CN206053978U CN201620907849.1U CN201620907849U CN206053978U CN 206053978 U CN206053978 U CN 206053978U CN 201620907849 U CN201620907849 U CN 201620907849U CN 206053978 U CN206053978 U CN 206053978U
Authority
CN
China
Prior art keywords
sleeve
rod
anchor bar
rectangular pyramid
new expansion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620907849.1U
Other languages
Chinese (zh)
Inventor
张立博
冯佰研
秦哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201620907849.1U priority Critical patent/CN206053978U/en
Application granted granted Critical
Publication of CN206053978U publication Critical patent/CN206053978U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

This utility model is a kind of new expansion grouted anchor bar, belongs to suspension roof support field.A kind of new expansion grouted anchor bar is by the body of rod、Nut、Stop grouting plug、Sleeve、Backing plate、Slurry outlet、Stifled slurry plug、Injected hole is constituted,There are four double rectangular pyramid slab structures in the axial direction of the body of rod,There is slurry outlet in double rectangular pyramid slab structures projection,Which is connected with the central slip casting passage in the body of rod,There are uniform openings corresponding with the raised protrusion sleeve of double rectangular pyramid slab structures on sleeve outside the body of rod,There are eight longitudinal slots that sleeve is uniformly divided into bearing part and the coupling part being interspersed simultaneously,Bearing part carries the two-way axial force in double rectangular pyramid slab structure projections,And radially strut and increase frictional resistance is contacted with country rock,Coupling part mainly keeps stablizing for the axial direction of sleeve,The afterbody of anchor bar body is by nut、Stifled slurry plug、Backing plate、Injected hole、Stop grouting plug is constituted,There are between a kind of new expansion grouted anchor bar and country rock 28 expansion contact faces,Its anchor force is larger,Ensure when country rock produces deformation in the presence of the factor such as gravity or tectonic stress,Expansion anchor rod still plays anchorage effect.

Description

A kind of new expansion grouted anchor bar
Technical field
This utility model belongs to a kind of new expansion grouted anchor bar, belongs to Anchor in Geotechnical Engineering supporting field.
Background technology
Suspension roof support can not only be significantly improved as a kind of support pattern of the underground engineerings such as effective tunnel, mine Supporting effect, strengthen country rock stability, substantial amounts of supporting and maintenance cost can also be saved, with support cost it is low, into road Speed is fast, the low advantage of labor intensity, thus suspension roof support becomes a kind of main support pattern of tunnel support.But it is traditional Anchor pole is typically prismatic, little with the contact area of country rock, and withdrawal resistance is little, especially in special geological conditions, it is difficult to Meet the actual requirement of engineering.
Utility model content
For the deficiency that above technology is present, this utility model offer is simple, convenient efficiently a kind of new Expansion grouted anchor bar.
For achieving the above object, this utility model is adopted the following technical scheme that and is achieved:A kind of new expansion slip casting Anchor pole is made up of the body of rod, nut, stifled slurry plug, sleeve, backing plate, slurry outlet, stop grouting plug, injected hole, has two in the axial direction of the body of rod More than double rectangular pyramid slab structures, have slurry outlet on double rectangular pyramid slab structures are raised, its with the body of rod in central slip casting Passage is connected.
As improvement, there is protrusion raised with double rectangular pyramid slab structures on the sleeve outside the body of rod sleeve is corresponding and uniformly open Mouthful.
As improvement, on sleeve, there are eight longitudinal slots that sleeve is uniformly divided into bearing part and the connection being interspersed Part, bearing part carry the raised two-way axial force of double rectangular pyramid slab structures, and radially strut and contact with country rock Increase frictional resistance, coupling part mainly keeps stablizing for sleeve axial direction.
Used as improvement, sleeve is connected using screw thread with backing plate, it is to avoid the relative rotation of sleeve and the body of rod.
Description of the drawings
Fig. 1 is a kind of new expansion grouted anchor bar overall structure diagram.
Fig. 2 is a kind of raised axial schematic diagram of new double rectangular pyramid plate profile structures of expansion grouted anchor bar.
Fig. 3 is a kind of new expansion grouted anchor bar A-A generalized sections.
Fig. 4 is a kind of new expansion grouted anchor bar sleeve schematic diagram.
Reference:The 1- bodies of rod, 2- nuts, 3- stop grouting plugs, 4- sleeves, 5- backing plates, 6- slurry outlets, the stifled slurry plugs of 7-, 8- notes Slurry hole, 9- central authorities' slip casting passages, 10- openings, 11- longitudinal directions crack, the double rectangular pyramid slab structures of 12- are raised.
Specific embodiment
The following drawings is further described to particular content of the present utility model.
Specific embodiment:Anchor pole is squeezed into after bolthole, sleeve(4)With backing plate(5)It is fixed, anchor bar body is pushed away forward Move, on the body of rod, double rectangular pyramid slab structures are raised(12)Part moves forward, and the bearing part of sleeve carries the power of axial direction, and edge Radially uniform struts, then anchor bar body is pulled back, and on anchor bar body, double rectangular pyramid slab structure bossings are moved rearwards by, and cover The bearing part of cylinder carries the power of axial direction, radially even to strut, by the nut of anchor pole end(2)Tighten, slip casting, increase anchor pole With the contact area of rock mass, increase withdrawal resistance.
It is illustrated in figure 1 a kind of new expansion grouted anchor bar overall structure diagram.The utility model discloses a kind of New expansion grouted anchor bar, this utility model mainly by the body of rod, nut, stop grouting plug, sleeve, backing plate, slurry outlet, stifled slurry plug, Injected hole is constituted, the body of rod(1)Axial direction on have four double rectangular pyramid slab structures, it is raised in double rectangular pyramid slab structures(12)On There is grout outlet(6), its with the body of rod in central slip casting passage(9)It is connected, the sleeve outside the body of rod(4)On have and double rectangular pyramids Slab structure is raised(12)The corresponding uniform openings of protrusion sleeve(10), on sleeve, have eight longitudinal slots(11)Sleeve is uniform Be divided into the bearing part and coupling part being interspersed, it is raised that bearing part carries double rectangular pyramid slab structures(12)On it is double To axial force, and radially strut contact with country rock increase frictional resistance, coupling part mainly keep sleeve axial direction it is steady It is fixed.The afterbody of anchor bar body by nut, stifled slurry plug, backing plate, injected hole, only starch hole and constitute, between this expansion grouted anchor bar and country rock With 28 expansion contact faces, its anchor force is larger, it is ensured that when country rock is in the effect of the factor such as gravity or tectonic stress During lower generation deformation, expansion anchor rod still plays anchorage effect.
It is illustrated in figure 2 a kind of raised axial direction schematic diagram of the double rectangular pyramid slab structures of new expansion grouted anchor bar.Double four Pyramid slab structure is raised(12)Power on the body of rod is passed to into sleeve(4)On bearing part, bearing part stress, radially Strut, increase contact surface is contacted with country rock, anchor force is improved.
It is illustrated in figure 3 a kind of schematic diagram of new expansion grouted anchor bar A-A sections.In double rectangular pyramid plate shapes of the body of rod The projection of structure(12)On have grout outlet(6), the central slip casting passage with the body of rod(9)It is connected, each grout outlet is spaced 90 °, just It is uniform in pulp.
It is illustrated in figure 4 a kind of new expansion grouted anchor bar sleeve schematic diagram., bearing part carries double rectangular pyramid plate shapes Structure is raised(12)Upper two-way axial force, and radially strut contact with country rock and increase frictional resistance, coupling part is main Keep stablizing for sleeve axial direction.

Claims (3)

1. a kind of new expansion grouted anchor bar, by the body of rod(1), nut(2), stop grouting plug(3), sleeve(4), backing plate(5), pulp Hole(6), stifled slurry plug(7), injected hole(8)Composition, it is characterised in that:The body of rod(1)Axial direction on have plural pair of rectangular pyramid Slab structure, it is raised in double rectangular pyramid slab structures(12)On have grout outlet(6), its with the body of rod in central slip casting passage(9) It is connected, the afterbody of anchor bar body is by nut(2), stop grouting plug(3), backing plate(5), injected hole(8), stifled slurry plug(7)Composition.
2. a kind of new expansion grouted anchor bar according to claim 1, it is characterised in that:Sleeve outside the body of rod(4) On have and double rectangular pyramid slab structures are raised(12)The corresponding uniform openings of protrusion sleeve(10).
3. a kind of new expansion grouted anchor bar according to claim 1, it is characterised in that:There are eight longitudinal seams on sleeve Gap(11)Sleeve is uniformly divided into bearing part and the coupling part being interspersed, bearing part carries double rectangular pyramid plate shape knots Structure is raised(12)On two-way axial force, and radially strut increase frictional resistance contacted with country rock, coupling part is main Keep sleeve(4)Axial stablizes.
CN201620907849.1U 2016-08-22 2016-08-22 A kind of new expansion grouted anchor bar Expired - Fee Related CN206053978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620907849.1U CN206053978U (en) 2016-08-22 2016-08-22 A kind of new expansion grouted anchor bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620907849.1U CN206053978U (en) 2016-08-22 2016-08-22 A kind of new expansion grouted anchor bar

Publications (1)

Publication Number Publication Date
CN206053978U true CN206053978U (en) 2017-03-29

Family

ID=58384714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620907849.1U Expired - Fee Related CN206053978U (en) 2016-08-22 2016-08-22 A kind of new expansion grouted anchor bar

Country Status (1)

Country Link
CN (1) CN206053978U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108087004A (en) * 2017-12-29 2018-05-29 青岛林川工程技术咨询有限公司 A kind of device of the first branch steel arch-shelf tension stability of raising
CN110593928A (en) * 2019-10-15 2019-12-20 河源市海川新材料科技有限公司 Anchor rod made of light-cured glass fiber reinforced rib
CN113294189A (en) * 2021-07-28 2021-08-24 徐州祥瑞工程机械科技有限公司 Grouting anchor rod
CN113323702A (en) * 2021-06-17 2021-08-31 文山麻栗坡紫金钨业集团有限公司 Transmission expansion type anchor rod and installation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108087004A (en) * 2017-12-29 2018-05-29 青岛林川工程技术咨询有限公司 A kind of device of the first branch steel arch-shelf tension stability of raising
CN110593928A (en) * 2019-10-15 2019-12-20 河源市海川新材料科技有限公司 Anchor rod made of light-cured glass fiber reinforced rib
CN110593928B (en) * 2019-10-15 2024-04-26 河源市海川新材料科技有限公司 Anchor rod made of photo-cured glass fiber reinforced rib
CN113323702A (en) * 2021-06-17 2021-08-31 文山麻栗坡紫金钨业集团有限公司 Transmission expansion type anchor rod and installation method thereof
CN113294189A (en) * 2021-07-28 2021-08-24 徐州祥瑞工程机械科技有限公司 Grouting anchor rod
CN113294189B (en) * 2021-07-28 2021-10-01 徐州祥瑞工程机械科技有限公司 Grouting anchor rod

Similar Documents

Publication Publication Date Title
CN206053978U (en) A kind of new expansion grouted anchor bar
CN207004554U (en) A kind of multistage allows pressure grouting anchor pole
CN102877868B (en) Novel expansion-type yielding prestress grouting anchor rope and using method thereof
CN101338679B (en) Deep well great section loose wall rock laneway support method
CN102877867B (en) Novel inflatable yielding pre-stress grouting anchor rod and usage method thereof
CN203475429U (en) Combined type anchor rod suitable for loess side slope
CN108343458A (en) Overall length bonds large deformation pressure-relieving achor bar and its construction method
CN202881945U (en) Grouting anchor-bolt-end type multistage stop-grouting plug
CN102086770A (en) Cone resistive friction sleeve large-deformation anchor rod
CN202595739U (en) Anchor rod suitable for soft soil layer
CN205422773U (en) Novel hollow grouting anchor bolt
CN206530356U (en) A kind of Novel hollow grouted anchor bar
CN104847354A (en) Method for improving performance of strip coal pillar by grouting combined support anchor rod
CN204475327U (en) A kind of novel fabricated anchor pole with cage of reinforcement
CN206448830U (en) A kind of self-advancing type Hollow non-metallic screw thread reinforced resin anchor pole
CN205422769U (en) Novel hollow grouting anchor bolt
CN204370418U (en) A kind of hydraulic buckling anchor pole
CN203393706U (en) Self-locking anti-pulling anchor rod
CN206071626U (en) It is rotary can quick anchoring install binding type hollow bolt
CN205260061U (en) Flexible intumescent cavity slip casting stock
CN202228096U (en) Conical-blocking type friction sleeve large-deformation anchor rod
CN203613538U (en) Hollow anchor bolt with steel bar skeleton
CN203430543U (en) Expansion anchor rod
CN202832594U (en) Novel inflatable yielding prestressed grouting anchor rod
CN204827500U (en) Pinniform wedge body stock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20170822