CN206037376U - Cabinet air conditioner evaporimeter bearing structure - Google Patents
Cabinet air conditioner evaporimeter bearing structure Download PDFInfo
- Publication number
- CN206037376U CN206037376U CN201620881423.3U CN201620881423U CN206037376U CN 206037376 U CN206037376 U CN 206037376U CN 201620881423 U CN201620881423 U CN 201620881423U CN 206037376 U CN206037376 U CN 206037376U
- Authority
- CN
- China
- Prior art keywords
- supporting construction
- vaporizer
- vaporizer supporting
- weather board
- cabinet air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 92
- 239000006200 vaporizer Substances 0.000 claims description 278
- 238000010276 construction Methods 0.000 claims description 177
- 230000000712 assembly Effects 0.000 claims description 17
- 238000000429 assembly Methods 0.000 claims description 17
- 230000008020 evaporation Effects 0.000 claims description 10
- 238000001704 evaporation Methods 0.000 claims description 10
- 239000004020 conductor Substances 0.000 claims description 9
- 238000010025 steaming Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 4
- 230000002787 reinforcement Effects 0.000 description 8
- 230000008602 contraction Effects 0.000 description 6
- 230000000694 effects Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 238000005485 electric heating Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- -1 mounting bracket Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 210000003437 trachea Anatomy 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Landscapes
- Air-Conditioning For Vehicles (AREA)
Abstract
The utility model provides a cabinet air conditioner evaporimeter bearing structure, evaporimeter bearing structure (7) including evaporimeter bearing structure tray (71), evaporimeter bearing structure backplate (72) and evaporimeter bearing structure water guiding board (710), one side of evaporimeter bearing structure tray (71) is evaporimeter bearing structure backplate (72), the below of evaporimeter bearing structure backplate (72) is evaporimeter bearing structure water guiding board (710), evaporimeter bearing structure tray (71) and evaporimeter bearing structure backplate (72) be equipped with under the evaporimeter bearing structure water hole (76) in the junction, through the utility model discloses, simplified evaporimeter bearing structure, the installation dismantlement is convenient moreover, and is fixed effectual.
Description
Technical field
The present invention relates to field of air conditioning, in particular belongs to the vaporizer supporting construction in cabinet air-conditioner field.
Background technology
In prior art, CN201410182520.9 provides a kind of evaporator assemblies and air conditioner room unit.The evaporation
Device assembly includes that vaporizer, mounting bracket, water container and vaporizer pressing plate, vaporizer and water container are solid with mounting bracket
It is fixed to connect, and water container is placed on the installation of water container positioned at the lower end in the lower section of evaporator body, evaporator body
In groove, upper end is fixed in mounting bracket by vaporizer pressing plate.The supporting structure that the invention is provided is complicated, takes up room big,
Installation and removal are all inconvenient.
A kind of vaporizer support meanss of the CN201210255951.4 disclosure of the invention, are respectively used to support including two and steam
The support unit at device two ends is sent out, at least one support unit is integral type support plate, having on integral type support plate is used for and vaporizer
The fixed edge being fixedly connected and the connection side for being fixedly connected with air conditioner casing.Although the invention simplifies supporting construction, but
Installing/dismounting is inconvenient.
In view of this, propose this utility model.
The content of the invention
The purpose of this utility model is to provide a kind of cabinet air-conditioner vaporizer supporting construction.
This utility model is accomplished by.
A kind of cabinet air-conditioner vaporizer supporting construction, described vaporizer supporting construction include vaporizer supporting construction support
Disk, vaporizer supporting construction backplate and vaporizer supporting construction weather board, the side of vaporizer supporting construction pallet is evaporation
Device supporting construction backplate, the lower section of vaporizer supporting construction backplate is vaporizer supporting construction weather board, described evaporation
Device supporting construction pallet is provided with vaporizer supporting construction drainage hole with vaporizer supporting construction backplate in junction.
Preferably, the periphery in vaporizer supporting construction pallet is provided with vaporizer supporting construction pallet flange, for stopping
Water is flowed out from vaporizer supporting construction pallet.
Further, vaporizer supporting construction weather board is obliquely installed and is contacted with water leg, and vaporizer supports knot
Structure weather board is placed on above water leg.
Vaporizer supporting construction support block is provided with the downside of vaporizer supporting construction pallet, in vaporizer supporting construction
Support block away from vaporizer supporting construction backplate side at least provided with a vaporizer supporting construction fastener, in vaporizer
Supporting construction fastener is provided with vaporizer supporting construction cable clamping interface.
In this utility model, there are two adjacent snap fits using vaporizer supporting construction fastener, snap fit has a fixing end,
It is fixed in vaporizer supporting construction support block, the other end is free end, the fixing end of two snap fits is adjacent, two free end sides
To conversely, during fixed electric wire, electric wire is pierced into from vaporizer supporting construction cable clamping interface and passes the direction for changing current on electric wire, is prevented
Sealing is low on electric-controlled plate or other electric elements along electric wire.
Additionally, vaporizer supporting construction water conductor assemblies are provided with below vaporizer supporting construction backplate, it is described
Vaporizer supporting construction water conductor assemblies are arranged on vaporizer supporting construction weather board.
Wherein, vaporizer supporting construction water conductor assemblies include the first weather board of vaporizer supporting construction and are arranged on vaporizer
The second weather board of vaporizer supporting construction between the first weather board of supporting construction and it is arranged on vaporizer supporting construction pallet
The first ribs of vaporizer supporting construction on lower section and vaporizer supporting construction backplate, the vaporizer supporting construction first
Ribs is with vaporizer supporting construction the first weather board homonymy and is connected.
Vaporizer supporting construction water conductor assemblies also include vaporizer supporting construction water hole, the vaporizer supporting construction
Water hole is located at the weather board between the second weather board of the first weather board of vaporizer supporting construction and vaporizer supporting construction most
Lower end.
The side of vaporizer supporting construction weather board is provided with the second ribs of vaporizer supporting construction, further strengthens
The bulk strength of vaporizer supporting construction.
At the same time it can also set vaporizer supporting construction weather board flange on vaporizer supporting construction weather board, to increase which strong
Degree.
By this utility model, vaporizer supporting construction, and easy installation and removal, good fixing effect is simplified.
Description of the drawings
Fig. 1 is this utility model vaporizer rearview;
Fig. 2 is this utility model vaporizer front view;
Fig. 3 is this utility model vaporizer explosive view;
Fig. 4 is this utility model vaporizer the first side view of supporting construction;
Fig. 5 is this utility model vaporizer the second side view of supporting construction;
Fig. 6 is this utility model water leg side view;
Fig. 7 is this utility model water leg top view;
Fig. 8 is the left hangers axis side view of this utility model vaporizer;
Fig. 9 is the right hangers axis side view of this utility model vaporizer;
Figure 10 is this utility model vaporizer upper mounting plate view;
Figure 11 is the partial view at Fig. 5 I;
Figure 12 is the partial view at Fig. 6 II.
In order to be better understood from the present invention, the supporting construction of cabinet air-conditioner vaporizer described in this utility model is given below
Part numbers, wherein, 6, vaporizer;61st, evaporator assemblies;6101st, evaporator assemblies suspension member;6102nd, heat exchanger tube;62nd, evaporate
Device upper mounting plate;6201st, the first connecting plate of vaporizer upper mounting plate;6202nd, the second connecting plate of vaporizer upper mounting plate;6203、
The first connecting hole of vaporizer upper mounting plate;6204th, the second connecting hole of vaporizer upper mounting plate;6205th, vaporizer upper mounting plate
Three connecting holes;63rd, vaporizer left plate;6301st, vaporizer left plate main body;6302 vaporizer left plate side panels;6303rd, steam
Send out the first connecting hole of device left plate;6304th, vaporizer left plate flange;6305th, vaporizer left plate strengthening groove;6306th, evaporate
Device left plate spliced eye;64th, the left installing plate of vaporizer;6401st, the left installing plate main body of vaporizer;6402nd, the left installing plate of vaporizer
Flange;6403rd, the left installing plate upper mounting holes of vaporizer;6404th, the left installing plate Lower mounting hole of vaporizer;6405th, vaporizer
Installing hole in the middle part of left installing plate;65th, the left hangers of vaporizer;6501st, the left hangers connecting hole of vaporizer;6502nd, the left hangers of vaporizer
Fixing hole;6503rd, the left hangers top board of vaporizer;6504th, the left hangers base plate of vaporizer;6505th, the left hangers reinforcement of vaporizer;
66th, the right hangers of vaporizer;6601st, the right hangers fixing hole of vaporizer;6602nd, the right hangers top board of vaporizer;6603rd, the right extension of vaporizer
Ear reinforcement;6604th, the right hangers base plate of vaporizer;67th, the right installing plate of vaporizer;6701st, the right installing plate main body of vaporizer;
6702nd, the right installing plate flange of vaporizer;6704th, installing hole in the middle part of the right installing plate of vaporizer;6705th, the right installing plate bottom of vaporizer
Installing hole;6706th, right the first installing hole of installing plate top of vaporizer;6707th, right the second installing hole of installing plate top of vaporizer;
68th, vaporizer right plate;6801st, the first connecting plate of vaporizer right plate;6802nd, vaporizer right plate top connecting hole;6803、
The second connecting plate of vaporizer right plate;6804th, connecting hole in the middle part of vaporizer right plate;6805th, vaporizer right plate spliced eye;
6806th, vaporizer right plate main body;6807th, the 3rd connecting plate of vaporizer right plate;6808th, vaporizer right plate bottom connection
Hole;6809th, the 4th connecting plate of vaporizer right plate;6810th, the first connecting hole of vaporizer right plate.7th, vaporizer supporting construction;
71st, vaporizer supporting construction main body;72nd, vaporizer supporting construction backplate;73rd, vaporizer supporting construction main body flange;74th, steam
Send out device supporting construction left connection board;7401st, the first connecting hole of vaporizer supporting construction;75th, vaporizer supporting construction right connection board;
7501st, the second connecting hole of vaporizer supporting construction;76th, vaporizer supporting construction drainage hole;77th, vaporizer supporting construction is supported
Block;78th, vaporizer supporting construction fastener;7801st, vaporizer supporting construction cable clamping interface;79th, vaporizer supporting construction water conductor assemblies;
7901st, the first weather board of vaporizer supporting construction;7902nd, the second weather board of vaporizer supporting construction;7903rd, vaporizer supports knot
The first ribs of structure;7904th, vaporizer supporting construction water hole;7905th, weather board on the left of vaporizer supporting construction;7906th, steam
Send out weather board on the right side of device supporting construction;7907th, the second ribs of vaporizer supporting construction;710th, vaporizer supporting construction water guide
Plate;711st, vaporizer supporting construction weather board flange.
8th, water leg;81st, water leg backplate;82nd, catchment trough floor;83rd, water leg front panel;84th, water leg block reinforcement,
85th, the first crossed beam trunking of water leg;86th, water leg first crosses tube seat;87th, water leg overflow groove;88th, water leg osculum;89th, collect
Sink drain;810th, water leg drain pipe connection buckle;811st, water leg first side;812nd, water leg second side;
813rd, the first contraction flow region of water leg;814th, the second contraction flow region of water leg.
Specific embodiment
Embodiment
A kind of cabinet air-conditioner vaporizer supporting construction, described vaporizer 6 include evaporator assemblies 61, in evaporator assemblies
61 top is provided with vaporizer upper mounting plate 62, and 61 left and right sides of evaporator assemblies is by being inserted into grafting by heat exchanger tube 6102
It is connected with vaporizer left plate 63 and vaporizer right plate 68 in hole respectively, in vaporizer left plate 63 away from evaporator assemblies 61
Side be provided with installing plate 64 on the left of vaporizer, the vaporizer right plate 68 is provided with away from the side of evaporator assemblies 61
The right installing plate 67 of vaporizer, described vaporizer left and right side plate, the top of vaporizer left and right side installing plate respectively with vaporizer
Upper mounting plate 62 is bolted link.
Specifically, the bottom of vaporizer left side plate and vaporizer left and right sides installing plate is led to vaporizer supporting construction 7
Cross bolt to be fixedly connected;The left side of vaporizer upper mounting plate 62 is provided with the first connecting plate of vaporizer upper mounting plate 6201, evaporation
The right side of device upper mounting plate 62 is provided with the second connecting plate of vaporizer upper mounting plate 6202, in the left side of vaporizer left plate 63
The left hangers 65 of vaporizer is provided with plate, is provided with the right hangers 66 of vaporizer, the left extension of vaporizer on the right plate 68 of vaporizer
Ear 65 includes:The left hangers top board 6503 of vaporizer and it is located at the left hangers of the left hangers fixing hole 6502, vaporizer of vaporizer thereon
Base plate 6504 and the left hangers connecting hole 6501 of vaporizer thereon is located at, the left hangers top board 6503 of vaporizer and the left hangers of vaporizer
It is the left hangers main body of vaporizer between base plate 6504;The left hangers reinforcement of vaporizer is additionally provided with the left hangers of vaporizer 65
6505;The right hangers of vaporizer 66 includes:The right hangers top board 6602 of vaporizer and it is located at the right hangers fixing hole of vaporizer thereon
6601, the right hangers reinforcement 6603 of vaporizer and the right hangers base plate 6604 of vaporizer, the right hangers top board of vaporizer 6602 with steam
Send out between the right hangers base plate of device 6604 is the right hangers main body of vaporizer;The left hangers top board 6503 of vaporizer is by bolt and cabinet-type air conditioner shell
The left plate of body is fixedly connected, and the right hangers top board 6602 of vaporizer is fixedly connected with the right plate of cabinet-type air conditioner housing by bolt.
Further, described vaporizer upper mounting plate 62 is fixedly connected with the backboard of cabinet-type air conditioner housing by bolt, enters one
Step improves the stability of vaporizer and cabinet-type air conditioner housing integrated connection.
Described vaporizer supporting construction 7 includes vaporizer supporting construction main body 71, vaporizer supporting construction main body 71
Side is connected with vaporizer supporting construction backplate 72, is respectively arranged with evaporation at the two ends of vaporizer supporting construction backplate 72
Device supporting construction left connection board 74 and vaporizer supporting construction right connection board 75, vaporizer supporting construction left connection board 74 and evaporation
Device supporting construction right connection board 75 respectively with vaporizer left and right side plate, the bottom of vaporizer left and right side installing plate is connected, described
Vaporizer supporting construction main body 71 be provided with water under vaporizer supporting construction with vaporizer supporting construction backplate 72 in junction
Hole 76.
Vaporizer supporting construction main body flange 73 is provided with the periphery of vaporizer supporting construction main body 71, such setting can
So that the condensed water dropped down on vaporizer Jing vaporizer supporting constructions drainage hole 76 is flowed in water leg 8, it is to avoid vaporizer
The overflow of upper condensed water and sinuous flow occur, and the lower section of the vaporizer supporting construction backplate 72 is connected with vaporizer supporting construction
Weather board 710, vaporizer supporting construction weather board 710 are obliquely installed and are contacted with water leg 8, and vaporizer supporting construction
Weather board 710 is placed on water leg 8, and the downside of vaporizer supporting construction main body 71 is provided with vaporizer supporting construction
Bracer 77, described vaporizer supporting construction support block 77 are supported away from vaporizer in vaporizer supporting construction support block 77 and are tied
The side of structure backplate 72 is provided with vaporizer supporting construction fastener 78, by what is arranged on vaporizer supporting construction fastener 78
Vaporizer supporting construction cable clamping interface 7801 is used for fixing electrically heated electric wire, electric wire from vaporizer supporting construction cable clamping interface 7801
Through flow direction on electric wire is changed, prevent current low on electric-controlled plate or other electrical parts directly with electric wire.In evaporation
The lower section of device supporting construction backplate 72 is provided with vaporizer supporting construction water conductor assemblies 79, and described vaporizer supporting construction is led
Water assembly 79 is arranged on vaporizer supporting construction backplate 72, vaporizer supporting construction weather board 710 and supports near vaporizer
The side of structure cable clamping interface 7801, described vaporizer supporting construction water conductor assemblies 79 also function to the effect of reinforcement, described
Vaporizer supporting construction 7 is fixedly connected with evaporation structure by bolt.
Preferably, set away from the side of vaporizer supporting construction cable clamping interface 7801 in vaporizer supporting construction weather board 710
The second ribs of vaporizer supporting construction 7907 is equipped with, further strengthens the bulk strength of vaporizer supporting construction.
Further, it is connected with vaporizer supporting construction weather board on described vaporizer supporting construction weather board 710 to turn over
Side 711, vaporizer supporting construction weather board flange 711 are arranged in two side flangings on vaporizer supporting construction weather board 710.
Described water leg 8 includes trough floor 82 of catchmenting, and arranges the water leg back side on the upper side of trough floor 82 of catchmenting
Plate 81, water leg front panel 83, water leg first side 811 and water leg second side 812, arrange in trough floor 82 catchmenting
There is water leg block reinforcement 84, the water leg block reinforcement 84 is used for and the bottom contact of vaporizer supporting construction 7 connects, will be from vaporizer
The water section stream that support structure 7 flows out takes full advantage of the slot space that catchments to the rear side of water leg 8.Water leg front panel 83 with
The first contraction flow region of water leg 813, water leg front panel 83 and water leg second side is connected between water leg first side 811
The second contraction flow region of water leg 814 is connected between 812, and this is provided for being connected for water leg 8 and vaporizer supporting construction,
Water leg osculum 88 is provided with trough floor 82 catchmenting, and is connected with water leg drain pipe in the lower section of water leg osculum 88
89。
Preferably, the side of water leg the first contraction flow region 813 is provided with water leg the on water leg front panel 83
One crossed beam trunking 85, the crossed beam trunking are used for configuring electric heating wire.
Further, the side near the second contraction flow region of water leg 814 on water leg front panel 83 is provided with water leg
First crosses tube seat 86, and this crosses tube seat for configuring vaporizer entry/exit trachea.
Preferably, water leg overflow groove 87 is provided with water leg second side 812, for providing in a kind of water leg
Flow pass when water is excessive, current along side wall stream on base, prevent water in water leg because no overfall
Water (flow) direction does not know, and causes in the powered or moving components such as possible water Liu Dao electric-controlled boxes.
Further, described water leg osculum 88 passes through water leg drain pipe connection buckle with water leg drain pipe 89
Carry out snapping connection, it is ensured that the water energy in water leg 8 is enough stable, reliable by drain pipe outflow.
Flange described herein refers to the one side or a few sides being upturned that extends out from body, and example pallet flange is
Refer to the side being upturned for water is blocked that extends out from pallet, conflict with this if any other definition, with this in the application
It is defined.
Upper and lower, left and right described herein orientation shown in scheme is defined.
It should be pointed out that for the person of ordinary skill of the art, in the premise without departing from this utility model principle
Under, some improvement and modification can also be carried out to this utility model, these improve and modification also falls into this utility model right and wants
In the protection domain asked.
Claims (10)
1. a kind of cabinet air-conditioner vaporizer supporting construction, it is characterised in that:Described vaporizer supporting construction(7)Including vaporizer
Supporting construction pallet(71), vaporizer supporting construction backplate(72)With vaporizer supporting construction weather board(710), the evaporation
Device supporting construction pallet(71)Side be vaporizer supporting construction backplate(72), the vaporizer supporting construction backplate
(72)Lower section be vaporizer supporting construction weather board(710), described vaporizer supporting construction pallet(71)With vaporizer
Support structure backplate(72)Vaporizer supporting construction drainage hole is provided with junction(76).
2. cabinet air-conditioner vaporizer supporting construction according to claim 1, it is characterised in that:In vaporizer supporting construction support
Disk(71)Periphery be provided with vaporizer supporting construction pallet flange(73).
3. cabinet air-conditioner vaporizer supporting construction according to claim 1, it is characterised in that:Vaporizer supporting construction water guide
Plate(710)It is obliquely installed and and water leg(8)Contact.
4. cabinet air-conditioner vaporizer supporting construction according to claim 1, it is characterised in that:In vaporizer supporting construction support
Disk(71)Downside be provided with vaporizer supporting construction support block(77), in vaporizer supporting construction support block(77)Away from evaporation
Device supporting construction backplate(72)Side at least provided with a vaporizer supporting construction fastener(78), support in vaporizer and tie
Structure fastener(78)It is provided with vaporizer supporting construction cable clamping interface(7801).
5. cabinet air-conditioner vaporizer supporting construction according to claim 4, it is characterised in that:Vaporizer supporting construction fastener
(78)There are two adjacent snap fits, snap fit has a fixing end, is fixed on vaporizer supporting construction support block(77)On, the other end
For free end, the fixing end of two snap fits is adjacent, and two free ends are in opposite direction.
6. cabinet air-conditioner vaporizer supporting construction according to claim 1, it is characterised in that:Carry on the back in vaporizer supporting construction
Panel(72)Lower section be provided with vaporizer supporting construction water conductor assemblies(79), described vaporizer supporting construction water conductor assemblies
(79)It is arranged on vaporizer supporting construction weather board(710)On.
7. cabinet air-conditioner vaporizer supporting construction according to claim 6, it is characterised in that:Vaporizer supporting construction water guide
Component(79)Including the first weather board of vaporizer supporting construction(7901)Be arranged on the first weather board of vaporizer supporting construction
(7901)Between the second weather board of vaporizer supporting construction(7902)And it is arranged on vaporizer supporting construction pallet(71)Under
Side and vaporizer supporting construction backplate(72)On the first ribs of vaporizer supporting construction(7903), the vaporizer support
The first ribs of structure(7903)With the first weather board of vaporizer supporting construction(7901)Homonymy and be connected.
8. cabinet air-conditioner vaporizer supporting construction according to claim 7, it is characterised in that:Vaporizer supporting construction water guide
Component(79)Also include vaporizer supporting construction water hole(7904), the vaporizer supporting construction water hole(7904)It is located at steaming
Send out the first weather board of device supporting construction(7901)With the second weather board of vaporizer supporting construction(7902)Between weather board most
Lower end.
9. cabinet air-conditioner vaporizer supporting construction according to claim 1, it is characterised in that:Lead in vaporizer supporting construction
Water plate(710)Side be provided with the second ribs of vaporizer supporting construction(7907), further strengthen vaporizer supporting construction
Bulk strength.
10. cabinet air-conditioner vaporizer supporting construction according to claim 1, it is characterised in that:Vaporizer supporting construction is led
Water plate(710)It is provided with vaporizer supporting construction weather board flange(711).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620881423.3U CN206037376U (en) | 2016-08-15 | 2016-08-15 | Cabinet air conditioner evaporimeter bearing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620881423.3U CN206037376U (en) | 2016-08-15 | 2016-08-15 | Cabinet air conditioner evaporimeter bearing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206037376U true CN206037376U (en) | 2017-03-22 |
Family
ID=58306298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620881423.3U Active CN206037376U (en) | 2016-08-15 | 2016-08-15 | Cabinet air conditioner evaporimeter bearing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206037376U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020172944A1 (en) * | 2019-02-25 | 2020-09-03 | 广东美的制冷设备有限公司 | Heat exchange component for air conditioner indoor unit, and air conditioner indoor unit having same |
-
2016
- 2016-08-15 CN CN201620881423.3U patent/CN206037376U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020172944A1 (en) * | 2019-02-25 | 2020-09-03 | 广东美的制冷设备有限公司 | Heat exchange component for air conditioner indoor unit, and air conditioner indoor unit having same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205897496U (en) | Cabinet air conditioner evaporimeter | |
CN206037376U (en) | Cabinet air conditioner evaporimeter bearing structure | |
CN102003744A (en) | Dehumidifier | |
CN1417534A (en) | Air conditioner | |
CN205897494U (en) | Cabinet air conditioner evaporimeter | |
CN107447471A (en) | The pedestal of heat pump and for dryer or the heat pump of washing-drying integral machine | |
CN217383182U (en) | Fog-free hot air humidifier | |
CN107246727A (en) | A kind of cabinet air-conditioner evaporator | |
CN205919437U (en) | A yielding rubber spare and air conditioner for fixing flash vessel | |
CN205561188U (en) | Air -out frame and indoor set of air conditioner of falling to ground | |
CN108626871A (en) | A kind of window air conditioner rear bulkhead component and window air conditioner | |
CN210861519U (en) | Anhydrous air conditioning equipment | |
CN208385948U (en) | It is a kind of can pre- anti-condensation outdoor electricity distribution cabinet | |
CN208154666U (en) | The automatically controlled case assembly and air conditioner of air conditioner | |
CN219640353U (en) | Air conditioner | |
CN111811046B (en) | Indoor unit and air conditioner with same | |
CN208379276U (en) | The pedestal and device for clothing processing of device for clothing processing | |
CN214837395U (en) | Fan assembly's support, fan assembly and locker of locker | |
CN205641188U (en) | Air conditioner that erects money wall -mounted air -conditioner indoor and have it | |
CN207299188U (en) | A kind of small air conditioner for elevator of modular | |
WO2019101114A1 (en) | Mounting structure of drainage pump and washing machine | |
CN205641446U (en) | Air conditioner that erects money wall -mounted air -conditioner indoor and have it | |
CN218269397U (en) | Central humidification device | |
CN108826655A (en) | Fixed bracket and wet film component, air conditioner indoor unit with it | |
CN220355586U (en) | Window type air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170522 Address after: 315191 Yinzhou District Province, Ningbo City, Jiang Shan town on the village of summer ho Patentee after: AUX air conditioning Limited by Share Ltd Address before: 315191 Zhejiang city of Ningbo province Jiangshan town Yinzhou District Mingguang Road No. 1166 Patentee before: Ningbo AUX Group. |