CN206053275U - Hanging cage structure - Google Patents
Hanging cage structure Download PDFInfo
- Publication number
- CN206053275U CN206053275U CN201621018695.7U CN201621018695U CN206053275U CN 206053275 U CN206053275 U CN 206053275U CN 201621018695 U CN201621018695 U CN 201621018695U CN 206053275 U CN206053275 U CN 206053275U
- Authority
- CN
- China
- Prior art keywords
- bar
- cage
- railing
- shield cage
- pull bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 27
- 239000010959 steel Substances 0.000 claims description 27
- 238000010276 construction Methods 0.000 abstract description 8
- 238000003466 welding Methods 0.000 description 8
- 238000009434 installation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
This utility model provides a kind of hanging cage structure, uses to be hung in building structure, including:Pull bar and hanging cage, the pull bar include screw mandrel, the wing nut being placed on the screw mandrel and be placed on the screw mandrel, and one end is close proximity to the buckle of the wing nut, the hanging cage structure is hung by the wing nut and the buckle and is fixed in the building structure, adjustably it is arranged on screw mandrel by wing nut and buckle are movable, traditional construction is solved according to building structure sectional dimension to make the technical problem of hanging cage, construction cost is reduced, is facilitated the purpose for using and remove, improve work efficiency of hanging cage.
Description
Technical field
This utility model is related to the technical field of construction hanging cage, relates in particular to a kind of peace for building structure
Dress and the hanging cage structure welded.
Background technology
Conventional ultra high building structure install lifted by tower crane or lifting machine it is in place, building structure need after installing with
Steel column or built-in fitting welding, facilitate personnel in building structure side, bottom welding using hanging cage during welding, because of building structure
Sectional dimension is more, it is impossible to using unified hanging cage, can only by the big little makings hanging cage of sectional dimension and with building structure section surrounding
Fixed, on the one hand manufacture hanging cage consumptive material is more, and installation hanging cage is cumbersome, removes hanging cage operation also extremely not after the completion of welding
Just, another aspect hanging cage quantity is more, is not easy to field management, affects the use in live place.
Utility model content
In view of the foregoing, this utility model provides a kind of hanging cage structure, uses to be hung in building structure, including
Pull bar and shield cage, the pull bar include screw mandrel, wing nut and buckle, are adjusted by the wing nut above pull bar and buckle activity
Save land and be arranged on screw mandrel, buckle is connected with building structure left-hand thread, solve traditional construction and come according to building structure sectional dimension
Make the technical problem of hanging cage.
For achieving the above object, this utility model is adopted the technical scheme that:
A kind of hanging cage structure, uses to be hung in building structure, including:Pull bar and shield cage, the shield cage tool have phase
To top and bottom, located at the top of the shield cage, the pull bar includes screw mandrel, the butterfly being placed on the screw mandrel to the pull bar
Shape nut and be placed on screw mandrel, and one end is close proximity to the buckle of wing nut, the wing nut and the movable tune of the buckle
Save land and be arranged on the screw mandrel, the hanging cage structure is hung by the wing nut and the buckle and is fixed on the building
In structure.
This utility model hanging cage structure further improvement is that:One end of the pull bar and shield cage connection is provided with ear
Plate and steel plate, the otic placode are affixed with the screw mandrel of the pull bar, and the steel plate is affixed with the shield cage, the otic placode and the steel
Plate pivot joint.
This utility model hanging cage structure further improvement is that:The top of the shield cage is near the building structure
Side is provided with pull bar described in two, connects with 1 waling stripe between the steel plate of two pull bar.
This utility model hanging cage structure further improvement is that:The bottom of the shield cage is equipped with a plurality of lower horizontal
Bar, and two be located at the lower horizontal bar two ends the cross bar that be connected with the lower horizontal boom end, the definition shield cage
Side towards the building structure is inner side, is outside away from the side of the building structure, and two cross bar is located at described
One end on the inside of shield cage is connected with two columns, and the other end of the column is connected with the pull bar, and two cross bar is located at described
One end on the outside of shield cage is connected with two hounds, and the other end of the hound is connected with the column top;Two column
Between be interval with the upper level bar parallel with the lower horizontal bar and middle part horizon bar, and the shield cage is described in correspondence
The height and position of upper level bar and middle part horizon bar is respectively equipped with top railing and middle part railing, and the shield cage passes through on described
Portion's horizon bar, middle part horizon bar, top railing and middle part railing and the column and hound form safeguard structure.
This utility model hanging cage structure further improvement is that:The top railing and the middle part railing are configured to U
Bracing piece connection is provided with the top railing, middle part railing middle section position on the outside of type bar, and the shield cage.
The beneficial effects of the utility model are:
This utility model is arranged on screw mandrel by the wing nut and buckle activity adjustment above pull bar, hanging cage structure
Hung by the wing nut and the buckle and be fixed in building structure, traditional construction is solved according to building structure size
To make the technical problem of hanging cage, so as to reducing construction cost, facilitating using and removing, improve work efficiency for hanging cage
Purpose.
Description of the drawings
Dimensional structure diagrams of the Fig. 1 for this utility model hanging cage structure.
Fig. 2 is the dimensional structure diagram of this utility model pull bar part.
Fig. 3 is the plane graph of this utility model hanging cage part.
Reference is as follows with the corresponding relation of part:
1- pull bars, 2- hanging cages, 11- wing nuts, 12- buckles, 13- screw mandrels, 14- otic placodes, 15- steel plates, 16- connecting rods, 17-
Upper level bar, horizon bar in the middle part of 18-, 19- lower horizontal bars, 20- bracing pieces, 21- columns, 22- hounds, 23- enclose on top
Bar, railing in the middle part of 24-, 25- buckle mouth, 26- cross bars, H1- upper level bar 17 arrives 21 tip height of column, H2- middle part horizon bar
18 arrive 17 height of upper level bar, H3- lower horizontal bar 19 is to 18 height of middle part horizon bar, width between two columns 21 of W-.
Specific embodiment
For the benefit of to understanding of the present utility model, illustrate below in conjunction with drawings and Examples.
Fig. 1 to Fig. 3 is referred to, this utility model provides a kind of hanging cage structure, used to be hung in building structure, bag
Include pull bar 1 and shield cage 2.Wherein:
As shown in figure 1, the shield cage 2 includes upper level bar 17, middle part horizon bar 18, lower horizontal bar 19, hound
22nd, bracing piece 20, column 21, cross bar 26, top railing 23 and middle part railing 24, define the shield cage 2 towards the building knot
The side of structure is inner side, is outside away from the side of the building structure, and the shield cage 2 is with relative bottom and top, institute
The inner side that pull bar 1 is connected to the shield cage 2 is stated, and a pull bar 1 is respectively set at 2 top two ends of shield cage.The bottom paving of the shield cage 2
It is provided with a plurality of lower horizontal bar 19 and is located at 19 two ends of lower horizontal bar and is connected with 19 end of lower horizontal bar
Two cross bars 26, two cross bar 26 is located at the one end on the inside of the shield cage 2 and is connected with two columns 21, the column 21 it is another
End is connected with the pull bar 1, and two cross bar 26 is located at the one end on the outside of the shield cage 2 and is connected with two hounds 22, described oblique
The other end of strut 22 is connected with 21 top of the column, is interval with and the lower horizontal bar 19 between two column 21
Parallel upper level bar 17 and middle part horizon bar 18, and the shield cage 2 is in the correspondence upper level bar 17 and middle part level
The height and position of bar 18 is respectively equipped with top railing 23 and middle part railing 24, and the top railing 23 and middle part railing 24 are configured to
U-shaped bar structure, top railing 23 are connected the upper protective coil structures to form horizontally set, middle part railing 24 with upper level bar 17
It is connected the middle part protection coil structures to form horizontally set with middle part horizon bar 18;It is described shield cage 2 on the outside of the top railing 23,
Middle part 24 middle section position of railing is provided with a bracing piece 20 and connects, and one end of bracing piece 20 is connected with the middle section position of top railing 23
Connect, the other end is connected with the middle section position of 19 outermost horizon bar of lower horizontal bar Jing after being connected with 24 middle section position of middle part railing
Connect.
As shown in Fig. 2 pull bar 1 include screw mandrel 13, the wing nut 11 being placed on screw mandrel 13 and be placed on screw mandrel, and one end
It is close proximity to the buckle 12 of wing nut 11, the wing nut 11 and buckle 12 is movable is adjustably arranged on the screw mandrel
On 13, one end of the pull bar 1 and the shield connection of cage 2 is provided with an otic placode 14 and two steel plates 15, and otic placode 14 is solid with the screw mandrel 13 of pull bar 1
Connect, two steel plates 15 are affixed with the column 21 of shield cage 2, the otic placode 14 and two steel plates, 15 pivot joint, so as to by pull bar 1 and shield cage
2 pivot joints become the hanging cage structure of movable regulation.Further, there is a waling stripe 16 between the steel plate 15 of two pull bar 1
Connection, so as to strengthen the stability of hanging cage structure.
Preferably, by M16 bolt bearing pin pivot joints, two steel plates 15 are passed through with the column of shield cage 2 for otic placode 14 and two steel plates 15
The mode of welding is affixed.The thickness of the otic placode 14 is 14mm, and the thickness of the steel plate 15 is 8mm.
In the present embodiment, the building structure refers to the wing plate plate edge (not shown) of H profile steel.Specifically, the buckle
12 are configured to L-shaped, and after making the buckle 12 be sheathed on the screw mandrel 13, the end of buckle 12 is prolonged in parallel with the screw mandrel 13
Stretch, 12 end of buckle is collectively forming one with the screw mandrel 13 and buckles mouth 25, therefore by the H profile steel is set in wing plate level
Put, then by it is described buckle mouth 25 and buckle be positioned on the wherein side of the wing plate plate edge, while making shield cage 2 pass through 1 court of pull bar
The opposite side of the wing plate plate edge extends and hangs from above in H profile steel, finally by the wing nut 11 is tightened, makes pull bar 1 tight
Admittedly it is arranged on the wing plate of the H profile steel, to carry out the installation of girder steel with welding link.It is to be understood that the building knot
Structure is not limited to H profile steel, and the steel beam structure for being installed with such as horizontal wing plate is all applied to this utility model hanging cage structure.
Preferably, the hanging cage structure width 0.6m, high 1.05m, upper level bar and middle part horizon bar, the middle part water of hanging cage
Spacing between flat bar and lower horizontal bar is 300mm, and upper level bar is 430mm with the distance of column top.The hanging cage
The plane graph of structure is as shown in Figure 3.
Preferably, the spacing between a plurality of horizon bar in bottom is laid according to 150mm.
Preferably, connecting rod 16, upper level bar 17, middle part horizon bar 18, lower horizontal bar 19, bracing piece 20, column 21,
Hound 22, top railing 23, middle part railing 24 and cross bar 26 adopt 16 round steel structures.
This utility model hanging cage structure is hung by the wing nut and buckle on pull bar and is fixed in building structure, butterfly
Nut and buckle are arbitrarily adjustably arranged on screw mandrel, realize that hanging cage structure can be consolidated with building structure according to building structure size
Connection.After hanging cage installation, operating personnel enters hanging cage, in order to weld with girder steel or built-in fitting;After the completion of welding, people
It is dismountable overall hanging cage that work turns round wing nut, and the peace of next girder steel can be directly entered on the premise of hanging cage body is not destroyed
Dress and welding link.The raising work efficiency of this utility model energy high degree, convenient use and dismounting, reduction of erection time, reduce
Construction cost, and construction safety coefficient is high.
This utility model is described in detail above in association with drawings and Examples, those skilled in the art can
Make many variations example according to the above description to this utility model.Thus, some of embodiment details should not be constituted to this reality
With new restriction, this utility model is by the scope defined using appended claims as protection domain of the present utility model.
Claims (5)
1. a kind of hanging cage structure, uses to be hung in building structure, it is characterised in that include:Pull bar (1) and shield cage (2),
, with relative top and bottom, the pull bar (1) is located at the top of shield cage (2), the pull bar (1) for shield cage (2)
Including screw mandrel (13), the wing nut (11) being placed on the screw mandrel and it is placed on screw mandrel and one end is close proximity to the card of wing nut
Button (12), the wing nut (11) and the buckle (12) is movable is adjustably arranged on the screw mandrel (13), the extension
Basket structure is hung and is fixed in the building structure by the wing nut (11) and the buckle (12).
2. hanging cage structure according to claim 1, it is characterised in that:The pull bar (1) and it is described shield cage (2) connect one
End is provided with otic placode (14) and steel plate (15), and the otic placode (14) is affixed with the screw mandrel (13) of the pull bar (1), the steel plate (15)
It is affixed with shield cage (2), the otic placode (14) and the steel plate (15) pivot joint.
3. hanging cage structure according to claim 2, it is characterised in that:The top of shield cage (2) is near the building
The side of structure is provided with pull bar described in two (1), connects with a waling stripe (16) between the steel plate (15) of two pull bar.
4. the hanging cage structure according to claim 1 or 2 or 3, it is characterised in that:The bottom of shield cage (2) is equipped with many
Bar lower horizontal bar (19), and be located at lower horizontal bar (19) two ends and be connected with lower horizontal bar (19) end
Two cross bars (26), define it is described shield cage (2) towards the building structure side be inner side, away from the one of the building structure
Side is outside, and two cross bar (26) is connected with two columns (21), the column (21) positioned at the one end on the inside of shield cage (2)
The other end be connected with the pull bar (1), two cross bar (26) is connected with two diagonal braces positioned at the one end on the outside of shield cage (2)
Bar (22), the other end of the hound (22) are connected with the column (21) top;It is spaced between two column (21) and sets
There are the upper level bar (17) parallel with the lower horizontal bar (19) and middle part horizon bar (18), and shield cage (2) right
The upper level bar (17) and the height and position of middle part horizon bar (18) is answered to be respectively equipped with top railing (23) and middle part railing
(24), shield cage (2) is by the upper level bar (17), middle part horizon bar (18), top railing (23) and middle part railing
And the column (21) and hound (22) form safeguard structure (24).
5. hanging cage structure according to claim 4, it is characterised in that:The top railing (23) and the middle part railing
(24) it is configured to be provided with the top railing (23), middle part railing (24) middle section position on the outside of U-shaped bar, and shield cage (2)
One bracing piece (20) connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621018695.7U CN206053275U (en) | 2016-08-31 | 2016-08-31 | Hanging cage structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621018695.7U CN206053275U (en) | 2016-08-31 | 2016-08-31 | Hanging cage structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206053275U true CN206053275U (en) | 2017-03-29 |
Family
ID=58373876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621018695.7U Expired - Fee Related CN206053275U (en) | 2016-08-31 | 2016-08-31 | Hanging cage structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206053275U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107605140A (en) * | 2017-08-08 | 2018-01-19 | 中建钢构有限公司 | Portable operates hanging cage |
-
2016
- 2016-08-31 CN CN201621018695.7U patent/CN206053275U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107605140A (en) * | 2017-08-08 | 2018-01-19 | 中建钢构有限公司 | Portable operates hanging cage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206289945U (en) | A kind of assembled Portable safety crosshead | |
CN206053275U (en) | Hanging cage structure | |
CN208456100U (en) | A kind of connection structure of the protective net of climbing frame | |
CN206986741U (en) | A kind of Cast-in-situ Beam wing plate integral support support | |
CN208235924U (en) | A kind of mobile working platform for cantilevered structure side skirt alien invasion surface construction | |
CN215671267U (en) | Telescopic edge protection device | |
CN205840289U (en) | A kind of suspension type vertical operating platform | |
CN205663282U (en) | Light -duty lattice formula steel column of large capacity | |
CN205531410U (en) | A simply can dismantle construction canopy for steel construction job site | |
CN205954972U (en) | Steel structure floor slab | |
CN211572535U (en) | Adjustable movable frame reinforcing device | |
CN209704028U (en) | A kind of assembled architecture standardization protection system | |
CN206753084U (en) | The safe discharging platform of assembled for construction | |
CN208039878U (en) | A kind of portable steel construction wind-proof shed | |
CN208023608U (en) | A kind of post-cast strip can have enough to meet the need steel channel formwork system | |
CN206205452U (en) | A kind of telescopic bulk concrete pours regularization operating platform | |
CN207436526U (en) | A kind of movable folding type finished product protection device for preventing foundation pit slope protection spray anchor pollution | |
CN205709522U (en) | A kind of dividing plate technique support | |
CN206672738U (en) | A kind of oil-filled transformer safety protective mechanisms | |
CN207110400U (en) | A kind of cross plate assembly scaffold | |
CN207377096U (en) | Overlength large girder scaffold building structure | |
CN206299106U (en) | A kind of steel pipe inner wall anticorrosive coating construction operation platform | |
CN204953578U (en) | Foundary weight removes hanging flower basket device | |
CN204781932U (en) | Superelevation zhongting concrete beam shaped steel formwork support platform | |
CN209975995U (en) | Elevator shaft regularization operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 |