CN206055197U - CNG integrated form aerating devices - Google Patents

CNG integrated form aerating devices Download PDF

Info

Publication number
CN206055197U
CN206055197U CN201621060613.5U CN201621060613U CN206055197U CN 206055197 U CN206055197 U CN 206055197U CN 201621060613 U CN201621060613 U CN 201621060613U CN 206055197 U CN206055197 U CN 206055197U
Authority
CN
China
Prior art keywords
panel body
high pressure
valve
pressure filter
aerating device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621060613.5U
Other languages
Chinese (zh)
Inventor
李波
李贵安
康庄
向建
陈小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Polytron Technologies Inc
Original Assignee
Beijing Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Polytron Technologies Inc filed Critical Beijing Polytron Technologies Inc
Priority to CN201621060613.5U priority Critical patent/CN206055197U/en
Application granted granted Critical
Publication of CN206055197U publication Critical patent/CN206055197U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pressure Vessels And Lids Thereof (AREA)

Abstract

This utility model provides a kind of CNG integrated forms aerating device, including panel body and the high pressure filter being installed on panel body, and the filtration channel of UNICOM to high pressure filter is prefabricated with panel body, and high pressure filter is installed on filtration channel.By the filtration channel with high pressure filter is set up on panel body, in gas replenishment process, gases at high pressure are directly passed through by filtration channel prefabricated inside panel body, so that gases at high pressure directly Jing high pressure filters can be conveyed, avoid such as the situation for connecting high pressure filter and panel body using high-voltage tube in prior art, the attachment structure between high pressure filter and panel body is reduced, so as to reduce air leakage point, the safety in CNG integrated form aerating device gas replenishment processes is improved.

Description

CNG integrated form aerating devices
Technical field
This utility model is related to Compressed Natural Gas Technology field, more particularly, it relates to CNG integrated form aerating devices.
Background technology
CNG is that compressed natural gas (Compressed Natural Gas, abbreviation CNG) is natural gas pressurization and is stored up with gaseous state Deposit in a reservoir.
CNG carry out gas it is supplementary when, gas is passed into by device interior by CNG integrated form aerating devices.It is existing CNG integrated form aerating devices be that related valve is organized on one piece of panel, inflate panel on part generally comprise charge valve, Inflation stop valve, supply stop valve, exhaust-valve, shockproof pressure gage, high-pressure pressure sensor, check valve, electronic overcurrent protective valve, High pressure filter etc., valve body structure are connected using Steel Tube Special in installation process, there is provided the mounting structure of different valve bodies, but Due to the high voltage structures in gas replenishment process, as pipeline jointing construction causes inflation panel upper pipeline joint more, produce more Air leakage point, affect inflation panel safe handling.And due to valve body and the pipeline jointing construction of inflation panel, cause to install Journey is complex, produces more work time cost.After gas leakage is produced, in maintenance and when safeguarding, dismounting difficulty is larger, carries for user The high maintenance cost of user.
Therefore, how to reduce the air leakage point of CNG integrated form aerating device pipeline structures, be current those skilled in the art urgently Problem to be solved.
Utility model content
In view of this, this utility model provides a kind of CNG integrated forms aerating device, to reduce CNG integrated forms inflation dress Put the air leakage point of pipeline structure.
In order to achieve the above object, this utility model provides following technical scheme:
A kind of CNG integrated forms aerating device, including panel body and the high pressure filter being installed on the panel body, The filtration channel of UNICOM to the high pressure filter is prefabricated with the panel body, the high pressure filter is installed in the mistake On filter passage.
Preferably, in above-mentioned CNG integrated forms aerating device, on the panel body, also it is fixed with electronic overcurrent protective valve And check valve, be prefabricated with the panel body UNICOM to the electronic overcurrent protective valve and the check valve overcurrent protection lead to Road and filling channel.
Preferably, in above-mentioned CNG integrated forms aerating device, the panel body is body structure, is prefabricated with inside which Filling channel, the high pressure filter, the electronic overcurrent protective valve and the check valve are installed on the panel body.
Preferably, in above-mentioned CNG integrated forms aerating device, filling channel and electromotor in the panel body, are prefabricated with Air supply channel, the valve body that filling channel described in multiple UNICOMs and the electromotor air supply channel are reserved with the panel body connect Connect hole.
Preferably, in above-mentioned CNG integrated forms aerating device, the panel body be rectangular structure, the panel sheet Pressure transducer, atmospheric pressure table and electronic overcurrent protective valve are installed at the top of body;The bottom of the panel body is provided with The electromotor connecting hole of connection electromotor, connects the second gas of the first gas cylinder connecting hole with check valve and connection gas cylinder of gas cylinder Bottle connecting hole.
Preferably, in above-mentioned CNG integrated forms aerating device, the side of the panel body thickness direction is provided with high pressure Filter, the opposite side of the panel body thickness direction are provided with main stop valve, inflation stop valve, exhaust-valve and inflation connection Hole.
The CNG integrated form aerating devices that this utility model is provided, including panel body and the height being installed on panel body Filter is pressed through, the filtration channel of UNICOM to high pressure filter in panel body, is prefabricated with, high pressure filter is installed in filtration channel On.By the filtration channel with high pressure filter is set up on panel body, in gas replenishment process, gases at high pressure are directly by panel The prefabricated filtration channel of body interior is passed through, so that gases at high pressure directly Jing high pressure filters can be conveyed, it is to avoid such as Connect the situation of high pressure filter and panel body in prior art using high-voltage tube, reduce high pressure filter and panel body it Between attachment structure, so as to reduce air leakage point, improve the safety in CNG integrated form aerating device gas replenishment processes.
Description of the drawings
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or accompanying drawing to be used is briefly described needed for description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise for not paying creative work Under, can be with according to these other accompanying drawings of accompanying drawings acquisition.
The structural representation of the CNG integrated form aerating devices that Fig. 1 is provided for this utility model;
The left view of the CNG integrated form aerating devices that Fig. 2 is provided for this utility model.
Specific embodiment
The utility model discloses a kind of CNG integrated forms aerating device, reduces CNG integrated form aerating device pipeline structures Air leakage point.
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clear, complete description, it is clear that described embodiment is only this utility model a part of embodiment, rather than whole Embodiment.Based on embodiment of the present utility model, those of ordinary skill in the art institute under the premise of creative work is not made The every other embodiment for obtaining, belongs to the scope of this utility model protection.
As depicted in figs. 1 and 2, the structural representation of the CNG integrated form aerating devices that Fig. 1 is provided for this utility model;Fig. 2 The left view of the CNG integrated form aerating devices provided for this utility model.
Present embodiments provide a kind of CNG integrated forms aerating device, including panel body 1 and be installed on panel body 1 High pressure filter 2, the filtration channel of UNICOM to high pressure filter 2 is prefabricated with panel body 1, high pressure filter 2 is installed in On filtration channel.By the filtration channel with high pressure filter 2, in gas replenishment process, gases at high pressure are set up on panel body 1 Directly it is passed through by prefabricated filtration channel inside panel body 1, so that gases at high pressure directly Jing high pressure filters 2 can be carried out Conveying, it is to avoid such as the situation for connecting high pressure filter 2 and panel body 1 using high-voltage tube in prior art, reduce high-pressure filteration Attachment structure between device 2 and panel body 1, so as to reduce air leakage point, improves in CNG integrated form aerating device gas replenishment processes Safety.
In the present embodiment, electronic overcurrent protective valve 3 and check valve 4 are also fixed with panel body 1, in panel body 1 It is prefabricated with the overcurrent protection passage and filling channel of UNICOM to electronic overcurrent protective valve 2 and check valve 4.Electronic overcurrent protective valve 2 It is the part for controlling CNG flows, the contingency such as pressure duct Joint's falling off, when natural gas is leaked in a large number, electronic overcurrent protection Valve 2 will be automatically switched off, it is to avoid the danger that natural gas leaking brings.When pipe-line system is inflated using dual circuit, with overcurrent Protection valve 2 is used cooperatively.During aerating, valve element is automatically opened up, and at the end of aerating, self-return is closed.Panel body 1 is opened up for inside The structure of overcurrent protection passage and filling channel, electronic overcurrent protective valve 2 and check valve 4 are directly mounted at 1 surface of panel body Installing hole on, and circulated by the passage inside panel body 1, by gas stream is directly formed inside panel body 1 Circulation passage, it is to avoid need the attachment structure of separately installed Steel Tube Special by board-like panel construction, reduces and installs leakage point.
Specifically, panel body 1 is body structure, and filling channel, high pressure filter 2, electronic excessively stream are prefabricated with inside which Protection valve 3 and check valve 4 are installed on panel body 1.Panel body 1 is body structure, by directly opening up logical inside which Air pipe, such as directly obtains the hole connection structure on 1 surface of pipeline configuration and panel body using processing modes such as drilling, Che Kong, In terms of reducing junction point, and dismounting, maintenance cost is reduced.Specifically, panel body 1 is cube or rectangular structure, just Install in equipment.
In the present embodiment, filling channel and electromotor air supply channel are prefabricated with panel body 1, it is pre- on panel body 1 Leave the valve body connection hole of multiple UNICOM's filling channels and electromotor air supply channel.
Specifically, panel body 1 is rectangular structure, and the top of panel body 1 is provided with pressure transducer 5, air pressure pressure Power table 6 and electronic overcurrent protective valve 3;The bottom of panel body 1 is provided with the electromotor connecting hole 7 of connection electromotor, connects gas Second gas cylinder connecting hole 9 of the first gas cylinder connecting hole with check valve 4 and connection gas cylinder of bottle.Install at the top of panel body 1 Pressure transducer 5, atmospheric pressure table 6 and electronic overcurrent protective valve 3, top reserving installation hole.Install the two sides of panel body 1 The installing hole being connected with gas cylinder and exhaust structure, the passage inside equal UNICOM's panel body 1, attachment structure are simple, and panel 1 internal openings aperture of body is big compared with original Steel Tube Special diameter of movement, and inflationtime shortens, improved efficiency.
Specifically, the side of 1 thickness direction of panel body is provided with high pressure filter 2,1 thickness direction of panel body it is another Side is provided with main stop valve 10, inflation stop valve 11, exhaust-valve 12 and inflation connecting hole 13.Inflation connecting hole 13 installs gas Valve, dust cap (plug) under taking during inflation (pull out), inflation terminate on lid (inserting).Inflation stop valve 11, opens during inflation, and inflation terminates Close.Main stop valve 10 is supply stop valve, opens during supply, and vehicle stops transport or cuts out when overhauling.Exhaust-valve 12, this valve are normal Valve closing, only in maintenance for emptying the gas in pipeline.Atmospheric pressure table 6 is high pressure gauge, and high pressure gauge shown for fuel, display Pressure in gas cylinder.Supply stop valve, opens during supply, and vehicle stops transport or cuts out when overhauling.High-pressure filteration valve 2 is high pressure fine straining Device, for removing the impurity in gas and mist of oil, with nozzle and its precision components in ensureing in gas burning system.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or use that this practicality is new Type.Various modifications to these embodiments will be apparent for those skilled in the art, determined herein The General Principle of justice can be realized in the case of without departing from spirit or scope of the present utility model in other embodiments.Cause This, this utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide scope consistent with features of novelty.

Claims (6)

1. a kind of CNG integrated forms aerating device, including panel body and the high pressure filter being installed on the panel body, its It is characterised by, the filtration channel of UNICOM to the high pressure filter is prefabricated with the panel body, and the high pressure filter is solid Loaded on the filtration channel.
2. CNG integrated forms aerating device according to claim 1, it is characterised in that be also fixed with the panel body Electronic overcurrent protective valve and check valve, are prefabricated with UNICOM to the electronic overcurrent protective valve and described unidirectional in the panel body The overcurrent protection passage of valve and filling channel.
3. CNG integrated forms aerating device according to claim 2, it is characterised in that the panel body is body structure, Filling channel is prefabricated with inside which, the high pressure filter, the electronic overcurrent protective valve and the check valve are installed in described On panel body.
4. CNG integrated forms aerating device according to claim 3, it is characterised in that be prefabricated with the panel body and fill Gas passage and electromotor air supply channel, are reserved with filling channel described in multiple UNICOMs on the panel body and the electromotor is supplied The valve body connection hole of gas passage.
5. CNG integrated forms aerating device according to claim 4, it is characterised in that the panel body is cuboid knot Structure, is provided with pressure transducer, atmospheric pressure table and electronic overcurrent protective valve at the top of the panel body;The panel body Bottom be provided with connection electromotor electromotor connecting hole, connect gas cylinder the first gas cylinder connecting hole with check valve and connection Second gas cylinder connecting hole of gas cylinder.
6. CNG integrated forms aerating device according to claim 5, it is characterised in that the panel body thickness direction Side is provided with high pressure filter, and the opposite side of the panel body thickness direction is provided with main stop valve, inflation stop valve, row Empty valve and inflation connecting hole.
CN201621060613.5U 2016-09-18 2016-09-18 CNG integrated form aerating devices Expired - Fee Related CN206055197U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621060613.5U CN206055197U (en) 2016-09-18 2016-09-18 CNG integrated form aerating devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621060613.5U CN206055197U (en) 2016-09-18 2016-09-18 CNG integrated form aerating devices

Publications (1)

Publication Number Publication Date
CN206055197U true CN206055197U (en) 2017-03-29

Family

ID=58370271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621060613.5U Expired - Fee Related CN206055197U (en) 2016-09-18 2016-09-18 CNG integrated form aerating devices

Country Status (1)

Country Link
CN (1) CN206055197U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107166164A (en) * 2017-05-16 2017-09-15 上海瀚氢动力科技有限公司 Integrated cylinder valve provided with air releasing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107166164A (en) * 2017-05-16 2017-09-15 上海瀚氢动力科技有限公司 Integrated cylinder valve provided with air releasing device
CN107166164B (en) * 2017-05-16 2019-03-26 上海瀚氢动力科技有限公司 Integrated cylinder valve equipped with air releasing device

Similar Documents

Publication Publication Date Title
CN203727650U (en) Fuel supply system of unmanned plane
CN111911798A (en) Skid-mounted hydrogenation device for new energy automobile
CN206055197U (en) CNG integrated form aerating devices
CN203036239U (en) Gas pressure energy storage emergency system
CN214528111U (en) Crane tube of ammonia water loading and unloading truck
CN202729345U (en) Pneumatic dedusting system
CN108181061A (en) A kind of new energy car battery packet tests system
CN204822316U (en) Safe supply reserve fuel tank
CN204187267U (en) A kind of hydraulic pressure aerating type bundled tube shipping container
CN209181975U (en) A kind of Hydrogen Fuel-cell Vehicles hydrogen pipeline exhaust leakage detection apparatus
CN203452882U (en) Exhaust emission device for mobile power station
CN206352129U (en) A kind of selexol process device
CN205828498U (en) Accumulator battery concentrates exhaust structure
CN207351618U (en) A kind of air-tight pneumatic sole mechanism
CN206225144U (en) A kind of transformer vacuum recharging oil device
CN208578782U (en) A kind of monorail crane locomotive and its fuel loading system
CN203052213U (en) Low-temperature liquid storage and transportation device with economical pipeline
CN213812772U (en) Air bag leakage detection device
CN215636505U (en) Liquefied gas workstation is with high leakproofness face and is deposited bucket
CN205461473U (en) Pulse valve support structure for dust remover is special
CN206974759U (en) A kind of portable gas production bag
CN209495136U (en) A kind of propane is unloaded gas phase recovery system
CN203384132U (en) Breathing hydraulic oil tank used under reciprocating turnover working condition
CN208720122U (en) A kind of high measuring body LED aluminum enclosure
CN208682608U (en) A kind of fuel tank breathing equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20200918

CF01 Termination of patent right due to non-payment of annual fee