CN206042194U - Liquid crystal TV plastic metal frame - Google Patents
Liquid crystal TV plastic metal frame Download PDFInfo
- Publication number
- CN206042194U CN206042194U CN201621010999.9U CN201621010999U CN206042194U CN 206042194 U CN206042194 U CN 206042194U CN 201621010999 U CN201621010999 U CN 201621010999U CN 206042194 U CN206042194 U CN 206042194U
- Authority
- CN
- China
- Prior art keywords
- plastic cement
- cement center
- internal portion
- ornamental strip
- rustless steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model discloses a liquid crystal TV plastic metal frame, including plastic center, stainless steel ornamental strip and backplate. The plastic center has and only for one, exposes the built -in part of subtotal plastic center including the plastic center. The plastic center has exposed the partial replacement and has been used for blocking plastic center and glass's the structure of bending with frame forward to extend to the backplate orientation, the plastic center exposes still to be equipped with in the part and is used for inserting the backplate partial fixed slot of bending. The built -in part of plastic center still is equipped with the downwardly extending's that can settle glass concave part. A space that the plastic center was inserted on the limit of stainless steel ornamental strip, with the protruding constitution buckle of stuck point at the built -in partial top of plastic center, another limit cooperates with fixed glass with the concave part of the built -in part bottom of plastic center. The utility model discloses a stainless steel ornamental strip replaces the former preceding frame of part and acts on, gives the exterior trim function of plastic center as preceding frame, will splice the effectual reduction of disconnected poor weakness of the preceding frame structure of stainless steel and hide, and the reduction finishes the constitution originally.
Description
Technical field
This utility model is related to a kind of plastic metal frame, particularly a kind of liquid crystal TV set plastic metal frame.
Background technology
The respective definite functions of existing liquid crystal TV set front frame and center, center is only fixed between backboard and front frame
The inner structural members of plate glass, either plastic rubber front frame or aluminum front frame or rustless steel front frame be all be wrapped in center until
Backboard, and acute angle problem, side offset problem and the difficulty of processing that the side angle of metal front frame coordinates causes production knot to constitute
This is of a relatively high.
Utility model content
Utility model purpose:The purpose of this utility model is to solve existing LCD TV front frame and center river rising in Ningxia and flowing into central Shaanxi Weihe point
It is bright, there is the defect problem of the acute angle and side offset of the cooperation of rustless steel side angle.
Technical scheme:This utility model provides technical scheme below:A kind of liquid crystal TV set plastic metal frame, including plastic cement
Center, rustless steel ornamental strip and backboard, have space in the middle part of the plastic cement center, upper and lower two parts are split up into plastic cement center and are exposed
Part and plastic cement center internal portion, the plastic cement center exposed parts instead of conventional front frame for blocking plastic cement center, glass
The bending construction of glass, and extend to backboard direction, it is additionally provided with plastic cement center exposed parts for inserting backboard dogleg section
Fixing groove;The plastic cement center internal portion includes at the top of plastic cement center internal portion and plastic cement center internal portion bottom again
Portion, with plastic cement center internal portion bottom integrated molding at the top of plastic cement center internal portion, at the top of plastic cement center internal portion
It is provided with raised for blocking the stuck point of rustless steel ornamental strip installation on the bending part side of the raised insertion rustless steel ornamental strip of stuck point
Hole;Prop up rustless steel ornamental strip at the top of the plastic cement center internal portion makes which be fixed on the backboard of insertion fixing groove to bar
On;The plastic cement center internal portion bottom is also had for being matched somebody with somebody the concave part for merging that placement glass is fixed with rustless steel ornamental strip;
The a line of the rustless steel ornamental strip is blocked glass and plays former front frame partial function, recessed with plastic cement center internal portion bottom
Groove portion cooperation is configured to accommodate and dispose the cavity of glass, the built-in portion of another a line insertion plastic cement center of rustless steel ornamental strip
Space at the top of point and between plastic cement center exposed parts.
Used as optimization, the plastic cement center exposed parts are less than outer frame in plastic cement to the Partial Height that backboard direction is extended
Reveal the height of front part to facilitate backboard bending part to be inserted into completing card in the fixing groove of plastic cement center exposed parts therewith
Connect.
Used as optimization, the backboard is perpendicular to the side to bar direction and supports the distance between bar less than backboard insertion fixing groove
0~the 3mm of the length of side on place side.
Used as optimization, the plastic cement center internal portion side props up rustless steel ornamental strip, and built-in in plastic cement center
Part is provided with the draw-in groove projection for extending downwardly near the side of glass, and the draw-in groove projection makes what plastic cement center internal portion was constituted
Concave part can cooperatively form the cavity that can be accommodated and dispose glass with rustless steel ornamental strip.
As optimization, with plastic cement center exposed parts bottom at the top of the rustless steel ornamental strip insertion plastic cement center internal portion
Between portion, the length of side in space is raised not less than the stuck point at the top of plastic cement center internal portion arrives the distance between rustless steel ornamental strip.
Used as optimization, at the top of the plastic cement center internal portion and plastic cement center internal portion bottom constitutes horizontal " U "
Type is designed, and it is raised that " U " type bottom is provided with draw-in groove.
As optimization, it is provided with backboard and extends downwardly near backboard side at the top of the plastic cement center internal portion
Releasing snap lock pay muscle position, on backboard by screw insert Brake screws, Brake screws extend into backboard end be taper.
Brake screws and contacting to bar on plastic cement center internal portion is turned, rustless steel ornamental strip and plastic cement center can be made
The raised purpose for snapping connection releasing, reaching detachable maintaining machine for constituting of internal portion stuck point.
As optimization, at the top of rustless steel ornamental strip insertion plastic cement center internal portion with plastic cement center exposed parts it
Between space side and plastic cement center internal portion on stuck point projection constitute the buckle for fixing rustless steel ornamental strip.
Space at the top of the rustless steel ornamental strip insertion plastic cement center internal portion and between plastic cement center exposed parts
Side and constitute the installing hole raised for fixing stuck point at the top of plastic cement center internal portion to bar.
Used as optimization, the plastic cement center exposed parts wrap rustless steel ornamental strip insertion plastic cement center internal portion top
The side in space between portion and plastic cement center exposed parts causes the rustless steel splicing offset of conventional side to be hidden in space.
As optimization, draw-in groove that the plastic cement center internal portion is extended downwardly it is raised and rustless steel ornamental strip between away from
From for 0~3mm.
Beneficial effect:This utility model is compared with prior art:
1st, this utility model includes substituting the effect of part front frame using rustless steel ornamental strip, gives the modeling of former inner structural members
Glue center increases the exterior trim function of its fore shell, without traditional TV set front frame concept, effectively reduces knot and constitutes
This.
2nd, the unavoidable side splicing seams of current rustless steel splicing front frame institute can be solved using this utility model structure to break
Difference problem, acute angle problem etc., the mechanism can also reduce screw consumption, simplify assembly process, save the activity duration.
3rd, this utility model is formed and can be accommodated with plastic cement center exposed parts using at the top of the plastic cement center internal portion
And disposing the space of rustless steel ornamental strip so that the offset of conventional rustless steel stitching portion has been hidden in space.
4th, this utility model employing can accommodate and dispose the space of rustless steel ornamental strip, and plastic cement center is separated to mould
Glue center exposed parts and plastic cement center internal portion two parts, can individually realize its function, can also carry out integrated design,
Two or more part coordinated the function that can be completed in the past, was capable of achieving using plastic cement center single part of the present utility model.
5th, plastic cement center exposed parts of the present utility model are capable of achieving conventional front frame partial function, rustless steel ornamental strip
Conventional front frame partial function is capable of achieving, and is cooperated and conventional front frame is substituted for blocking the bending construction of plastic cement center, glass,
And solve the problems, such as there is offset using conventional art.
Description of the drawings
Frame structure schematic diagrams of the Fig. 1 for prior art LCD TV;
Fig. 2 is provided without the structural representation of Brake screws for this utility model;
Fig. 3 is structural representation of this utility model using Brake screws;
Fig. 4 is the offset schematic diagram existed outside the framework of prior art LCD TV;
Fig. 5 is the effect diagram after this utility model installation.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, further elucidate this utility model, it should be understood that these embodiments are only used for
Illustrate this utility model rather than limit scope of the present utility model, after this utility model has been read, art technology
Modification of the personnel to the various equivalent form of values of the present utility model falls within the application claims limited range.
Embodiment
As shown in Figures 1 to 5, a kind of liquid crystal TV set plastic metal frame, including plastic cement center, rustless steel ornamental strip and the back of the body
Plate, has space in the middle part of the plastic cement center, and upper and lower two parts are split up into plastic cement center exposed parts 1 and the built-in portion of plastic cement center
Point, the plastic cement center exposed parts 1 instead of conventional front frame for block plastic cement center, glass bending construction, and to
Backboard direction extends, and is additionally provided with the fixing groove 2 for inserting backboard dogleg section on plastic cement center exposed parts 1;The plastic cement
Center internal portion is again including at the top of plastic cement center internal portion 3 and plastic cement center internal portion bottom 4, the built-in portion of plastic cement center
Divide top 3 and 4 integrated molding of plastic cement center internal portion bottom, 3 are provided with for blocking not at the top of plastic cement center internal portion
The stuck point projection 7 of rust steel ornamental strip 6, stuck point raised 7 insert the installing hole 13 on the bending part side of rustless steel ornamental strip 6;The modeling
At the top of glue center internal portion 3 prop up rustless steel ornamental strip to bar 8 make its be fixed on insertion fixing groove 2 backboard 9 on;It is described
Plastic cement center internal portion bottom 4 also has for being configured to accommodate and dispose the cavity of glass with the cooperation of rustless steel ornamental strip 6
11。
The a line of the rustless steel ornamental strip 6 is blocked glass and plays former front frame partial function.
At the top of the another a line insertion plastic cement center internal portion of rustless steel ornamental strip 63 with plastic cement center exposed parts 1 it
Between space, the Partial Height that the plastic cement center exposed parts 1 extend to 9 direction of backboard is less than plastic cement center exposed parts
The height of 1 front portion with facilitate backboard bending part to be inserted into be completed in the fixing groove 2 of plastic cement center exposed parts 1 therewith clamping or
It is fixed.
The backboard 9 is located less than the insertion of backboard 9 fixing groove 2 perpendicular to the side to 8 direction of bar and to the distance between bar 8
0~the 3mm of the length of side on side.
The plastic cement center internal portion side props up rustless steel ornamental strip 6, and in rustless steel ornamental strip 6 and backboard 9
Between be provided with the draw-in groove projection 12 for extending downwardly, the concave part that the draw-in groove raised 12 and plastic cement center internal portion are constituted with not
Rust steel ornamental strip 6 can cooperatively form the cavity 11 that can be accommodated and dispose glass.
At the top of the insertion of the rustless steel ornamental strip 6 plastic cement center internal portion between 3 and 1 bottom of plastic cement center exposed parts
Stuck point raised 7 of the length of side in space not less than at the top of plastic cement center internal portion 3 arrives the distance between rustless steel ornamental strip 6.
At the top of the plastic cement center internal portion 3 and plastic cement center internal portion bottom 4 constitute " U " type design, " U " type bottom
Portion is provided with draw-in groove projection 12.
3 releasing for being provided with backboard 9 and extending downwardly near 9 side of backboard at the top of the plastic cement center internal portion
Snap lock pays muscle position 5, inserts Brake screws 10 by screw on backboard, and it is taper that Brake screws 10 extend into the end of backboard.
Brake screws 10 and contacting to bar 8 on plastic cement center internal portion is turned, rustless steel ornamental strip 6 and plastic cement can be made
The purpose for snapping connection releasing, reaching detachable maintaining machine that center internal portion is constituted.
Sky at the top of the insertion of the rustless steel ornamental strip 6 plastic cement center internal portion between 3 and plastic cement center exposed parts 1
Stuck point projection 7 on the side and plastic cement center internal portion of gap constitutes the buckle for fixing rustless steel ornamental strip 6.
Sky at the top of the insertion of the rustless steel ornamental strip 6 plastic cement center internal portion between 3 and plastic cement center exposed parts 1
The side of gap and the installing hole 13 for fixing 3 stuck point projections 7 at the top of plastic cement center internal portion is constituted to bar 8.
The plastic cement center exposed parts 1 wrap rustless steel ornamental strip 6 insertion plastic cement center internal portion at the top of 3 with modeling
The side in space between glue center exposed parts 1 causes the rustless steel splicing offset of conventional side to be hidden in space.
The distance between draw-in groove that the plastic cement center internal portion is extended downwardly raised 12 and rustless steel ornamental strip 6 are 0
~3mm.
Comparative example
A kind of existing liquid crystal TV set framework, including fore shell, glue frame and backboard, the fore shell cooperatively forms energy with glue frame
Enough accommodate and dispose the cavity of glass, glue frame side to prop up backboard, be provided with for preventing fore shell from sliding away from a side roof part of backboard
The dynamic cell body for arranging fore shell base angle.Backboard bending part withstands fore shell, and coordinates receiving glue frame with fore shell, constitutes liquid crystal
Television set framework.
Claims (10)
1. a kind of liquid crystal TV set plastic metal frame, it is characterised in that:Including plastic cement center, rustless steel ornamental strip and backboard, institute
State and have space in the middle part of plastic cement center, upper and lower two parts are split up into into plastic cement center exposed parts and plastic cement center internal portion, institute
State plastic cement center exposed parts conventional front frame is instead of for blocking the bending construction of plastic cement center, glass, and to backboard side
To extension, the fixing groove for inserting backboard dogleg section on plastic cement center exposed parts, is additionally provided with;The plastic cement center is built-in
Part again includes at the top of plastic cement center internal portion and plastic cement center internal portion bottom, at the top of plastic cement center internal portion and moulds
Glue center internal portion bottom integrated molding, is provided with the card for blocking rustless steel ornamental strip at the top of plastic cement center internal portion
Point is raised, the installing hole on the bending part side of the raised insertion rustless steel ornamental strip of stuck point;Support at the top of the plastic cement center internal portion
Firmly rustless steel ornamental strip to bar make its be fixed on insertion fixing groove backboard on;The plastic cement center internal portion bottom also has
For matching somebody with somebody the concave part for merging that placement glass is fixed with rustless steel ornamental strip;The a line of the rustless steel ornamental strip blocks glass
Former front frame partial function is played, is coordinated with the concave part of plastic cement center internal portion bottom and is configured to accommodate and disposes glass
Cavity, the sky at the top of the another a line insertion plastic cement center internal portion of rustless steel ornamental strip and between plastic cement center exposed parts
Gap.
2. liquid crystal TV set plastic metal frame according to claim 1, it is characterised in that:The plastic cement center exposed parts
The Partial Height extended to backboard direction is less than the anterior height of plastic cement center exposed parts facilitating the backboard bending part can
Clamping or fixation is completed therewith in the fixing groove of insertion plastic cement center exposed parts.
3. liquid crystal TV set plastic metal frame according to claim 1, it is characterised in that:The backboard is perpendicular to bar side
To while and to the distance between bar less than backboard insert fixing groove place while 0~3mm of the length of side.
4. liquid crystal TV set plastic metal frame according to claim 1, it is characterised in that:The plastic cement center internal portion
Side props up rustless steel ornamental strip, and plastic cement center internal portion to be provided with the draw-in groove for extending downwardly near the side of glass convex
Rise, the draw-in groove projection enables the concave part that plastic cement center internal portion is constituted to cooperatively form with rustless steel ornamental strip and can hold
Receive and dispose the cavity of glass.
5. liquid crystal TV set plastic metal frame according to claim 1, it is characterised in that:The rustless steel ornamental strip insertion
At the top of plastic cement center internal portion, the length of side in space is not less than the built-in portion of plastic cement center and plastic cement center exposed parts bottom between
Stuck point projection at the top of point arrives the distance between rustless steel ornamental strip.
6. liquid crystal TV set plastic metal frame according to claim 1, it is characterised in that:The plastic cement center internal portion
Top and plastic cement center internal portion bottom constitute horizontal " U " type design, and it is raised that " U " type bottom is provided with draw-in groove.
7. liquid crystal TV set plastic metal frame according to claim 1, it is characterised in that:The plastic cement center internal portion
The releasing snap lock that top is provided with backboard near backboard side and extends downwardly pays muscle position;Inserted by screw on backboard
Brake screws, it is taper that Brake screws extend into the end of backboard.
8. liquid crystal TV set plastic metal frame according to claim 1, it is characterised in that:The rustless steel ornamental strip insertion
Card on the side and plastic cement center internal portion in the space at the top of plastic cement center internal portion and between plastic cement center exposed parts
Point projection constitutes the buckle for fixing rustless steel ornamental strip.
9. liquid crystal TV set plastic metal frame according to claim 1, it is characterised in that:The plastic cement center exposed parts
Wrap the side in the space at the top of rustless steel ornamental strip insertion plastic cement center internal portion and between plastic cement center exposed parts
So that the rustless steel splicing offset of side is hidden in space in the past.
10. liquid crystal TV set plastic metal frame according to claim 4, it is characterised in that:The built-in portion of the plastic cement center
The distance between the draw-in groove projection for extending downwardly and rustless steel ornamental strip is divided to be 0~3mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621010999.9U CN206042194U (en) | 2016-08-31 | 2016-08-31 | Liquid crystal TV plastic metal frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621010999.9U CN206042194U (en) | 2016-08-31 | 2016-08-31 | Liquid crystal TV plastic metal frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206042194U true CN206042194U (en) | 2017-03-22 |
Family
ID=58301110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621010999.9U Active CN206042194U (en) | 2016-08-31 | 2016-08-31 | Liquid crystal TV plastic metal frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206042194U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106162014A (en) * | 2016-08-31 | 2016-11-23 | 江苏利通电子有限公司 | A kind of liquid crystal TV set plastic metal frame |
-
2016
- 2016-08-31 CN CN201621010999.9U patent/CN206042194U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106162014A (en) * | 2016-08-31 | 2016-11-23 | 江苏利通电子有限公司 | A kind of liquid crystal TV set plastic metal frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103619213B (en) | Drawer | |
CN206042194U (en) | Liquid crystal TV plastic metal frame | |
CN106200345A (en) | A kind of removable wrist-watch of watchband | |
CN202833501U (en) | Inserted pin | |
CN204945552U (en) | A kind of fore shell center one module | |
CN106162014A (en) | A kind of liquid crystal TV set plastic metal frame | |
CN107901192A (en) | A kind of easily demoulding detachable concrete experimental block mould | |
CN109881850A (en) | A kind of pseudo-classic architecture Bao Ding | |
CN104477087A (en) | Automobile rear registration plate lamp decorating plate body mounting structure | |
CN204236338U (en) | A kind of this mounting structure of rear license plate lamp of automobile trim board | |
CN209642728U (en) | Mounting structure and mobile terminal | |
CN207657701U (en) | A kind of L-type installation structure of automobile tail lamp | |
CN209627528U (en) | A kind of transparent hood mounting structure of video camera and the video camera with it | |
CN208296270U (en) | The housing unit of air conditioner and air conditioner with it | |
CN207764522U (en) | A kind of ultrathin backlight modular structure | |
CN206159187U (en) | Plate connection part | |
CN206722132U (en) | Punched-type split connecting bridge | |
CN208559529U (en) | It is a kind of convenient for backplate under fixed B column | |
CN205427705U (en) | Touch control integrated machine's preceding frame member | |
CN207842846U (en) | A kind of three layers of part of vehicle decorative plastic | |
CN208314676U (en) | A kind of cabinet | |
CN204903970U (en) | New -type wrist -watch structure | |
CN217897651U (en) | Glass fixing structure for door and window | |
CN208329736U (en) | A kind of lifting lever apparatus and Integral type shower room | |
CN209665711U (en) | A kind of combined type processing mold of arc partition plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 214200 Jiangsu province Wuxi City District Xu Yixing City Industrial Road No. 5 Patentee after: Jiangsu Litong electronic Limited by Share Ltd Address before: 214200 Jiangsu city of Wuxi province Xu Yixing City Industrial Zone Patentee before: Jiangsu Lettall Electronic Co., Ltd. |
|
CP03 | Change of name, title or address |