CN206029972U - Pincers are chopped off to spring pressure formula reinforcing bar for construction industry - Google Patents

Pincers are chopped off to spring pressure formula reinforcing bar for construction industry Download PDF

Info

Publication number
CN206029972U
CN206029972U CN201620909605.7U CN201620909605U CN206029972U CN 206029972 U CN206029972 U CN 206029972U CN 201620909605 U CN201620909605 U CN 201620909605U CN 206029972 U CN206029972 U CN 206029972U
Authority
CN
China
Prior art keywords
downside
reinforcing bar
spring
pincers
pressure head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620909605.7U
Other languages
Chinese (zh)
Inventor
张琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaomi City Dingli Aluminum Co. Ltd.
Original Assignee
张琦
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张琦 filed Critical 张琦
Priority to CN201620909605.7U priority Critical patent/CN206029972U/en
Application granted granted Critical
Publication of CN206029972U publication Critical patent/CN206029972U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Scissors And Nippers (AREA)

Abstract

The utility model discloses a pincers are chopped off to spring pressure formula reinforcing bar for construction industry, include base, mount, pressure head piece, compression spring, tup, go up stripping -comb, lower hammering block, pin, depression bar, handheld handle, wedge head, pulley, spout, case and spacing spring, the base upside is connected with the mount, the mount upside is equipped with the pressure head piece, compression spring is installed to pressure head piece downside, the compression spring downside is connected with the tup, the tup downside is connected with the stripping -comb, going up the stripping -comb downside and installing down the hammering block, the pressure head piece has a depression bar through pin joint, the depression bar upside is connected with handheld, pressure head piece downside is equipped with wedge head, the pulley is installed to wedge head downside symmetry. Pincers simple structure is chopped off to this spring pressure formula reinforcing bar for building, adopts lever principle, and it is effectual to chop the reinforcing bar fracture off, the follow -up processing of the reinforcing bar of being convenient for, and workman convenient and fast safe in utilization when chopping the reinforcing bar off reduces the processing cost.

Description

A kind of building industry spring pressure formula reinforcing bar chops pincers off
Technical field
This utility model is related to Architectural Equipment technical field, and specially a kind of building industry spring pressure formula reinforcing bar is chopped off Pincers.
Background technology
It is a kind of architectural conventional instrument that reinforcing bar chops pincers off, and it is, for chopping reinforcing bar off, or to cut off iron wire etc., at this stage Reinforcing bar chop pincers off and have varied, small-sized has hand-held reinforcing bar pincers, and the large-scale various hydraulic colds that have chop pincers off, and small-sized Hand-held reinforcing bar pincers can only chop the thinner steel wire of diameter off, and large-scale hydraulic cold chops pincers off, although can chop comparison off thick Reinforcing bar, but work efficiency is slow, and as fluid pressure type is chopped off, process is slow, easily forms very big burr in incision position, after being difficult Continuous processing, causes reinforcing bar whole processing speed slow, affects the duration of a project, and price is costly.
The content of the invention
The purpose of this utility model is to provide that a kind of simple structure, cost are relatively low, safe and convenient to use efficiently build Industry spring pressure formula reinforcing bar chops pincers off, to solve the problems, such as to propose in above-mentioned background technology.
For achieving the above object, this utility model provides following technical scheme:
A kind of building industry spring pressure formula reinforcing bar chops pincers off, including base, fixed mount, pressure head block, compression spring, hammer Head, upper die, lower anvil, pin, depression bar, hand-held handle, sphenocephaly, pulley, chute, valve element and limit spring, on the upside of the base Fixed mount is connected with, pressure head block on the upside of the fixed mount, is provided with, compression spring, the pressure bullet are installed on the downside of the pressure head block Tup is connected with the downside of spring, is connected with die, lower anvil is installed on the downside of the upper die on the downside of the tup;Pressure head block passes through Pin is connected with depression bar, is connected with hand-held on the upside of the depression bar;Sphenocephaly is provided with the downside of the pressure head block, under the sphenocephaly Side is symmetrically installed with pulley, and the pulley is arranged in chute by pin, is provided with valve element on the right side of the pulley, and the valve element is right Side is provided with limit spring.
Preferably, the Its lower side is symmetrically installed with castor.
Preferably, the depression bar adopts external diameter for 6cm, steel pipe of the internal diameter for 4cm.
Preferably, the pulley and limit spring are symmetrically installed with regard to sphenocephaly perpendicular bisector, and use front coating lubricating oil.
Preferably, the upper die and lower anvil are all set to demountable structure.
Compared with prior art, the beneficial effects of the utility model are:
1) the spring pressure formula reinforcing bar for building is chopped pincers off and is provided with compression spring and depression bar, using lever principle, chops steel off Tendon breaking mouth effect is good, is easy to the following process of reinforcing bar, reduces processing cost.
2) valve element is provided with the right side of pulley, limit spring is installed on the right side of valve element, workman is easy to use when reinforcing bar is chopped off, pacify It is complete quick.
Description of the drawings
Fig. 1 chops pincers positive structure schematic off for a kind of building industry spring pressure formula reinforcing bar of this utility model;
Fig. 2 chops pincers side structure schematic diagram off for a kind of building industry spring pressure formula reinforcing bar of this utility model;
Fig. 3 chops pincers tup part-structure schematic diagram off for a kind of building industry spring pressure formula reinforcing bar of this utility model;
In figure:1st, base, 2, fixed mount, 3, pressure head block, 4, compression spring, 5, tup, 6, upper die, 7, lower anvil, 8, pin Nail, 9, depression bar, 10, hand-held, 11, sphenocephaly, 12, pulley, 13, chute, 14, valve element, 15, limit spring.
Specific embodiment
Below in conjunction with the accompanying drawing 1-3 in this utility model embodiment, this utility model provides a kind of technical scheme:
A kind of building industry spring pressure formula reinforcing bar chops pincers off, including base 1, fixed mount 2, pressure head block 3, compression spring 4, It is tup 5, upper die 6, lower anvil 7, pin 8, depression bar 9, hand-held 10, sphenocephaly 11, pulley 12, chute 13, valve element 14 and spacing Spring 15, reinforcing bar to be chopped off are placed on the upside of lower anvil 7, be connected with fixed mount 2, be symmetrically installed on the downside of base 1 on the upside of base 1 There is castor, be moved easily this and chop pincers off, on the upside of fixed mount 2, be provided with pressure head block 3, compression spring 4 is installed on the downside of pressure head block 3, press Tup 5 is connected with the downside of power spring 4, die 6 is connected with the downside of tup 5, and lower anvil 7, upper die 6 are installed on the downside of upper die 6 Demountable structure is all set to lower anvil 7, during in case upper die 6 or lower anvil 7 being damaged, can be changed, pressure head block 3 passes through pin 8 Depression bar 9 is connected with, depression bar 9 adopts external diameter for 6cm, steel pipe of the internal diameter for 4cm, it is ensured that the strength and stiffness of depression bar 9, on depression bar 9 Side is connected with hand-held 10, is provided with sphenocephaly 11, is symmetrically installed with pulley 12, pulley 12 on the downside of sphenocephaly 11 on the downside of pressure head block 3 It is arranged in chute 13 by pin 8, is provided with valve element 14 on the right side of pulley 12, limit spring 15, pulley are installed on the right side of valve element 14 12 and limit spring 15 be symmetrically installed with regard to 11 perpendicular bisector of sphenocephaly, and use front coating lubricating oil, it is ensured that sphenocephaly 11 declines When, pulley 12 can smoothly promote valve element 14, make tup in the presence of compression spring 4, impact downwards.
Operation principle:When pincers are chopped off using the spring pressure formula reinforcing bar for building, the reinforcing bar that will first chop off is placed on The upside of lower anvil, hand-held of workman, firmly pushes, and is acted on pressure head block by depression bar, and pressure head block is moved downward, compression pressure Spring, when compression spring is compressed to certain limit, simultaneously sphenocephaly is also being moved downward, and sphenocephaly propelling sheave is being slided , to two lateral movements, pulley is in motor process, slow to promote valve element to fixed mount internal motion, when valve element no longer supports tup for groove When, tup falls in the presence of compression spring suddenly, and the upper die on the downside of tup is once chopped off to reinforcing bar, unclamps handss Handle is held, depression bar is lifted, valve element returns to original position in the presence of limit spring, and compression spring also replys former long immediately, so as to Complete a reinforcing bar and chop work off.
Although being described in detail to this utility model with reference to the foregoing embodiments, for those skilled in the art comes Say, which still can be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered Row equivalent, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvements made etc. all should It is included within protection domain of the present utility model.

Claims (5)

1. a kind of building industry spring pressure formula reinforcing bar chops pincers off, including base (1), fixed mount (2), pressure head block (3), pressure bullet Spring (4), tup (5), upper die (6), lower anvil (7), pin (8), depression bar (9), hand-held handle (10), sphenocephaly (11), pulley (12), chute (13), valve element (14) and limit spring (15), it is characterised in that:Fixed mount is connected with the upside of base (1) (2), pressure head block (3) is provided with the upside of fixed mount (2), compression spring (4), the pressure are installed on the downside of pressure head block (3) Tup (5) is connected with the downside of power spring (4), die (6) is connected with the downside of tup (5), is pacified on the downside of upper die (6) Equipped with lower anvil (7), pressure head block (3) is connected with depression bar (9) by pin (8), is connected with hand-held on the upside of depression bar (9) (10), sphenocephaly (11) is provided with the downside of pressure head block (3), be symmetrically installed with pulley (12), institute on the downside of sphenocephaly (11) State pulley (12) to be arranged in chute (13) by pin (8), on the right side of pulley (12), be provided with valve element (14), the valve element (14) limit spring (15) is installed on the right side of.
2. a kind of building industry spring pressure formula reinforcing bar according to claim 1 chops pincers off, it is characterised in that:The base (1) castor is symmetrically installed with the downside of.
3. a kind of building industry spring pressure formula reinforcing bar according to claim 1 chops pincers off, it is characterised in that:The depression bar (9) external diameter is adopted for 6cm, steel pipe of the internal diameter for 4cm.
4. a kind of building industry spring pressure formula reinforcing bar according to claim 1 chops pincers off, it is characterised in that:The pulley (12) it is symmetrically installed with regard to sphenocephaly (11) perpendicular bisector with limit spring (15).
5. a kind of building industry spring pressure formula reinforcing bar according to claim 1 chops pincers off, it is characterised in that:Cut on described Knife (6) and lower anvil (7) are all set to demountable structure.
CN201620909605.7U 2016-08-19 2016-08-19 Pincers are chopped off to spring pressure formula reinforcing bar for construction industry Expired - Fee Related CN206029972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620909605.7U CN206029972U (en) 2016-08-19 2016-08-19 Pincers are chopped off to spring pressure formula reinforcing bar for construction industry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620909605.7U CN206029972U (en) 2016-08-19 2016-08-19 Pincers are chopped off to spring pressure formula reinforcing bar for construction industry

Publications (1)

Publication Number Publication Date
CN206029972U true CN206029972U (en) 2017-03-22

Family

ID=58307196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620909605.7U Expired - Fee Related CN206029972U (en) 2016-08-19 2016-08-19 Pincers are chopped off to spring pressure formula reinforcing bar for construction industry

Country Status (1)

Country Link
CN (1) CN206029972U (en)

Similar Documents

Publication Publication Date Title
CN106965251A (en) A kind of manual compound cutting die
CN107234198A (en) The processing method of forging socket-clevis eye
CN206029972U (en) Pincers are chopped off to spring pressure formula reinforcing bar for construction industry
CN2871112Y (en) Chunking spanner with head detachable
KR200472863Y1 (en) Pipe processing device equipped with cutting and push machine
CN203887317U (en) Upper hold-down device for sawing machine
CN204308237U (en) A kind of fire extinguisher tank valve fixing hole forming machine
CN106140941A (en) A kind of gear former hole precision hot piercing mould
CN204486543U (en) Telescopic compund die
CN205519796U (en) Puncher for machining
CN204523972U (en) The accurate hot piercing mould in a kind of gear former hole
CN206009800U (en) A kind of device mould of quick removal conductor spacer pouring and riser systemses
CN205689146U (en) A kind of hydraulic tongs sucker rod unloads buckle assembly
CN206717123U (en) A kind of labor-saving type manual cutter
CN204308079U (en) A kind of Automatic-feeding equipment
CN204353305U (en) Cylindrical work pieces side opening punch die
CN205414568U (en) Press device that cooperation plate shearing machine used
CN203171638U (en) Multi-station clamping tool
CN204294841U (en) A kind of anti-skidding ejector half spring bender
CN202225462U (en) Inclined cutting edge device of lower cutter of stamping die
CN202565668U (en) Novel hand tool
CN207757535U (en) A kind of elastic tooling for cylinder bore installation cylinder sleeve
CN201586963U (en) Damping sledge hammer
CN206527149U (en) A kind of recycle device of shabby track
CN202725774U (en) High-strength fine punch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Xu Xueqin

Inventor before: Zhang Qi

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20171208

Address after: 261500 Shandong city of Weifang Province Gaomi Economic Development Zone, Road No. 184 Yao Yao Ge Zhuang community

Patentee after: Gaomi City Dingli Aluminum Co. Ltd.

Address before: 264200 Weihai City, Shandong Province, Weihai Torch High Technology Industrial Development Zone, culture West Road No.

Patentee before: Zhang Qi

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322

Termination date: 20200819

CF01 Termination of patent right due to non-payment of annual fee