CN206039265U - Central control system - Google Patents
Central control system Download PDFInfo
- Publication number
- CN206039265U CN206039265U CN201621090940.5U CN201621090940U CN206039265U CN 206039265 U CN206039265 U CN 206039265U CN 201621090940 U CN201621090940 U CN 201621090940U CN 206039265 U CN206039265 U CN 206039265U
- Authority
- CN
- China
- Prior art keywords
- equipment
- control system
- central control
- data center
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011159 matrix material Substances 0.000 claims abstract description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 238000012423 maintenance Methods 0.000 abstract description 12
- 230000000007 visual effect Effects 0.000 abstract description 6
- 239000003245 coal Substances 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002817 coal dust Substances 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Abstract
The utility model relates to a control system field discloses a central control system, and having solved among the prior art whole control system, to lack the macroscopic view visual, and the capital equipment distance far is unfavorable for that maintainer carries out the problem of plant maintenance. The system includes magnetic disc matrix and network card and memory treater including at least one the equipment control system, core switch, data center rack and the UPS of uninterrupted power source system that connect gradually, data center rack, and every equipment control system includes the switch under the equipment, PLC frame, customer end and input/output equipment, and the customer end includes the display for show the man -machine interface of appointed equipment, appointed equipment is the corresponding equipment of AND operation authority. The utility model discloses be applied to in the equipment control process at coal harbour.
Description
Technical field
This utility model is related to control system field, more particularly to a kind of central control system.
Background technology
The capital equipment of Coal Ports includes tippler, stacker, reclaimer, ship loader, water sprayer etc., and each equipment has
The PLC (Programmable Logic Controller, programmable logic controller (PLC)) of their own, server, input and output set
A standby and client for being furnished with independent man machine interface.In addition, the PLC of affiliated central control room there is also one it is independent man-machine
Interface client, input-output equipment, server.In such cases, overall system control lacks macroscopic visual, for example, in
The client of centre control room can not monitor the human machine interface screen of tippler, and vice versa;Live capital equipment, for example, shipment
Machine, reclaimer or stacker cause the operating room huge, coal dust of vibrations many when running, the server hard disc probability of damage of corresponding device
Greatly, need to change hard disk, refitting system after hard disk corruptions, configuration software is installed, is authorized again, it is impossible to recover in the short time, lead
Normally production is affected to cause harbour, while live capital equipment distance is remote, bad environments are unfavorable for that attendant carries out equipment
Safeguard.
Utility model content
Embodiment of the present utility model provides a kind of central control system, simplifies system architecture, and man machine interface is visual
Improved, it is easy to recovery system and data, mitigated maintenance difficulties.
To achieve these goals, embodiment of the present utility model is adopted the following technical scheme that:
This utility model provides a kind of central control system, and the system includes:
At least one apparatus control system, core switch, data center's rack and the uninterrupted power source being sequentially connected
System UPS, wherein, data center's rack includes disk matrix and network interface card and memory processor, each described equipment control
System includes the switch belonging to equipment, and be connected with the switch respectively programmable logic controller (PLC) PLC machine frame, visitor
Family end and input-output equipment, the client include display, and for showing the man machine interface of designated equipment, described specifying sets
Standby is equipment corresponding with operating right.
Optionally, each described apparatus control system is star-like connection with the core switch.
Optionally, the system also includes:Spare core switch, respectively with least one apparatus control system and
Data center's rack connection.
Optionally, the disk matrix, for arranging Vmware ESXi virtual servers, the Vmware ESXi are virtual
Server includes the virtual server belonging to each equipment.
Optionally, the disk matrix, is additionally operable to configure on the Vmware ESXi virtual servers
Factorytalk View platforms.
Optionally, the UPS, for providing on-Line UPS for data center's rack.
Optionally, the client, is additionally operable to receive call instruction from the input-output equipment, and the call instruction is used
In the man machine interface for calling designated equipment.
Optionally, the equipment is tippler, stacker, reclaimer, ship loader or water sprayer.
A kind of central control system that this utility model embodiment is provided, the system include at least one for being sequentially connected
Apparatus control system, core switch, data center's rack and uninterruptible power system UPS, wherein, the data center
Rack includes disk matrix and network interface card and memory processor, and each described apparatus control system includes the switch belonging to equipment,
And programmable logic controller (PLC) PLC machine frame, client and the input-output equipment being connected with the switch respectively, the visitor
Family end includes display, and for showing the man machine interface of designated equipment, the designated equipment is equipment corresponding with operating right.
During this utility model embodiment solves prior art, overall system control lacks macroscopic visual, and capital equipment distance is remote unfavorable
The problem of plant maintenance is carried out in attendant, system architecture is simplified, man machine interface visuality is improved, it is easy to restorer
System and data, mitigate maintenance difficulties.
Other features and advantages of the utility model will be described in detail in subsequent specific embodiment part.
Description of the drawings
Accompanying drawing is further understood to of the present utility model for providing, and constitutes a part for description, and following
Specific embodiment be used for together explaining this utility model, but do not constitute to restriction of the present utility model.In the accompanying drawings:
A kind of structure chart of central control system that Fig. 1 is provided for this utility model embodiment;
The structure chart of another kind of central control system that Fig. 2 is provided for this utility model embodiment;
The structure chart of another central control system that Fig. 3 is provided for this utility model embodiment.
Description of reference numerals
1 apparatus control system, 2 core switch
3 data center's rack, 4 UPS
5 disk matrix, 6 network interface card and memory processor
7 switch, 8 PLC machine frame
9 client, 10 input-output equipment
11 display, 12 spare core switch
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.It should be appreciated that herein
Described specific embodiment is merely to illustrate and explains this utility model, is not limited to this utility model.
This utility model embodiment provides a kind of central control system, as shown in figure 1, the system includes:It is sequentially connected
At least one apparatus control system 1, core switch 2, data center's rack 3, and uninterruptible power system UPS 4, its
In, data center's rack 2 includes disk matrix 5 and network interface card and memory processor 6, and each described apparatus control system 1 is wrapped
Include the switch 7 belonging to equipment, and the programmable logic controller (PLC) PLC machine frame 8, client being connected with the switch 7 respectively
End 9 and input-output equipment 10, the client includes display 11, for showing the man machine interface of designated equipment, the finger
Locking equipment is equipment corresponding with operating right.
By this utility model above-mentioned technical proposal, in solving prior art, overall system control lacks macroscopic visual
Property, capital equipment distance is far unfavorable for that attendant carries out the problem of plant maintenance, simplifies system architecture, and man machine interface is visual
Property improved, it is easy to recovery system and data, mitigate maintenance difficulties.
Wherein, each described apparatus control system 1 includes the switch 7 belonging to equipment, PLC machine frame 8,9 and of client
Input-output equipment 10, refers to prior art on functional realiey, and here is omitted.
Optionally, as shown in Fig. 2 each described apparatus control system is star-like connection with the core switch, will be existing
The structure for having bus-type is changed into hub-and-spoke configuration, improves the speed of service and work efficiency of each equipment.
As shown in figure 3, the system also includes spare core switch 12, with least one equipment control it is respectively
System 1 and data center's rack 2 connect.
Optionally, the disk matrix 5, for arranging Vmware ESXi virtual servers, the Vmware ESXi are empty
Intending server includes the virtual server belonging to each equipment.
In addition, the resource stored on the network interface card and memory processor 6 is on the disk matrix 5 described in each equipment
Virtual server is shared.
Optionally, the disk matrix 5, is additionally operable to configure on the Vmware ESXi virtual servers
Factorytalk View platforms, are easy to run man machine interface in the Factorytalk View platforms.
In addition, the UPS 4, for providing on-Line UPS for data center's rack 3.
Optionally, the client 9, is additionally operable to receive call instruction from the input-output equipment 10, described to call finger
Make the man machine interface for calling designated equipment.
In addition, the equipment can be tippler, stacker, reclaimer, ship loader or water sprayer, the master on Coal Ports
Want the man machine interface of equipment concentrate in the central control system.
By embodiment of the present utility model, the man machine interface of each equipment independence and active station are set up described
On Vmware ESXi virtual servers, replace man machine interface and the active station of equipment in prior art, the wherein people of each equipment
The function at machine interface is not changed.The client of each equipment is connected to described by VMware Horizon View softwares
On Vmware ESXi virtual servers.
Operator can log in the client of any one equipment, and transfer operator's power by call instruction
The man machine interface of the equipment in limit, for example, when the operator are attendant, as the attendant of each equipment gathers around
There are the operating right and modification page permissions of relevant device man machine interface, then when attendant is logged on any one equipment
Afterwards, the display of equipment shows the man machine interface of the equipment in attendant's authority automatically, so that the attendant is to described
Equipment is safeguarded.When the operator are system manager, after system manager logs in any one equipment, due to
The authority operated with the man machine interface to all devices by the system manager, then the system manager can call
The man machine interface of arbitrary equipment.
By above-mentioned embodiment of the present utility model so that the visuality of Coal Ports production operation is improved, by
This can encourage the production management of more active;The man machine interface of each equipment is implemented after concentrating on server virtual platform, letter
The maintenance of man machine interface is changed, increased the simplicity of upgrading, farthest using property server, allowed all Virtual Services
Device and client shared drive and computing resource;Whole power consumption is reduced by reducing the number of servers on capital equipment
Purpose;Centralized data center rack is beneficial to strict control, is easy to checking maintenance, ensures safety.
It is improved by above-mentioned embodiment man machine interface visuality of the present utility model, simplifies the maintenance of system,
The simplicity of system extension is increased, as maintainer can be in the client of any one equipment to wanted maintenance of equipment
Maintenance is called in man machine interface, is easy to recover the system and data of wanted maintenance of equipment, is reduced energy consumption, reduce system cost,
Safety is ensured, strict management promotes aggressive management practice.
In being embodied as, Huanghua Port amount to 13 tipplers (CD1-CD13), 8 stackers (S1-S8), 2
Stacker-reclaimer (SR, SR1), 16 reclaimers (R0-R15), 13 ship loaders (SLK, SL1-SL12), 4 phase central control systems
Central control system system of the present utility model, actual feedback has been adopted to work well.
Preferred implementation of the present utility model is described in detail above in association with accompanying drawing, but, this utility model is not limited
Detail in above-mentioned embodiment, in range of the technology design of the present utility model, can be to skill of the present utility model
Art scheme carries out various simple variants, and these simple variants belong to protection domain of the present utility model.
It is further to note that each particular technique feature described in above-mentioned specific embodiment, in not lance
In the case of shield, can be combined by any suitable means.In order to avoid unnecessary repetition, this utility model is to each
Plant possible compound mode no longer separately to illustrate.
Additionally, combination in any between a variety of embodiments of the present utility model, can also be carried out, as long as which is not disobeyed
Thought of the present utility model is carried on the back, which should equally be considered as content disclosed in the utility model.
Claims (8)
1. a kind of central control system, it is characterised in that the system includes:
At least one apparatus control system, core switch, data center's rack and the uninterruptible power system being sequentially connected
UPS, wherein, data center's rack includes disk matrix and network interface card and memory processor, each described apparatus control system
Including the switch belonging to equipment, and be connected with the switch respectively programmable logic controller (PLC) PLC machine frame, client
And input-output equipment, the client includes display, and for showing the man machine interface of designated equipment, the designated equipment is
Equipment corresponding with operating right.
2. central control system according to claim 1, it is characterised in that each described apparatus control system and the core
Heart switch is star-like connection.
3. central control system according to claim 1, it is characterised in that the system also includes:Spare core is exchanged
Machine, is connected with least one apparatus control system and data center's rack respectively.
4. central control system according to claim 1, it is characterised in that the disk matrix, for arranging Vmware
ESXi virtual servers, the Vmware ESXi virtual servers include the virtual server belonging to each equipment.
5. central control system according to claim 4, it is characterised in that the disk matrix, is additionally operable to described
Factorytalk View platforms are configured on Vmware ESXi virtual servers.
6. central control system according to claim 1, it is characterised in that the UPS, for for data center's machine
Cabinet provides on-Line UPS.
7. central control system according to claim 1, it is characterised in that the client, is additionally operable to from the input
Outut device receives call instruction, and the call instruction is used for calling the man machine interface of designated equipment.
8. central control system according to claim 1, it is characterised in that the equipment is tippler, stacker, feeding
Machine, ship loader or water sprayer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621090940.5U CN206039265U (en) | 2016-09-28 | 2016-09-28 | Central control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621090940.5U CN206039265U (en) | 2016-09-28 | 2016-09-28 | Central control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206039265U true CN206039265U (en) | 2017-03-22 |
Family
ID=58297274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621090940.5U Active CN206039265U (en) | 2016-09-28 | 2016-09-28 | Central control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206039265U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108388165A (en) * | 2018-07-06 | 2018-08-10 | 长沙荣业软件有限公司 | Particulate matter on-line intelligence feeding controller |
-
2016
- 2016-09-28 CN CN201621090940.5U patent/CN206039265U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108388165A (en) * | 2018-07-06 | 2018-08-10 | 长沙荣业软件有限公司 | Particulate matter on-line intelligence feeding controller |
CN108388165B (en) * | 2018-07-06 | 2020-07-31 | 长沙荣业软件有限公司 | Online intelligent material taking controller for particulate matters |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105183554B (en) | High-performance calculation and cloud computing hybrid system and its method for managing resource | |
CN103281306B (en) | Cloud data center virtualization base platform | |
US10316623B2 (en) | Method and system for controlling well operations | |
CN104463492A (en) | Operation management method of electric power system cloud simulation platform | |
CN202918339U (en) | Ground test-launch-control system of carrier rocket based on cloud computing | |
CN103986786A (en) | Remote cloud desktop operation system | |
CN104767741B (en) | A kind of calculating service separation and safety system based on light-duty virtual machine | |
CN103309721A (en) | Virtual machine monitor management system and method | |
CN104539716A (en) | Cloud desktop management system desktop virtual machine dispatching control system and method | |
CN103414712A (en) | Management system and method of distributed virtual desktop | |
CN102253860A (en) | Asynchronous operation method and asynchronous operation management device | |
CN104657150A (en) | Automatic operation and maintenance method under cluster environment | |
CN112639640A (en) | Redundant hot standby control system, control device, redundant hot standby method, and computer-readable storage medium | |
CN108011699A (en) | reactor computer monitoring system network architecture method | |
CN206039265U (en) | Central control system | |
CN102592374B (en) | Intelligent terminal for network invoices | |
CN105187482A (en) | PaaS platform fault self-recovery realizing method and message server | |
CN115619162A (en) | Power supply service command system based on cloud platform and micro-service architecture | |
CN109656213A (en) | Man-machine interface system and dcs with loss protecting mechanism | |
CN116319341A (en) | Cloud sharing industrial control network safety shooting range system | |
CN115292004A (en) | Fault emergency method and device, electronic equipment and storage medium | |
CN113467816A (en) | Management platform for remote safe operation and maintenance of automation system based on virtualization | |
Dayabhai et al. | The role of virtualization in a smart-grid enabled substation automation system | |
CN105630420A (en) | Network computer storage system and storage method thereof | |
CN203301534U (en) | Virtual machine management platform based on cloud architecture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100011 Shenhua building, 22 West Binhe Road, Dongcheng District, Beijing Patentee after: China Shenhua Energy Co.,Ltd. Patentee after: Guoneng Huanghua Port Co.,Ltd. Address before: 100011 Shenhua building, 22 West Binhe Road, Dongcheng District, Beijing Patentee before: China Shenhua Energy Co.,Ltd. Patentee before: SHENHUA HUANGHUA PORT Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |