CN206028207U - Beer production is with filtering cardboard belt cleaning device - Google Patents

Beer production is with filtering cardboard belt cleaning device Download PDF

Info

Publication number
CN206028207U
CN206028207U CN201620876223.9U CN201620876223U CN206028207U CN 206028207 U CN206028207 U CN 206028207U CN 201620876223 U CN201620876223 U CN 201620876223U CN 206028207 U CN206028207 U CN 206028207U
Authority
CN
China
Prior art keywords
nut
reel
cleaning device
shower nozzle
bracing wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620876223.9U
Other languages
Chinese (zh)
Inventor
郭水平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Gan Quan Beer Co Ltd
Original Assignee
Jiangxi Gan Quan Beer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Gan Quan Beer Co Ltd filed Critical Jiangxi Gan Quan Beer Co Ltd
Priority to CN201620876223.9U priority Critical patent/CN206028207U/en
Application granted granted Critical
Publication of CN206028207U publication Critical patent/CN206028207U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning By Liquid Or Steam (AREA)

Abstract

The utility model relates to a belt cleaning device especially relates to a beer production is with filtering cardboard belt cleaning device. The to -be -solved technical problem of the utility model is to provide a beer production is with filtering cardboard belt cleaning device of rinsing thoroughly. In order to solve the technical problem, the utility model provides a such beer production is with filtering cardboard belt cleaning device, including the rotating electrical machines, first reel, the hot -water tank, the second reel, first water pump, the second water pump, the cold water storage cistern, the lead screw, the roof, right side bearing frame, first fixed pulley, the second is acted as go -between, the second nut, the second connecting rod, the second hose, first nut, first connecting rod, first hose, left side bearing frame, the second fixed pulley, the apparatus further comprises a rotating shaft, first acting as go -between, a slide rail, the slider, the thumb cylinder, the bottom plate, first shower nozzle and second shower nozzle, bottom plate top bilateral symmetry is equipped with the slide rail. The utility model discloses reached and washd thoroughly, washd effect convenient, labour saving and time saving.

Description

A kind of Beer Brewage filter board cleaning device
Technical field
The utility model is related to a kind of cleaning device, more particularly to a kind of Beer Brewage filter board cleaning device.
Background technology
Beer is one of most ancient alcoholic beverage of the mankind, is the drink that consumption is number three in the world after water and tea Material.Beer belongs to external wine kind in earlier 1900s incoming China.Beer with fructus hordei germinatus, hops, water as primary raw material, Jing yeast The full carbonated alcoholic strength low wine that fermentation is brewed, is referred to as " liquid bread ", is a kind of low-concentration ethanol Beverage.Beer ethanol content is minimum, therefore have the beer and fascinating be harmful to the health, drink on a small quantity on the contrary to healthy helpful. International beer major part adds auxiliary material now.
Filter board is also known as filter core cardboard.For air filtering, lubricating oil or fuel oil filter disc or the cardboard of poppet. Papery vegetable bulky reality, has good air permeability and filtering efficiency.It is all generally raw material with bleached cotton starch, Jing dissociates shape long fibre Beating, adds melamine wet-strength resins in slurry, process in paper phenolic resin and organosilicon after copy paper, so as to have one Fixed water resistant and humidity resistance.
There is the halfway shortcoming of cleaning in existing cleaning device, therefore need a kind of cleaning of design thoroughly Beer Brewage badly Use filter board cleaning device.
Utility model content
(1) technical problem to be solved
The utility model cleans halfway shortcoming, skill to be solved in the utility model to overcome existing cleaning device Art problem is to provide a kind of cleaning thoroughly Beer Brewage filter board cleaning device.
(2) technical scheme
In order to solve above-mentioned technical problem, the utility model cleans dress there is provided such a Beer Brewage filter board Put, include electric rotating machine, the first reel, boiler, the second reel, the first water pump, the second water pump, cold water storage cistern, screw mandrel, Top board, right axle bearing, the first fixed pulley, the second bracing wire, the second nut, second connecting rod, the second flexible pipe, the first nut, first connect Bar, the first flexible pipe, left shaft holder, the second fixed pulley, rotating shaft, the first bracing wire, slide rail, slide block, thumb cylinder, base plate, the first spray Head and the second shower nozzle, symmetrical at the top of base plate to be provided with slide rail, on the left of the slide rail on right side, upper end is connected with the first fixed pulley, slide rail Slide block is provided with, thumb cylinder on the inside of slide block, is provided with, top board directly over base plate, is provided with, first through hole and second is provided with top board and is led to Hole, first through hole are located on the left of the second through hole, and top board bottom is sequentially provided with electric rotating machine, left shaft holder and right bearing from left to right Seat, left shaft holder lower end are connected with the second fixed pulley, are provided with rotating shaft on left shaft holder, and rotating shaft left end is connected with electric rotating machine Connect, rotating shaft is provided with the first reel and the second reel, and the first reel is located at the second reel left, the first reel On be wound with the first bracing wire, the first bracing wire lower end is connected with left slider, is wound with the second bracing wire, the second bracing wire on the second reel The first fixed pulley and the second fixed pulley is bypassed, the second bracing wire bottom righthand side is connected with right side slide block, left shaft holder and right axle bearing Between screw mandrel is installed, screw mandrel left end is connected with rotating shaft, and screw mandrel is provided with the first nut and the second nut, the first nut and Two nuts are coordinated with screw mandrel, and the first nut is located at the left of the second nut, and the first nut lower end is connected with first connecting rod, the One connecting rod lower end is connected with the first shower nozzle, and the second nut lower end is connected with second connecting rod, and second connecting rod lower end is connected with the second spray Head, is provided with boiler and cold water storage cistern at the top of top board, and boiler is located on the left of cold water storage cistern, is provided with the first water pump in boiler, the The first flexible pipe is connected with one water pump, and the first flexible pipe passes through first through hole, the first flexible pipe lower end to be connected with the first shower nozzle, cold water Be provided with the second water pump in case, on the second water pump, be connected with the second flexible pipe, the second flexible pipe passes through the second through hole, the second flexible pipe lower end with Second shower nozzle is connected.
Preferably, sponge is also included, on the top board in first through hole and the second through hole, is equipped with sponge, the shape of sponge For annular, the outer surface and top plate contact of sponge, a height of 10cm of sponge, the thickness of sponge is 2cm.
Preferably, wastewater trough is also included, at the top of base plate, is provided with wastewater trough, wastewater trough is vertical at the top of base plate, waste water Groove is located at the underface of top board, and wastewater trough is located on the inside of slide rail, and the volume of wastewater trough is 1m3, the material of wastewater trough is plastics, is given up The thickness of tank is 1cm.
Preferably, fixed plate and waterproof glass is also included, left and right is arranged with fixed plate at the top of the front side of wastewater trough, Gu The length of fixed board is 20cm, is provided with waterproof glass at the top of fixed plate, and waterproof glass is located on front side of the first shower nozzle and the second shower nozzle, gear A length of 1.3m of waterglass, a height of 1.1m of waterproof glass.
Preferably, electric rotating machine is servomotor.
Preferably, the first bracing wire and the second bracing wire are steel wire rope.
Preferably, the material of boiler and cold water storage cistern is stainless steel.
Operation principle:When cleaning to filter board, filter board is put in thumb cylinder, starts thumb gas Cylinder working, makes thumb cylinder clamp filter board, then starts the first water pump and the second pump working, makes cold in cold water storage cistern Water enters the second flexible pipe, and cold water sprays from the second shower nozzle, filter board is rinsed, and the hot water in boiler is soft into first Pipe, hot water are sprayed from the first shower nozzle, carry out sterilizing process to filter board, make the more thorough of filter board cleaning.Simultaneously Start electric rotating machine alternating to rotate and reverse, drive rotating shaft alternating to rotate and reverse, when rotating shaft is rotated forward, the first reel and the Two reels are rotated forward, and the first bracing wire and the second bracing wire are withdrawn in the first reel and the second coiling respectively, and band movable slider is moved up, Move up filter board, rotating shaft is rotated forward, while driving screw mandrel to rotate forward, drive the first nut and the second nut to move right, So as to drive the first shower nozzle and the second shower nozzle to move right, when rotating shaft is inverted, the first reel and the second reel are inverted, the The first bracing wire and the second bracing wire are released in one reel and the second coiling respectively, move down slide block, while screw mandrel reversion is driven, Drive the first nut and the second nut to be moved to the left, be moved to the left the first shower nozzle and the second shower nozzle, rotating shaft is alternately rotated forward and anti- Turn, drive filter board constantly to move up and down, the first shower nozzle and the second shower nozzle are constantly moved left and right, and make filter board complete by cold water Orientation is rinsed, and hot water is to the thorough sterilizing of filter board.Cardboard to be filtered cleaning is finished, and slide block is when setting back, and closes Electric rotating machine, cuts out thumb cylinder, makes thumb cylinder unclamp filter board, just can remove filter board.
Because also including sponge, on the top board in first through hole and the second through hole, it is equipped with sponge, sponge is shaped as Annular, the outer surface and top plate contact of sponge, a height of 10cm of sponge, the thickness of sponge are 2cm, so sponge is avoided that the One flexible pipe and the second flexible pipe and top plate contact, prevent hose fracture.
Because also including wastewater trough, wastewater trough at the top of base plate, is provided with, wastewater trough is vertical at the top of base plate, wastewater trough position In the underface of top board, wastewater trough is located on the inside of slide rail, and the volume of wastewater trough is 1m3, the material of wastewater trough is plastics, wastewater trough Thickness be 1cm, so cleaning filter board produce waste water flow into wastewater trough, it is to avoid contaminated wastewater environment.
Because also including fixed plate and waterproof glass, at the top of the front side of wastewater trough, left and right is arranged with fixed plate, fixed The length of plate is 20cm, is provided with waterproof glass at the top of fixed plate, and waterproof glass is located on front side of the first shower nozzle and the second shower nozzle, dash A length of 1.3m of glass, a height of 1.1m of waterproof glass, so waterproof glass can block waste water, prevent waste water stream to wastewater trough Where in addition.
Because electric rotating machine is servomotor, it is possible to more precisely adjust rotating speed.
Because the first bracing wire and the second bracing wire are steel wire rope, the intensity of steel wire rope is big, so the first bracing wire and second is drawn Line is difficult to break.
Because the material of boiler and cold water storage cistern is stainless steel, boiler and cold water storage cistern are difficult corrosion, can To extend the service life of boiler and cold water storage cistern.
(3) beneficial effect
The utility model has reached thorough, easy to clean, the time saving and energy saving effect of cleaning, electric rotating machine work, drives the One shower nozzle and the movement of the second nozzle right, while driving filter board to move up and down, make that filter board is comprehensive to be cleared up, and Cleaning is thorough, also accelerates cleaning speed, saves substantial amounts of manpower and materials.
Description of the drawings
Fig. 1 the first main structure diagram of the present utility model.
Fig. 2 second main structure diagram of the present utility model.
Fig. 3 the third main structure diagram of the present utility model.
Fig. 4 the 4th kind of main structure diagram of the present utility model.
Mark in accompanying drawing for:1- electric rotating machines, the first reels of 2-, 3- boilers, the second reels of 4-, the first water of 5- Pump, 6- first through hole, the second water pumps of 7-, the second through holes of 8-, 9- cold water storage cisterns, 10- screw mandrels, 11- top boards, 12- right axle bearings, 13- First fixed pulley, the second bracing wires of 14-, the second nuts of 15-, 16- second connecting rods, the second flexible pipes of 17-, the first nuts of 18-, 19- One connecting rod, the first flexible pipes of 20-, 21- left shaft holders, the second fixed pulleys of 22-, 23- rotating shafts, the first bracing wires of 24-, 25- slide rails, 26- Slide block, 27- thumb cylinders, 28- filter boards, 29- base plates, the first shower nozzles of 30-, the second shower nozzles of 31-, 32- sponges, 33- waste water Groove, 34- fixed plates, 35- waterproof glass.
Specific embodiment
With reference to the accompanying drawings and examples the utility model is further described.
Embodiment 1
A kind of Beer Brewage filter board cleaning device, as Figure 1-4, includes electric rotating machine 1, the first reel 2nd, boiler 3, the second reel 4, the first water pump 5, the second water pump 7, cold water storage cistern 9, screw mandrel 10, top board 11, right axle bearing 12, One fixed pulley 13, the second bracing wire 14, the second nut 15, second connecting rod 16, the second flexible pipe 17, the first nut 18, first connecting rod 19, First flexible pipe 20, left shaft holder 21, the second fixed pulley 22, rotating shaft 23, the first bracing wire 24, slide rail 25, slide block 26, thumb cylinder 27th, base plate 29, the first shower nozzle 30 and the second shower nozzle 31, at the top of base plate 29, left and right is arranged with slide rail 25, and the slide rail 25 on right side is left Side upper end is connected with the first fixed pulley 13, and slide rail 25 is provided with slide block 26, is provided with thumb cylinder 27 on the inside of slide block 26, and base plate 29 is just Top is provided with top board 11, is provided with first through hole 6 and the second through hole 8 on top board 11, and first through hole 6 is located on the left of the second through hole 8, top 11 bottom of plate is sequentially provided with electric rotating machine 1, left shaft holder 21 and right axle bearing 12 from left to right, and 21 lower end of left shaft holder is connected with Second fixed pulley 22, is provided with rotating shaft 23 on left shaft holder 21,23 left end of rotating shaft is connected with electric rotating machine 1, is set in rotating shaft 23 There are the first reel 2 and the second reel 4, and the first reel 2 is located at 4 left of the second reel, is wound with the first reel 2 First bracing wire 24,24 lower end of the first bracing wire are connected with left slider 26, are wound with the second bracing wire 14 on the second reel 4, and second Bracing wire 14 bypasses the first fixed pulley 13 and the second fixed pulley 22, and 14 bottom righthand side of the second bracing wire is connected with right side slide block 26, left axle Screw mandrel 10 is installed between bearing 21 and right axle bearing 12,10 left end of screw mandrel is connected with rotating shaft 23, and screw mandrel 10 is provided with first Nut 18 and the second nut 15, the first nut 18 and the second nut 15 are coordinated with screw mandrel 10, and the first nut 18 is located at second The left of nut 15,18 lower end of the first nut are connected with first connecting rod 19, and 19 lower end of first connecting rod is connected with the first shower nozzle 30, the Two nuts, 15 lower end is connected with second connecting rod 16, and 16 lower end of second connecting rod is connected with the second shower nozzle 31, is provided with heat at the top of top board 11 Water tank 3 and cold water storage cistern 9, and boiler 3 is on the left of cold water storage cistern 9, is provided with the first water pump 5, connects on the first water pump 5 in boiler 3 The first flexible pipe 20 is connected to, the first flexible pipe 20 passes through first through hole 6,20 lower end of the first flexible pipe to be connected with the first shower nozzle 30, cold water The second water pump 7 is provided with case 9, the second flexible pipe 17 on the second water pump 7, is connected with, the second flexible pipe 17 passes through the second through hole 8, and second is soft 17 lower end of pipe is connected with the second shower nozzle 31.
Sponge 32 is also included, sponge 32 on the top board 11 in first through hole 6 and the second through hole 8, is equipped with, sponge 32 Be shaped as annular, the outer surface of sponge 32 is contacted with top board 11, sponge 32 it is a height of10Cm, the thickness of sponge 32 is 2cm.
Wastewater trough 33 is also included, wastewater trough 33 at the top of base plate 29, is provided with, wastewater trough 33 is vertical at the top of base plate 29, given up Tank 33 is located at the underface of top board 11, and wastewater trough 33 is located on the inside of slide rail 25, and the volume of wastewater trough 33 is 1m3, wastewater trough 33 Material be plastics, the thickness of wastewater trough 33 is 1cm.
Fixed plate 34 and waterproof glass 35 are included also, at the top of the front side of wastewater trough 33, left and right is arranged with fixed plate 34, The length of fixed plate 34 is 20cm, is provided with waterproof glass 35 at the top of fixed plate 34, and waterproof glass 35 is located at the first shower nozzle 30 and the On front side of two shower nozzles 31, a length of 1.3m of waterproof glass 35, a height of 1.1m of waterproof glass 35.
Electric rotating machine 1 is servomotor.
First bracing wire 24 and the second bracing wire 14 are steel wire rope.
The material of boiler 3 and cold water storage cistern 9 is stainless steel.
Operation principle:When cleaning to filter board 28, filter board 28 is put in thumb cylinder 27, is started Thumb cylinder 27 works, and makes thumb cylinder 27 clamp filter board 28, then starts the first water pump 5 and the second water pump 7 works, The cold water in cold water storage cistern 9 is made to enter the second flexible pipe 17, cold water sprays from the second shower nozzle 31, is rinsed to filter board 28, heat Hot water in water tank 3 enters the first flexible pipe 20, and hot water sprays from the first shower nozzle 30, filter board 28 is carried out at sterilizing Reason, makes the more thorough of the cleaning of filter board 28.Start the alternating of electric rotating machine 1 simultaneously to rotate and reverse, alternately just drive rotating shaft 23 Turn and invert, when rotating shaft 23 is rotated forward, the first reel 2 and the second reel 4 are rotated forward, the first reel 2 and the second coiling divide First bracing wire 24 and the second bracing wire 14 are not withdrawn, band movable slider 26 is moved up, and moves up filter board 28, and rotating shaft 23 is just Turn, while driving screw mandrel 10 to rotate forward, drive the first nut 18 and the second nut 15 to move right, so as to drive 30 He of the first shower nozzle Second shower nozzle 31 moves right, and when rotating shaft 23 is inverted, the first reel 2 and the second reel 4 are inverted, 2 He of the first reel The first bracing wire 24 and the second bracing wire 14 are released in second coiling respectively, move down slide block 26, while drive screw mandrel 10 to invert, band Dynamic first nut 18 and the second nut 15 are moved to the left, and are moved to the left the first shower nozzle 30 and the second shower nozzle 31, and rotating shaft 23 replaces Rotate and reverse, drive filter board 28 constantly to move up and down, the first shower nozzle 30 and the second shower nozzle 31 are constantly moved left and right, and are made , by the comprehensive flushing of cold water, hot water is to 28 thorough sterilizing of filter board for filter paper plate 28.The cleaning of cardboard to be filtered 28 is finished, and When slide block 26 sets back, electric rotating machine 1 is closed, close thumb cylinder 27, made thumb cylinder 27 unclamp filter board 28, just may be used Remove filter board 28.
Because also including sponge 32, on the top board 11 in first through hole 6 and the second through hole 8, sponge 32, sponge is equipped with 32 are shaped as annular, and the outer surface of sponge 32 is contacted with top board 11, a height of 10cm of sponge 32, the thickness of sponge 32 is 2cm, so sponge 32 is avoided that the first flexible pipe 20 is contacted with top board 11 with the second flexible pipe 17, prevents hose fracture.
Because also including wastewater trough 33, wastewater trough 33 at the top of base plate 29, is provided with, wastewater trough 33 is vertical at base plate 29 and pushes up Portion, wastewater trough 33 are located at the underface of top board 11, and wastewater trough 33 is located on the inside of slide rail 25, and the volume of wastewater trough 33 is 1m3, waste water The material of groove 33 is plastics, and the thickness of wastewater trough 33 is 1cm, so the waste water that cleaning filter board 28 is produced flows into wastewater trough 33, it is to avoid contaminated wastewater environment.
Because also including fixed plate 34 and waterproof glass 35, at the top of the front side of wastewater trough 33, left and right is arranged with fixed plate 34, the length of fixed plate 34 is 20cm, is provided with waterproof glass 35 at the top of fixed plate 34, and waterproof glass 35 is located at 30 He of the first shower nozzle On front side of second shower nozzle 31, a length of 1.3m of waterproof glass 35, a height of 1.1m of waterproof glass 35, so waterproof glass 35 can keep off Firmly waste water, where preventing waste water stream to beyond wastewater trough 33.
Because electric rotating machine 1 is servomotor, it is possible to more precisely adjust rotating speed.
Because the first bracing wire 24 and the second bracing wire 14 are steel wire rope, the intensity of steel wire rope is big, so 24 He of the first bracing wire Second bracing wire 14 is difficult to break.
Because the material of boiler 3 and cold water storage cistern 9 is stainless steel, boiler 3 and cold water storage cistern 9 are difficult corruption of getting rusty Erosion, can extend the service life of boiler 3 and cold water storage cistern 9.
Embodiment described above only expresses preferred embodiment of the present utility model, and its description is more concrete and detailed, But therefore can not be interpreted as the restriction to the utility model the scope of the claims.It should be pointed out that common for this area For technical staff, without departing from the inventive concept of the premise, some deformations, improvement and replacement can also be made, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be defined by claims.

Claims (7)

1. a kind of Beer Brewage filter board cleaning device, it is characterised in that include electric rotating machine (1), the first reel (2), boiler (3), the second reel (4), the first water pump (5), the second water pump (7), cold water storage cistern (9), screw mandrel (10), top board (11), right axle bearing (12), the first fixed pulley (13), the second bracing wire (14), the second nut (15), second connecting rod (16), second Flexible pipe (17), the first nut (18), first connecting rod (19), the first flexible pipe (20), left shaft holder (21), the second fixed pulley (22), Rotating shaft (23), the first bracing wire (24), slide rail (25), slide block (26), thumb cylinder (27), base plate (29), the first shower nozzle (30) and Second shower nozzle (31), at the top of base plate (29), left and right is arranged with slide rail (25), and on the left of the slide rail (25) on right side, upper end is connected with the One fixed pulley (13), slide rail (25) are provided with slide block (26), are provided with thumb cylinder (27) on the inside of slide block (26), and base plate (29) is just gone up Side is provided with top board (11), is provided with first through hole (6) and the second through hole (8) on top board (11), and first through hole (6) is located at the second through hole (8) on the left of, top board (11) bottom is sequentially provided with electric rotating machine (1), left shaft holder (21) and right axle bearing (12) from left to right, left Bearing block (21) lower end is connected with the second fixed pulley (22), is provided with rotating shaft (23), rotating shaft (23) left end on left shaft holder (21) It is connected with electric rotating machine (1), rotating shaft (23) is provided with the first reel (2) and the second reel (4), and the first reel (2) the second reel (4) left is located at, on the first reel (2), is wound with the first bracing wire (24), the first bracing wire (24) lower end and a left side Side slide (26) is connected, and is wound with the second bracing wire (14) on the second reel (4), and the second bracing wire (14) bypasses the first fixed pulley (13) and the second fixed pulley (22), the second bracing wire (14) bottom righthand side are connected with right side slide block (26), left shaft holder (21) with it is right Screw mandrel (10) is installed between bearing block (12), screw mandrel (10) left end is connected with rotating shaft (23), and screw mandrel (10) is provided with first Nut (18) and the second nut (15), the first nut (18) and the second nut (15) are coordinated with screw mandrel (10), and the first nut (18) positioned at the left of the second nut (15), the first nut (18) lower end is connected with first connecting rod (19), under first connecting rod (19) End is connected with the first shower nozzle (30), and the second nut (15) lower end is connected with second connecting rod (16), the connection of second connecting rod (16) lower end There is the second shower nozzle (31), be provided with boiler (3) and cold water storage cistern (9) at the top of top board (11), and boiler (3) is located at cold water storage cistern (9) The first water pump (5) is provided with left side, boiler (3), the first flexible pipe (20), the first flexible pipe (20) on the first water pump (5), is connected with Through first through hole (6), the first flexible pipe (20) lower end is connected with the first shower nozzle (30), is provided with the second water pump in cold water storage cistern (9) (7) the second flexible pipe (17), is connected with the second water pump (7), and the second flexible pipe (17) passes through the second through hole (8), the second flexible pipe (17) Lower end is connected with the second shower nozzle (31).
2. a kind of Beer Brewage filter board cleaning device according to claim 1, it is characterised in that also include sea Continuous (32), be equipped with sponge (32) on the top board (11) in first through hole (6) and the second through hole (8), sponge (32) are shaped as Annular, the outer surface of sponge (32) are contacted with top board (11), a height of 10cm of sponge (32), and the thickness of sponge (32) is 2cm.
3. a kind of Beer Brewage filter board cleaning device according to claim 1, it is characterised in that also include useless Tank (33), is provided with wastewater trough (33) at the top of base plate (29), wastewater trough (33) is vertical at the top of base plate (29), wastewater trough (33) Positioned at the underface of top board (11), wastewater trough (33) is located on the inside of slide rail (25), and the volume of wastewater trough (33) is 1m3, wastewater trough (33) material is plastics, and the thickness of wastewater trough (33) is 1cm.
4. a kind of Beer Brewage filter board cleaning device according to claim 3, it is characterised in that also include solid Fixed board (34) and waterproof glass (35), at the top of the front side of wastewater trough (33), left and right is arranged with fixed plate (34), fixed plate (34) Length be 20cm, be provided with waterproof glass (35) at the top of fixed plate (34), waterproof glass (35) is located at the first shower nozzle (30) and the On front side of two shower nozzles (31), a length of 1.3m of waterproof glass (35), a height of 1.1m of waterproof glass (35).
5. a kind of Beer Brewage filter board cleaning device according to claim 1, it is characterised in that electric rotating machine (1) it is servomotor.
6. a kind of Beer Brewage filter board cleaning device according to claim 1, it is characterised in that the first bracing wire (24) and the second bracing wire (14) is steel wire rope.
7. a kind of Beer Brewage filter board cleaning device according to claim 1, it is characterised in that boiler (3) Stainless steel is with the material of cold water storage cistern (9).
CN201620876223.9U 2016-08-15 2016-08-15 Beer production is with filtering cardboard belt cleaning device Expired - Fee Related CN206028207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620876223.9U CN206028207U (en) 2016-08-15 2016-08-15 Beer production is with filtering cardboard belt cleaning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620876223.9U CN206028207U (en) 2016-08-15 2016-08-15 Beer production is with filtering cardboard belt cleaning device

Publications (1)

Publication Number Publication Date
CN206028207U true CN206028207U (en) 2017-03-22

Family

ID=58309137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620876223.9U Expired - Fee Related CN206028207U (en) 2016-08-15 2016-08-15 Beer production is with filtering cardboard belt cleaning device

Country Status (1)

Country Link
CN (1) CN206028207U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108215237A (en) * 2018-02-26 2018-06-29 蒋丰亮 A kind of material for PE heavy caliber fiber reinforcement pipelines squeezes out and molding press device
CN109127499A (en) * 2018-09-20 2019-01-04 盐城市金发机械厂 A kind of cleaning device of gearbox recycling and reusing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108215237A (en) * 2018-02-26 2018-06-29 蒋丰亮 A kind of material for PE heavy caliber fiber reinforcement pipelines squeezes out and molding press device
CN109127499A (en) * 2018-09-20 2019-01-04 盐城市金发机械厂 A kind of cleaning device of gearbox recycling and reusing
CN109127499B (en) * 2018-09-20 2021-01-08 苏州鸿仕泰机械有限公司 Cleaning device for recycling gearbox

Similar Documents

Publication Publication Date Title
CN206028207U (en) Beer production is with filtering cardboard belt cleaning device
CN211415786U (en) Water jet cutting glass device capable of collecting sewage and separating
CN112108424A (en) Casting mould pouring port cleaning device
CN206064939U (en) A kind of solar energy vacuum tube high-efficiency scale cleaning plant
CN213924232U (en) High-efficient aeration equipment of garden sewage
CN211442241U (en) Unmanned car washer of environment-friendly
CN217942834U (en) Corner grinding device for steel plate machining
CN208006002U (en) A kind of ceramic tile cutter with dust reduction capability
CN206913475U (en) A kind of agalmatolite processing cutting machine
CN213913328U (en) Stirring device with automatic cleaning function for grinding aid production
CN213265706U (en) Canned equipment is used in plum syrup beverage production
CN210995688U (en) White spirit processing is with beverage bottle belt cleaning device
CN212026184U (en) River course floater collection ship
CN210497422U (en) Can filter belt cleaning device of aluminium bits
CN207206050U (en) A kind of household appliance glass edge polisher of water circulation use
CN206444929U (en) A kind of artificial tooth model cleaning device
CN221792025U (en) Stone thicknessing machine for building stone processing
CN209974439U (en) Efficient and energy-saving circulating water treatment equipment
CN218283088U (en) Spraying and cleaning device for fireproof glass production
CN218504058U (en) Automatic grinding device of seamless steel pipe inner wall
CN205570958U (en) Wine jar belt cleaning device
CN218214662U (en) Nuclear power is from having water works filtering pond pool wall belt cleaning device
CN218306951U (en) Waste gas purification device is used in paper products production
CN219519764U (en) Cleaning equipment for production device
CN221181949U (en) Water purification unit fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322

Termination date: 20180815