CN206070524U - Anchor clipper tightening assistant tool - Google Patents
Anchor clipper tightening assistant tool Download PDFInfo
- Publication number
- CN206070524U CN206070524U CN201621030655.4U CN201621030655U CN206070524U CN 206070524 U CN206070524 U CN 206070524U CN 201621030655 U CN201621030655 U CN 201621030655U CN 206070524 U CN206070524 U CN 206070524U
- Authority
- CN
- China
- Prior art keywords
- anchor
- clipper
- anchor clipper
- anchorage
- instrument cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
This utility model is related to anchor clipper tightening assistant tool, on prestressed anchor, for anchor clipper is fastened in anchorage, including instrument cylinder and implement handle, the prestressed anchor sequentially passes through instrument cylinder, anchor clipper and anchorage, the anchor clipper is located at anchorage leading portion, and the implement handle is arranged on outside the side wall of instrument cylinder.In work progress, when putting intermediate plate toward on anchor pole, intermediate plate often falls this utility model, or not in one plane.Fastener is exactly that, in order to intermediate plate is uniformly put in anchorage, such stress can be uniform.This utility model simple structure, solves intermediate plate in anchor clipper fastener cycle and comes off or fasten phenomenon not in place, easy to operate, safe and reliable.
Description
Technical field
This utility model is related to the anchor clipper fastening work in Geotechnical Engineering before anchor pole tensioning.
Background technology
Anchorage is indispensable in prestressed anchor use at present, and the fastening of current anchor clipper mainly adopts artificial socket joint
Method, often occur anchor clipper in stretching process and come off, fasten the phenomenon such as not in place, strong influence prestressed anchor
Stretch-draw effect etc..
Utility model content
Technical problem to be solved in the utility model is to provide a kind of anchor clipper tightening assistant tool, can improve anchor
Tool intermediate plate fastening method, is integrally anchored on anchor clipper in anchorage with aid, improves anchor pole tensioning fixation construction quality,
Guarantee Foundation Pit Support Design purpose and construction effect.
The technical scheme that this utility model solves above-mentioned technical problem is as follows:Anchor clipper tightening assistant tool, is arranged on
On prestressed anchor, for anchor clipper is fastened in anchorage, including instrument cylinder and implement handle, the prestressed anchor
Instrument cylinder, anchor clipper and anchorage are sequentially passed through, the anchor clipper is located at anchorage leading portion, and the implement handle is arranged on work
On the lateral wall of tool cylinder, the implement handle can drive instrument cylinder to move along prestressed anchor and prop up anchor clipper and make
Which moves and is fastened in anchorage.
The beneficial effects of the utility model are:In work progress, when putting intermediate plate toward on anchor pole, intermediate plate is often
Fall, or not in one plane.Fastener is exactly that, in order to intermediate plate is uniformly put in anchorage, such stress can be uniform.
On the basis of above-mentioned technical proposal, this utility model can also do following improvement:
Further, the length of the instrument cylinder and the length ratio of anchor clipper are 3:1~4:1.
Further, the interior diameter of the instrument cylinder and the diameter ratio of prestressed anchor are 1.1:1~1.3:1.
Anchor pole should be slightly larger than using the internal diameter that the beneficial effect of above-mentioned further scheme is instrument cylinder, other are not affected
The operation of intermediate plate, two is too heavy, it has not been convenient to operated.
Further, the implement handle is arranged on the one end of instrument cylinder away from anchor clipper, and is located at the tool barrel
At the 1/4~1/3 of body length.
It is conveniently to apply thrust to implement handle using the beneficial effect of above-mentioned further scheme.
Further, the material of the instrument cylinder is light-weight metal.
It is that light-weight metal avoids overweight impact operation using the beneficial effect of above-mentioned further scheme.
Description of the drawings
Fig. 1 is this utility model structural representation.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, instrument cylinder, 2, prestressed anchor, 3, anchor clipper, 4, anchorage, 5, implement handle.
Specific embodiment
Principle of the present utility model and feature are described below in conjunction with accompanying drawing, example is served only for explaining this practicality
It is new, it is not intended to limit scope of the present utility model.
As shown in figure 1, one embodiment of the present utility model is, anchor clipper tightening assistant tool is answered installed in pre-
On power anchor pole 2, for anchor clipper 3 is fastened in anchorage 4, including instrument cylinder 1 and implement handle 5, the prestressed anchor
Bar 2 sequentially passes through instrument cylinder 1, anchor clipper 3 and anchorage 4, and the anchor clipper 3 is located at 4 leading portion of anchorage, the implement handle
5 are arranged on the lateral wall of instrument cylinder 1, and the implement handle 5 can drive instrument cylinder 1 to move simultaneously along prestressed anchor 2
Prop up anchor clipper 3 to move it and be fastened in anchorage 4.The length of the instrument cylinder and the length ratio of anchor clipper 3
For 4:1.The interior diameter of the instrument cylinder 1 is 1.1 with the diameter ratio of prestressed anchor 2:1.The implement handle 5 is arranged on
The one end of instrument cylinder 1 away from anchor clipper 3, and at the 1/3 of 1 length of instrument cylinder.The material of the instrument cylinder 1
Matter is light-weight metal.In Fig. 1, anchorage 4 is a hole, and the anchorage 4 can be porous.
Second embodiment of the present utility model, with one embodiment difference be, the length of the instrument cylinder 1
Degree is 3 with the length ratio of anchor clipper 3:1.
The interior diameter of the instrument cylinder 1 is 1.3 with the diameter ratio of prestressed anchor 2:1.
The implement handle 5 is arranged on the one end of instrument cylinder 1 away from anchor clipper 3, and grows positioned at the instrument cylinder 1
At the 1/4 of degree.
3rd embodiment of the present utility model, with one embodiment difference be, the length of the instrument cylinder 1
Degree is 3.5 with the length ratio of anchor clipper 3:1.
The interior diameter of the instrument cylinder 1 is 1.2 with the diameter ratio of prestressed anchor 2:1.
The implement handle 5 is arranged on the one end of instrument cylinder 1 away from anchor clipper 3, and grows positioned at the instrument cylinder 1
At the 7/24 of degree.
Operation principle of the present utility model and the course of work:By anchor clipper 3 as 4 leading portion of anchorage, instrument cylinder 1 is worn
Cross the tensioning front end of the prestressed anchor body of rod, handheld tool handle 5, using being manually anchored on anchor clipper 3 overall in anchorage 4.
This utility model simple structure, it is cheap, install and convenient disassembly.Fastened by the entirety of anchor clipper, drop
The low labor intensity of workman, improves work efficiency.
Preferred embodiment of the present utility model is the foregoing is only, it is not to limit this utility model, all in this practicality
Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in guarantor of the present utility model
Within the scope of shield.
Claims (5)
1. anchor clipper tightening assistant tool, on prestressed anchor (2), for anchor clipper (3) is fastened on anchorage
(4) in, it is characterised in that including instrument cylinder (1) and implement handle (5), the prestressed anchor (2) sequentially passes through tool barrel
Body (1), anchor clipper (3) and anchorage (4), the anchor clipper (3) are installed positioned at anchorage (4) leading portion, the implement handle (5)
On the lateral wall of instrument cylinder (1), the implement handle (5) can drive instrument cylinder (1) mobile along prestressed anchor (2)
And prop up anchor clipper (3) and move it and be fastened in anchorage (4).
2. anchor clipper tightening assistant tool according to claim 1, it is characterised in that the length of the instrument cylinder (1)
Length ratio with anchor clipper (3) is 3:1~4:1.
3. anchor clipper tightening assistant tool according to claim 1, it is characterised in that the instrument cylinder (1) it is interior straight
Footpath is 1.1 with the diameter ratio of prestressed anchor (2):1~1.3:1.
4. the anchor clipper tightening assistant tool according to any one of claims 1 to 3, it is characterised in that the implement handle
(5) installed in instrument cylinder (1) away from anchor clipper (3) one end, and be located at instrument cylinder (1) length 1/4~1/3
Place.
5. the anchor clipper tightening assistant tool according to any one of claims 1 to 3, it is characterised in that the instrument cylinder
(1) material is light-weight metal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621030655.4U CN206070524U (en) | 2016-08-31 | 2016-08-31 | Anchor clipper tightening assistant tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621030655.4U CN206070524U (en) | 2016-08-31 | 2016-08-31 | Anchor clipper tightening assistant tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206070524U true CN206070524U (en) | 2017-04-05 |
Family
ID=58436584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621030655.4U Active CN206070524U (en) | 2016-08-31 | 2016-08-31 | Anchor clipper tightening assistant tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206070524U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107175617A (en) * | 2017-07-12 | 2017-09-19 | 江苏金贸科技发展有限公司 | A kind of concrete prefabricated piping lane Special ground tackle core caliper brake fastener |
-
2016
- 2016-08-31 CN CN201621030655.4U patent/CN206070524U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107175617A (en) * | 2017-07-12 | 2017-09-19 | 江苏金贸科技发展有限公司 | A kind of concrete prefabricated piping lane Special ground tackle core caliper brake fastener |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204470473U (en) | Screw concrete stirrup coiling shaped device | |
CN206070524U (en) | Anchor clipper tightening assistant tool | |
CN202725874U (en) | Reinforcing steel bar bending wrench | |
CN201838934U (en) | Novel portable adjustable rod upper platform | |
CN202250111U (en) | Supporting tool | |
CN203390893U (en) | Sliding weight for pulling pin | |
CN203271739U (en) | Support for electric coal drill | |
CN202117299U (en) | Tool type support system of cantilever scaffold | |
CN207795795U (en) | Heavy solid nail | |
CN202673294U (en) | Simple underground danger eliminating rod for mine | |
CN203270439U (en) | Prestressed anchorage device used for road and bridge construction | |
CN202690091U (en) | Fore poling bar type temporary support device used in anchor bolt support roadway construction | |
CN204958268U (en) | Fore -cramp jack | |
CN205421913U (en) | Scalable formwork ejector pin | |
CN210067472U (en) | Straight thread sleeve connection mounting pliers for steel bar joint | |
CN203867075U (en) | Seamless carbon fiber plate anchorage device for construction engineering | |
CN211164469U (en) | Colliery drilling shutoff stemming making devices | |
CN203373621U (en) | Sleeper replacement pliers | |
CN203804205U (en) | Nodulizing bag cleaning equipment | |
CN204343777U (en) | A kind of convenient line bar base | |
CN203654753U (en) | Dabbing device for concrete | |
CN202866278U (en) | Building template fixture | |
CN204435228U (en) | For the semiautomatic plant of bridge deck concrete dabbing | |
CN217177941U (en) | Foundation bolt interval adjusting device | |
CN217324876U (en) | Curb construction mobile device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |