CN206022314U - Solar panels production line and its solar panels detection means - Google Patents
Solar panels production line and its solar panels detection means Download PDFInfo
- Publication number
- CN206022314U CN206022314U CN201621007553.0U CN201621007553U CN206022314U CN 206022314 U CN206022314 U CN 206022314U CN 201621007553 U CN201621007553 U CN 201621007553U CN 206022314 U CN206022314 U CN 206022314U
- Authority
- CN
- China
- Prior art keywords
- solar panels
- transhipment portion
- air intake
- intake duct
- transhipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of solar panels production line and its solar panels detection means,Including frame,The frame is provided with the first transhipment portion along travelling belt transporting direction,Be provided with the first transhipment portion some for by solar panels on travelling belt while the first suction unit for picking up,The first transhipment portion is connected with the first drive division for driving the rotation of the first transhipment portion to overturn solar panels,The side in the first transhipment portion is provided with the second transhipment portion,Being provided with several in the second transhipment portion is used for the solar panels in the first suction unit while the second suction unit for picking up,The second transhipment portion is connected with and drives the second transhipment portion to rotate to overturn solar panels and make the second drive division that the Chaoyang of solar panels faces outwardly,Its drip irrigation device is the first suction unit、Some solar panels are picked up by the second suction unit respectively simultaneously,Reach the effect for effectively preventing that tin bar fractures between adjacent solar panels in detection process.
Description
Technical field
The utility model is related to a kind of solar panels production technical field, more specifically, it relates to a kind of solar panels
Production line and its solar panels detection means.
Background technology
Solar panels are also solar module, are the cores in solar power system, and solar energy is sent out
Most important part in electric system.
Monomer solar panels can not directly do power supply use, it is necessary to connect and tightly some monomer solar panels series and parallels
Component is packaged into, some solar panels are connected, is that the one side of solar panels is by the tin bar connection that welds on solar panels
Mounting surface, another side are towards sunny side, the mounting surface of solar panels and are welded with tin bar towards sunny side, solar panels after manufacture,
Staff can be detected to the welding situation of the tin bar on solar panels, in existing Publication No. CN102997956A
State's patent provides a kind of solar panels and detects support, and by being provided with speculum below frame, speculum is anti-by light source
It is mapped on solar panels, as there is solar panels certain translucency, speculum light is passed through solar panels, so as to detect
The welding situation of the tin bar on solar panels two sides, solar panels towards detection faces are wanted based on sunny side, so in the detection sun
Can be during plate, solar panels are directed towards testing staff's towards sunny side.
But, the detection frame of this structure is needed manually by solar panels from the travelling belt of transport solar panels
Remove, then solar panels be transported in frame, during carrying, operating personnel are careless slightly will cause adjacent too
The tin bar connected between positive energy plate fractures, and causes the work for repeating in a large number to weld tin bar.
Utility model content
In view of the shortcomings of the prior art, main purpose of the present utility model is that providing one kind effectively prevents in detection
During tin bar fractures between adjacent solar panels solar panels detection means.
For achieving the above object, the utility model provides following technical scheme:
A kind of solar panels detection means, including frame, the frame is provided with first turn along travelling belt transporting direction
Fortune portion, be provided with the first transhipment portion some for by solar panels on travelling belt while the first suction unit for picking up,
The first transhipment portion is connected with for driving the first transhipment portion to rotate the first drive division to overturn solar panels, and described the
The side in one transhipment portion is provided with the second transhipment portion, and being provided with several in the second transhipment portion is used for the first suction unit
The second suction unit for simultaneously picking up of solar panels, the second transhipment portion is connected with the second transhipment portion of driving and rotates to overturn too
Positive energy plate the second drive division for facing outwardly the Chaoyang of solar panels.
Face up and be placed on travelling belt by adopting above-mentioned technical proposal, the Chaoyang of solar panels, work as travelling belt
When some connected solar panels are transported to the first transhipment portion, the first drive division drives the first transhipment portion to rotate, so as to
Make the first suction unit move closer to and solar panels of fitting towards sunny side, the first suction unit air-breathing, so as at the first suction unit produce
Raw negative pressure, so that the atmospheric pressure in the external world promotes some solar panels simultaneously close to the first suction unit, and by the first air-breathing
Portion picks up simultaneously, and now the first drive division drives the first transhipment portion to rotate, so that solar panels upset, solar panels are near the
During two transhipment portions, the second transhipment portion being rotated by the second drive division, until the second suction unit is moved to the first suction unit
On solar panels at, the second suction unit air-breathing, the first suction unit stop suction, and solar panels are simultaneously adsorbed by the second suction unit
Rise, now the Chaoyang of solar panels faces outwardly, facing to operating personnel, the second drive division continues to drive for the Chaoyang of solar panels
Two transhipment portions rotate, until the second transhipment portion by solar panels turn to operating personnel be easy to check, at position detect, this ties
The design of structure avoids the carrying of personnel, so as to avoid the folding of tin bar between adjacent solar panels during personnel move
Disconnected, the tacit agreement cooperation of operating personnel on the other hand, during personnel carry, is needed, to prevent tin between adjacent solar panels
Bar fractures, thus the handling process of operating personnel can be meticulous and increased the time of carrying, due to first suction unit, the
Two suction units are separately fixed at the first transhipment portion, in the second transhipment portion, in the transport process of solar panels, some sun
Can plate static both with respect to the first transhipment portion, the second transhipment portion, so the tin bar on adjacent solar panels will not fracture, so as to can
To accelerate the rotation in the first transhipment portion, the second transhipment portion, the handling time of solar panels is effectively reduced, solar panels are improve
The efficiency of detection work.
Preferably, first suction unit includes being fixedly installed in the first transhipment portion and the mouth of pipe is towards the of travelling belt
One air intake duct, toward air-breathing in the first air intake duct so that the first air intake duct the first negative pressure pump for picking up solar panels.
By adopting above-mentioned technical proposal, when the first air intake duct is located at solar panels, the first negative pressure pump is inhaled toward first
Solar panels are picked up by tracheal strips air-breathing, the first air intake duct, compared with manipulator, will not be in solar panels by way of absorption
Surface on will not produce scratch, so as to ensure that the surface quality of solar panels.
Preferably, first air intake duct is arranged in pairs in the first transhipment portion along the transporting direction perpendicular to travelling belt
On.
By adopting above-mentioned technical proposal, during the first transhipment portion rotates, positioned at the direction two of travelling belt transport
First air intake duct of side adsorbs the both sides of solar panels, prevent solar panels from laying particular stress on and caused rock, so as to prevent solar energy
Plate drops due to rocking the generation of situation.
Preferably, first air intake duct is used for adsorbing the mouth of pipe of solar panels to the direction away from the first transhipment portion gradually
Expand and formed the adsorption tube of tapered structure.
By adopting above-mentioned technical proposal, adsorption tube is maximum with section at the mouth of pipe of the contact of solar panels, and adsorption tube increases
The big area with solar panels absorption, so that the adsorbed pipe absorption of solar panels is more consolidated.
Preferably, second suction unit includes being fixed in the second transhipment portion the second air intake duct, toward the second air intake duct
Interior air-breathing is so that the second air intake duct picks up the second negative pressure pump of solar panels on the first air intake duct.
By adopting above-mentioned technical proposal, the second air intake duct is also adopted by the mode for adsorbing solar panels, whole so as to ensure that
The surface quality of solar panels in individual transport process.
Preferably, each second air intake duct is corresponded with the first air intake duct respectively and the corresponding mouth of pipe is coaxially disposed.
By adopting above-mentioned technical proposal, when the second air intake duct is turned at the first air intake duct, the second air intake duct is by
Solar panels on one air intake duct are picked up, and the absorption position of solar panels is constant, it is to avoid during exchange adsorption, the sun
The stress of energy plate is gathered conversion and causes rocking for solar panels, so that the very stable absorption of solar panels is in the second air intake duct
On.
Preferably, second drive division includes the drive cylinder being rotatably arranged in frame, the work of the drive cylinder
Stopper rod is rotated with the second transhipment portion side and is connected.
Piston rod, and each shifting of the piston rod of drive cylinder are respectively provided with by adopting above-mentioned technical proposal, drive cylinder
Dynamic stroke is consistent, and when the piston rod of drive cylinder drives the second transhipment portion to rotate, the piston rod of drive cylinder extends first,
The piston rod of drive cylinder promotes the side in the second transhipment portion, as the driving point of drive cylinder deviates the rotation in the second transhipment portion
Axle center, so the second transhipment portion rotates, until the piston rod elongation of drive cylinder terminates, the angle that the second transhipment portion rotates each time
Degree is identical, and the position stopped at so as to each solar panels in face of operating personnel is identical, is easy to the detection of operating personnel.
Preferably, the frame be provided with above travelling belt and for irradiate solar panels towards the first of sunny side
Light source, is provided with the second transhipment portion for irradiating the secondary light source of the mounting surface of solar panels.
By adopting above-mentioned technical proposal, when solar panels are during detection, the first light source is radiated at solar panels
Towards sunny side, be easy to operating personnel clearly detect solar panels towards sunny side, secondary light source is radiated at the mounting surface of solar panels,
As there is solar panels certain translucency, secondary light source the tin bar on solar panels mounting surface can be projected in solar energy
On plate, operating personnel are easy to the welding situation for detecting tin bar on solar panels mounting surface through solar panels.
Secondary objective of the present utility model is that providing one kind effectively prevents in detection process between adjacent solar panels
The solar panels production line that tin bar fractures
A kind of solar panels production line, including solar panels detection means as above.
By adopting above-mentioned technical proposal, using above-mentioned solar panels detection means, effectively can prevent from detecting
In journey, between adjacent solar panels, tin bar fractures.
Preferably, the side of the solar panels detection means is provided with for collecting the collecting frame of solar panels, described
It is provided with hardness to be less than solar panels to prevent the placement plate that solar panels are damaged on collecting frame.
By adopting above-mentioned technical proposal, after the completion of solar panels detection, solar panels are placed on placement plate, are placed
Hardness of the hardness of plate less than solar panels, it is possible to prevent placement plate from marking cut on solar panels, it is ensured that solar energy
The surface quality of plate.
In sum, the utility model has the advantages that:
1st, the fractureing of adjacent solar panels between tin bar is effectively prevented in detection process;
2nd, the efficiency of solar panels detection work is improve;
3rd, scratch will not will not be produced on the surface of solar panels by way of absorption, so as to ensure that solar panels
Surface quality.
Description of the drawings
Structural representations of the Fig. 1 for embodiment one;
Another structural representations of the Fig. 2 for embodiment one;
Fig. 3 is some solar panels structural representations connected by tin bar in embodiment one;
Fig. 4 is the sectional view of the solar panels in embodiment one;
Structural representations of the Fig. 5 for embodiment two.
In figure:1st, frame;11st, the first transhipment portion;111st, the first drive division;112nd, the first air intake duct;113rd, adsorption tube;
12nd, the second transhipment portion;121st, drive cylinder;1211st, piston rod;122nd, the second air intake duct;2nd, the first light source;3rd, secondary light source;
4th, travelling belt;5th, solar panels;51st, towards sunny side;52nd, mounting surface;53rd, tin bar;6th, collecting frame;61st, plate is placed;7th, guide rail;
71st, thrust cylinder.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment, the utility model is described in detail.
Embodiment one:
A kind of solar panels detection means, with reference to Fig. 1, Fig. 3 and Fig. 4, which includes that frame 1, frame 1 are arranged on travelling belt
4 surface, on travelling belt 4 transport welding tin bar 53 after solar panels 5, in frame 1 along travelling belt 4 transporting direction
The first transhipment portion 11 is provided with, the first transhipment portion 11 is elongate rod-like structures, and the two ends in the first transhipment portion 11 are rotatably arranged on machine
On frame 1, frame 1 is located at the one end in the first transhipment portion 11 and is provided with the first drive division 111, and the first drive division 111 is motor,
The rotating shaft of motor is fixedly connected with the first transhipment portion 11, the axis of rotation of motor, so as to drive the first transhipment portion 11
Rotation.
With reference to Fig. 1, Fig. 2 and Fig. 3, several first suction units in the first transhipment portion 11, are provided with, the first suction unit includes
First air intake duct 112 and the first negative pressure pump(Not shown in figure), negative pressure pump is that existing market can have been bought, then this does not do principle
Property repeat, 180 degree reciprocating motion is only made in the rotating shaft of motor, and the rotating shaft of motor has two extreme positions, first
Extreme position:Immediately below the mouth of pipe of the first air intake duct 112 is vertically oriented to, second extreme position:The mouth of pipe of the first air intake duct 112
Directly over being vertically oriented to;For the ease of description, first it is described with first extreme position of motor, the first air intake duct
112 are fixed in the first transhipment portion 11, and the first air intake duct 112 is arranged in pairs in the both sides in the first transhipment portion 11, the first air intake duct
112 mouth of pipe is vertically oriented to lower section, and the mouth of pipe below the first air intake duct 112 is downwardly extending adsorption tube 113, adsorption tube 113
For tapered structure, the portlet of adsorption tube 113 is connected at the first air intake duct 112, the large port of adsorption tube 113 downward,
To increase the adsorption area of absorption solar panels 5, the first negative pressure pump is located at the side of frame 1, and the first air intake duct 112 is away from absorption
One end of pipe 113 is communicated with the first negative pressure pump, the first negative pressure pump air-breathing, so that all of first air intake duct 112 is inhaled simultaneously
Gas, when the first negative pressure pump quits work, all first air intake ducts 112 are stopped suction simultaneously.
With reference to Fig. 1, Fig. 2 and Fig. 4, the second transhipment portion 12 that is provided with frame 1, is rotated, the second transhipment portion 12 is also elongate rod
Shape structure, and be arranged in parallel with the first transhipment portion 11, the second transhipment portion 12 is located at the top in the first transhipment portion 11, sets in frame 1
The second drive division for driving the second transhipment portion 12 to rotate is equipped with, the second drive division includes drive cylinder 121, drive cylinder 121
Housing into rotation is arranged in frame 1, and drive cylinder 121 rotates the top that junction is located at the second transhipment portion 12 with frame 1, drives
The piston rod 1211 of cylinder 121 of taking offence is rotated with the side of the second drive division and is connected.
With reference to Fig. 2, several second suction units in the second transhipment portion 12, are provided with, the second suction unit includes the second air intake duct
122 and second negative pressure pump(Not shown in figure), the second air intake duct 122 is separately fixed in the second transhipment portion 12, the second air intake duct
Adsorption tube 113 is provided with 122 mouth of pipe, and each second air intake duct 122 is corresponding with the first air intake duct 112 respectively to be set
Put, the second air intake duct 122 is communicated with the second negative pressure pump away from one end of adsorption tube 113, the second transhipment portion 12 has two poles
Extreme position, first extreme position:When the piston rod 1211 of drive cylinder 121 is fully retracted, in the second transhipment portion 12
The mouth of pipe of two air intake ducts 122 is straight down;Second extreme position:When the piston rod 1211 of drive cylinder 121 fully extended
When, the mouth of pipe of the second air intake duct 122 in the second transhipment portion 12 is inclined towards at operating personnel;When the second transhipment portion 12 is in
When at the first extreme position, the rotating shaft of motor with second extreme position, the first air intake duct 112 and the second air intake duct 122
The mouth of pipe coaxial, be provided with the first light source 2 in frame 1, the first light source 2 is arranged on the top of operating personnel's test position, first
Light source 2 provides the power supply of electric energy for LED and for LED, is provided with secondary light source 3 in the second transhipment portion 12, and secondary light source 3 sets
Put in the second transhipment portion 12, secondary light source 3 also provides the power supply of electric energy for LED and for LED, at the second transhipment portion 12
When second extreme position, the LED of the first light source 2 be radiated at solar panels 5 towards sunny side 51, the LED of secondary light source 3
It is radiated at the mounting surface 52 of solar panels 5.
The course of work:With reference to Fig. 2, Fig. 3 and Fig. 4, when the welding situation for needing to detect the tin bar 53 on solar panels 5,
Several are sent to travelling belt 4 underface in the first transhipment portion 11 by the solar panels 5 that tin bar 53 connects, and are then driven
The axis of rotation of cylinder 121 is to first extreme position, court of the adsorption tube 113 in the first transhipment portion 11 positioned at solar panels 5
At sunny side 51, the first negative pressure pump air-breathing, so that solar panels 5 are picked up by the adsorption tube 113 on the first air intake duct 112, drives
Motor-driven rotatable shaft is rotated, and when the volume axis of rotation of motor is to second extreme position, the rotating shaft of motor drives the
The rotation 180 degree in one transhipment portion 11, now, solar panels 5 are in horizontality, and the mounting surface 52 of solar panels 5 is upward, drive
Cylinder 121 of taking offence drives piston rod 1211 to bounce back, so that the second transhipment portion 12 is located at first extreme position, the second air intake duct
Straight down, now, each second air intake duct 122 is located at just going up for the first corresponding air intake duct 112 to 122 mouth of pipe respectively
Side, the adsorption tube 113 on the second air intake duct 122 are fitted on the mounting surface 52 of solar panels 5.
With reference to Fig. 2, the second negative pressure pump is opened, the second negative pressure pump air-breathing, so that the adsorption tube 113 of the second air intake duct 122
Place produces negative pressure, and then the first negative pressure pump stops suction, and solar panels 5 are picked up by the adsorption tube 113 of the second air intake duct 122, this
When solar panels 5 mounting surface 52 fit with the adsorption tube 113 of the second air intake duct 122.
With reference to Fig. 2, Fig. 3 and Fig. 4, the piston rod 1211 of drive cylinder 121 is fully extended, and the second transhipment portion 12 rotates, from
And turn to solar panels 5 at operating personnel, operating personnel are just checked towards sunny side 51 to solar panels 5, are checked
During 53 welding situation of tin bar on solar panels 5, the mounting surface 52 of solar panels 5 and towards sunny side 51 be subject to LED
Irradiation, the detection process is not required to a dead lift, and the mode of absorption is by some solar panels 5 connected by tin bar 53 while inhaling
Attached, it is to avoid fractureing for tin bar 53, the then transhipment of drive cylinder 121 and motor, so as to automatically put solar panels 5
Put in face of operating personnel.
Embodiment two:
A kind of solar panels production line, with reference to Fig. 3 and Fig. 5, including the solar panels detection means described in embodiment one,
The side of solar panels detection means is the side of operating personnel's detection, and opposite side is provided with for collecting the receipts of solar panels 5
Collection frame 6, is provided with placement plate 61 on collecting frame 6, in order to prevent the scratch of solar panels 5, the hardness for placing plate 61 is less than the sun
The hardness of energy plate 5, it can be cardboard etc. to place plate 61.
With reference to Fig. 3 and Fig. 5, in order that solar panels 5 automatically can be placed on solar panel on placement plate 61, by frame
1 point is two parts, the frame 1 that a part is located for the first transhipment portion 11, and another part is by the second transhipment portion 12 and drive cylinder
121 frames 1 being located, are provided with guide rail 7, the second transhipment portion 12, drive gas above the factory building that 5 production line of solar panels is located
1 sliding of frame that cylinder 121 is located is arranged on guide rail 7, is provided with thrust cylinder 71 on guide rail 7, and guide rail 7 is perpendicular to travelling belt
The direction of 4 transports, thrust cylinder 71 promote the frame 1 that the second transhipment portion 12, drive cylinder 121 are located to the first transhipment portion 11
The surface of surface and placement plate 61 moves back and forth.
The course of work:With reference to Fig. 3 and Fig. 5, after operating personnel's detection is finished, thrust cylinder 71 promotes the second transhipment portion
12nd, drive cylinder 121 be located frame 1 move to 6 direction of collecting frame away from operating personnel side, when the second rotary part in
During the surface of collecting frame 6, the piston rod retraction of drive cylinder 121, so that the second transhipment portion 12 is in first limit position
Put, straight down, the second negative pressure pump stops suction 113 mouth of pipe of adsorption tube on the second air intake duct 122, solar panels 5 lose
The absorption of two negative pressure pumps, due to Action of Gravity Field, solar panels 5 are fallen on placement plate 61;
Then, the piston rod of drive cylinder 121 stretches out, so that the second transhipment portion 12 is pushed away in second extreme position
Strength cylinder 71 promotes the frame 1 that the second transhipment portion 12, drive cylinder 121 are located to move to operating personnel direction, until second turn
Fortune portion 12 is located at the surface in the first transhipment portion 11, completes one-time detection and the process that collects.
The above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to
Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.Should refer to
Go out, for those skilled in the art, some improvement under the premise of without departing from the utility model principle and
Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.
Claims (10)
1. a kind of solar panels detection means, including frame (1), is characterized in that:Frame (1) is transported along travelling belt (4)
Direction is provided with the first transhipment portion (11), be provided with the first transhipment portion (11) some for by travelling belt (4) too
Positive can plate (5) while the first suction unit for picking up, the first transhipment portion (11) are connected with for driving the first transhipment portion (11)
The first drive division (111) to overturn solar panels (5) is rotated, the side of the first transhipment portion (11) is provided with second turn
Fortune portion (12), be provided with several on the second transhipment portion (12) for by the solar panels (5) in the first suction unit while
The second suction unit for picking up, the second transhipment portion (12) are connected with the second transhipment portion (12) of driving and rotate to overturn solar panels
(5) and second drive division towards sunny side (51) outwardly of solar panels (5) is made.
2. solar panels detection means according to claim 1, is characterized in that:First suction unit includes being fixedly installed
Go up in the first transhipment portion (11) and the mouth of pipe is towards first air intake duct (112) of travelling belt (4), toward in the first air intake duct (112)
Air-breathing is so that the first air intake duct (112) the first negative pressure pump for picking up solar panels (5).
3. solar panels detection means according to claim 2, is characterized in that:Described first air intake duct (112) are along vertical
It is arranged in pairs in the first transhipment portion (11) in the transporting direction of travelling belt (4).
4. solar panels detection means according to claim 2, is characterized in that:Described first air intake duct (112) are used for inhaling
The mouth of pipe of attached solar panels (5) gradually expands and forms the adsorption tube of tapered structure to the direction away from the first transhipment portion (11)
(113).
5. solar panels detection means according to claim 3, is characterized in that:Second suction unit includes being fixed on
The second air intake duct (122) in two transhipment portions (12), toward the interior air-breathing of the second air intake duct (122) so that the second air intake duct (122) inhale
Play the second negative pressure pump of the upper solar panels (5) of the first air intake duct (112).
6. solar panels detection means according to claim 5, is characterized in that:Each described second air intake duct (122) point
Do not correspond with the first air intake duct (112) and the corresponding mouth of pipe is coaxially disposed.
7. solar panels detection means according to claim 1, is characterized in that:Second drive division includes rotating setting
Drive cylinder (121) in frame (1), the piston rod (1211) of drive cylinder (121) and the second transhipment portion (12)
Side rotates connection.
8. solar panels detection means according to claim 1, is characterized in that:Frame (1) is provided with positioned at transport
Above belt (4) and for irradiating first light source (2) towards sunny side (51) of solar panels (5), the second transhipment portion (12)
On be provided with for irradiating the secondary light source (3) of the mounting surface (52) of solar panels (5).
9. a kind of solar panels production line, is characterized in that:Including the arbitrary described solar panels detection means of claim 1-8.
10. solar panels production line according to claim 9, is characterized in that:The side of the solar panels detection means
Be provided with for collecting the collecting frame (6) of solar panels (5), hardness is provided with collecting frame (6) less than solar panels (5)
With the placement plate (61) for preventing solar panels (5) from damaging.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621007553.0U CN206022314U (en) | 2016-08-31 | 2016-08-31 | Solar panels production line and its solar panels detection means |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621007553.0U CN206022314U (en) | 2016-08-31 | 2016-08-31 | Solar panels production line and its solar panels detection means |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206022314U true CN206022314U (en) | 2017-03-15 |
Family
ID=58256351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621007553.0U Expired - Fee Related CN206022314U (en) | 2016-08-31 | 2016-08-31 | Solar panels production line and its solar panels detection means |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206022314U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108417520A (en) * | 2018-03-26 | 2018-08-17 | 李慧 | Solar panels tipper |
CN111383937A (en) * | 2018-12-27 | 2020-07-07 | 苏州能讯高能半导体有限公司 | Sheet rewinding machine |
-
2016
- 2016-08-31 CN CN201621007553.0U patent/CN206022314U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108417520A (en) * | 2018-03-26 | 2018-08-17 | 李慧 | Solar panels tipper |
CN108417520B (en) * | 2018-03-26 | 2019-07-12 | 睢宁阿特斯新能源有限公司 | Solar panels tipper |
CN111383937A (en) * | 2018-12-27 | 2020-07-07 | 苏州能讯高能半导体有限公司 | Sheet rewinding machine |
CN111383937B (en) * | 2018-12-27 | 2022-08-12 | 苏州能讯高能半导体有限公司 | Sheet rewinding machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203498763U (en) | Bridge expansion joint cleaning device | |
CN105327865B (en) | A kind of processing screening installation of high light efficiency LED lamp modelled after an antique | |
CN107472900A (en) | Photoelectric detection equipment with auxiliary absorption | |
CN103255736A (en) | Bridge expansion joint cleaner | |
CN206022314U (en) | Solar panels production line and its solar panels detection means | |
CN107324049A (en) | A kind of optoelectronic detecting device provided with auxiliary absorbing | |
CN206770134U (en) | A kind of tower cleaning robot | |
CN206041878U (en) | Mobile solar power panel | |
CN205887592U (en) | Oil storage tank cleaning robot for petrochemical industry | |
CN205904580U (en) | Battery sheet's automation of welding equipment | |
CN202651181U (en) | Turnover and moving device for solar panel laminate | |
CN207425829U (en) | A kind of solar panels quality inspection production line | |
CN206179830U (en) | Solar cell panel appearance detection device | |
CN208743237U (en) | A kind of cylindrical battery end face dust-extraction unit | |
CN205202537U (en) | Teaching blackboard dust extraction | |
CN203534914U (en) | Detection device for bending strength of connecting part between power line and plug | |
CN206868789U (en) | A kind of dust collection cover car | |
CN206729833U (en) | A kind of dust catcher of good dedusting effect | |
CN206262956U (en) | A kind of cleaning device of solar panels glass | |
CN205790195U (en) | Base box machine automatically for cylindrical battery | |
CN205295688U (en) | Dust collection structure for embroidery machine | |
CN209175146U (en) | A kind of welding dust exhaust apparatus | |
CN208102439U (en) | A kind of solar energy profile laminator | |
CN108534409B (en) | Air conditioner refrigerant recovery device | |
CN206942950U (en) | A kind of automobile oil well pump easy to use |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170315 Termination date: 20200831 |