CN206074794U - The portable power storage load box checked by false wiring of electric energy metering equipment - Google Patents

The portable power storage load box checked by false wiring of electric energy metering equipment Download PDF

Info

Publication number
CN206074794U
CN206074794U CN201621094614.1U CN201621094614U CN206074794U CN 206074794 U CN206074794 U CN 206074794U CN 201621094614 U CN201621094614 U CN 201621094614U CN 206074794 U CN206074794 U CN 206074794U
Authority
CN
China
Prior art keywords
capacitor
load box
wiring
air switch
thermorelay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621094614.1U
Other languages
Chinese (zh)
Inventor
杨仕军
陈瑜
刘文虎
尹利胜
李海清
王春艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Power Supply Bureau of Yunnan Power Grid Co Ltd
Original Assignee
Kunming Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Power Supply Bureau of Yunnan Power Grid Co Ltd filed Critical Kunming Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority to CN201621094614.1U priority Critical patent/CN206074794U/en
Application granted granted Critical
Publication of CN206074794U publication Critical patent/CN206074794U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The portable power storage load box checked by false wiring of electric energy metering equipment, including capacitor, short circuit and overload protection and control loop;Capacitor C presses △ shape wiring;Capacitor and the first air switch QF1, catalyst KM main contacts, reactor X, thermorelay FR main contacts composition main circuit, with the first air switch, thermorelay and reactor are as the short circuit of circuit, overload and suppress dash current protection when closing a floodgate;By the second air switch QF2, catalyst KM auxiliary contact, start button SB2, stop button SB1, thermorelay FR auxiliary contact as the control loop of main circuit, the switching of capacitor is controlled;First air switch, the second air switch, stop button, start button, load box cabinet panel is installed on, other components and parts closings are installed in load box body.This load box can carry out wiring check and analysis to the comprehensive wiring of metering device, and preventing error wiring occurs.

Description

The portable power storage load box checked by false wiring of electric energy metering equipment
Technical field
This utility model belongs to electric power meter wiring check technical field of tools, particularly for low-voltage electric energy metering Device false wiring checks the capacitive load case with analysis.
Background technology
Electric power meter wiring correctness is directly connected to the accuracy of metering, is related to user and power supply enterprise Economic interests.And new clothes user, substantially can not check because of zero load electric current whether metering device wiring is correct in time, fortune Whether row is normal.Need to carry out first inspection in one month, and portions of client in first inspection also because of zero load electric current, need repeatedly to existing Field carries out inspection process, and this not only wastes the production cost of power supply enterprise, can't find metering device with the presence or absence of mistake in time Situations such as mis-wired, electric personnel are met to dress table and cause certain psychological burden.And wiring error is found in first inspection, although it is wrong The mis-wired time is shorter, but has resulted in metering mistake all the time, causes certain economic loss or shadow to client or power supply enterprise Ring.
For the client for being configured with low-voltage reactive compensator, it is possible to use switching low-voltage reactive-load compensation capacitor carries out height For the inspection and analysis of the metering device false wiring of low meter, but for 80kVA and following Electricity customers, due to not configuring low pressure Reactive power compensator, it is impossible to dress table connect the electric same day can just grasp metering device operation it is whether normal.And commercial type is negative Case is carried, a secondary load source is typically all simulated, it is impossible to which Inspection and analysis is carried out to current transformer itself and comprehensive wiring, It is only capable of the error of electric energy meter is checked and analyzed.
The content of the invention
The purpose of this utility model is to solve electric power meter new clothes user because zero load electric current can not be timely Judge the whether correct problem of wiring, there is provided a kind of that the comprehensive wiring of metering device current transformer, electric energy meter can be carried out The portable power storage load box that wiring check is occurred with analysis, effective preventing error wiring.
The purpose of this utility model is achieved through the following technical solutions:
The portable power storage load box checked by false wiring of electric energy metering equipment, including the electric capacity as load Device, short circuit and overload protection and control loop;It is 10kvar for 0.45kV, rated capacity that the capacitor is a rated voltage ~20kvar, the mode of connection press the low voltage three-phase power capacitor C of △ shape wiring;Capacitor and the first air switch QF1, contact Device KM main contacts, reactor X, thermorelay FR main contacts composition main circuit, with the first air switch QF1, thermorelay FR and Reactor X as circuit short circuit, overload and suppress close a floodgate when dash current protection;By the second air switch QF2, catalyst The control loop of KM auxiliary contact, start button SB2, stop button SB1, thermorelay FR auxiliary contact as main circuit is right The switching of capacitor is controlled;Operation part components and parts the first air switch QF1 and the second air switch QF2, stop button SB1, start button SB2 are installed on load box cabinet panel, other components and parts capacitor C, catalyst KM, reactor X, hot relay Device FR closings are installed in load box body.
This utility model is provided with louvre or heat abstractor in the capacitor C installation sites of load box, in thermorelay FR installation sites are provided with SR.Connecting wire in load box body between each first device is not less than 4mm using cross-sectional area2 Insulation annealed copper wire.
This utility model use low voltage three-phase power capacitor as load, air switch as equipment short-circuit protection, Reactor shoves protection, thermorelay as capacitor overtemperature protection as limit, by the use of catalyst as control device, Neng Gou When not using, circuit disconnects automatically, prevents the anti-power transmission of capacitor from causing personnel to get an electric shock.New clothes user's dress table should after the completion of connecing electricity Load box accesses to metering device low-voltage current mutual inductor rear end or subscribers feeder cabinet outlet switch, capacitive load of closing case electricity Source and control power supply, after clicking on start button, capacitor comes into operation, and produces a three-phase equilibrium and stable rated current (root Different rated current are produced according to from different rated capacitor capacity), electric energy metrical is filled using the rated current for producing The false wiring put checked and analyzed, the generation of effective preventing error wiring.
Description of the drawings
Fig. 1 is capacitive load case elementary diagram;
Fig. 2 is capacitive load case panel layout;
Fig. 3 is capacitive load case and electric power meter wiring schematic diagram;
Fig. 4 is that capacitive load case checks electric energy meter correct wiring phasor diagram.
Specific embodiment
With reference to the accompanying drawings and detailed description this utility model is described in further detail.
The wiring for being illustrated in figure 1 the portable power storage load box checked to false wiring of electric energy metering equipment is former Reason figure, including load, short circuit and overload protection and control loop;The load, from a rated voltage be 0.45kV, Rated capacity for 10kvar~20kvar low voltage three-phase power capacitor C as load, carry out wiring by the △ shapes mode of connection. Main circuit is constituted with the first air switch QF1, catalyst KM main contacts, reactor X, thermorelay FR main contacts, it is empty with first Air cock QF1 can play the short-circuit protection of circuit as load box total power switch.Capacitor is in input moment phase in theory When in dash, when line voltage not zero passage, input capacitor has very big inrush phenomenon, therefore, current-limiting reactor in circuit X with suppress close a floodgate when dash current.Thermorelay FR can be prevented because of capacitor mistake as capacitor is overheated and overload protection Heat breaks down.And control loop is then pressed by the second air switch QF2, catalyst KM auxiliary contact, start button SB2, stopping Button SB1, thermorelay FR auxiliary contact are controlled to the switching of capacitor as the control loop of main circuit, one side energy Enough to carry out frequently switching operation to capacitor, more importantly capacitor itself can store electric charge, when not in use, can Prevent capacitor discharge powered to switch or binding post, be prevented effectively from operating personnel and send out during mobile device NOR operation It is raw to get an electric shock.
Capacitive load case panel layout is illustrated in figure 2, by capacitor C, catalyst KM, reactor X, thermorelay FR closings are installed in load box body, the first air switch QF1, the second air switch QF2, stop button SB1, start button SB2 is installed on cabinet panel.Operation part is arranged on panel, and electric connection part is placed in casing, it is ensured that case body equipment Exposed parts safety.Louvre is set in the capacitor C installation sites of load box, is arranged in thermorelay FR installation sites and is resetted Button, is easy to the radiating of capacitor and the reset operation of thermorelay.When capacitive load case is connected to low-voltage electric energy metering dress After putting a load side energization, a rated current of a three-phase equilibrium and homeostasis is produced.Each first device in load box body Between connecting wire, then the rated current according to selected capacitor, is not less than 4mm using cross-sectional area2Insulation annealed copper wire.Electricity Container payload case power supply junction adopts plug-in type, and power line is because the rated capacitor capacity for selecting is in the specified of 10 to 20kvar Electric current is usually no more than 30A, is known using wired colour code, and cross-sectional area is not less than 4mm2Annealed copper wire connect as power line and equipment Ground wire, and outer layer protection is carried out to power line with insulating sheath, during preventing use, insulating barrier is damaged.Power line opposite side with Low-voltage circuit junction then adopts clamp-type, is made using insulant, it is ensured that insulation safety in operating process at gripper handles It is reliable.
Capacitive load case and electric power meter wiring schematic diagram are illustrated in figure 3, and the electric same day are connect in dress table, are worked as user After switchgear house power transmission, on the premise of any user's burden with power is not also put into, capacitive load case is connected to power line Electric power meter Z low-voltage current mutual inductors rear end or subscribers feeder cabinet outlet switch, capacitive load of closing case main power One air switch QF1 and the second air switch QF2, after clicking on start button SB2, capacitor C comes into operation, and produces a three-phase Balance and stable rated current (producing different rated current according to from different rated capacitor capacity), as selected Rated capacitor capacity is 15kvar, and rated current is 19.2A, and at this moment, the primary side current passed through in metering device is three-phase The electric current of balance and stable 19.2A, it is possible to use this electric current that capacitor is produced carries out wiring inspection to electric power meter Look into and analysis.
First, with circuit tester, phase-sequence meter or by checking that electric energy meter magnitude of voltage judges electric energy meter voltage whether normal, phase sequence It is whether correct;Secondly, whether the rated current for being produced with input capacitive load case judges the current loop of metering device Normally, if metering no-load voltage ratio is 150/5A, then the secondary current of electric energy meter should be 19.2 ÷ 30=0.64A (because of supply voltage, electric capacity The impact of device and metering device equal error, current value have certain deviation), check or measure that multifunctional electric energy meter shows two Primary current value, if the secondary side current value of electric energy meter three-phase is balanced and is close to 0.64A, can determine that as metering device electric current Loop is normal.If there is current loop has short circuit or open circuit situation, will can differ larger with the load current value that capacitor is produced, If wherein one phase or line to line fault or open circuit, will appear from three-phase current extremely uneven.
Finally, because the load box for putting into is purely capacitive load, using total power factorAndThis will Point, calculates reverse reactive power valueThe instantaneous reversely idle work(for showing with multifunctional electric energy meter or measuring Rate is compared, and judges whether wiring is correct.Or phase place voltammertry angle is directly used, or use three-phase electric energy meter on-site Tester directly carries out wiring differentiation and verification multifunctional electric energy meter reactive power error and carries out the inspection and analysis of metering device wiring, And at this time, it may be necessary to it is to be noted that in phasor diagram, be electric current leading voltage oneAngle, andAngle is approximately equal to 90 °, correct wiring Phasor diagram it is as shown in Figure 4.
This utility model by the use of capacitor as load, with conducts such as air switch, catalyst, reactor, thermorelays Protection and control, are fabricated to a Portable load box.Dress table connects the electric same day and accesses this utility model in the rear end of metering device, A three-phase equilibrium and stable primary current are produced, the comprehensive wiring to metering device current transformer, electric energy meter connects Ray examination and analysis, can effectively prevent the generation of wiring error.

Claims (3)

1. the portable power storage load box checked by pair false wiring of electric energy metering equipment, it is characterised in that include conduct The capacitor of load, short-circuit and overload protection and control loop;It is 0.45kV, specified appearance that the capacitor is a rated voltage Measure for 10kvar~20kvar, the mode of connection by △ shape wiring low voltage three-phase power capacitor C;Capacitor is opened with the first air QF1, catalyst KM main contacts, reactor X, thermorelay FR main contacts composition main circuit are closed, with the first air switch QF1, heat Relay FR and reactor X as circuit short circuit, overload and suppress close a floodgate when dash current protection;By the second air switch The control of QF2, catalyst KM auxiliary contact, start button SB2, stop button SB1, thermorelay FR auxiliary contact as main circuit Loop processed, is controlled to the switching of capacitor;Operation part components and parts the first air switch QF1 and the second air switch QF2, Stop button SB1, start button SB2 are installed on load box cabinet panel, other components and parts capacitor C, catalyst KM, reactor X, thermorelay FR closing is installed in load box body.
2. the portable power storage load box checked by false wiring of electric energy metering equipment according to claim 1, Characterized in that, the capacitor C installation sites in load box are provided with louvre or heat abstractor, in thermorelay FR installation positions Install and be equipped with SR.
3. the portable power storage load box checked by false wiring of electric energy metering equipment according to claim 1, Characterized in that, the connecting wire in load box body between each first device is not less than 4mm using cross-sectional area2Insulation annealed copper wire.
CN201621094614.1U 2016-09-30 2016-09-30 The portable power storage load box checked by false wiring of electric energy metering equipment Active CN206074794U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621094614.1U CN206074794U (en) 2016-09-30 2016-09-30 The portable power storage load box checked by false wiring of electric energy metering equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621094614.1U CN206074794U (en) 2016-09-30 2016-09-30 The portable power storage load box checked by false wiring of electric energy metering equipment

Publications (1)

Publication Number Publication Date
CN206074794U true CN206074794U (en) 2017-04-05

Family

ID=58441371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621094614.1U Active CN206074794U (en) 2016-09-30 2016-09-30 The portable power storage load box checked by false wiring of electric energy metering equipment

Country Status (1)

Country Link
CN (1) CN206074794U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108107313A (en) * 2018-01-30 2018-06-01 国网河南省电力公司平顶山供电公司 The method that unloaded situation judges connection box of electric energy meter correctness
CN109444801A (en) * 2018-10-25 2019-03-08 国网浙江乐清市供电有限公司 A kind of device being conducive to the carrying of misconnection line detector
CN109709457A (en) * 2019-01-22 2019-05-03 苏州工业职业技术学院 A kind of Insulation monitoring and thermal protector reset test device
CN111722101A (en) * 2020-05-29 2020-09-29 宁波三星医疗电气股份有限公司 Detection circuit and protection method of double-loop relay

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108107313A (en) * 2018-01-30 2018-06-01 国网河南省电力公司平顶山供电公司 The method that unloaded situation judges connection box of electric energy meter correctness
CN109444801A (en) * 2018-10-25 2019-03-08 国网浙江乐清市供电有限公司 A kind of device being conducive to the carrying of misconnection line detector
CN109709457A (en) * 2019-01-22 2019-05-03 苏州工业职业技术学院 A kind of Insulation monitoring and thermal protector reset test device
CN109709457B (en) * 2019-01-22 2023-12-12 苏州工业职业技术学院 Insulation detection and thermal protector reset testing device
CN111722101A (en) * 2020-05-29 2020-09-29 宁波三星医疗电气股份有限公司 Detection circuit and protection method of double-loop relay
CN111722101B (en) * 2020-05-29 2023-09-01 宁波三星医疗电气股份有限公司 Detection circuit and protection method of double-loop relay

Similar Documents

Publication Publication Date Title
CN206074794U (en) The portable power storage load box checked by false wiring of electric energy metering equipment
CN104198832B (en) A kind of high pressure transformer and distribution power station Integrated Checkout test method
CN102593737B (en) Relay protection vector checkout facility method before putting into operation with the transformer station of capacitance compensation
CN204497589U (en) Multifunctional ligand electrical control cabinet
CN106856332A (en) A kind of distributed photovoltaic power generation grid-connected system
CN201740862U (en) Portable three-phase voltage transformer intelligent calibrating device
CN202748425U (en) Residual current protection uninterrupted testing device
CN103136999B (en) Simulation demonstrator used for training remote electric load control function
CN2938505Y (en) Intelligent reactive compensation distribution box
CN204117459U (en) Typical low pressure fault handling training platform device
CN202127172U (en) Transformer coil-out circuit of electric furnace
CN204903715U (en) Many functional switch power test operation platform
CN203981735U (en) Variable specific current transformer self-checking device
CN206480263U (en) A kind of low-voltage collecting meter reading failure training set
CN101561976A (en) Low-voltage electric energy metering training device
CN205657343U (en) Comprehensive distribution box
CN201289990Y (en) Multifunctional low voltage distribution box
CN105186457B (en) Motor Protective Device
CN208420975U (en) Dual power supply switching equipment testing auxiliary device
CN206712478U (en) A kind of distributed photovoltaic power generation grid-connected system
CN207675927U (en) A kind of improved portable capacitive load case
CN206400910U (en) A kind of basic electrician practical training apparatus
CN207518284U (en) A kind of accident disconnection device of small power incorporating into power network
CN203193138U (en) Low voltage crossover fuse box
CN206431231U (en) Breaker failure starting-up later time detector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant