CN206019396U - A kind of driving stirs cooling bay - Google Patents

A kind of driving stirs cooling bay Download PDF

Info

Publication number
CN206019396U
CN206019396U CN201620960579.0U CN201620960579U CN206019396U CN 206019396 U CN206019396 U CN 206019396U CN 201620960579 U CN201620960579 U CN 201620960579U CN 206019396 U CN206019396 U CN 206019396U
Authority
CN
China
Prior art keywords
cooling bay
cooling
bay
temperature
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620960579.0U
Other languages
Chinese (zh)
Inventor
李国刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin City Die Casting Co Ltd
Original Assignee
Tianjin City Die Casting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin City Die Casting Co Ltd filed Critical Tianjin City Die Casting Co Ltd
Priority to CN201620960579.0U priority Critical patent/CN206019396U/en
Application granted granted Critical
Publication of CN206019396U publication Critical patent/CN206019396U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of drive stirring cooling bay, aim to provide a kind of cooling effectiveness and preferably drive stirring cooling bay, its drip irrigation device is, including the first cooling bay, first cooling bay is connected with the second cooling bay by water pipe, water pipe is provided with check valve, first cooling bay is provided with the stirring chiller connected with the second cooling bay, stirring chiller includes the suction pump supported above the first cooling bay by support, it is located at the groove bucket of the pump discharge that draws water, the netted draining board being fixedly connected with groove bucket and the first agitator and the second agitator in the first cooling bay and the second cooling bay, be located at the second cooling bay in be additionally provided with for control whole device switch temperature control equipment.

Description

A kind of driving stirs cooling bay
Technical field
This utility model is related to cooling device field, and more particularly to a kind of driving stirs cooling bay.
Background technology
Currently, with the development of China's science and technology, die industry development is also increasingly rapider, the material that uses, equipment Deng also increasingly advanced, and in the production process of mould, due to the difference of material, mould has the performance that expands with heat and contract with cold, because The size that this needs is made according to different materials is needed more than actual size, and therefore, mould needs in process of production Cooled down.
At present, the Chinese patent of Publication No. 204085237U discloses a kind of quick cooling bay of driving stirring-type, including Cell body, is provided with the first reservoir on the left of the cell body, be provided with the second reservoir on the right side of cell body, is provided with the first reservoir One motor, is provided with the second motor in the second reservoir, the inwall side of cell body is provided with the first shaft, the first stirring Axle sleeve is equipped with some first stirring vanes, and the first motor is connected by the first drive shaft with the first shaft, cell body interior Wall opposite side is provided with the second shaft, and the second shaft is set with some second stirring vanes, and the second motor is stirred with second Mix axle to connect by the second drive shaft.
This driving quick cooling bay of stirring-type, although single filter can be carried out and stirring vane is controlled by shaft Rotate to improve cooling effectiveness, but only relatively low by stirring cooling effectiveness, it is impossible to quick drain heat.
Utility model content
The purpose of this utility model is to provide a kind of driving and stirs cooling bay, and which has the temperature that can quickly reduce cooling water, Fast cooling, the preferable advantage of cooling effect is dripped by disperseing cooling water from eminence.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of driving stirs cooling bay, and including the first cooling bay, first cooling bay is by water pipe and the second cooling bay It is connected, first cooling bay is provided with the stirring chiller connected with the second cooling bay, the stirring chiller bag The suction pump supported by support above the first cooling bay is included, positioned at the groove bucket of the pump discharge that draws water, is fixedly connected with groove bucket Netted draining board and the first agitator and the second agitator in the first cooling bay and the second cooling bay.
Being arranged such, cooling distribution can preferably being carried out by arranging two cooling bays, the second cooling bay is directly participated in To in production process, the mould of contact need cooling, therefore in the second cooling bay, cooling water temperature is of a relatively high, and the first cooling Pond is used for the cooling water cooled down in the second cooling bay and is used for caching, and can meet consecutive production, it is to avoid only one of which is cooled down During pond, consecutive production is not enough to supply cooling water, by the stirring chiller on the first cooling bay in the second cooling bay Cooling water is lowered the temperature, and the top that the cooling water in the second cooling bay is evacuated to the first cooling bay using suction pump, in suction pump Outlet be provided with groove bucket, cooling water sprays outlet and enters groove bucket, is fixedly connected with netted draining board, can efficiently separate on groove bucket Cooling water, is divided into a grain globule, and so as to expand area of dissipation, and the globule drips from eminence, further speeds up radiating, Radiating effect is effectively improved, and in the first cooling bay and the second cooling bay being additionally provided with the first agitator and the second agitator is used for Auxiliary heat dissipation, to ensure that radiating effect is more preferable.
Further arrange:The water pipe is provided with and cooling water in the first cooling bay can be delivered to the list in the second cooling bay To valve.
It is arranged such, the second cooling bay of cooling current direction when check valve is opened in the first cooling bay, without occurring Situations such as adverse current, it is ensured that the temperature of cooling water enters back into the second cooling bay after reducing in the first cooling bay, it is to avoid mixed flow occur.
Further arrange:Quick air exhausting device, the quick row is additionally provided with first cooling bay and the second cooling bay Wind apparatus include that several are fixedly connected with pool wall by fixing device above the first cooling bay and the second cooling bay pool wall Exhaust fan.
It is arranged such, the first cooling bay and the can be gathered in by the heat in whole stirring cooling procedure, giving out Near above two cooling bays, by quick air exhausting device, accelerating air flow can increase the effect of cold and hot exchange, by hot-air Discharge near cooling bay, cold air is entered accelerates cooldown rate, and quick air exhausting device is mainly made up of several exhaust fan, air draft Fan is fixed on pool wall top by fixing device, can pump out by the heat in cooling bay in convulsion, accelerates cold and hot sky Gas is exchanged.
Further arrange:The fixing device includes the bearing positioned at pool wall edge, the fixing hole on bearing and use Gim peg in fixed exhaust fan.
Be arranged such, by fixing device fix exhaust fan, fixing device mainly by be fixed on pool wall tip edge Seat, which is mainly used in supporting fixed exhaust fan, while the fixing hole that bearing is provided with, cooperation gim peg will through exhaust fan both sides Which is fixed on bearing, so as to reach fixed effect.
Further arrange:It is provided with second cooling bay for adjusting the temperature control equipment of cooling water temperature, described Temperature control equipment includes that the temperature signal for collecting is input into by temperature sensor in the second cooling bay, temperature sensor Temperature signal is compared by the automatic controller being located on the second cooling bay outer wall, temperature controller with preset value, works as temperature Signal exports regulation and control instruction when being more than preset value, and the charger being connected with each equipment is started working.
It is arranged such, in the second cooling bay, is provided with temperature control equipment, is mainly used in playing to whether whole device works Decisive action, determines a need for starting stirring chiller according to the temperature in the second cooling bay, on the one hand can be to cooling Temperature in pond is had gained some understanding, on the other hand can effective energy saving, reduce production cost, by being located at the second cooling bay Interior temperature sensor can learn the temperature in the second cooling bay, be judged by feeding back to automatic controller, if temperature Then automatic controller control charger is operated to exceed the temperature value for setting, and charger is that whole device is each by internal wiring Individual equipment provides electric energy, to ensure that each equipment is operated, when in the second cooling bay, temperature is less than set temperature value, controls automatically Device processed disconnects charger and powers, and equipment shuts down, and then the effectively save energy.
Further arrange:It is additionally provided with second cooling bay for supplementing the water inlet pipe of cooling water.
It is arranged such, can evaporates as water is heated, even if therefore cooling water repetitive cycling is utilized, still can be lost, Therefore the water inlet pipe being provided with the second cooling bay can be used to supplement cooling water, for supplementing the cooling water of loss, while necessary When can also add cooling water fast cooling when needing fast cooling.
Further arrange:The water inlet pipe is provided with stop valve.
Be arranged such, by the stop valve on water inlet pipe can using when open be passed through cooling water, can close when not using Close, it is to avoid the cooling water adverse current in cooling water inflow or the second cooling bay is gone out.
In sum, this utility model has the advantages that:Effectively the cooling water in cooling bay can be carried out cold But, while repeated collection utilizes cooling water, accelerate cooling effectiveness using stirring chiller, and by temperature control equipment to each Equipment is controlled the effectively save energy.
Description of the drawings
Fig. 1 is to drive stirring cooling bay overall structure diagram;
Fig. 2 is to drive stirring cooling bay top view;
Fig. 3 is to drive stirring cooling bay A-A cross-sectional views;
Fig. 4 is to drive stirring cooling bay ventilating fan structure schematic diagram.
In figure, the 1, first cooling bay;2nd, the second cooling bay;3rd, water pipe;4th, chiller is stirred;41st, suction pump;42nd, groove Bucket;43rd, draining board;44th, the first agitator;45th, the second agitator;5th, support;6th, check valve;7th, quick air exhausting device;71st, arrange Fan;8th, fixing device;81st, bearing;82nd, fixing hole;83rd, gim peg;9th, temperature control equipment;91st, temperature sensor;92、 Automatic controller;93rd, charger;10th, water inlet pipe;11st, water check valve.
Specific embodiment
This utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment 1:A kind of driving stirs cooling bay, and as shown in Figure 1, Figure 2 and Figure 3, which mainly includes two cooling bays, i.e., First cooling bay 1 and the second cooling bay 2, are connected by water pipe 3 between two cooling bays, and water pipe 3 is provided with check valve 6, can only Make the cooling water in the first cooling bay 1 be passed through the second cooling bay 2, it is impossible to countercurrently, supported by support 5 on the first cooling bay 1 It is provided with stirring chiller 4, stirring chiller 4 includes being connected in the second cooling bay 2 by pipeline cold for extracting second But in pond 2 cooling water suction pump 41,41 exit of suction pump is provided with the different groove bucket 42 of before and after's openings of sizes, and groove bucket 42 is less Opening be set in 41 exit of suction pump, cooling water sprays logical groove bucket 42 from exit, and groove bucket 42 is provided with and groove bucket The 42 netted draining boards 43 being fixedly connected, cooling water are divided into some droplets by 43 surface of draining board, and drop to In one cooling bay 1, while being additionally provided with the first agitator 44 and the second agitator 45 in the first cooling bay 1 and the second cooling bay 2.
As shown in figure 4, quick air exhausting device 7 is additionally provided with the first cooling bay 1 and the second cooling bay 2, by several positions Exhaust fan 71 in 2 pool wall top of the first cooling bay 1 and the second cooling bay is constituted, and exhaust fan 71 is fixed on by fixing device 8 On pool wall, fixing device 8 includes that bearing 81, bearing 81 are provided with fixing hole 82, runs through 71 both sides of exhaust fan by gim peg 83 In fixed and fixing hole 82.
Temperature control equipment 9 is additionally provided with simultaneously in the second cooling bay 2, including the temperature positioned at 2 bottom of the second cooling bay Sensor 91, the automatic controller 92 being connected with temperature sensor 91, by receive the temperature transmitted of temperature sensor 91 come The switch of control charger 93, predominantly each equipment of whole device of charger 93 provide electric energy, including suction pump 41, fan Deng.
Simultaneously it is additionally provided with the second cooling bay 2 for supplementing the water inlet pipe 10 of cooling water, by cutting on water inlet pipe 10 Only valve to be controlling the entrance of cooling water, while also water inlet pipe 10 can quickly be discharged the cooling in pond as drain pipe if necessary Water.
Its main operational principle is as follows:During production mould, need to cool down mould, by being put into second Cooled down in cooling bay 2, temperature rises the cooling water in the second cooling bay 2 over time, by the second internal agitator 45 can be lowered the temperature in advance, but effect is general, therefore by being located at the suction pump 41 on the first cooling bay 1 by the second cooling bay In 2, the higher cooling water of temperature is pumped, while arranging groove bucket 42 on the outlet of suction pump 41, is fixedly connected on groove bucket 42 There is draining board 43, by cooling water higher for temperature is separated into the globule, the first cooling is dropped to by netted draining board 43 In pond 1, preferably reduce the temperature of cooling water, by improving the area of dissipation of cooling water, and radiating is accelerated by eminence drippage, from And improve radiating efficiency.
Cooling water is entered in the first cooling bay 1 and further stirs cooling by the first agitator 44, while can pass through The check valve 6 connected between the first cooling bay 1 and the second cooling bay 2 on water pipe 3 is opened, temperature in the first cooling bay 1 is reduced Cooling water be re-delivered to the second cooling bay 2 and carry out cooling work.
The exhaust fan 71 that fixes by fixing device 8 is equipped with the first cooling bay 1 and 2 outer wall top of the second cooling bay, Reduce cooling effect when generally rising and converge in certain space due to heat, therefore pass through exhaust fan 71 by the first cooling bay 1 and second heat near cooling bay 2 discharge, accelerate cooling effect.
Temperature control equipment 9 is provided with the second cooling bay 2, including the temperature sensor 91 in the second cooling bay 2, The temperature signal for collecting input is located at the automatic controller 92 on 2 outer wall of the second cooling bay, temperature control by temperature sensor 91 Temperature signal is compared by device processed with preset value, exports regulation and control instruction when temperature signal is more than preset value, with each equipment phase Charger 93 even is started working, and therefore temperature controller can be with the effectively save energy, when cooling water temperature in the second cooling bay 2 When relatively low, each equipment does not work, and when temperature reaches a timing, charger 93 provides power equipment and starts working, and is easy to Producer section About the energy, reduces production cost.
The above embodiments are only which is not to restriction of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification without creative contribution after this specification is read as needed to the present embodiment, but As long as all being protected by Patent Law in right of the present utility model.

Claims (7)

1. a kind of driving stirs cooling bay, including the first cooling bay(1), first cooling bay(1)By water pipe(3)With second Cooling bay(2)It is connected, it is characterised in that:First cooling bay(1)It is provided with and the second cooling bay(2)The stirring of connection is cold But device(4), the stirring chiller(4)Including positioned at the first cooling bay(1)Top passes through support(5)The suction pump of support (41), positioned at suction pump(41)The groove bucket of outlet(42), with groove bucket(42)The netted draining board being fixedly connected(43)And it is located at the One cooling bay(1)With the second cooling bay(2)The first interior agitator(44)And second agitator(45).
2. according to claim 1 driving stirs cooling bay, it is characterised in that:The water pipe(3)Being provided with can be by first Cooling bay(1)Interior cooling water is delivered to the second cooling bay(2)Interior check valve(6).
3. according to claim 1 driving stirs cooling bay, it is characterised in that:First cooling bay(1)And second is cold But pond(2)On be additionally provided with quick air exhausting device(7), the quick air exhausting device(7)The first cooling bay is located at including several(1) And second cooling bay(2)Pass through fixing device above pool wall(8)The exhaust fan being fixedly connected with pool wall(71).
4. according to claim 3 driving stirs cooling bay, it is characterised in that:The fixing device(8)Including positioned at pond The bearing at wall edge(81), be located at bearing(81)On fixing hole(82)And be used for fixing exhaust fan(71)Gim peg(83).
5. according to claim 1 driving stirs cooling bay, it is characterised in that:Second cooling bay(2)Use is inside provided with Temperature control equipment in control and regulation cooling water temperature(9), the temperature control equipment(9)Including positioned at the second cooling bay (2)Interior temperature sensor(91), temperature sensor(91)The temperature signal for collecting input is located at the second cooling bay(2)Outward Automatic controller on wall(92), temperature signal is compared by temperature controller with preset value, when temperature signal is more than default Regulation and control instruction, the charger being connected with each equipment is exported during value(93)Start working.
6. according to claim 1 driving stirs cooling bay, it is characterised in that:Second cooling bay(2)On be additionally provided with For supplementing the water inlet pipe of cooling water(10).
7. according to claim 6 driving stirs cooling bay, it is characterised in that:The water inlet pipe(10)It is provided with cut-off Valve.
CN201620960579.0U 2016-08-26 2016-08-26 A kind of driving stirs cooling bay Expired - Fee Related CN206019396U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620960579.0U CN206019396U (en) 2016-08-26 2016-08-26 A kind of driving stirs cooling bay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620960579.0U CN206019396U (en) 2016-08-26 2016-08-26 A kind of driving stirs cooling bay

Publications (1)

Publication Number Publication Date
CN206019396U true CN206019396U (en) 2017-03-15

Family

ID=58251463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620960579.0U Expired - Fee Related CN206019396U (en) 2016-08-26 2016-08-26 A kind of driving stirs cooling bay

Country Status (1)

Country Link
CN (1) CN206019396U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110745892A (en) * 2019-11-07 2020-02-04 伊犁新天煤化工有限责任公司 Gravity cooling salt collecting device
CN114562897A (en) * 2022-03-09 2022-05-31 南通元兴智能科技有限公司 Automatic polishing solution cooling system for polishing silicon carbide

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110745892A (en) * 2019-11-07 2020-02-04 伊犁新天煤化工有限责任公司 Gravity cooling salt collecting device
CN114562897A (en) * 2022-03-09 2022-05-31 南通元兴智能科技有限公司 Automatic polishing solution cooling system for polishing silicon carbide
CN114562897B (en) * 2022-03-09 2023-11-17 南通元兴智能科技有限公司 Polishing liquid cooling automatic system for silicon carbide polishing

Similar Documents

Publication Publication Date Title
CN206019396U (en) A kind of driving stirs cooling bay
CN203534308U (en) Cooling device for circulating water
CN206531131U (en) A kind of Multifunctional air heater for bathroom
CN106642805A (en) Control method and device for double-variable-capacity heat pump cooling and heating combined system
CN202933651U (en) Air-cooling type chilling device for spinning processing of lubricating grease
CN203175904U (en) Ceiling fan with heating function
CN214842734U (en) Cooling tower temperature automatic control equipment based on thing networking
CN206478725U (en) A kind of Multifunctional air heater for bathroom with wind-guiding angle
CN210651570U (en) Water recycling device applied to foam board machine
CN211098544U (en) A stirring pond for concrete waste water treatment
CN208809496U (en) A kind of rectifier unit convenient for heat transfer
CN203816473U (en) Compressed air cooling and dehumidifying device
CN203973878U (en) Circulating cooling tank
CN206874427U (en) Shear turbine power generation system in a kind of boundary layer
CN207304249U (en) The high ferro traction motor quickly cooled down
CN207797791U (en) A kind of aerating and cooling tower control device
CN206402614U (en) A kind of data center module cooling system
CN214949484U (en) Energy-saving air conditioner efficient cooling unit
CN206042877U (en) Device for cooling is mended in a kind of silo machine aeration ventilation
CN201093661Y (en) New type battery polar plate solidified machine and split type centrifugal humidifier
CN205617217U (en) Thermal cycle pouring machine
CN109443042A (en) A kind of cooling equipment of high efficiency
CN203707107U (en) IGBT power module cooling device
CN205011429U (en) Ocean greasy dirt clearance heating device
CN209181568U (en) A kind of cooling equipment of high efficiency

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315