CN206019395U - A kind of high-efficiency cooling tower of water for industrial use - Google Patents

A kind of high-efficiency cooling tower of water for industrial use Download PDF

Info

Publication number
CN206019395U
CN206019395U CN201620915145.9U CN201620915145U CN206019395U CN 206019395 U CN206019395 U CN 206019395U CN 201620915145 U CN201620915145 U CN 201620915145U CN 206019395 U CN206019395 U CN 206019395U
Authority
CN
China
Prior art keywords
water
arc
heat exchange
industrial use
equidistant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620915145.9U
Other languages
Chinese (zh)
Inventor
陈刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Kai Chuang Machinery Co Ltd
Original Assignee
Hubei Kai Chuang Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Kai Chuang Machinery Co Ltd filed Critical Hubei Kai Chuang Machinery Co Ltd
Priority to CN201620915145.9U priority Critical patent/CN206019395U/en
Application granted granted Critical
Publication of CN206019395U publication Critical patent/CN206019395U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model discloses a kind of high-efficiency cooling tower of water for industrial use, including tower body, air duct is provided with the top of the tower body, the water collection device includes bracing frame, middle part on the left of the arc water collecting piece is provided with the first arc-shaped watertight shutter, bottom on the left of the arc water collecting piece is provided with the second arc-shaped watertight shutter, the bottom of the arc water collecting piece is provided with end of dripping, the bottom of the water distributor is equidistant to be provided with shower nozzle, the both sides of the packing layer are equipped with carbon fiber epoxy plate, the inner chamber of the carbon fiber epoxy plate is equidistant to be provided with air vent, heat exchange packing layer and heat exchange tube layer is provided between two carbon fiber epoxy plates, the inner chamber of the heat exchange packing layer is equidistant to be provided with heat exchange filler, guiding gutter is provided between two heat exchange fillers, the bottom of described filler bracket is provided with air-inlet window.This utility model can improve the receipts water effect of water collection device, it is possible to increase the cooling degree of water for industrial use, so as to strengthen the practicality of cooling tower.

Description

A kind of high-efficiency cooling tower of water for industrial use
Technical field
This utility model is related to cooling tower technical field, specially a kind of high-efficiency cooling tower of water for industrial use.
Background technology
Cooling tower is to use water as circulating coolant, absorbs heat dissipation into air, to reduce water temperature from a system Device, which is cold be contacted with air flow using water after carry out cold and hot exchange and produce steam, steam volatilization is taken away heat and is reached The principles such as evaporative heat loss, convection heat transfer' heat-transfer by convection and radiant heat transfer reduce water temperature to disperse the waste heat produced in industrial or refrigeration air-conditioner Evaporating radiator, to ensure that the normal operation of system, device are generally tubbiness, therefore named for cooling tower.
At present the packing and water collection device in cooling tower is unusual pith, but most packing at present Cooling effect general, the water collection device in cooling tower is to separate the water droplet in air-flow with air, reduces water for industrial use by air Take away, the receipts water effect of current water collection device is poor so that can affect the cooling effect of water for industrial use, so as to affect the reality of cooling tower The property used.
Utility model content
The purpose of this utility model is to provide a kind of high-efficiency cooling tower of water for industrial use, possesses minimizing water for industrial use by gas Stream take away and improve water for industrial use cooling degree advantage, solve the problems, such as affect cooling tower practicality.
For achieving the above object, this utility model provides following technical scheme:A kind of high-efficiency cooling tower of water for industrial use, bag Tower body is included, air duct at the top of the tower body, is provided with, the bottom of the air duct inner chamber is provided with motor rack, sets at the top of the motor rack There are motor, the top connection rotating shaft of the motor, the top connection flabellum on the outside of the rotating shaft to set at the top of the tower body inner chamber There is water collection device, the water collection device includes bracing frame, the bottom of support frame as described above is equidistant to connect arc water collecting piece, and the arc is received Middle part on the left of water piece is provided with the first arc-shaped watertight shutter, and the bottom on the left of the arc water collecting piece is provided with the second arc-shaped watertight shutter, The bottom of the arc water collecting piece is provided with end of dripping, and the bottom of the water collection device is provided with water distributor through tower body, the water distributor Bottom equidistant be provided with shower nozzle, be provided with packing layer in the middle part of the tower body inner chamber, the both sides of the packing layer are equal Carbon fiber epoxy plate is provided with, the inner chamber of the carbon fiber epoxy plate is equidistant to be provided with air vent, two carbon fiber epoxy plates Between be provided with heat exchange packing layer and heat exchange tube layer, the inner chamber of the heat exchange packing layer is equidistant to be provided with heat exchange filler, described in two Guiding gutter is provided between heat exchange filler, the bottom of the packing layer is provided with filler bracket, and the bottom of described filler bracket sets The bottom for having air-inlet window, the air-inlet window is provided with water collection tank, is provided with outlet pipe in the middle part of the water collection tank bottom.
Preferably, the bottom of the water collection tank is equidistant is provided with pillar, and the left side of the water collection tank connects the first pipeline, institute The bottom for stating the first pipeline is provided with pulsating pump, the left side connection second pipe of the pulsating pump, the top of the second pipe with Water distributor connects.
Preferably, the surface of the outlet pipe is provided with sewage draining exit, the bottom thread connection lid of the outlet pipe.
Preferably, waterproof silencer cover is provided with the outside of the motor, and the bottom of the waterproof silencer cover is connected with motor rack.
Preferably, staircase is provided with the right side of the tower body, and the bottom of the staircase is connected with ground, the top of the staircase It is connected with air duct.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, use of this utility model by the first arc-shaped watertight shutter and the second arc-shaped watertight shutter on water collection device so that energy The receipts water effect of water collection device is enough improved, so as to avoid excessive water for industrial use from being entrained by the flow of air, by arc water collecting piece bottom End of dripping, enabling improve water fender on water drippage speed such that it is able to reduce the moisture content that air-flow is taken away, by drench The use of the carbon fiber epoxy plate on water packing layer so that the quality of packing layer is slimmer and more graceful, by exchanging heat tube layer and changing Hot filler is used cooperatively, enabling improve the cooling degree of water for industrial use, so as to strengthen the practicality of cooling tower, by leading The use of chute so that avoid packing layer that the situation of blocking occurs, so as to allow cooling tower to run more smooth.
2nd, this utility model is connected by water collection tank bottom the first pipeline and pulsating pump, enabling will be cold in water collection tank But water for industrial use is discharged by the first pipeline, connects second pipe by pulsating pump, and second pipe connects water distributor so that collection Water energy in water vat is enough to be cooled down again by water distributor, so as to go the cooling degree for strengthening water for industrial use, by motor outside The waterproof silencer cover of side, enabling mitigate the noise that motor is produced, so that provide a good building ring to staff Border.
Description of the drawings
Fig. 1 is this utility model structural representation;
Fig. 2 is this utility model packing Rotating fields schematic diagram;
Fig. 3 is this utility model water collection device structural representation.
In figure:1 tower body, 2 second pipes, 3 water distributors, 4 water collection devices, 5 motor racks, 6 air ducts, 7 waterproof silencer covers, 8 flabellums, 9 rotating shafts, 10 motors, 11 staircases, 12 shower nozzles, 13 packing layers, 14 filler brackets, 15 air-inlet windows, 16 water collection tanks, 17 blowdowns Mouth, 18 lids, 19 pillars, 20 pulsating pumps, 21 first pipelines, 22 outlet pipes, 23 carbon fiber epoxy plates, 24 air vents, 25 heat exchange Packing layer, 26 heat exchange tube layer, 27 guiding gutters, 28 heat exchange fillers, 29 bracing frames, 30 arc water collecting pieces, 31 first arc-shaped watertight shutters, Drip end in 32 second arc-shaped watertight shutters, 33.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole Embodiment.Embodiment in based on this utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of this utility model protection.
Refer to Fig. 1, a kind of high-efficiency cooling tower of water for industrial use, including tower body 1, the top of tower body 1 is provided with air duct 6, wind The bottom of 6 inner chambers of cylinder is provided with motor rack 5, and the top of motor rack 5 is provided with motor 10, and the outside of motor 10 is provided with waterproof silencer cover 7, The bottom of waterproof silencer cover 7 is connected with motor rack 5, by the waterproof silencer cover 7 on the outside of motor 10, enabling mitigate motor 10 The noise of generation, so as to provide a good working environment to staff, the top connection rotating shaft 9 of motor 10, outside rotating shaft 9 The top connection flabellum 8 of side, is provided with water collection device 4 at the top of 1 inner chamber of tower body, the bottom of water collection device 4 is provided with water distributor through tower body 1 3, the bottom of water distributor 3 is equidistant to be provided with shower nozzle 12, is provided with packing layer 13, packing layer 13 in the middle part of 1 inner chamber of tower body Bottom be provided with filler bracket 14, by the use of filler bracket 14 so that filler bracket 14 can be to 13, packing layer Supporting role is arrived, so as to improve the stability operationally of packing layer 13, the bottom of filler bracket 14 is provided with air-inlet window 15, The bottom of air-inlet window 15 is provided with water collection tank 16, and the bottom of water collection tank 16 is equidistant to be provided with pillar 19, the left side connection of water collection tank 16 First pipeline 21, the bottom of the first pipeline 21 are provided with pulsating pump 20, the left side connection second pipe 2 of pulsating pump 20, second pipe 2 Top be connected with water distributor 3, by 16 bottom of water collection tank connect the first pipeline 21 and pulsating pump 20, enabling will catchment In cylinder 16, the water for industrial use of cooling is discharged by the first pipeline 21, connects second pipe 2 by pulsating pump 20, and second pipe 2 connects Connect water distributor 3 so that the water energy in water collection tank 16 is enough cooled down again by water distributor 3, so as to go to strengthen water for industrial use Cooling degree, is provided with outlet pipe 22 in the middle part of 16 bottom of water collection tank, the surface of outlet pipe 22 is provided with sewage draining exit 17, outlet pipe 22 Bottom thread connects lid 18, by the sewage draining exit on outlet pipe 22, enabling carry out clearly the residue in moisture content in tower body 1 Remove, so as to improve the quality of water for industrial use, the right side of tower body 1 is provided with staircase 11, and the bottom of staircase 11 is connected with ground, staircase 11 Top be connected with air duct 6, by the use of staircase 11 so that cooling tower occur damage when operator can pass through staircase 11 enter into the place for checking problem on air duct 6.
Fig. 1 and 2 is referred to, the both sides of packing layer 13 are equipped with carbon fiber epoxy plate 23, by packing layer 13 On carbon fiber epoxy plate 23 use so that the quality of packing layer 13 is slimmer and more graceful, the inner chamber of carbon fiber epoxy plate 23 Equidistant be provided with air vent 24, be provided with heat exchange packing layer 25 and heat exchange tube layer 26 between two carbon fiber epoxy plates 23, heat exchange is filled out The inner chamber of the bed of material 25 is equidistant to be provided with heat exchange filler 28, by using cooperatively for exchange heat tube layer 26 and heat exchange filler 28 so that energy The cooling degree of water for industrial use is enough improved, so as to strengthen the practicality of cooling tower, between two heat exchange fillers 28, guiding gutter is provided with 27, by the use of guiding gutter 27 so that avoid packing layer 13 that the situation of blocking occurs, so as to allow cooling tower to run More smooth.
Fig. 1 and 3 is referred to, water collection device 4 includes bracing frame 29, and the bottom of bracing frame 29 is equidistant to connect arc water collecting piece 30, the middle part on the left of arc water collecting piece 30 is provided with the first arc-shaped watertight shutter 31, and the bottom on the left of arc water collecting piece 30 is provided with second Arc-shaped watertight shutter 32, by the use of the first arc-shaped watertight shutter 31 and the second arc-shaped watertight shutter 32 on water collection device 4, enabling The receipts water effect of water collection device 4 is improved, so as to avoid excessive water for industrial use from being entrained by the flow of air, the bottom of arc water collecting piece 30 sets There is end 33 of dripping, by the end 33 of dripping of 30 bottom of arc water collecting piece, enabling improve the speed of the water drippage on water fender, So as to reduce the moisture content that air-flow is taken away.
During use, one end connection water for industrial use pipeline of water distributor 3, cold air are entered in tower body 1 from air-inlet window 15, Start motor 10, motor 10 drives flabellum 8 to take away the air of the heating in tower body 1, and water distributor 3 passes through shower nozzle 12 by water distributor , on packing layer 13, the heat exchange tube layer 26 and heat exchange filler 28 on packing layer 13 is to water for industrial use for Water spray in 3 Cooled down.
In sum:The high-efficiency cooling tower of the water for industrial use, by the first arc-shaped watertight shutter 31 on arc water collecting piece 30 With the use of the heat exchange tube layer 26 on the second arc-shaped watertight shutter 32 and packing layer 13 and the filler 28 that exchanges heat, cooling tower is solved The problem of practicality.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, Be appreciated that these embodiments can be carried out multiple changes in the case of without departing from principle of the present utility model and spirit, repair Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of high-efficiency cooling tower of water for industrial use, including tower body (1), it is characterised in that:Wind is provided with the top of tower body (1) Cylinder (6), the bottom of air duct (6) inner chamber is provided with motor rack (5), is provided with motor (10) at the top of motor rack (5), described The top connection rotating shaft (9) of motor (10), top connection flabellum (8) on the outside of rotating shaft (9), tower body (1) inner chamber Top is provided with water collection device (4), and described water collection device (4) include bracing frame (29), the equidistant connection in the bottom of support frame as described above (29) Arc water collecting piece (30), the middle part on the left of arc water collecting piece (30) are provided with the first arc-shaped watertight shutter (31), and the arc is received Bottom on the left of water piece (30) is provided with the second arc-shaped watertight shutter (32), and the bottom of arc water collecting piece (30) is provided with end of dripping (33), the bottom of water collection device (4) is provided with water distributor (3) through tower body (1), and the bottom of water distributor (3) is equidistant to be set There is shower nozzle (12), in the middle part of tower body (1) inner chamber, be provided with packing layer (13), the both sides of packing layer (13) are equal Carbon fiber epoxy plate (23) is provided with, the inner chamber of carbon fiber epoxy plate (23) is equidistant to be provided with air vent (24), described in two Heat exchange packing layer (25) and heat exchange tube layer (26), the inner chamber of heat exchange packing layer (25) is provided between carbon fiber epoxy plate (23) Equidistant be provided with heat exchange filler (28), be provided with guiding gutter (27), the packing layer between two heat exchange filler (28) (13) bottom is provided with filler bracket (14), and the bottom of described filler bracket (14) is provided with air-inlet window (15), the air-inlet window (15) bottom is provided with water collection tank (16), is provided with outlet pipe (22) in the middle part of water collection tank (16) bottom.
2. the high-efficiency cooling tower of a kind of water for industrial use according to claim 1, it is characterised in that:Water collection tank (16) Bottom is equidistant to be provided with pillar (19), and the left side of water collection tank (16) connects the first pipeline (21), the first pipeline (21) Bottom be provided with pulsating pump (20), left side connection second pipe (2) of pulsating pump (20), the top of second pipe (2) Portion is connected with water distributor (3).
3. the high-efficiency cooling tower of a kind of water for industrial use according to claim 1, it is characterised in that:Outlet pipe (22) Surface is provided with sewage draining exit (17), bottom thread connection lid (18) of outlet pipe (22).
4. the high-efficiency cooling tower of a kind of water for industrial use according to claim 1, it is characterised in that:Outside motor (10) Side is provided with waterproof silencer cover (7), and the bottom of waterproof silencer cover (7) is connected with motor rack (5).
5. the high-efficiency cooling tower of a kind of water for industrial use according to claim 1, it is characterised in that:The right side of tower body (1) Side is provided with staircase (11), and the bottom of staircase (11) is connected with ground, and the top of staircase (11) is connected with air duct (6).
CN201620915145.9U 2016-08-22 2016-08-22 A kind of high-efficiency cooling tower of water for industrial use Expired - Fee Related CN206019395U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620915145.9U CN206019395U (en) 2016-08-22 2016-08-22 A kind of high-efficiency cooling tower of water for industrial use

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620915145.9U CN206019395U (en) 2016-08-22 2016-08-22 A kind of high-efficiency cooling tower of water for industrial use

Publications (1)

Publication Number Publication Date
CN206019395U true CN206019395U (en) 2017-03-15

Family

ID=58250841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620915145.9U Expired - Fee Related CN206019395U (en) 2016-08-22 2016-08-22 A kind of high-efficiency cooling tower of water for industrial use

Country Status (1)

Country Link
CN (1) CN206019395U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107342191A (en) * 2017-08-16 2017-11-10 湖南太阳电力电瓷电器制造有限公司 A kind of fuse insulator automatic processing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107342191A (en) * 2017-08-16 2017-11-10 湖南太阳电力电瓷电器制造有限公司 A kind of fuse insulator automatic processing device

Similar Documents

Publication Publication Date Title
CN105757850B (en) Multilayer spraying formula plate pipe indirect-direct composite evaporation cooling air conditioning unit
CN206019395U (en) A kind of high-efficiency cooling tower of water for industrial use
CN214582760U (en) Cooling tower filler device capable of efficiently collecting water and dissipating heat
CN109812913A (en) Indirect evaporation internally-cooled solution fresh air dehumidification device
CN104315885A (en) Water cooling heat exchanger
CN106352716A (en) Novel square combined-flow closed cooling tower
CN108332318A (en) A kind of female vertical gilled tube indirect evaporating-cooling core of band
CN209672865U (en) A kind of evaporation type oil cooler
CN107101296A (en) The indirect direct evaporating-cooling air conditioner unit of anti-water leakage of Driven by Solar Energy
CN204963610U (en) Intensive heat exchanger of built -in rotatory flexible hob
CN206919702U (en) A kind of integral type dry and wet combines air cooling tower
CN206192180U (en) Novel cooling tower blower
CN110371962A (en) A kind of preparation facilities of graphene film
CN206104562U (en) A circulation water saving system for million tonner rod production technologies
CN205317018U (en) Countercurrent type filler cooling tower
CN205940198U (en) High -efficient low noise cooling tower
CN207050509U (en) A kind of adjustable cooling tower of air inflow
CN210773517U (en) Condenser
CN207778530U (en) Energy-saving environmentally-friehoty hoty water oil smoke removing machine
CN207066171U (en) It is a kind of that there is energy-efficient cooling tower
CN206208054U (en) A kind of rain-proof dust-proof square counter flow cooling tower
CN206709654U (en) A kind of dry and wet combination air cooler
CN204649005U (en) high-efficiency cooling tower
CN207066173U (en) A kind of environment-friendly highly efficient cooling tower
CN206469740U (en) A kind of shell-and-plate blast furnace evaporative air-cooling system of use soft water airtight circulating cooling system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

Termination date: 20180822

CF01 Termination of patent right due to non-payment of annual fee