CN206039265U - Central control system - Google Patents

Central control system Download PDF

Info

Publication number
CN206039265U
CN206039265U CN201621090940.5U CN201621090940U CN206039265U CN 206039265 U CN206039265 U CN 206039265U CN 201621090940 U CN201621090940 U CN 201621090940U CN 206039265 U CN206039265 U CN 206039265U
Authority
CN
China
Prior art keywords
equipment
control system
central control
data center
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621090940.5U
Other languages
Chinese (zh)
Inventor
白栋材
张延军
王凯
马明轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Huanghua Port Co ltd
China Shenhua Energy Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201621090940.5U priority Critical patent/CN206039265U/en
Application granted granted Critical
Publication of CN206039265U publication Critical patent/CN206039265U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a control system field discloses a central control system, and having solved among the prior art whole control system, to lack the macroscopic view visual, and the capital equipment distance far is unfavorable for that maintainer carries out the problem of plant maintenance. The system includes magnetic disc matrix and network card and memory treater including at least one the equipment control system, core switch, data center rack and the UPS of uninterrupted power source system that connect gradually, data center rack, and every equipment control system includes the switch under the equipment, PLC frame, customer end and input/output equipment, and the customer end includes the display for show the man -machine interface of appointed equipment, appointed equipment is the corresponding equipment of AND operation authority. The utility model discloses be applied to in the equipment control process at coal harbour.

Description

A kind of central control system
Technical field
This utility model is related to control system field, more particularly to a kind of central control system.
Background technology
The capital equipment of Coal Ports includes tippler, stacker, reclaimer, ship loader, water sprayer etc., and each equipment has The PLC (Programmable Logic Controller, programmable logic controller (PLC)) of their own, server, input and output set A standby and client for being furnished with independent man machine interface.In addition, the PLC of affiliated central control room there is also one it is independent man-machine Interface client, input-output equipment, server.In such cases, overall system control lacks macroscopic visual, for example, in The client of centre control room can not monitor the human machine interface screen of tippler, and vice versa;Live capital equipment, for example, shipment Machine, reclaimer or stacker cause the operating room huge, coal dust of vibrations many when running, the server hard disc probability of damage of corresponding device Greatly, need to change hard disk, refitting system after hard disk corruptions, configuration software is installed, is authorized again, it is impossible to recover in the short time, lead Normally production is affected to cause harbour, while live capital equipment distance is remote, bad environments are unfavorable for that attendant carries out equipment Safeguard.
Utility model content
Embodiment of the present utility model provides a kind of central control system, simplifies system architecture, and man machine interface is visual Improved, it is easy to recovery system and data, mitigated maintenance difficulties.
To achieve these goals, embodiment of the present utility model is adopted the following technical scheme that:
This utility model provides a kind of central control system, and the system includes:
At least one apparatus control system, core switch, data center's rack and the uninterrupted power source being sequentially connected System UPS, wherein, data center's rack includes disk matrix and network interface card and memory processor, each described equipment control System includes the switch belonging to equipment, and be connected with the switch respectively programmable logic controller (PLC) PLC machine frame, visitor Family end and input-output equipment, the client include display, and for showing the man machine interface of designated equipment, described specifying sets Standby is equipment corresponding with operating right.
Optionally, each described apparatus control system is star-like connection with the core switch.
Optionally, the system also includes:Spare core switch, respectively with least one apparatus control system and Data center's rack connection.
Optionally, the disk matrix, for arranging Vmware ESXi virtual servers, the Vmware ESXi are virtual Server includes the virtual server belonging to each equipment.
Optionally, the disk matrix, is additionally operable to configure on the Vmware ESXi virtual servers Factorytalk View platforms.
Optionally, the UPS, for providing on-Line UPS for data center's rack.
Optionally, the client, is additionally operable to receive call instruction from the input-output equipment, and the call instruction is used In the man machine interface for calling designated equipment.
Optionally, the equipment is tippler, stacker, reclaimer, ship loader or water sprayer.
A kind of central control system that this utility model embodiment is provided, the system include at least one for being sequentially connected Apparatus control system, core switch, data center's rack and uninterruptible power system UPS, wherein, the data center Rack includes disk matrix and network interface card and memory processor, and each described apparatus control system includes the switch belonging to equipment, And programmable logic controller (PLC) PLC machine frame, client and the input-output equipment being connected with the switch respectively, the visitor Family end includes display, and for showing the man machine interface of designated equipment, the designated equipment is equipment corresponding with operating right. During this utility model embodiment solves prior art, overall system control lacks macroscopic visual, and capital equipment distance is remote unfavorable The problem of plant maintenance is carried out in attendant, system architecture is simplified, man machine interface visuality is improved, it is easy to restorer System and data, mitigate maintenance difficulties.
Other features and advantages of the utility model will be described in detail in subsequent specific embodiment part.
Description of the drawings
Accompanying drawing is further understood to of the present utility model for providing, and constitutes a part for description, and following Specific embodiment be used for together explaining this utility model, but do not constitute to restriction of the present utility model.In the accompanying drawings:
A kind of structure chart of central control system that Fig. 1 is provided for this utility model embodiment;
The structure chart of another kind of central control system that Fig. 2 is provided for this utility model embodiment;
The structure chart of another central control system that Fig. 3 is provided for this utility model embodiment.
Description of reference numerals
1 apparatus control system, 2 core switch
3 data center's rack, 4 UPS
5 disk matrix, 6 network interface card and memory processor
7 switch, 8 PLC machine frame
9 client, 10 input-output equipment
11 display, 12 spare core switch
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.It should be appreciated that herein Described specific embodiment is merely to illustrate and explains this utility model, is not limited to this utility model.
This utility model embodiment provides a kind of central control system, as shown in figure 1, the system includes:It is sequentially connected At least one apparatus control system 1, core switch 2, data center's rack 3, and uninterruptible power system UPS 4, its In, data center's rack 2 includes disk matrix 5 and network interface card and memory processor 6, and each described apparatus control system 1 is wrapped Include the switch 7 belonging to equipment, and the programmable logic controller (PLC) PLC machine frame 8, client being connected with the switch 7 respectively End 9 and input-output equipment 10, the client includes display 11, for showing the man machine interface of designated equipment, the finger Locking equipment is equipment corresponding with operating right.
By this utility model above-mentioned technical proposal, in solving prior art, overall system control lacks macroscopic visual Property, capital equipment distance is far unfavorable for that attendant carries out the problem of plant maintenance, simplifies system architecture, and man machine interface is visual Property improved, it is easy to recovery system and data, mitigate maintenance difficulties.
Wherein, each described apparatus control system 1 includes the switch 7 belonging to equipment, PLC machine frame 8,9 and of client Input-output equipment 10, refers to prior art on functional realiey, and here is omitted.
Optionally, as shown in Fig. 2 each described apparatus control system is star-like connection with the core switch, will be existing The structure for having bus-type is changed into hub-and-spoke configuration, improves the speed of service and work efficiency of each equipment.
As shown in figure 3, the system also includes spare core switch 12, with least one equipment control it is respectively System 1 and data center's rack 2 connect.
Optionally, the disk matrix 5, for arranging Vmware ESXi virtual servers, the Vmware ESXi are empty Intending server includes the virtual server belonging to each equipment.
In addition, the resource stored on the network interface card and memory processor 6 is on the disk matrix 5 described in each equipment Virtual server is shared.
Optionally, the disk matrix 5, is additionally operable to configure on the Vmware ESXi virtual servers Factorytalk View platforms, are easy to run man machine interface in the Factorytalk View platforms.
In addition, the UPS 4, for providing on-Line UPS for data center's rack 3.
Optionally, the client 9, is additionally operable to receive call instruction from the input-output equipment 10, described to call finger Make the man machine interface for calling designated equipment.
In addition, the equipment can be tippler, stacker, reclaimer, ship loader or water sprayer, the master on Coal Ports Want the man machine interface of equipment concentrate in the central control system.
By embodiment of the present utility model, the man machine interface of each equipment independence and active station are set up described On Vmware ESXi virtual servers, replace man machine interface and the active station of equipment in prior art, the wherein people of each equipment The function at machine interface is not changed.The client of each equipment is connected to described by VMware Horizon View softwares On Vmware ESXi virtual servers.
Operator can log in the client of any one equipment, and transfer operator's power by call instruction The man machine interface of the equipment in limit, for example, when the operator are attendant, as the attendant of each equipment gathers around There are the operating right and modification page permissions of relevant device man machine interface, then when attendant is logged on any one equipment Afterwards, the display of equipment shows the man machine interface of the equipment in attendant's authority automatically, so that the attendant is to described Equipment is safeguarded.When the operator are system manager, after system manager logs in any one equipment, due to The authority operated with the man machine interface to all devices by the system manager, then the system manager can call The man machine interface of arbitrary equipment.
By above-mentioned embodiment of the present utility model so that the visuality of Coal Ports production operation is improved, by This can encourage the production management of more active;The man machine interface of each equipment is implemented after concentrating on server virtual platform, letter The maintenance of man machine interface is changed, increased the simplicity of upgrading, farthest using property server, allowed all Virtual Services Device and client shared drive and computing resource;Whole power consumption is reduced by reducing the number of servers on capital equipment Purpose;Centralized data center rack is beneficial to strict control, is easy to checking maintenance, ensures safety.
It is improved by above-mentioned embodiment man machine interface visuality of the present utility model, simplifies the maintenance of system, The simplicity of system extension is increased, as maintainer can be in the client of any one equipment to wanted maintenance of equipment Maintenance is called in man machine interface, is easy to recover the system and data of wanted maintenance of equipment, is reduced energy consumption, reduce system cost, Safety is ensured, strict management promotes aggressive management practice.
In being embodied as, Huanghua Port amount to 13 tipplers (CD1-CD13), 8 stackers (S1-S8), 2 Stacker-reclaimer (SR, SR1), 16 reclaimers (R0-R15), 13 ship loaders (SLK, SL1-SL12), 4 phase central control systems Central control system system of the present utility model, actual feedback has been adopted to work well.
Preferred implementation of the present utility model is described in detail above in association with accompanying drawing, but, this utility model is not limited Detail in above-mentioned embodiment, in range of the technology design of the present utility model, can be to skill of the present utility model Art scheme carries out various simple variants, and these simple variants belong to protection domain of the present utility model.
It is further to note that each particular technique feature described in above-mentioned specific embodiment, in not lance In the case of shield, can be combined by any suitable means.In order to avoid unnecessary repetition, this utility model is to each Plant possible compound mode no longer separately to illustrate.
Additionally, combination in any between a variety of embodiments of the present utility model, can also be carried out, as long as which is not disobeyed Thought of the present utility model is carried on the back, which should equally be considered as content disclosed in the utility model.

Claims (8)

1. a kind of central control system, it is characterised in that the system includes:
At least one apparatus control system, core switch, data center's rack and the uninterruptible power system being sequentially connected UPS, wherein, data center's rack includes disk matrix and network interface card and memory processor, each described apparatus control system Including the switch belonging to equipment, and be connected with the switch respectively programmable logic controller (PLC) PLC machine frame, client And input-output equipment, the client includes display, and for showing the man machine interface of designated equipment, the designated equipment is Equipment corresponding with operating right.
2. central control system according to claim 1, it is characterised in that each described apparatus control system and the core Heart switch is star-like connection.
3. central control system according to claim 1, it is characterised in that the system also includes:Spare core is exchanged Machine, is connected with least one apparatus control system and data center's rack respectively.
4. central control system according to claim 1, it is characterised in that the disk matrix, for arranging Vmware ESXi virtual servers, the Vmware ESXi virtual servers include the virtual server belonging to each equipment.
5. central control system according to claim 4, it is characterised in that the disk matrix, is additionally operable to described Factorytalk View platforms are configured on Vmware ESXi virtual servers.
6. central control system according to claim 1, it is characterised in that the UPS, for for data center's machine Cabinet provides on-Line UPS.
7. central control system according to claim 1, it is characterised in that the client, is additionally operable to from the input Outut device receives call instruction, and the call instruction is used for calling the man machine interface of designated equipment.
8. central control system according to claim 1, it is characterised in that the equipment is tippler, stacker, feeding Machine, ship loader or water sprayer.
CN201621090940.5U 2016-09-28 2016-09-28 Central control system Active CN206039265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621090940.5U CN206039265U (en) 2016-09-28 2016-09-28 Central control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621090940.5U CN206039265U (en) 2016-09-28 2016-09-28 Central control system

Publications (1)

Publication Number Publication Date
CN206039265U true CN206039265U (en) 2017-03-22

Family

ID=58297274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621090940.5U Active CN206039265U (en) 2016-09-28 2016-09-28 Central control system

Country Status (1)

Country Link
CN (1) CN206039265U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108388165A (en) * 2018-07-06 2018-08-10 长沙荣业软件有限公司 Particulate matter on-line intelligence feeding controller

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108388165A (en) * 2018-07-06 2018-08-10 长沙荣业软件有限公司 Particulate matter on-line intelligence feeding controller
CN108388165B (en) * 2018-07-06 2020-07-31 长沙荣业软件有限公司 Online intelligent material taking controller for particulate matters

Similar Documents

Publication Publication Date Title
CN105183554B (en) High-performance calculation and cloud computing hybrid system and its method for managing resource
CN103281306B (en) Cloud data center virtualization base platform
US10316623B2 (en) Method and system for controlling well operations
CN104463492A (en) Operation management method of electric power system cloud simulation platform
CN202918339U (en) Ground test-launch-control system of carrier rocket based on cloud computing
CN103986786A (en) Remote cloud desktop operation system
CN104767741B (en) A kind of calculating service separation and safety system based on light-duty virtual machine
CN103309721A (en) Virtual machine monitor management system and method
CN104539716A (en) Cloud desktop management system desktop virtual machine dispatching control system and method
CN103414712A (en) Management system and method of distributed virtual desktop
CN102253860A (en) Asynchronous operation method and asynchronous operation management device
CN104657150A (en) Automatic operation and maintenance method under cluster environment
CN112639640A (en) Redundant hot standby control system, control device, redundant hot standby method, and computer-readable storage medium
CN108011699A (en) reactor computer monitoring system network architecture method
CN206039265U (en) Central control system
CN102592374B (en) Intelligent terminal for network invoices
CN105187482A (en) PaaS platform fault self-recovery realizing method and message server
CN115619162A (en) Power supply service command system based on cloud platform and micro-service architecture
CN109656213A (en) Man-machine interface system and dcs with loss protecting mechanism
CN116319341A (en) Cloud sharing industrial control network safety shooting range system
CN115292004A (en) Fault emergency method and device, electronic equipment and storage medium
CN113467816A (en) Management platform for remote safe operation and maintenance of automation system based on virtualization
Dayabhai et al. The role of virtualization in a smart-grid enabled substation automation system
CN105630420A (en) Network computer storage system and storage method thereof
CN203301534U (en) Virtual machine management platform based on cloud architecture

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100011 Shenhua building, 22 West Binhe Road, Dongcheng District, Beijing

Patentee after: China Shenhua Energy Co.,Ltd.

Patentee after: Guoneng Huanghua Port Co.,Ltd.

Address before: 100011 Shenhua building, 22 West Binhe Road, Dongcheng District, Beijing

Patentee before: China Shenhua Energy Co.,Ltd.

Patentee before: SHENHUA HUANGHUA PORT Co.,Ltd.

CP01 Change in the name or title of a patent holder