned in a row on the connecting plate two.
Further, the plug-in heavy frame is supported by the first crane span structure clamping seat, the second crane span structure clamping seat, support and two
Pin is connected as a single entity composition, is equipped with multiple draw-in grooves, for clamping institute on the first crane span structure clamping seat and the second crane span structure clamping seat
Crane span structure is stated, the rectangular triangular support shape in top of the support, hypotenuse support the first crane span structure clamping seat as support edge
One end, the other end of the first crane span structure clamping seat is connected with the support, the second crane span structure clamping seat and the first crane span structure
Clamping seat is parallel, be arranged on the bottom of the support, and its two ends is supported by the support, the bottom two ends difference of the support
It is provided with the support feet.
Further, the cable management accessories include an at least plate, at least two Inside and outside screws, a fixed plate, a peace
Dress plate, two bolts and two nuts, place is provided with screwed hole between two parties at the two ends of the plate, and three demarcation strips are formed on the plate,
The plate is divided into into two cable separated regions and two screw thread bore regions, the cable separated region is provided with a plurality of separation muscle,
For separating cable, the two ends one side of the plate forms groove, and another side forms the projection with the groove fit, described interior
Outside nut is used to connect the assembly of the plate and fixed plate, the plate and fixed plate and is arranged on the inside of the crane span structure, leads to
Cross the screw bolt and nut and be connected with the installing plate for being arranged on correspondence position on the outside of the crane span structure.
Further, it is welded and fixed between the parallel and radial line.
Further, the crane span structure is capable of achieving standard modular assembling, leads directly to and horizontal threeway is standard module component.
The utility model has the advantage of, possess modular standard architecture and such as lead directly to, the standard module such as horizontal threeway
Component, Fang Jing justify the structure of latitude, enhance product bearing capacity, and simplified coupling assembly is convenient to be installed, accommodation function module
, with conventional mesh formula cable-management crane span structure than reducing the Site Service used time more than 40%, plug-in heavy frame can for quick assembling scheme
Multichannel crane span structure is carried, coordinates self-produced rack to reduce the Site Service used time more than 20% again, the cable management accessories of combined
Can cabling, wiring for greater flexibility, the utility model is current unique solution in like product on the market.
Description of the drawings
A kind of structural representations of the Fig. 1 for crane span structure.
Fig. 2 is a kind of structural representation of horizontal threeway.
A kind of structural representations of the Fig. 3 for coupling assembly.
A kind of structural representations of the Fig. 4 for plug-in heavy frame.
A kind of structural representations of the Fig. 5 for plate.
In figure, part numbers are as follows:
1 is straight-through;2 is horizontal threeway;3 is Part I;4 is Part II;5 is transition wall;6 is connecting plate one;7 are
Connecting plate two;8 is the first crane span structure clamping seat;9 is the second crane span structure clamping seat;10 is support;11 is support feet;12 is plate.
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with accompanying drawing, becomes apparent from those skilled in the art
Ground understands how to put into practice the utility model.Although describing the utility model with reference to its preferred embodiment, these
Embodiment is simply illustrated, rather than limits scope of the present utility model.
As shown in Figure 1 and Figure 2, a kind of grid type cable-management crane span structure that the present embodiment is provided, including crane span structure, for connecting
The coupling assembly of multiple crane span structures, the plug-in heavy frame for carrying the crane span structure and cable management accessories, the bridge
It is erected on the plug-in heavy frame, the cable management accessories are located on the crane span structure, the crane span structure is circle by cross section
The parallel of shape and cross section are constituted for the radial line of rectangle, and the cross section of the crane span structure is U-type groove shape, and the radial line is fixed on described
The outside of parallel, the crane span structure include at least one straight-through 1 and at least one horizontal threeway 2, and the horizontal threeway 2 is by Part I 3
It is connected as a single entity composition with Part II 4, the Part I opens jaggy straight-through for avris wall place placed in the middle, described second
Points 4 be one be used to connecting straight-through 1, it is shorter straight-through, the Part II 4 is arranged on the indentation, there of the Part I 4, described
The parallel of Part II 4 is connected on the parallel of the Part I 3, and the side wall of the Part I 3 and Part II 4 leads to
Cross a transition wall 5 to connect, the coupling assembly includes an at least connecting plate 1 and at least two connecting plates 27, straight-through 1 He
Part II 4 is connected with each other by the coupling assembly.
The transition wall 5 is in straight flange and is in 135 with the side wall angle of the Part I 3 and Part II 4 being connected
Degree, the Part I 3 and Part II 4 are mutually perpendicular to.
As shown in figure 3, the top edge and lower limb of the connecting plate 1 are to 90 degree of same lateral bend, on the connecting plate 1
A circular hole and multiple strip holes are provided with, the connecting plate 27 is provided with multiple circular holes.
The circular hole is centrally positioned on the connecting plate 1, and the quantity of the strip hole is six, the strip hole three
Individual to be distributed on the left and right sides of the circular hole into a row, the circular hole quantity on the connecting plate 27 is three, and equidistantly, into
It is centrally positioned on the connecting plate 27 one row.
As shown in figure 4, the plug-in heavy frame is by the first crane span structure clamping seat 8, the second crane span structure clamping seat 9,10 and of support
Two support feets 11 are connected as a single entity composition, are equipped with multiple draw-in grooves on the first crane span structure clamping seat 8 and the second crane span structure clamping seat 9,
For crane span structure described in clamping, the rectangular triangular support shape in top of the support 10, hypotenuse support described the as support edge
One end of one crane span structure clamping seat 8, the other end of the first crane span structure clamping seat 8 are connected with the support 10, second crane span structure
Clamping seat 9 is supported by the support 10 with 8 bottom that is parallel, being arranged on the support 10 of the first crane span structure clamping seat, its two ends,
The bottom of the support 10 is respectively arranged at two ends with the support feet 11.
As shown in figure 5, the cable management accessories include an at least plate 12, at least two Inside and outside screws, a fixed plate, one
Installing plate, two bolts and two nuts, place is provided with screwed hole between two parties at the two ends of the plate 12, forms three points on the plate 12
The plate 12 is divided into two cable separated regions and two screw thread bore regions by dividing plate, and the cable separated region is provided with a plurality of
Separate muscle, for separating cable, the two ends one side of the plate 12 forms groove, and another side forms prominent with the groove fit
Rise, the Inside and outside screw is used to connect the assembly of the plate 12 and fixed plate, the plate 12 and fixed plate and is arranged on institute
State on the inside of crane span structure, be connected with the installing plate for being arranged on correspondence position on the outside of the crane span structure by the screw bolt and nut.
It is welded and fixed between the parallel and radial line.
The crane span structure be capable of achieving standard modular assembling, lead directly to 1 and horizontal threeway 2 be standard module component.
An at least connecting plate 1 and two connecting plates 27 can realize the connection of two sections of crane span structures, the top edge of connecting plate 1
It is stuck on the outside of the vertical wall of two sections of crane span structures with lower limb, two connecting plates 27 are separately positioned on the inside of two sections of crane span structures, with connecting plate one
Buckle is realized in 6 cooperations, completes the connection of two sections of crane span structures.
Multiple plates 12 can be by the groove at two ends, protrusions match, and Inside and outside screw locking carries out being overlapped mutually setting
Put, the assembly of single plate 12 or multiple plates 12 arranges fixed plate in bottom, and fixed plate is by nethermost plate 12
Inside and outside screw connects.
It should be pointed out that for the utility model that Jing is absolutely proved, can also have various conversion and the enforcement retrofited
Scheme, it is not limited to the specific embodiment of above-mentioned embodiment.Above-described embodiment as just explanation of the present utility model, and
It is not to restriction of the present utility model.In a word, protection domain of the present utility model should include those for ordinary skill
Obvious conversion or replacement and remodeling for personnel.
Claims (8)
1. a kind of grid type cable-management crane span structure, it is characterised in that:Including crane span structure, the connection group for connecting multiple crane span structures
Part, the plug-in heavy frame for carrying the crane span structure and cable management accessories, the crane span structure are located at the plug-in load
On frame, the cable management accessories are located on the crane span structure, and the crane span structure is that circular parallel and cross section are square by cross section
The radial line composition of shape, the cross section of the crane span structure is U-type groove shape, and the radial line is fixed on the outside of the parallel, the crane span structure
Including at least one straight-through (1) and at least one horizontal threeway (2), the horizontal threeway (2) is by Part I (3) and Part II
(4) be connected as a single entity composition, and the Part I opens jaggy straight-through for avris wall place placed in the middle, and the Part II (4) is
One is used to connecting straight-through (1), shorter straight-through, and the Part II (4) is arranged on the indentation, there of the Part I (4), institute
The parallel for stating Part II (4) is connected on the parallel of the Part I (3), the Part I (3) and Part II (4)
Side wall connected by a transition wall (5), the coupling assembly includes at least a connecting plate one (6) and at least two connecting plates two
(7), straight-through (1) and Part II (4) are connected with each other by the coupling assembly.
2. grid type cable-management crane span structure according to claim 1, it is characterised in that:The transition wall (5) in straight flange and
It is in 135 degree with the side wall angle of the Part I (3) and Part II (4) being connected, the Part I (3) and second
Partly (4) are mutually perpendicular to.
3. grid type cable-management crane span structure according to claim 1, it is characterised in that:The top of the connecting plate one (6)
, to 90 degree of same lateral bend, the connecting plate one (6) is provided with a circular hole and multiple strip holes, the connecting plate two for edge and lower limb
(7) multiple circular holes are provided with.
4. grid type cable-management crane span structure according to claim 3, it is characterised in that:The circular hole is centrally positioned in described
On connecting plate one (6), the quantity of the strip hole is six, three left and right that the circular hole is distributed on into a row of the strip hole
Both sides, the circular hole quantity on the connecting plate two (7) are three, and are centrally positioned in the connecting plate equidistantly, in a row
On two (7).
5. grid type cable-management crane span structure according to claim 1, it is characterised in that:The plug-in heavy frame is by first
Crane span structure clamping seat (8), the second crane span structure clamping seat (9), support (10) and two support feets (11) are connected as a single entity composition, first bridge
Multiple draw-in grooves are equipped with frame clamping seat (8) and the second crane span structure clamping seat (9), for crane span structure described in clamping, the support (10)
The rectangular triangular support shape in top, hypotenuse supports one end of the first crane span structure clamping seat (8) as support edge, described
The other end of the first crane span structure clamping seat (8) is connected with the support (10), the second crane span structure clamping seat (9) and the first crane span structure card
Joint chair (8) is parallel, be arranged on the bottom of the support (10), and its two ends is supported by the support (10), the support (10)
Bottom be respectively arranged at two ends with the support feet (11).
6. grid type cable-management crane span structure according to claim 1, it is characterised in that:The cable management accessories include to
Few a plate (12), at least two Inside and outside screws, a fixed plate, an installing plate, two bolts and two nuts, the two of the plate (12)
End place placed in the middle is provided with screwed hole, forms three demarcation strips on the plate (12), and the plate (12) is divided into the separation of two cables
Region and two screw thread bore regions, the cable separated region are provided with a plurality of separation muscle, for separating cable, the plate (12)
Two ends one side form groove, another side is formed and the projection of the groove fit, and the Inside and outside screw is used to connect the plate
The assembly of part (12) and fixed plate, the plate (12) and fixed plate is arranged on the inside of the crane span structure, by the bolt and
Nut is connected with the installing plate for being arranged on correspondence position on the outside of the crane span structure.
7. grid type cable-management crane span structure according to claim 1, it is characterised in that:Weld between the parallel and radial line
It is fixed.
8. grid type cable-management crane span structure according to claim 1, it is characterised in that:The crane span structure is capable of achieving standard module
Change assembling, it is standard module component to lead directly to (1) and horizontal threeway (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620885901.8U CN206076866U (en) | 2016-08-16 | 2016-08-16 | Grid type cable-management crane span structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620885901.8U CN206076866U (en) | 2016-08-16 | 2016-08-16 | Grid type cable-management crane span structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206076866U true CN206076866U (en) | 2017-04-05 |
Family
ID=58431936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620885901.8U Expired - Fee Related CN206076866U (en) | 2016-08-16 | 2016-08-16 | Grid type cable-management crane span structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206076866U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109149455A (en) * | 2017-06-15 | 2019-01-04 | 居言智能技术(上海)有限公司 | A kind of grid bridge assembly |
CN110994439A (en) * | 2019-12-20 | 2020-04-10 | 陕西建工第三建设集团有限公司 | Slot box installation method based on modular combination intercommunication type slot box connection model |
-
2016
- 2016-08-16 CN CN201620885901.8U patent/CN206076866U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109149455A (en) * | 2017-06-15 | 2019-01-04 | 居言智能技术(上海)有限公司 | A kind of grid bridge assembly |
CN110994439A (en) * | 2019-12-20 | 2020-04-10 | 陕西建工第三建设集团有限公司 | Slot box installation method based on modular combination intercommunication type slot box connection model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20170086579A1 (en) | Shelving unit and fixing member for a shelving unit | |
CN206076866U (en) | Grid type cable-management crane span structure | |
JPS62225172A (en) | Tower structure for high voltage equipment | |
US10473282B2 (en) | Elevated structure-mounted lighting system | |
US8672092B2 (en) | Wire rope tension grid improvements | |
CN206041384U (en) | GridLayout cable management crane span structure | |
RU2539042C1 (en) | TEMPORARY QUICK-MOUNTING AND DISMOUNTING SUPPORT OF OVERHEAD TRANSMISSION LINE PER 35-110 Kv | |
CN105332352A (en) | On-site protection guardrail for repairing outdoor electrical equipment | |
CN106894625B (en) | Modularized external hanging scaffold | |
KR20140008830A (en) | Form device | |
CN105711741A (en) | Detachable handrail structure | |
CN103967314A (en) | 10kv-110kv emergency repair pole | |
CN205051187U (en) | Equipment adjustable switch board | |
CN203997421U (en) | A kind of fender guard of spring damper | |
US20200021090A1 (en) | Integrated cable tray and skid assembly | |
CN210002654U (en) | porcelain plate curtain wall system | |
CN206600051U (en) | A kind of close net stairwell protection network | |
CN202164711U (en) | Steel frame connecting member of prefabricated building | |
CN202838845U (en) | Light emitting diode (LED) display screen installation device | |
CN2191903Y (en) | Plugging type universal pipe joint | |
CN212611896U (en) | Base connecting piece, base connection structure and landing stage sideslip base | |
CN206059918U (en) | The bus solid arrangement of the double segmentation power distribution equipments of double-bus | |
CN207660242U (en) | Plane floor package assembly | |
CN104767139B (en) | Operating platform for hanging ground wire on high voltage side of transformer | |
CN205565297U (en) | Low -voltage switchgear tank bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170405 Termination date: 20190816 |