CN206038878U - Box is switched in test of power efficiency - Google Patents

Box is switched in test of power efficiency Download PDF

Info

Publication number
CN206038878U
CN206038878U CN201620991192.1U CN201620991192U CN206038878U CN 206038878 U CN206038878 U CN 206038878U CN 201620991192 U CN201620991192 U CN 201620991192U CN 206038878 U CN206038878 U CN 206038878U
Authority
CN
China
Prior art keywords
sample cell
test
display
box body
convertbox
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620991192.1U
Other languages
Chinese (zh)
Inventor
杨韫芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620991192.1U priority Critical patent/CN206038878U/en
Application granted granted Critical
Publication of CN206038878U publication Critical patent/CN206038878U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model discloses a box is switched in test of power efficiency, including box body, NULL power, sample cell and direct current output load, the box body in be provided with power meter, relay unit, controller, display, the NULL power set up the one side at the box body to it is connected with power meter, relay unit respectively to cross the connecting wire with the NULL power -on, the sample cell setting in box body one side to it is connected with the display to pass through the connecting wire with the sample cell, direct current output load pass through the connecting wire and be connected with the sample cell. The utility model discloses be provided with a plurality of sample cells on the box body to all set up the structure into the one -to -one with sample cell and display and sample cell with direct current output load, realized that test or a plurality of sample is tested simultaneously to a single sample, reduced the set up time product test in -process personnel, improved the efficiency of testing.

Description

A kind of power supply efficiency test ConvertBox
Technical field
The utility model is related to power supply efficiency test field, specifically a kind of power supply efficiency test ConvertBox.
Background technology
With the raising that the aggravation and people's energy-conserving and environment-protective of world's greenhouse effects are realized, all over the world energy to electronic product Effect requires also more and more higher, therefore, the demand of the efficiency test of electric equipment products also increases therewith.At present, in electric equipment products efficiency In test process, mostly one equipment test terminates, and can just carry out next equipment test, not only after manually arranging corresponding parameter Inefficiency is reduced, the amount of labour of staff is also increased, is improve testing cost.
The content of the invention
The purpose of this utility model is to overcome existing electric equipment products carrying out a product present in efficiency test process Test terminates just to carry out that next product, inefficiency, the amount of labour be big, the problem of high cost, there is provided it is a kind of both can a product Product individually test also can multiple products test, high working efficiency, the power supply efficiency test that operating cost is low, workload is little are cut simultaneously Change box.
The technical scheme taken of technical problem that the utility model is solved is:
A kind of power supply efficiency test ConvertBox, loads including box body, alternating current input power supplying, sample cell and direct current output, institute Power meter, relay unit, controller, display is provided with the box body stated, and described alternating current input power supplying is arranged on box body Side, and alternating current input power supplying is connected with power meter, relay unit respectively by connecting line, described sample cell is arranged In box body side, and sample cell is connected with display by connecting line, described direct current output load is by connecting line and sample Product groove connects.
Described relay unit is connected with power meter, controller, display respectively by connecting line, will by connecting line Each element connection, improves the sensitivity that the energy tests ConvertBox.
Described alternating current input power supplying is connected with power meter, relay unit respectively by connecting line, improves testing efficiency And the degree of accuracy of test result.
Described sample cell is connected with display by connecting line, can be reflected in the information in test process in time aobvious Show on device, be easy to operating personnel to observe.
Switch is provided with connecting line between described relay unit and display, and realizing is carried out to single sample Test or multiple samples are tested simultaneously, improve operating efficiency.
Described sample cell is disposed as one-to-one structure with display and sample cell with direct current output load, realizes Single sample is tested or multiple samples are while tested, when reducing the setting of personnel during product test Between, improve the efficiency of test.
Described sample cell, its quantity are 2-6, are provided with multiple sample cells, and multiple samples can be surveyed simultaneously Examination, improves operating efficiency.
Beneficial effect:The utility model is provided with multiple sample cells on box body, and by sample cell and display and sample The load of groove and direct current output is disposed as one-to-one structure, realize single sample is tested or multiple samples while Tested, reduce the setting time of the personnel during product test, improve the efficiency of test.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure:1. box body, 2. alternating current input power supplying, 3. power meter, 4. relay unit, 5. controller, 6. connecting line, 7. Display, 8. sample cell, 9. direct current output load, 10. switch.
Specific embodiment
The utility model is described in detail below with reference to accompanying drawing.
Embodiment 1:
As shown in Figure 1, a kind of power supply efficiency test ConvertBox, including box body 1, alternating current input power supplying 2,8 and of sample cell Direct current output load 9, is provided with power meter 3, relay unit 4, controller 5, display 7 in described box body 1, it is described after Electric appliance unit 4 is connected with power meter 3, controller 5, display 7 respectively by connecting line 6, is connected each element by connecting line 6 Connect, improve the sensitivity that the energy tests ConvertBox, described alternating current input power supplying 2 is arranged on the side of box body 1, and will exchange defeated Enter power supply 2 to be connected with power meter 3, relay unit 4 by connecting line 6 respectively, improve the accurate of testing efficiency and test result Degree, described sample cell 8 is arranged on 1 side of box body, and sample cell 8 is connected with display 7 by connecting line 6, will can survey On the display 7, described sample cell 8, its quantity are 3 to the reflection in time of information during examination, are provided with multiple sample cells 8, multiple samples can be tested simultaneously, improve operating efficiency, be easy to operating personnel to observe, described direct current output is born Carry 9 to be connected with sample cell 8 by connecting line 6, and sample cell 8 is all provided with direct current output load 9 with display 7 and sample cell 8 One-to-one structure is set to, is realized and single sample is tested or multiple samples are while test, reduce and producing The setting time of personnel in product test process, the efficiency of test is improve, between described relay unit 4 and display 7 Switch 10 is provided with connecting line 6, is realized by switch 10 and single sample is tested or multiple samples are while survey Examination, improves operating efficiency, is provided with multiple sample cells 8 on box body 1, and by sample cell 8 and display 7 and sample cell 8 with Direct current output load 9 is disposed as one-to-one structure, can quickly understand the test feelings relative to sample by display 7 Condition, realizes and single sample is tested or multiple samples are while test, reduce the personnel during product test The setting time, improve the efficiency of test.
Embodiment 2:
As shown in Figure 1, a kind of power supply efficiency test ConvertBox, including box body 1, alternating current input power supplying 2,8 and of sample cell Direct current output load 9, is provided with power meter 3, relay unit 4, controller 5, display 7 in described box body 1, it is described after Electric appliance unit 4 is connected with power meter 3, controller 5, display 7 respectively by connecting line 6, is connected each element by connecting line 6 Connect, improve the sensitivity that the energy tests ConvertBox, described alternating current input power supplying 2 is arranged on the side of box body 1, and will exchange defeated Enter power supply 2 to be connected with power meter 3, relay unit 4 by connecting line 6 respectively, improve the accurate of testing efficiency and test result Degree, described sample cell 8 is arranged on 1 side of box body, and sample cell 8 is connected with display 7 by connecting line 6, will can survey On the display 7, described sample cell 8, its quantity are 7 to the reflection in time of information during examination, are provided with multiple sample cells 8, multiple samples can be tested simultaneously, improve operating efficiency, be easy to operating personnel to observe, described direct current output is born Carry 9 to be connected with sample cell 8 by connecting line 6, and sample cell 8 is all provided with direct current output load 9 with display 7 and sample cell 8 One-to-one structure is set to, is realized and single sample is tested or multiple samples are while test, reduce and producing The setting time of personnel in product test process, the efficiency of test is improve, between described relay unit 4 and display 7 Switch 10 is provided with connecting line 6, is realized by switch 10 and single sample is tested or multiple samples are while survey Examination, improves operating efficiency, is provided with multiple sample cells 8 on box body 1, and by sample cell 8 and display 7 and sample cell 8 with Direct current output load 9 is disposed as one-to-one structure, can quickly understand the test feelings relative to sample by display 7 Condition, realizes and single sample is tested or multiple samples are while test, reduce the personnel during product test The setting time, improve the efficiency of test.
The utility model is not directed to partly same as the prior art or can be realized using prior art.

Claims (7)

1. a kind of power supply efficiency test ConvertBox, loads including box body, alternating current input power supplying, sample cell and direct current output, and which is special Levy and be:Power meter, relay unit, controller, display is provided with described box body, and described alternating current input power supplying sets Put in the side of box body, described sample cell is arranged on box body side, and will, described direct current output load by connecting line with Sample cell connects.
2. power supply efficiency test ConvertBox according to claim 1, it is characterised in that:Described relay unit is by connecting Wiring is connected with power meter, controller, display respectively.
3. power supply efficiency test ConvertBox according to claim 1, it is characterised in that:Described alternating current input power supplying passes through Connecting line is connected with power meter, relay unit respectively.
4. power supply efficiency test ConvertBox according to claim 1, it is characterised in that:Described sample cell passes through connecting line It is connected with display.
5. power supply efficiency test ConvertBox according to claim 2, it is characterised in that:Described relay unit and display Switch is provided with connecting line between device.
6. power supply efficiency test ConvertBox according to claim 4, it is characterised in that:Described sample cell and display and Sample cell is disposed as one-to-one structure with direct current output load.
7. power supply efficiency test ConvertBox according to claim 1, it is characterised in that:Described sample cell, its quantity is 2-6.
CN201620991192.1U 2016-08-30 2016-08-30 Box is switched in test of power efficiency Expired - Fee Related CN206038878U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620991192.1U CN206038878U (en) 2016-08-30 2016-08-30 Box is switched in test of power efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620991192.1U CN206038878U (en) 2016-08-30 2016-08-30 Box is switched in test of power efficiency

Publications (1)

Publication Number Publication Date
CN206038878U true CN206038878U (en) 2017-03-22

Family

ID=58304265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620991192.1U Expired - Fee Related CN206038878U (en) 2016-08-30 2016-08-30 Box is switched in test of power efficiency

Country Status (1)

Country Link
CN (1) CN206038878U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111458584A (en) * 2020-04-16 2020-07-28 广东电网有限责任公司 Automatic energy efficiency test platform and test method for power electronic equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111458584A (en) * 2020-04-16 2020-07-28 广东电网有限责任公司 Automatic energy efficiency test platform and test method for power electronic equipment

Similar Documents

Publication Publication Date Title
CN202693702U (en) General-purpose tester of transformer
CN104459566A (en) Secondary electric power supply testing system and method
CN201057535Y (en) Intelligent electric power experiment load system
CN105890474A (en) Intelligent fuse safety testing device
CN204086504U (en) Power supply product measurement jig
CN206038878U (en) Box is switched in test of power efficiency
CN202886517U (en) Testing device of power distribution terminal
CN104361796A (en) Electric energy metering device simulation training platform
CN202676892U (en) Airborne power supply integrated test system
CN206807145U (en) A kind of automatic test device of distribution terminal
CN202994932U (en) Rapid test device of LED power source drivers
CN206096202U (en) Electronic load
CN209525427U (en) Relay test platform composite control apparatus
CN204332187U (en) A kind of electric power meter simulation training platform
CN205861846U (en) Multifunctional radio-frequency test device
CN202102059U (en) Power unit testing apparatus
CN205720629U (en) A kind of mutual inductor measuring test system with left and right handoff functionality
CN204287351U (en) A kind of concentrator hardware capability automatic test fixture
CN205539253U (en) Transformer comprehensive testing appearance
CN103364738A (en) Power supply aging tester
CN102375126A (en) Method, device and system for detecting battery pack sampling module
CN206363297U (en) A kind of versatile interface automatic test device
CN201698577U (en) Transformer test data measuring system based on wireless network
CN206235685U (en) It is a kind of to support various program control charger test boards for filling agreement soon
CN206848462U (en) Multifunctional electric energy meter rate test diagnosis system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322

Termination date: 20170830